HARGA SATUAN UPAH DAN BAHAN MATERIAL LOKASI
: KABUPATEN DOMPU
TAHUN ANGGARAN
: 2023
NO
UPAH DAN BAHAN
SATUAN
1
2
3
HSBGN 2023 (Rp) 4
Upah Tenaga Kerja 1
Pekerja
OH
170,000.00
2
Tukang Batu
OH
200,000.00
3
Kepala Tukang Batu
OH
250,000.00
4
Tukang Kayu
OH
200,000.00
5
Kepala Tukang Kayu
OH
250,000.00
6
Tukang Besi Beton
OH
200,000.00
7
Kepala Tukang Besi Beton
OH
250,000.00
8
Tukang alumnium
OH
200,000.00
9
Kepala Tukang alumunium
OH
250,000.00
10
Tukang Las
OH
200,000.00
11
Kepala Tukang Las
OH
250,000.00
12
Tukang Politur
OH
200,000.00
13
Tukang Cat
OH
200,000.00
14
Kepala Tukang Cat
OH
250,000.00
15
Pemecah Batu
OH
180,000.00
16
Penggergaji
OH
180,000.00
17
Mandor pengisi Bronjong
OH
250,000.00
18
pengisi Bronjong
OH
180,000.00
19
Penganyam Bronjong
OH
200,000.00
20
Kepala Penganyam Bronjong
OH
250,000.00
21
Mandor
OH
250,000.00
22
Sopir
OH
220,000.00
23
Pembantu Sopir
OH
170,000.00
24
Mekanik
OH
200,000.00
25
Pembantu Mekanik
OH
170,000.00
26
Operator Alat Ringan
OH
200,000.00
27
Operator Alat Berat
OH
220,000.00
28
Pembantu Operator
OH
180,000.00
29
Pemasak Aspal
OH
170,000.00
30
Penunjuk Jalan
OH
170,000.00
31
Tukang Pipa
OH
200,000.00
32
Tukang Bor
OH
200,000.00
33
Tukang Listrik
OH
200,000.00
34
Kepala Tukang Listrik
OH
250,000.00
35
Penjaga Malam
OH
150,000.00
36
Penggosok Tegel
OH
150,000.00
37
Kepala Tukang Politur
OH
250,000.00
38
Kepala Tukang Pipa
OH
250,000.00
39
Tukang Cor
OH
200,000.00
40
Pekerja Cor
OH
180,000.00
41
Tukang Interior
OH
250,000.00
42
Kepala Tukang Interior
OH
300,000.00 -
1
IMB
m2
20,000.00 -
Bahan Pasangan
-
1
Batu Kali Belah 15-20 cm
M³
300,000.00
2
Batu Kali Alam
M³
265,000.00
3
Kerikil Pecah 5/7 cm
M³
465,000.00
4
Kerikil 5/7 cm (Stone Crusher)
M³
600,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
5
Kerikil Pecah 3/5 cm
M³
555,000.00
6
Kerikil 3/5 cm (Stone Crusher)
M³
600,000.00
7
Kerikil Pecah 2/3 cm
M³
625,000.00
8
Kerikil 2/3 cm (Stone Crusher)
M³
810,000.00
9
Kerikil Alam 0,5/1 Cm
M³
580,000.00
10
Kerikil Alam 2/3
M³
630,000.00
11
Kerikil Sungai - Riyalti
M³
400,000.00
12
Kerikil Beton (Maks 3 cm)
M³
400,000.00
13
Kerikil Pecah 1/2 cm
M³
870,000.00
14
Batu Kali Keping / Tempel
M³
325,000.00
15
Kerikil Alam 5/7
M³
262,000.00
16
Kerikil Alam 3/5
M³
275,000.00
17
Kerikil Alam 2/3 Cm
M³
400,000.00
Kerikil (maksimum 30 mm)
kg
18
Agregate Kasar (Stone Crusher)
M³
870,000.00
19
Agregate Halus (Stone Crusher)
M³
995,000.00
20
Agregate Klas B (20% Agg.Hls:80% Agg.Ksr)
M³
750,000.00
21
Batu Apung
Kg
300,000.00
22
Batu Bata Kelas I (Press)
Buah
1,000.00
23
Batu Bata Kelas II (Lokal)
Buah
900.00
24
Bata ringan/Hebel, 10X20X60
m3
1,600,000.00
25
Bata ringan/Hebel, 10X20X60
bh
22,000.00
26
Pasir Beton ( Pasir Hodo )
M³
600,000.00
27
Pasir Pasang
M³
265,000.00
28
Pasir Urug
M³
240,000.00
29
Sirtu
M³
300,000.00
30
Tanah Urug biasa
M³
155,000.00
31
Tanah Urug Pilihan
M³
232,000.00
32
Tanah Liat (TL)
M³
81,000.00 -
Bahan Pengikat campuran/Semen
-
1
Semen Merah (SM)
Kg
38,000.00
2
Semen Warna
Kg
38,000.00
3
PC. Merk Tiga Roda
Kg
1,750.00
4
PC. Merk Gresik
Kg
1,750.00
5
PC. Merk Tonasa
Kg
1,750.00
6
PC. Merk Holcim
Kg
1,750.00
7
PC. Merk Basuwa
Kg
1,700.00
8
PC. Merk Padang
Kg
1,700.00
9
PC. Merk Singa Merah
Kg
1,700.00
10
Semen Warna Butiran Halus
Kg
38,000.00
11
Semen Warna Butiran Kasar
Kg
38,000.00
12
Ornamen terawang custom
m2
1,000,000.00
13
Semen-MU 380 (Plesteran)
Kg
6,000.00
14
Semen-MU 200 (acian)
Kg
5,000.00
15
Acian Mild Kalsium
Kg
5,500.00
16
Acian Mild Kapur
Kg
2,500.00
17
Pengeras Beton
Kg
55,000.00
18
Perekat Beton
Kg
70,000.00 -
1
Rumput Gebalan
M²
60,000.00
2
Kapur Gamping/Labur
Kg
7,300.00
3
Kapur Biasa
Kg
4,000.00
4
Fuller (Abu Batu)
Kg
5,900.00 -
NO
UPAH DAN BAHAN
1
Air kerja
2
SATUAN
HSBGN 2023 (Rp)
Liter
6,000.00
Strorox - 100
Kg
60,000.00
3
Dinding Hollow Block (HB 20)
Bh
15,000.00
4
Dinding Hollow Block (HB 15)
Bh
12,000.00
5
Dinding Hollow Block (HB 10)
Bh
10,000.00 -
Bahan Atap
-
1
Sirap Kalimantan
Bh
5,800.00
2
Genteng Lokal
Bh
3,850.00
3
Genteng Beton /Pres
Bh
9,200.00
4
Genteng Karang Pilang/ Kodok
Bh
7,600.00
5
Genteng Pejaten Sudah di cat
Bh
5,800.00
6
Genteng Kaca
Bh
51,000.00
7
Genteng Keramik / 25bh
Bh
25,500.00
8
Genteng Keramik Glazur / 15bh
Bh
20,500.00
9
Genteng Kanmuri Full Flat, Natural
Bh
26,000.00
10
Genteng Karang Pilang Type Keramik
Bh
31,000.00
11
Genteng Aspal
Bh
12
Genteng Bubungan Lokal
Bh
9,400.00
13
Genteng Bubungan Beton
Bh
10,250.00
14
Genteng Bubungan Silang
Bh
8,500.00
15
Genteng Bubungan Pejaten
Bh
10,800.00
16
Genteng Bubungan Keramik / 4bh
Bh
53,000.00
17
Genteng Bubungan Keramik Glazur / 4bh
Bh
18,100.00
18
Bubungan Genteng kanmuri Full Flat, Natura
Bh
41,000.00
19
Bubungan Karang Pilang/ Kodok
Bh
33,500.00
20
Genteng Bubungan Aspal
Bh
21
Genteng Metal roof 0,25 mm (Lapis Butiran)
Lbr
165,000.00
22
Bubungan Metal Roof (Lapis Butiran)
M'
195,000.00
23
Genteng Metal roof 0,3 mm (Lapis Butiran)
Lbr
86,000.00
24
Bubungan Metal Roof (Lapis Butiran)
M'
195,000.00
25
Genteng Metal roof 0,25 mm (Tanpa Lapis Butiran) Sakura
Lbr
75,000.00
26
Bubungan Metal (Tanpa Lapis Butiran)
M'
112,000.00
27
Atap bitumen gelombang H : 3,0 mm
lbr
220,000.00
Atap bitumen gelombang H : 3,0 mm
lbr
220,000.00
28
Paku fiser bitumen
bh
10,000.00
29
Nok / Ridge Onduline
Lbr
150,000.00
30
Sekrup / Paku
bh
18,000.00
31
Asbes Type Genteng (tyluq)
Lembar
93,000.00
-
-
Asbes semen
M²
32
Ijuk Atap
kg
51,000.00
33
Asbes Gelombang Kecil 92 x 180 cm
Lembar
77,000.00
34
Asbes Gelombang Besar 105 x 240 cm
Lembar
232,000.00
35
Bubungan Asbes Gelombang Kecil 92 cm
Lembar
77,000.00
36
Bubungan Asbes Gelombang Besar 105 cm
Lembar
112,000.00
37
Seng.Glb Besar BJL.S 20
Lembar
93,000.00
38
Seng.Glb Besar BJL.S 25
Lembar
112,000.00
39
Seng.Glb Besar BJL.S 30
Lembar
129,000.00
40
Seng.Glb Kecil BJL.S 20
Lembar
100,000.00
41
Seng Plat BJL.S 18 lebar 90 cm
M'
71,000.00
42
Seng Plat BJL.S 20 lebar 90 cm
M'
99,000.00
43
Seng Plat BJL.S 25 lebar 90 cm
M'
129,000.00
44
Seng Plat BJL.S 28 lebar 90 cm
M'
141,000.00
45
Flashing (List Seng Lipat, 2.10.62x120 cm)
Bh
95,000.00
46
Seng Plat BJL.S 30 lebar 90 cm
M'
160,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
47
Seng Spandek 0.25 mm lebar 80 cm
M'
105,000.00
48
Seng Spandek 0.3 mm lebar 80 cm
M'
116,000.00
49
Seng Spandek 0.35 mm lebar 80 cm
M'
121,000.00
50
Seng Spandek 0.4 mm lebar 80 cm
M'
129,000.00
51
Seng Spandek 0.25 mm lebar 80 cm, Warna
M'
81,000.00
52
Seng Spandek 0.3 mm lebar 80 cm, Warna
M'
91,000.00
53
Seng Spandek 0.35 mm lebar 80 cm, Warna
M'
102,000.00
54
Seng Spandek 0,4 mm lebar 80 cm, Warna
M'
106,000.00
55
Atap Roof Fiber Glass
Lbr
153,000.00
56
Rangka Atap Roof Fiber Glass
M²
195,000.00
57
Plastik Aerator
M²
7,900.00
58
Atap Polycarbonat
Lbr
238,000.00
59
Atap Trimdeck 0.40 TCT (Spandek)
M²
129,000.00
60
Bubungan Trimdeck 0.40 TCT (Spandek)
M'
72,000.00
Bubungan Trimdeck 0.40 TCT (Spandek)
M'
72,000.00
61
Alumunium Foil
M²
32,500.00
62
Karet Talang
M'
100,000.00
63
Atap Polycarbonate (210 x 1180 cm)
Lembar
470,000.00
Atap Polycarbonate
M²
20,000.00
64
GRC Board bergelombang
m2
140,000.00
65
Profil C 75.100
M'
32,000.00
66
Profil C 75.75
M'
21,000.00
67
Profil C 80.100
M'
42,000.00
68
Profil C 80.75
M'
38,000.00
69
Reng U 0.55
M'
12,000.00
70
Reng U 0.45
M'
9,500.00
Reng U 0.40
M'
9,500.00
71
Baut Truss
Bh
800.00
72
Baut Reng
Bh
800.00
Bahan Kayu dan Bambu 1
Papan Kayu Klas I
M³
6,750,000.00
2
Papan Kayu Klas II
M³
5,500,000.00
3
Papan Kayu Klas III
M³
4,300,000.00
4
Balok Kayu Klas I
M³
6,150,000.00
5
Balok Kayu Klas II
M³
4,900,000.00
6
Balok Kayu Klas III
M³
3,700,000.00
7
Dolken / Perancah Dia. 7 Cm - 4 m
8
Papan Kayu Begisting
M³
3,090,000.00
9
Balok Kayu Begisting
M³
2,720,000.00
Batang
32,500.00
1
Lumbersering Kayu Kelas I
M³
4,080,000.00
2
Lumbersering Kayu Kelas II
M³
3,420,000.00
3
List Plafond
M'
11,000.00
4
List Plafond 2/4 Profil
M'
11,500.00
5
List Plafond 3/3 Profil
M'
13,500.00
6
List Plafond 4/4 Profil
M'
15,200.00
7
List Plafond 5/5 Profil
M'
18,200.00
8
Papan Nama
Bh
390,000.00
9
Bambu (Dia 12.5 cm, P 6 m)
Btg
62,500.00
10
Bambu (Dia 10 cm, P 6 m)
Btg
59,500.00
11
Bambu (Dia 7 cm, P 6 m)
Btg
49,500.00
12
Bedek Kulitan
M²
61,000.00
13
Bedek Biasa
M²
53,800.00
14
Bedek Pagar
M²
56,900.00
NO 15
UPAH DAN BAHAN Bilik Bambu
SATUAN M²
HSBGN 2023 (Rp) 71,000.00 -
Bahan Cetak
-
1
Lubang Angin 10x20 Cm
Bh
26,000.00
2
Lubang Angin 20x20 Cm
Bh
18,000.00
3
Lubang Angin 20x30 Cm
Bh
30,200.00
4
Buis Beton Dia. 10 Cm
Bh,L= 0,5M
87,000.00
5
Buis Beton Dia. 20 Cm
Bh,L= 0,5M
128,000.00
6
Buis Beton Dia. 30 Cm
Bh,L= 0,5M
145,000.00
7
Buis Beton Dia. 40 Cm
Bh,L= 0,5M
170,000.00
8
Buis Beton Dia. 50 Cm
Bh,L= 0,5M
255,000.00
9
Buis Beton Dia. 60 Cm
Bh,L= 0,5M
255,000.00
10
Buis Beton Dia. 80 Cm
Bh,L= 0,5M
318,000.00
11
Penutup Buis Beton Dia. 80 Cm
Bh
185,000.00
12
Batako 10 x 20 x 40 Cm
Bh
6,000.00
13
Paving Blok Persegi (t = 8 cm)
M2
100,000.00
14
Paving Blok Persegi (t = 6 cm)
M2
90,000.00
Paving Blok Persegi (warna)
M2
120,000.00
15
Paving Blok Persegi (t = 8 cm), Press
M2
175,000.00
16
Paving Blok Tiga Berlian
M2
230,000.00
17
Batu paras/Palimanan
M2
325,000.00
18
Batu Sisir/ Bergaris, hitam
M2
327,000.00
19
Lubang Angin Keramik 20 x 20 cm
Bh
62,500.00
20
Lubang Angin Keramik 30 x 30 cm
Bh
74,200.00
21
Glass Block
Bh
81,000.00
22
Roster Terawang (15 X 20 )
Bh
38,500.00
23
Roster 30 x 30
m2
250,000.00
24
Wall Line GRC + Rangka Hollow (Terpasang)
M2
1,180,000.00
25
Conblock tipe segi-empat abu-abu 8 cm, K-300
m2
200,000.00
26
Conblock tipe segi-enam abu-abu 8 cm, K-300
m2
170,000.00
27
Kisi-kisi 50x100 mm UPVC Motif Kayu
m1
180,000.00
28
Kanstein/Kerb T=30 cm, P=60 cm (jalan)
m1
250,000.00
29
Kanstein/Kerb T=40 cm, P=60 cm (taman)
m1
150,000.00
30
Udith (Beton pracetak), lebar 80 cm, tebal = 12 cm
Bh,P=1,2M
2,000,000.00
31
Udith (Beton pracetak), lebar 100 cm, tebal = 12 cm
Bh,P=1,2M
2,300,000.00 -
Bahan Lantai
-
1
Tegel Abu-abu 20 x 20
M²
81,000.00
2
Tegel Bergaris Abu 20 x 20 Cm
M²
92,000.00
3
Tegel Warna 20 x 20 Cm
M²
97,500.00
4
Tegel Bergaris Warna 20 x 20 Cm
M²
97,500.00
5
Tegel Traso Klas I 30 x 30
M²
103,000.00
6
Tegel Traso Klas II 30 x 30
M²
100,000.00
7
Granite Kw I
M²
465,000.00
8
Granite Kw II
M²
395,000.00
9
Geotextile
m2
380,000.00
10
Drainagecell
m2
180,000.00
11
Hospital plint 60 x 10 x 4
Buah
180,000.00
12
Stepnose tangga 10x40 cm
Buah
40,000.00
13
Karpet
kg
30,000.00
14
grassblock tebal 8 cm
m2
200,000.00
15
Lantai conwood deck 12" T-lock + Pengecetan
M²
810,000.00 -
1
Keramik Dinding Kw I (Motif)
M²
145,000.00
2
Keramik Dinding Kw II (Motif)
M²
135,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
3
Keramik Dinding Kw I (Polos)
M²
146,000.00
4
Keramik Dinding Kw II (Polos)
M²
109,000.00
1
Keramik Lantai Kualitas I (Motif)
M²
190,000.00
2
Keramik Lantai Kualitas II (Motif)
M²
150,000.00
3
Keramik Lantai Kualitas I (Polos)
M²
120,000.00
4
Keramik Lantai Kualitas II (Polos)
M²
100,000.00
-
Keramik cutting Motif
M²
175,000.00
Keramik artistik
Bh
15,000.00
2
Lantai Marmer
M²
750,000.00
3
Lantai Vinyl Kw I
M²
850,000.00
4
Lantai Vinyl Kw II
M²
550,000.00
5
Lantai parquete (dreamwood), Kw I
M²
1,200,000.00
6
Lantai parquete (dreamwood), Kw II
M²
1,000,000.00
7
Beton grid Pracetak K225, ( 5x40x240)
M3
3,200,000.00
8
Porselin Kualitas I (Polos)
M²
150,000.00
9
Plint Keramik
Bh
15,000.00
10
Plint Granite
Bh
36,000.00
Plint Ubin 15 x 20 cm
Buah
2,000.00
Plint Ubin 10 x 30 cm
Buah
2,000.00
Plint Ubin 10 x 40 cm
Buah
2,700.00
1
11
Coral sikat
Kg
11,000.00
12
Coral sikat, Warna
Kg
17,000.00
13
Dinding Kalsiplank 8" Jati+ Rangka Holow + Pengecetan
M²
760,000.00
14
Dinding Bahan HPL, Motif
M²
233,000.00
15
Dinding Bahan HPL, Polos
M²
203,000.00
16
Bahan HPL, Polos
m2
87,500.00
17
Kapur Sirih
Kg
30,000.00
18
Wall Paper
m2
150,000.00
19
Perekat
Kg
30,000.00
20
Kanstin
m2
90,000.00 -
Bahan Besi
-
1
Besi Beton Ulir
Kg
25,000.00
2
Besi Beton polos
Kg
22,000.00
3
Rangka Plafond Metal Furing
m2
264,000.00
4
Rangka Plafond Besi Hollow, (galvanis)
m2
213,000.00
5
Plat baja tebal 8 mm 4 feet x 8 feet
lbr
1,400,000.00
6
plat baja 15x9x9,2 cm
m1
350,000.00
7
Plat stainless steel
m2
750,000.00
8
Pull Handle ex. Dekson type 01
bh
1,500,000.00
9
Lock Case ex. Dekson
bh
200,000.00
10
Lever Handle ex. Dekson
bh
200,000.00
11
Engsel Floor hange Dexson
bh
1,850,000.00
12
Door Closer ex dekson
bh
450,000.00
bh
1,700,000.00
13
Slide Handle ex. Dekson
14
Engsel sliding
bh
300,000.00
15
Pintu plat baja tebal 5,5 mm lapis timah hitam ex. Bostinco
bh
20,000,000.00
16
Flush bolt ex. Dekson
bh
150,000.00
17
Engsel kupu ex. Dekson
bh
150,000.00
18
Plat timbah hitam 3 m
m2
950,000.00
19
Besi Profil (Siku), kanal C
Kg
62,000.00
20
Besi Baja IWF
Kg
62,500.00
21
Pipa Black Steel
Kg
700,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
22
Spaner
Kg
45,000.00
23
Curtain Wall + kaca templet 8 mm
m2
2,500,000.00
24
Kusen Alumunium Natural
M'
112,000.00
25
Kusen Alumunium Warna
M'
125,000.00
26
Daun pintu/jendela alumunium + kaca 5 mm, Complit (natural)
m2
1,450,000.00
27
Daun pintu/jendela alumunium + kaca 5 mm, Complit (warna)
m2
1,600,000.00
28
Daun pintu/jendela alumunium + kaca 8 mm, Complit (natural)
m2
1,850,000.00
29
Daun pintu/jendela alumunium + kaca 8 mm, Complit (warna)
m2
2,000,000.00
30
Alumunium Strip
M'
83,000.00
31
Alumunium "T"
M'
33,500.00
32
Kawat f 4 mm
M'
100,000.00
33
Profil kaca Alumunium
M'
117,000.00
34
Kawat Ikat Beton
Kg
35,000.00
35
Kawat Nyamuk Besi
M²
40,000.00
36
Kawat Saringan Pasir
M²
45,000.00
37
Kawat Duri
50/Rol
125,000.00
38
Kawat Bronjong digalvanisir
Kg
50,000.00
39
Kawat Las
Kotak
164,000.00
40
Besi Strip Tebal 5 mm
Kg
57,000.00
41
Besi Strip Tebal 3 x 2 mm
Kg
47,000.00
42
Besi Strip Tebal 2 x 2 mm
Kg
44,900.00
43
Besi Stainles Diameter 2"
M'
100,000.00
44
Besi Stainles Diameter 1"
M'
60,000.00
45
Besi Stainles Diameter 1/2"
M'
44,900.00
46
Daun Pintu Roling door alumunium
M²
630,000.00
47
Rangka Roling door alumunium
M'
355,000.00
48
Pintu Harmonika, Complet
M²
1,820,000.00
49
Sunscreen alluminium
M²
560,000.00
50
Alluminium Composit Panel (ACP) 0,30 mm, (Interior)
M²
660,000.00
51
Alluminium Composit Panel (ACP) 0,30 mm,(Exterior)
M²
910,000.00
M²
650,000.00
52
Wood Panel Composit (WPC) tebal 15mm
53
Pintu WCP, Complit
Unit
1,900,000.00
54
sealent
tube
47,000.00
55
Kawat Gerawang
M²
44,500.00
56
Besi Hollow 100 x 50 Zincromate L = 6m
M'
65,000.00
Besi Hollow 50 x 50 Zincromate L = 6m
M'
64,000.00
57
Besi Hollow 40 x 40 Zincromate L = 6m
M'
63,000.00
58
Besi Hollow 40 x 20 Zincromate L = 6m
M'
50,000.00
59
Besi Hollow 40 x 40 Stenlistail L = 6m
M'
130,000.00
60
Besi Hollow 20 x 20 Stenlistail L = 6m
M'
63,000.00
61
Pipa 2" black steel di cat duco
m1
75,000.00
62
Pipa 1"black steel dicat duco
m1
50,000.00
63
Galvanis Steel 3/4"
m1
50,000.00
64
Besi Stainless Ø 3/4'
m1
150,000.00
65
Syntetic Grass
m2
180,000.00
66
WPC 5x5 cm
m1
300,000.00
67
WPC 10x5 cm
m1
370,000.00
68
WPC 15x5 cm
m1
550,000.00
69
WPC 20x5 cm
m1
650,000.00
70
WPC Panel W15 x H2,5 cm
m1
350,000.00
71
WPC door type 02 include kaca 5 mm
bh
3,000,000.00
72
WPC door type 03 include kaca 5 mm
bh
4,800,000.00
73
WPC door type 04b include kaca 5 mm
bh
2,800,000.00
74
WPC door type 04c include kaca 5 mm
bh
2,200,000.00
75
WPC door type 06 uk. 2,2 x 0,8 m
bh
2,700,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
76
WPC door type 08 uk. 1.1 x 0,6 m
bh
1,900,000.00
77
WPC door type 09 uk. 2,2 x 1,5 m
bh
3,500,000.00
78
WPC door type 10 uk. 2,2 x 0,9 m
bh
2,900,000.00
79
WPC door type 11 uk. 2,2 x 1,3 m
bh
4,700,000.00
80
Kalsiboard rangka alumunium
set
900,000.00
81
Besi Hollow / Square Bars 20 x 40 mm
M'
23,000.00
82
Besi Hollow / Square Bars 40 x 40 mm
M'
36,000.00
83
Besi Hollow / Square Bars 40 x 60 mm
M'
55,000.00
83
Besi Hollow / Square Bars 50 x 50 mm
M'
58,000.00
84
Besi Hollow / Square Bars 40 x 80 mm
M'
86,000.00
85
Besi Hollow / Square Bars 50 x 100 mm
M'
130,000.00
86
Besi Hollow / Square Bars 100 x 100 mm
M'
175,000.00
86
pengelasan
cm1
1,500.00
87
Steel Frame Hollow Galvanis 150x40x3 mm
m1
38,000.00
88
Alumunium 4" Dark Gray ex. YKK
m1
250,000.00
89
Kunci Pintu Alumunium
Bh
262,000.00
90
Textile Tape
M'
57,000.00
91
Siku Pintu Otomatis
Bh
650,000.00
92
Karet Kaca
Set
172,000.00
93
Besi Plat 3 mm
Lembar
1,850,000.00
94
Besi Plat 2 mm
Lembar
1,350,000.00
Besi plat baja
Kg
35,000.00
95
Pintu kawat harmonika + Besi Siku
M²
290,000.00
96
Plat baja, ukuran 120 x 240 cm
Kg
44,500.00
97
Jarum Keras
Bh
50,000.00
98
Pintu Jeruji Besi Rangka besi siku 40.40.4 + Asisories
M²
550,000.00
99
Pintu Besi Pagar
M²
530,000.00
100 Pagar Besi
M²
510,000.00
101 Pintu Besi Pagar (dia. 16 mm)
M²
1,200,000.00
102 Pagar Besi (dia. 16 mm)
M²
1,100,000.00
103 Pagar Besi Pipa GI
M²
875,000.00
104 Pintu Pagar Besi Pipa GI
M²
935,000.00
105 Baut Sekrup Anti Karat
Bh
3,550.00
106 Ventilasi Siku
M2
290,000.00
107 Mata Kater
Bh
112,000.00
108 Roda Pintu Dorong
Bh
81,500.00
109 Mesin Bor Listirk
Unit
1,600,000.00
110 Wiremesh M6/ (34,76)kg
Kg
56,000.00
111 Wiremesh M8/ (61,79)kg
Kg
84,000.00
112 Wiremesh M10/ (96,54)kg
Kg
122,000.00
113 Bondek tebal 0.65 mm
M2
122,000.00
114 Bondek tebal 0.70 mm
M2
128,000.00
115 Bondek tebal 0.75 mm
M2
136,000.00
116 Bondek tebal 1.00 mm
M2
220,000.00 -
Bahan Langit-Langit
-
1
Eternit 100 x 100 Cm
Lembar
48,000.00
2
Triplek 120 x 240 x 2 mm
Lembar
77,000.00
3
Triplek 120 x 240 x 3 mm
Lembar
920,500.00
4
Triplek 120 x 240 x 4 mm
Lembar
112,000.00
5
Triplek 120 x 240 x 6 mm
Lembar
116,000.00
6
Triplek 120 x 240 x 9 mm
Lembar
190,000.00
7
Triplek 120 x 240 x 12 mm
Lembar
275,000.00
8
Triplek 120 x 240 x 18 mm
Lembar
375,000.00
9
Calsiboard 1200 x 240 x 3.5 mm
Lembar
157,000.00
NO
UPAH DAN BAHAN
10
Calsiboard 1200 x 240 x 6 mm
11
SATUAN
HSBGN 2023 (Rp)
Lembar
280,000.00
Gypsum board 1200 x 2400 x 9 mm
M2
135,000.00
12
PVC/ Shunda Plafond, 1.2 mm, Putih Polos
M2
261,000.00
13
PVC/ Shunda Plafond, 1.2 mm, Warna
M2
305,000.00
14
Plafond Akustik 600 x 600
M2
167,000.00
15
Plafond Papan Kayu Kls II, 2 cm
M2
167,000.00
16
Formika Putih 120 x 240 mm
Lembar
2,296,000.00
17
Formika Warna 120 x 240 mm
Lembar
300,000.00
18
Mega Teakwood 120 x 240 x 3 mm
Lembar
250,000.00
Plywood tebal 4 mm, ukuran 120 cm x 240 cm
Lembar
250,000.00
Plywood tebal 4 mm Ukuran (90 x 220) cm
Lembar
150,000.00
Triplek tebal 9 mm, ukuran 120 cm x 240 cm
Lbr
170,000.00
19
List Gypsum
M'
44,500.00
20
List Plafond Gypsum Type I
M'
76,000.00
21
List Plafond Gypsum Type II
M'
63,000.00
22
List Plafond Shadow Line, aluminium 0.30 mm
M'
7,000.00
23
Lem Kayu
Kg
75,000.00
24
Lem
Kg
75,000.00
25
Lem vinyl/perquete
Kg
75,000.00
26
Lem Gypsum
Kg
52,000.00
27
List Plafond Shadow Line, aluminium 0.30 mm
M'
10,000.00
28
Kasiplank (0.8 x 20)
M'
81,000.00
29
Top Cross Rail 250FX
btg
45,000.00
30
Furring Chanel PN 205
btg
120,000.00
31
Furring Chanel PN 208
bh
5,000.00
32
Suspension Spring Clip 223SS
bh
8,000.00
33
4 mm Soft Galv Suspension Rod PN 225
bh
8,000.00
34
Angle Bracket PN 220
bh
5,000.00
35
Wall Angle 252FX
bh
20,000.00
36
Paper Tape
roll
80,000.00
37
Steel Tape
roll
180,000.00
38
UB Cote Read Mix
kg
230,000.00
39
Papan WPC teval 7 mm
lbr
450,000.00 -
Bahan Kaca
-
1
Kaca Nako 5 mm
M²
145,000.00
2
Kaca Polos 3 mm
M²
135,000.00
3
Kaca Polos 5 mm
M²
170,000.00
4
Kaca Polos 8 mm
M²
200,000.00
5
Kaca Buram (ES) 5 mm Komplit
M²
230,000.00
6
Kaca Riben 3 mm
M²
141,000.00
7
Kaca Riben 5 mm
M²
180,000.00
8
Kaca Cermin 5 mm
M²
180,000.00
Lembar
600,000.00
9
Acrilic 2mm Bening 2mmx122cmx244cm
10
Kaca Tempreat 8 mm, Polos
M²
1,150,000.00
11
Kaca Tempreat 10 mm, Polos
m2
1,500,000.00
12
Kaca Tempreat 12 mm, Polos
M²
1,650,000.00
13
Kaca Tempreat 8 mm, Warna
M²
1,250,000.00
14
Kaca Tempreat 12 mm, Warna
M²
1,950,000.00
15
Kaca Lengkung 10 mm, Polos
M²
2,150,000.00
16
Kaca Lengkung 12 mm, Polos
M²
2,600,000.00 -
Bahan Finishing 1
Amplas
2
Plamir Kayu
Lembar
11,000.00
Kg
53,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
3
Spritus
Liter
51,000.00
4
Dempul
Kg
58,000.00
5
Batu Apung
Kg
290,000.00
6
Soda api
Liter
68,500.00
7
Sabun
Kg
38,500.00
8
Minyak Cat
Liter
41,500.00
9
Residu
Liter
47,000.00
10
Minyak Bekisting
Liter
39,000.00
11
Meni Besi
Kg
56,500.00
12
Meni Kayu
Kg
56,500.00
13
Cat Kayu Mutu Menengah
Kg
95,000.00
14
Cat Kayu Mutu Tinggi
Kg
111,000.00
15
Cat Tembok Mutu Tinggi, (Interior)
Kg
85,000.00
16
Cat Tembok Mutu Tinggi, (Exterior)
Kg
132,000.00
17
Cat Tembok Mutu Menengah, (Interior)
Kg
65,000.00
18
Cat Tembok Mutu Menengah, (Exterior)
Kg
70,000.00
19
Cat Besi
Kg
94,000.00
20
Cat Genteng
Kg
65,000.00
21
Plamir Tembok/ Plafond
Kg
72,000.00
22
Teer
Kg
59,000.00
23
Politur
Liter
59,000.00
24
Politur Jadi
Liter
59,000.00
25
Minyak Cat A Spesial
Liter
59,000.00
26
Cat Marka Jalan Scalato
Kg
129,000.00
27
Cat Marka Jalan Biasa
Kg
116,500.00
28
Cat Zigromeat
Kg
153,000.00
29
Vernis
Ltr
59,000.00
30
Kuas 5 Cm
Bh
51,000.00
31
Rol Cat
Bh
57,000.00
32
Glassbeads
Kg
71,000.00
33
Roadline thener
Ltr
78,000.00
34
Cat Roadline paint
Ltr
117,000.00
35
Water Proofing
Kg
81,000.00
36
Floor hardener 3 Kg/m2
m2
70,000.00
37
Cat Epoxy
Liter
200,000.00
38
ceramic stepnoosing 100 x 200 mm
m1
170,000.00
39
Grooe line 2 cm
m2
35,000.00
40
Floor hardener 7 Kg/m2
m2
80,000.00
41
Fiber Bakar
m2
130,000.00
42
Cat tembok dulux Watersilt Pro
Kg
150,000.00 -
Bahan Pengunci
-
1
kunci pintu mutu menengah
Bh
195,000.00
2
kunci pintu mutu tinggi
Bh
612,000.00
3
Yale 1 Slag
Bh
129,000.00
4
Yale 2 Slag
Bh
195,000.00
5
Kuda Terbang 1 Slag
Bh
141,000.00
6
Kuda Terbang 2 Slag
Bh
165,000.00
7
Royal
Stel
950,000.00
8
Haag Angin Besar
Stel
35,000.00
9
Haag Angin Kecil
Stel
30,500.00
10
Grendel Besar
Bh
44,500.00
11
Grendel Kecil
Bh
35,000.00
12
Engsel Nylon
Pas
41,500.00
13
Engsel H (biasa)
Pas
37,500.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
14
Expagnolet
Bh
129,000.00
15
Kunci Silinder
Bh
90,000.00
16
Pegangan Pintu KW I
Bh
300,000.00
17
Door Holder
Bh
280,000.00
18
Door Closer
Bh
280,000.00
19
Door Stoper
Bh
71,000.00
20
Kunci Selot Besar
Bh
117,000.00
21
Kunci Selot Kecil
Bh
95,500.00
22
Rel Pintu Dorong
M'
65,000.00
23
Lubang Pintu Intip (Door Viewer)
Bh
90,000.00 -
Bahan Sanitaire
-
1
Closet Duduk Biasa
Bh
950,000.00
2
Closet Jongkok Teraso
Bh
153,000.00
3
Closet Jongkok Porselin
Bh
290,000.00
4
Wastapel (KW 1 Super)
Bh
2,600,000.00
5
Wastapel Biasa
Bh
535,000.00
6
Urinoir Porselin (KW 1 Super)
Bh
2,950,000.00
7
Pembatas urinoir ex. TOTO A 100
bh
1,800,000.00
8
Kitchen Sink Stainless Steel ex. TOTO
bh
2,600,000.00
9
Closet Duduk (KW 1 Super)
Bh
3,950,000.00
10
Saringan Air Besi
Bh
145,000.00
11
Saringan Air Plastik
Bh
48,000.00
12
Bak Cuci Piring Teraso
Bh
440,000.00
13
Bak Cuci Piring Logam, 1 lubang
Bh
576,000.00
14
Bak Cuci Piring Logam, 2 lubang
Bh
750,000.00
15
Resesvoir Fybg Kapasitas 1 M3
Bh
4,200,000.00
16
Septictank Kapasitas 1 M3 + peresapan
Bh
5,750,000.00
17
Septictank Kapasitas 2 M3 + peresapan
Bh
8,200,000.00
18
Bak Fiberglass Kap 0.5 M3
Bh
580,000.00
19
Bak Fiberglass Kap 1.0 M3
Bh
1,350,000.00
20
Bak Mandi Plastik Kap. 0,5 M3
Bh
576,000.00
21
Bak Mandi Teraso 50 x 50 cm
Bh
534,000.00
22
Bak Mandi Poseslin KW I
Bh
522,000.00
23
Kran Shower
bh
450,000.00
24
Kran Air 1/2"
Bh
43,000.00
25
Kran Air 3/4"
Bh
47,000.00
26
Floor Drain ex. TOTO TX 1 BV 3
bh
480,000.00
27
Floor Drain
Bh
47,000.00
28
Roof Drain Metal
Bh
47,000.00
29
Seal Tape
Bh
6,600.00
30
Lem Pipa
Kg
81,500.00
31
Klep 3/4"
Bh
36,500.00
32
Plampung Air Otomatis
Bh
161,000.00
33
Tandon Air Fyberglass Kapasitas 500 Liter vertikal
Bh
1,550,000.00
34
Tandon Air Fyberglass Kapasitas 1000 Liter vertikal
Bh
2,200,000.00
35
Tandon Air Fyberglass Kapasitas 2000 Liter vertikal
Bh
10,900,000.00
36
Tandon Air Fyberglass Kapasitas 3000 Liter vertikal
Bh
14,650,000.00
37
Tandon Air Fyberglass Kapasitas 4000 Liter vertikal
Bh
21,300,000.00
38
Tandon Air Fyberglass Kapasitas 5000 Liter vertikal
Bh
30,250,000.00
39
Tandon Air Fyberglass Kapasitas 1000 Liter horisontal
Bh
42,600,000.00
40
Tandon Air Fyberglass Kapasitas 2000 Liter horisontal
Bh
58,500,000.00
41
Tandon Air Fyberglass Kapasitas 3000 Liter horisontal
Bh
70,200,000.00
42
Tandon Air Fyberglass Kapasitas 4000 Liter horisontal
Bh
3,500,000.00
43
Wastapel Merk Ina (KW I Super)
Bh
200,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
44
Tempat Sabun (KW I)
Bh
92,500.00
45
Cermin + Acessories (Antik)
Bh
159,000.00
46
Gantungan Handuk + Acessories
Bh
201,500.00
47
Shower spray ex. TOTO TX 403 SBPIV
bh
900,000.00
48
Shower ex. TOTO TR 309 SZ
bh
700,000.00
49
Paper Holder ex. TOTO TIPE TS116R
bh
750,000.00
50
soap holder ex. TOTO S 156N
bh
185,000.00
51
hand railing stainless steel ex. TOTO TX 3A2
bh
1,200,000.00
52
Shower Splay + Acessories
Bh
503,500.00
53
Shower Set + Acessories
Bh
725,000.00
54
Hand Dryer + Acessories
Bh
1,600,000.00
55
Gantungan Baju + Acessories
Bh
280,000.00
56
Water Drain + Acesories
Bh
105,000.00
57
Pintu Fiber Glass (Wc)
Bh
930,000.00
58
Pembuatan dan Pemasangan Pintu jeruji besi Ø12mm + Rangka kosen besi siku 40.40.4 complit
M2
1,600,000.00
59
Bath Tub
Bh
7,300,000.00
60
Kitchen Sink 1 Bowl GS 5844
bh
1,750,000.00
61
Kran + asesories + Seal Tape
set
750,000.00
62
Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA
bh
4,500,000.00
63
Mirror 100x120 cm
bh
350,000.00
64
Siku alumunium
m1
120,000.00
65
Spoel hoek
bh
12,000,000.00
66
Kran Air Antik
Bh
92,000.00
67
Kran Zink
Bh
420,000.00
68
Kitchenzink
Bh
361,000.00
69
Kran Dinding
Bh
223,000.00
70
sumur pompa tangan terpasang
Bh
1,900,000.00 -
Bahan Paku
-
1
Paku panjang 1 - 5 Cm
Kg
56,200.00
2
Paku panjang 5 - 7 Cm
Kg
50,600.00
3
Paku panjang 7 - 10 Cm
Kg
50,600.00
4
Paku panjang 10 - 12 Cm
Kg
50,600.00
5
Paku Sekrup
Kg
57,500.00
Paku Sekrup
Bh
57,500.00
6
Paku Seng
Kg
68,500.00
7
Paku Asbes
Kg
68,500.00
8
Skrup/Piles 1,5 Cm
Doos Kecil
57,500.00
9
Skrup/Piles 2,0 Cm
Doos Kecil
53,500.00
10
Paku Sumbat
Bh
60,000.00
11
Baut Mur
Bh
7,500.00
12
Mur baut 12 mm
Bh
7,500.00
13
Mur baut 16 mm
Bh
7,600.00
14
Baut Mur 18 mm
Bh
9,000.00
15
Baut Mur 22 mm
Bh
10,600.00
16
Besi Beugel U + Baut Mur
Bh
60,800.00
17
Besi Beugel Plat + Baut Mur
Bh
60,800.00
18
Paku Calsiboth
Kg
57,500.00
19
Paku Baja
Kg
75,000.00
20
Angker Kusen
Bh
8,000.00
21
Paku Sekrup 5 cm
Kg
57,500.00
22
Paku Sekrup 10 cm
Kg
57,500.00
23
Paku Sekrup 1- 2,5 cm
Kg
57,500.00
24
Skrup Fixer
Bh
44,500.00
NO
25
UPAH DAN BAHAN
Ramset/ Dinabolt
SATUAN Kg
HSBGN 2023 (Rp) 76,500.00 -
Bahan Instalasi Listrik
-
1
Titik Lampu
Bh
385,000.00
2
Stop Kontak Tanam
Bh
244,000.00
3
Stop Kontak Luar
Bh
262,000.00
4
Saklar Double
Bh
155,000.00
5
Saklar Tunggal
Bh
75,500.00
6
Zekering Boxes 1 Group
Bh
467,000.00
7
Zekering Boxes 2 Group
Bh
624,000.00
8
Zekering Boxes 3 Group
Bh
770,000.00
9
Lampu Philip 18 W
Bh
84,000.00
10
Lampu Philip 14 W
Bh
72,000.00
11
Lampu Philip 5 W
Bh
56,200.00
12
Lampu Pijar 25 W
Bh
42,000.00
13
Lampu TL 40 W
Bh
123,000.00
14
Lampu TL 2 x 18 W
Bh
99,000.00
15
Lampu TL 2 x 36 W
Bh
166,000.00
16
Lampu TL 2 x 40 W
Bh
167,500.00
17
Lampu LED 2 x 14 W
Bh
240,000.00
18
Lampu Sorot (Sejenis Mercury)
Bh
770,000.00
19
Kabel NYA 2,5 mm
Roll/50
315,000.00
20
Kabel NGA 2 x 2,5 mm
Roll/50
624,000.00
21
Kabel NYM 3 x 2,5 mm
Roll/50
710,000.00
22
Kabel NYM 3 x 1,5 mm
Roll/50
590,000.00
23
Kabel NYM 2 x 2,5 mm
Roll/50
585,000.00
24
Kabel NYM 2 x 1,5 mm
Roll/50
410,000.00
25
Kabel NYM 4 x 6 mm
Roll/50
1,700,000.00
26
Kabel NYM 4 x 10 mm
Roll/50
2,750,000.00
27
Kabel NYY 4 x 50 mm
M'
450,000.00
28
Kabel BC 50 mm
M'
70,000.00
29
Kabel BC 35 mm
M'
60,000.00
30
Fiting Lampu
Bh
41,500.00
31
Fiting Lampu Tanam Dia. 4 "
Bh
62,500.00
32
Fiting Lampu Tanam Dia. 3 "
Bh
40,000.00
33
Box Panel 3 Phase, Comlite (80x120x25)
Set
13,000,000.00
34
Box Panel 3 Phase, Comlite (50x70x20)
Set
5,960,000.00
35
Box Panel 3 Phase, (30x40x15)
Bh
1,135,000.00
36
Box Panel PVC 4 MCB, (40x60x20)
Bh
410,000.00
37
MCB 6 A
Bh
73,000.00
38
MCB 4 A
Bh
68,500.00
39
Pemasukan Daya listrk
KWH
4,600.00
40
VA
2,500.00
41
Pemasangan Daya listrk AC (Air Conditioner) Kapasiitas 2 PK
Unit
14,500,000.00
42
AC (Air Conditioner) Kapasiitas 1 PK
Unit
7,600,000.00
43
AC (Air Conditioner) Kapasiitas 1/2 PK
Unit
11,300,000.00
44
Pas pengisap debu ruangan (Blower) + asisories complit
Bh
210,000.00
45
Pas Lampu darurat + asisories complit
Bh
175,000.00
46
Kabel Telepone 4 x 0.5 mm
M'
32,000.00
47
Isolasi
Bh
12,600.00
48
Outle TV
Bh
52,500.00
49
Outle Telephone
Bh
52,500.00
50
Dow ligth / PCL 13 W
Bh
134,000.00
51
Dow ligth / PCL 8 W
Bh
122,000.00
52
Dow ligth / LED 14 W
Bh
165,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
53
Dow ligth / LED 7 W
Bh
120,000.00
54
Dow ligth / LED 3 W
Bh
50,000.00
55
Lampu Tempel / LED 14 W
Bh
35,000.00
56
Lampu spot light/ LED 7 W
Bh
400,000.00
57
Lampu strip light/ LED 7 W
M'
45,000.00
58
Electroda Cooper dia. 1 inci
M'
450,000.00
59
Lampu Sorot taman spot light (LED), 10 watt
Bh
320,000.00
60
Lampu taman Tanam (LED), 8 watt
Bh
300,000.00
61
Bollard Lighting (LED), 9 watt
Bh
3,750,000.00
62
Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + Pipa GI + Pemasangan
Bh
1,300,000.00
63
Pipa Conduit PVC dia. 20 mm2
M'
3,500.00
64
Exshaust Fan 14 W
bh
650,000.00
65
Wall Type Exshaust Fan 2500 CMH
bh
1,200,000.00
66
Orbit Fan 60 Watt
bh
850,000.00
67
Exshaust Fan 353 CFM/ 34 W
bh
420,000.00
68
Pemasangan Penangkal Petir + Arde (Radius min. 50 m)
Unit
69
Pemasangan Penangkal Petir + Arde (Radius min. 25 m)
Unit
25,500,000.00 13,000,000.00 -
Pekerjaan Vegetasi Tanaman
-
1
Lempengan Rumput
M²
88,800.00
2
Sirih Gading
Bh
18,000.00
3
Bakung Lele
Bh
13,200.00
4
Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter
Bh
26,400.00
5
Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter
Bh
18,750.00
6
Adam Hawa
Bh
43,200.00
7
Sikas (tinggi ± 50 cm)
Bh
1,188,000.00
8
Pucuk Merah (tinggi ± 60 - 70 cm)
Bh
186,000.00
9
Pisang Hias (tinggi ± 50 - 100 cm)
Bh
165,000.00
10
Palem Phoenix (tinggi ± 80 - 100 cm)
Bh
335,000.00
11
Pandan Bali (tinggi ± 80 - 100 cm)
Bh
1,320,000.00
12
Bugenvil (tinggi ± 80 - 100 cm)
Bh
498,000.00
13
Ketappang Kencana (tinggi ± 200 cm)
Bh
492,000.00
14
Palem Putri (tinggi ± 200 - 300 cm)
Bh
900,000.00
15
Palem Kuning (tinggi ± 150 - 200 cm)
Bh
900,000.00
16
Tabebuya Kuning tinggi 4 meter
Bh
1,800,000.00
17
Tanam Pohon Palem raja tinggi 3 meter
Bh
1,500,000.00
18
Tanam Pohon Kamboja tinggi 5 meter
Bh
2,256,000.00
19
Tanam Pohon Pisang Kipas tinggi 1,5 meter
Bh
156,000.00
20
Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter
Bh
22,500.00
21
Pohon Damar (Agathis dammara) Tinggi 4m
Bh
995,000.00
22
Pohon Pulai (alstonia scholaris) Tinggi 6m
Bh
2,280,000.00
23
Pohon Kasia Jawa (Cassia javanica) Tinggi 4m
Bh
678,000.00
24
Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m
Bh
1,051,200.00
25
Pohon Flamboyan (Delonix regia) Tinggi 7m
Bh
1,425,600.00
26
Pohon Biola Cantik (Ficus lyrata) Tinggi 6m
Bh
975,600.00
27
Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m
Bh
1,278,000.00
28
Pohon Sosis (Kigelia pinnata) Tinggi 7m
Bh
1,278,000.00
29
Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m
Bh
1,056,000.00
30
Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6m
Bh
655,000.00
31
Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m
Bh
1,758,000.00
32
Pohon Parahiba (Schizolobium parahyba) Tinggi 7m
Bh
1,128,000.00
33
Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m
Bh
816,000.00
34
Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m
Bh
225,600.00
35
Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m
Bh
128,000.00
36
Pohon Palem Kol (Licualis grandis) Tinggi 1,5m
Bh
188,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
37
Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m
Bh
2,265,600.00
38
Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m
Bh
2,100,000.00
39
Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m
Bh
678,000.00
1
Semak Agave (Agave angustifolia) Tinggi 300-400 mm
Bh
120,000.00
2
Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-300mm
Bh
75,600.00
3
Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm
Bh
63,600.00
4
Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500-2500 mm
Bh
375,600.00
5
Semak Spineless (Spineless Yucca) Tinggi 800 mm
Bh
203,000.00
6
Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm
Bh
113,000.00
7
Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm
Bh
23,000.00
8
Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm
Bh
26,000.00
9
Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm
Bh
53,000.00
10
Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm
Bh
53,000.00
11
Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm
Bh
23,000.00
12
Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 700-800mm
Bh
105,600.00
13
Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800mm
Bh
23,000.00
14
Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm
Bh
15,600.00
15
Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm
Bh
87,600.00
16
Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 400-500mm
Bh
12,000.00
17
Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300mm
Bh
15,600.00
18
Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300mm
Bh
30,000.00
19
Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 100-150mm
Bh
23,000.00
20
Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm
Bh
11,200.00
21
Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm
Bh
30,000.00
22
Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx") Tinggi 200-250m
Bh
37,000.00
23
Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-600mm
Bh
45,600.00
24
Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300-400mm
Bh
55,000.00
25
Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400mm
Bh
13,000.00
26
Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi 400-500mm
Bh
13,000.00
27
Semak kembang Air Mancur Merah (Russelia equisetiformis) Tinggi 400-500m
Bh
33,600.00
28
Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-500mm
Bh
53,000.00
29
Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm
Bh
10,000.00
30
Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300
Bh
15,600.00
31
Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-400mm
Bh
23,000.00
32
Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-150
Bh
30,000.00
33
Semak Rumput Manila (Zoysia matrella)
M²
75,600.00
1
Tanaman Cemara
Bh
180,000.00
2
Tanaman Karambosa hijau
Bh
144,000.00
3
Tanaman Karambosa Karigata
Bh
162,000.00
4
Tanaman Batang Merah
Bh
30,000.00
5
Tanaman Erpah
Bh
78,000.00
6
Kembang pukul sembilan
Bh
504,000.00
7
Kembang rumput kuning
Bh
13,000.00
8
Bunga Agave
Bh
876,000.00
9
Bunga Andong
Bh
51,000.00
10
Bunga Asoka
Bh
180,000.00
11
Bunga Brokoli
Bh
63,600.00
12
Bunga Kembang Puring
Bh
150,000.00
13
Bunga Lidah mertua mini
Bh
63,600.00
14
Bunga Lidah Rumpun mertua mini
Bh
945,600.00
15
Bunga Puring kerupuk
Bh
315,600.00
16
Bunga Rumpun sansevieria
Bh
25,000.00
17
Bunga Soft india
Bh
935,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
18
Bunga Kembang sepatu
Bh
312,000.00
19
Pupuk daun dan kembang
Zak
189,600.00
20
Pupuk kandang
kg
37,000.00
21
Insektisida / Furadan
kg
36,000.00 -
Bahan Tambahan
-
1
Flux Oil
Ltr
41,000.00
2
Minyak pelumas
Ltr
70,000.00
3
Olie SAE 100
Ltr
60,000.00
4
Olie SAE 30
Ltr
75,000.00
5
Olie SAE 40
Ltr
90,000.00
6
Olie SAE 90
Ltr
100,000.00
7
Sambungan Rumah 1"
Set
3,350,000.00
8
Sambungan Rumah 1/2"
Set
2,000,000.00
9
Sambungan Rumah 3/4"
Set
2,350,000.00
10
Aspal (AC)
Kg
33,000.00
11
Kayu Bakar
M³
240,000.00
12
Sewa Stamper
Hari
250,000.00
13
Sewa Alat Bor
Hari
250,000.00
14
Sewa Genset
Hari
500,000.00
15
Sewa Mesin Las
Hari
500,000.00
16
Aspal Emulsi
Kg
12,000.00
17
Alat Bantu Bina Marga
Set
3,650,000.00
18
Alat Bantu Pengairan
Set
3,650,000.00
19
Minyak tanah
Ltr
11,000.00
20
Solar
Ltr
9,600.00
21
Bensin
Ltr
9,600.00
22
Pertalite
Ltr
11,000.00
23
Pertamax
Ltr
12,000.00
24
Pagar BRC tinggi 1,20 m
M'
135,000.00
25
Tiang BRC dia. 1,50 m
Buah
95,000.00
26
Three Colour
Btg
75,000.00
27
Mesin Las
Unit
18,200,000.00
28
Bor Listrik
Unit
1,310,000.00
29
Mesin Pemotong Besi
Bh
1,310,000.00
30
KWH Listrik
31
Kwh
3,500.00
Mata Bor
Bh
82,000.00
32
Pelicin/Lubrican
Kg
128,000.00
33
Alat Bantu Penyetelan (Trucker)
Set
141,000.00
34
Alat batu pekerja
Ls
32,000.00
35
Blower
Bh
560,000.00
36
Excause Van
Bh
560,000.00
37
Passbox
Bh
27,000,000.00
1
Pengeboran air + Pipa Casing Ø 6''
m
1,120,000.00
2
Pengeboran air + Pipa Casing Ø 4''
m
850,000.00
3
Pengeboran air + Pipa Casing Ø 3''
m
400,000.00
4
Pengeboran air + Pipa Casing Ø 2.5''
m
200,000.00
5
Mesin disel 6.5 . HP + Pompa Ebara ØINT 3'' OUT 3''
Unit
29,000,000.00
6
Mesin Pompa air 5 . HP Pompa ØINT OUT 2''
Unit
8,700,000.00
7
Mesin disel+Pompa Outo matis Jet pam ØINT OUT1.5'' - 30 Complit
Unit
26,000,000.00
8
Mesin disel+Pompa Outo matis ( setara sanyo ) ØINT 1''- 20 Complit
Unit
23,500,000.00
9
Mesin pompa air 5 . PK /type Hoda
Unit
7,500,000.00
10
Mesin pompa air 8 . PK /type Hoda
Unit
9,400,000.00
11
Slang Veleksibel Ø2.''
-
m
61,700.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
12
Slang Veleksibel Ø2.5.''
m
78,500.00
13
Slang Veleksibel Ø3.''
m
94,500.00
14
Mesin Jet Pump Kap. 250 watt
Unit
3,900,000.00
15
Mesin Pompa Tekan Kap. 150 watt
Unit
1,300,000.00
16
Sand Filter 520 ltr/mnt, (31.2 m3/jam), 2Hp - 3Hp, V 900 watt
Unit
16,000,000.00
17
Sand Filter, (24.9 m3/jam), 2Hp - 3Hp, V 800 watt
Unit
14,000,000.00
1
Tulisan Papan Nama, (Staenlis) - t = 1 cm + Pemasangan
cm
19,000.00
2
Tulisan Papan Nama, (Galvanil) - t = 1 cm + Pemasangan
cm
14,000.00
3
Tulisan Papan Nama, (Fiber) - t = 1 cm
cm
9,000.00
4
Tulisan Papan Nama/ Logo, (Akrilik + lampu LED) - t = 1 cm
cm
30,000.00 -
1
Genzet Outomatis zellent complit asisories 50 PK + pemasangan
2
Pompa Ebara ØINT 3'' OUT 3''
3
Sewa Molen Kpst 0.3 m3
Hari
310,000.00
4
Mobilisasi Alat berat
Km
310,000.00
5
Alat Berat Galian dan keprasan
Jam
750,000.00
6
Alat berat Pemadatan
Jam
700,000.00
7
Penatahalaman dan pembuatan taman + Bunga
m2
180,000.00
8
Contaner ( tong sampah ). 2.5 X 3 x 1.5 m
Bh
30,000,000.00
9
Alat bantu (Sewa Cren Kpst 7 ton)
Hari
15,200,000.00
10
Mesin kompresor
Bh
3,000,000.00
Unit Bh
204,000,000.00 9,000,000.00
HARGA BAHAN MATERIAL TIDAK BERTEKANAN Bahan Pipa 1
Pipa PVC
½"
m
7,400.00
2
¾"
m
9,000.00
3
1"
m
11,400.00
4
1 1/4"
m
18,400.00
5
1½"
m
23,900.00
6
2"
m
35,500.00
7
2,5"
m
45,500.00
8
3"
m
65,100.00
9
4"
m
122,000.00
10
5"
m
149,800.00
11
6"
m
197,900.00
12
8"
m
307,900.00
13
10"
m
437,500.00
14
12"
m
625,100.00
15
14"
m
879,500.00
16
16"
m
1,099,400.00 -
1
Pipa GI
1/2"
m
40,000.00
2
3/4"
m
51,000.00
3
1"
m
77,000.00
4
1 1/4"
m
102,000.00
5
1½"
m
117,000.00
6
2"
m
159,000.00
7
2½"
m
203,000.00
8
3"
m
262,000.00
9
4"
m
265,000.00
10
5"
m
510,000.00
11
6"
m
599,000.00
12
8"
m
1,075,000.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp) -
HARGA BAHAN MATERIAL BERTEKANAN Bahan Pipa 1
Pipa PVC
½"
m
9,900.00
2
¾"
m
18,100.00
3
1"
m
22,600.00
4
1 1/4"
m
25,400.00
5
1½"
m
33,800.00
6
2"
m
49,500.00
7
2,5"
m
72,500.00
8
3"
m
100,200.00
9
4"
m
146,100.00
10
6"
m
307,900.00
11
8"
m
501,100.00
12
10"
m
806,600.00 -
1
Pipa GI Medium
1/2"
m
37,400.00
2
3/4"
m
47,000.00
3
1"
m
77,300.00
4
1 1/4"
m
107,500.00
5
1½"
m
123,200.00
6
2"
m
131,600.00
7
2½"
m
182,300.00
8
3"
m
217,400.00
9
4"
m
306,700.00
10
6"
m
489,000.00
11
8"
m
754,700.00 -
1
Pipa HDPE
1/2"
m
9,700.00
2
1"
m
21,700.00
3
1½"
m
47,100.00
4
2"
m
65,200.00
5
2.5"
m
103,800.00
6
3"
m
149,700.00
7
4"
m
223,400.00
8
6"
m
468,500.00
9
8"
m
543,400.00 -
Jenis Barang
1,5"
Bh
169,600.00
2
2"
Bh
219,000.00
3
3"
Bh
313,300.00
4
4"
Bh
361,000.00
6"
Bh
834,900.00
6
8"
Bh
1,468,200.00
7
10"
Bh
2,790,900.00
8
12"
Bh
5,377,000.00
1
Flange Socket PVC
5
1,5"
Bh
155,300.00
2
2"
Bh
219,000.00
3
2,5"
Bh
273,200.00
4
3"
Bh
313,400.00
5
4"
Bh
361,000.00
6
6"
Bh
715,800.00
1
Flange Spigot PVC
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
7
8"
Bh
1,247,500.00
8
10"
Bh
2,562,000.00
9
12"
Bh
5,062,000.00 68,300.00
1
Bend PVC RR/SP/S-12,5
1"x90°
Bh
2
Bend PVC RR/SP/S-12,6
3/4"x90°
Bh
66,200.00
½"x90°
Bh
63,000.00
1½"x90°
Bh
81,900.00
2"x90°
Bh
133,600.00
6
3"x90°
Bh
220,200.00
7
4"x90°
Bh
312,900.00
8
6"x90°
Bh
655,700.00
9
8"x90°
Bh
1,181,400.00
10
10"x90°
Bh
1,763,000.00
12"x90°
Bh
3,050,300.00
3 4
Bend PVC RR/SP/S-12,5
5
11
1,5"x45°
Bh
101,100.00
2
2"x45°
Bh
115,600.00
3
3"x45°
Bh
196,200.00
4"x45°
Bh
275,600.00
5
6"x45°
Bh
596,700.00
6
8"x45°
Bh
1,020,200.00
7
10"x45°
Bh
1,608,600.00
8
12"x45°
Bh
2,753,100.00
2"x22,5°
Bh
101,100.00
2
3"x22,5°
Bh
181,700.00
3
4"x22,5°
Bh
255,000.00
4
6"x22,5°
Bh
495,600.00
8"x22,5°
Bh
859,000.00
6
10"x22,5°
Bh
1,330,400.00
7
12"x22,5°
Bh
2,221,800.00
1
Bend PVC RR/SP/S-12,5
4
1
Bend PVC RR/SP/S-12,5
5
1½"x45°
Bh
310,000.00
2"x45°
Bh
363,000.00
3
2,5"x45°
Bh
402,000.00
4
3"x45°
Bh
429,000.00
5
4"x45°
Bh
574,000.00
6
6"x45°
Bh
921,000.00
8"x45°
Bh
1,427,000.00
1
Bend GI All Flange
2
7
1½"x90°
Bh
353,000.00
2
2"x90°
Bh
452,000.00
3
2,5"x90°
Bh
498,000.00
3"x90°
Bh
526,000.00
5
4"x90°
Bh
708,000.00
6
6"x90°
Bh
1,147,000.00
7
8"x90°
Bh
1,793,000.00
1
Bend GI All Flange
4
1½"x22,5°
Bh
316,000.00
2
2"x22,5°
Bh
405,000.00
3
2,5"x22,5°
Bh
459,000.00
4
3"x22,5°
Bh
486,000.00
5
4"x22,5°
Bh
642,000.00
6
6"x22,5°
Bh
1,025,000.00
1
Bend GI All Flange
NO
UPAH DAN BAHAN
7
8"x22,5°
SATUAN Bh
HSBGN 2023 (Rp) 1,573,000.00 -
1½"x45°
Bh
365,000.00
2"x45°
Bh
429,000.00
3
2,5"x45°
Bh
466,000.00
4
3"x45°
Bh
505,000.00
5
4"x45°
Bh
676,000.00
6
6"x45°
Bh
1,086,000.00
7
8"x45°
Bh
1,682,000.00
1
Bend Drat GI
2
1
Bend Drat GI
2
3/4"x90°
Bh
11,000.00
1"x90°
Bh
278,000.00
3
Bend Drat GI/Knee GI
½"x90°
Bh
7,000.00
4
Long Bend Female dan Male ½"x90°
Bh
8,000.00
Bend Drat GI
1½"x90°
Bh
342,000.00
6
2"x90°
Bh
396,000.00
7
2,5"x90°
Bh
452,000.00
8
3"x90°
Bh
526,000.00
9
4"x90°
Bh
708,000.00
6"x90°
Bh
1,147,000.00
8"x90°
Bh
1,793,000.00
5
10 11
½"
Bh
9,000.00
¾"
Bh
10,000.00
1"
Bh
13,000.00
4
1½"
Bh
26,000.00
5
2"
Bh
41,000.00
6
2½"
Bh
65,000.00
7
3"
Bh
95,000.00
4"
Bh
159,000.00
9
6"
Bh
490,000.00
10
8"
Bh
858,000.00
1
Sock Drat GI
2 3
8
½"
Bh
7,000.00
¾"
Bh
9,600.00
3
1"
Bh
15,000.00
4
1½"
Bh
21,000.00
5
2"
Bh
28,300.00
6
2½"
Bh
56,600.00
3"
Bh
78,400.00
8
4"
Bh
99,900.00
9
6"
Bh
193,800.00
10
8"
Bh
389,800.00
1"x½"
Bh
45,700.00
2
1"x1"
Bh
92,700.00
3
1½"x½"
Bh
97,500.00
4
1½"x3/4"
Bh
113,200.00
5
1½"x1"
Bh
144,400.00
6
1½"x1½"
Bh
191,400.00
7
2"x 1"
Bh
222,600.00
8
2"x2"
Bh
239,500.00
9
3"x1"
Bh
285,600.00
10
3"x2"
Bh
333,900.00
11
3"x3"
Bh
415,800.00
1
Sock PVC Drat Luar
2
7
1
Tee All Socket PVC / RR
UPAH DAN BAHAN
12
4"x2"
Bh
509,300.00
13
4"x3"
Bh
582,800.00
14
4"x4"
Bh
630,000.00
6"x2"
Bh
787,500.00
16
6"x3"
Bh
908,300.00
17
6"x4"
Bh
976,500.00
18
6"x6"
Bh
1,176,000.00
19
8"x3"
Bh
1,995,000.00
20
8"x4"
Bh
1,984,500.00
21
8"x6"
Bh
2,436,000.00
22
8"x8"
Bh
2,625,000.00
23
10"x6"
Bh
6,510,000.00
24
10"x8"
Bh
7,560,000.00
25
10"x10"
Bh
8,820,000.00
Reduser All Socket PVC / RR 1½"x1"
Bh
99,800.00
15
SATUAN
HSBGN 2023 (Rp)
NO
1 2
½"x1"
Bh
45,200.00
3
1" x 3/4"
Bh
50,400.00
4
1" x 1 1/4"
Bh
57,800.00
2"x1"
Bh
123,900.00
6
2"x1½"
Bh
141,800.00
7
2"x2"
Bh
178,500.00
8
3"x1"
Bh
189,000.00
9
3"x2"
Bh
199,500.00
4"x2"
Bh
315,000.00
11
4"x3"
Bh
325,500.00
12
6"x2"
Bh
504,000.00
13
6"x3"
Bh
514,500.00
14
6"x4"
Bh
582,800.00
8"x3"
Bh
1,155,000.00
16
8"x4"
Bh
1,050,000.00
17
8"x6"
Bh
997,500.00
18
10"x6"
Bh
1,680,000.00
19
10"x8"
Bh
1,470,000.00
12"x10"
Bh
6,300,000.00
5
10
15
20
½"
Bh
6,800.00
2
1"
Bh
19,400.00
3
1½"
Bh
31,500.00
2"
Bh
96,600.00
5
3"
Bh
189,000.00
6
4"
Bh
241,500.00
1
Dop GI
4
2"
Bh
178,500.00
3"
Bh
224,700.00
3
4"
Bh
326,600.00
4
6"
Bh
535,500.00
5
8"
Bh
997,500.00
6
10"
Bh
1,155,000.00
7
12"
Bh
1,575,000.00
8
14"
Bh
2,310,000.00
9
16"
Bh
2,625,000.00
1
Gilbout Joint CI
2
1 2
Flange Las
2"
Bh
93,500.00
2,5"
Bh
101,900.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
3
3"
Bh
108,200.00
4
4"
Bh
136,500.00
5
6"
Bh
231,000.00
8"
Bh
215,300.00
7
10"
Bh
472,500.00
8
12"
Bh
535,500.00
9
16"
Bh
1,050,000.00
6
1½"
Bh
609,000.00
2
2"
Bh
813,800.00
3
2,5"
Bh
1,050,000.00
4
3"
Bh
1,155,000.00
5
4"
Bh
1,575,000.00
6
6"
Bh
2,730,000.00
8"
Bh
4,725,000.00
8
10"
Bh
6,615,000.00
9
12"
Bh
8,925,000.00
10
16"
Bh
2,100,000.00
1½"x½"
Bh
36,800.00
2
2"x ½"
Bh
67,200.00
3
2"x 3/4"
Bh
68,300.00
4
2"x 1"
Bh
73,500.00
5
3"x ½"
Bh
77,700.00
4"x ½"
Bh
89,300.00
7
4"x 2"
Bh
115,500.00
8
6"x½"
Bh
136,500.00
9
6"x 1"
Bh
147,000.00
10
6"x 2"
Bh
168,000.00
8"x 2"
Bh
84,000.00
8"x 3"
Bh
892,500.00
1
Gate Valve CI
7
1
Clamp Sadel CI
6
11 12
1
Hidran Umum Fiberglass
2 3
1000 lt
Bh
6,930,000.00
2000 lt
Bh
10,185,000.00
3000 lt
Bh
13,125,000.00 -
1
Profile Tank
2200 lt
Bh
6,510,000.00 -
1/2"
Bh
399,000.00
3/4"
Bh
630,000.00
3
1"
Bh
1,155,000.00
4
2"
Bh
1,785,000.00
5
3"
Bh
2,593,500.00
6
4"
Bh
3,255,000.00
6"
Bh
4,200,000.00
1
Water Meter
2
7
1
Manometer
1/2"
Bh
2,730,000.00 -
1/2"
Bh
89,300.00
3/4"
Bh
147,000.00
3
1"
Bh
315,000.00
4
1½"
Bh
624,800.00
5
2"
Bh
919,800.00
6
3"
Bh
1,480,500.00
7
4"
Bh
1,938,300.00
1 2
Stop Kran
NO
UPAH DAN BAHAN
8
6"
SATUAN Bh
HSBGN 2023 (Rp) 2,940,000.00 -
2"
Bh
115,500.00
3"
Bh
115,500.00
3
4"
Bh
141,800.00
4
6"
Bh
141,800.00
5
8"
Bh
257,300.00
1
Streetbox
2
1,5"
Bh
420,000.00
2
2"
Bh
787,500.00
3
2,5"
Bh
1,050,000.00
4
3"
Bh
1,260,000.00
5
4"
Bh
1,890,000.00
6
6"
Bh
3,465,000.00
8"
Bh
4,200,000.00
1
Chek Valve
7
1 1/4"
Bh
7,800.00
2
1"
Bh
63,000.00
3
2"
Bh
89,300.00
½"
Bh
383,300.00
2
¾"
Bh
573,300.00
3
1"
Bh
761,300.00
4
2"
Bh
1,239,000.00
3"
Bh
1,680,000.00
1
Valve socket
1
Singel Air Valve
5
1½"x¾"
Bh
218,400.00
2
1½"x1"
Bh
262,500.00
3
1½"x1½"
Bh
262,500.00
2"x1½"
Bh
367,500.00
5
2"x2"
Bh
472,500.00
6
2½"x2"
Bh
504,000.00
7
2½"x2½"
Bh
525,000.00
8
3"x2"
Bh
640,500.00
3"x3"
Bh
682,500.00
10
4"x2"
Bh
735,000.00
11
4"x3"
Bh
840,000.00
12
4"x4"
Bh
892,500.00
13
6"x2"
Bh
945,000.00
6"x3"
Bh
1,050,000.00
15
6"x4"
Bh
1,155,000.00
16
6"x6"
Bh
1,260,000.00
17
8"x3"
Bh
1,575,000.00
18
8"x4"
Bh
1,680,000.00
8"x6"
Bh
1,890,000.00
8"x8"
Bh
2,100,000.00
1/2" x 1/2"
Bh
6,300.00
22
1" x 1/2"
Bh
28,400.00
23
1" x 1 "
Bh
68,300.00
24
1,5" x 1,5 "
Bh
85,000.00
2" x 2"
Bh
116,600.00
1
Tee GI All Flange
4
9
14
19 20 21
Tee GI
25
8"
Bh
110,300.00
2
6"
Bh
89,300.00
3
4"
Bh
63,000.00
1
Packing Rubber
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
4
3"
Bh
42,000.00
5
2,5"
Bh
36,800.00
6
2"
Bh
25,200.00
1,5"
Bh
18,900.00
7
½"
Bh
18,900.00
2
1"
Bh
20,000.00
3
1½"
Bh
21,000.00
4
2"
Bh
26,300.00
5
2½"
Bh
39,900.00
6
3"
Bh
57,800.00
7
4"
Bh
94,500.00
8
6"
Bh
173,300.00
9
8"
Bh
525,000.00
½"
Bh
18,400.00
2
1"
Bh
18,400.00
3
1½"
Bh
18,900.00
4
2"
Bh
26,300.00
2½"
Bh
41,000.00
6
3"
Bh
56,700.00
7
4"
Bh
90,300.00
8
6"
Bh
189,000.00
9
8"
Bh
525,000.00
1"
Bh
20,000.00
2
1½"
Bh
29,400.00
3
2"
Bh
41,000.00
4
3"
Bh
63,000.00
4"
Bh
105,000.00
6
6"
Bh
194,300.00
7
8"
Bh
582,800.00
1
Socket PVC
1
Socket PVC Drat Dalam
5
1
Dop PVC
5
1,5"
Bh
115,500.00
2"
Bh
126,000.00
3
3"
Bh
147,000.00
4
4"
Bh
168,000.00
5
6"
Bh
367,500.00
6
8"
Bh
1,780,800.00
2" x 1"
Bh
161,700.00
2
2" x 1.5"
Bh
207,900.00
3
3" x 2"
Bh
316,000.00
4
3" x 1,5"
Bh
265,700.00
2" x 4"
Bh
532,400.00
6
4" x 3"
Bh
617,400.00
7
6" x 2"
Bh
1,074,200.00
8
6" x 3"
Bh
857,900.00
9
6" x 4"
Bh
750,800.00
1,5" x 1"
Bh
326,600.00
2
1" x 1"
Bh
165,900.00
3
1" x 1/2"
Bh
160,700.00
1
Stud Flange
2
1
Reduser HDPE
5
1
Tee Coupling HDPE
1
Tee HDPE
1,5" x 1,5"
Bh
300,300.00
NO
UPAH DAN BAHAN
SATUAN
HSBGN 2023 (Rp)
2
2" x 1"
Bh
354,900.00
3
2" x 1,5"
Bh
371,700.00
4
2" x 2"
Bh
387,500.00
2" x 3"
Bh
420,000.00
6
2" x 4"
Bh
557,600.00
7
3" x 4"
Bh
642,600.00
8
3" x 3"
Bh
437,900.00
9
4" x 4"
Bh
867,300.00
10
6" x 4"
Bh
991,200.00
11
6" x 3"
Bh
746,600.00
12
8" x 2"
Bh
2,208,200.00
5
1,5" x 2"
Bh
164,900.00
2" x 3"
Bh
227,900.00
2,5" x 2"
Bh
194,300.00
4
2,5" x 3"
Bh
257,300.00
5
2" x 4"
Bh
307,700.00
6
3" x 4"
Bh
314,000.00
7
4" x 6"
Bh
572,300.00
1 1/2" x 1 1/4
Bh
171,200.00
1 1/2" x 1
Bh
136,500.00
1
Reduser GI
2 3
8 9
1,5"x90°
Bh
97,700.00
2"x90°
Bh
176,400.00
3"x90°
Bh
279,300.00
4
4"x90°
Bh
637,400.00
5
6"x90°
Bh
873,600.00
6
8"x90°
Bh
1,999,200.00
1,5"x45°
Bh
91,400.00
2
2"x45°
Bh
159,600.00
3
3"x45°
Bh
264,600.00
4
4"x45°
Bh
613,200.00
5
6"x45°
Bh
827,400.00
8"x45°
Bh
1,916,300.00
1
Bend HDPE
2 3
1
Bend HDPE
6
1"
Bh
111,300.00
2
1,5"
Bh
176,400.00
3
2"
Bh
207,900.00
3"
Bh
378,000.00
5
4"
Bh
405,300.00
6
6"
Bh
729,800.00
1
Dop HDPE
4
1"
Bh
114,500.00
1,5"
Bh
182,700.00
3
2"
Bh
228,900.00
4
3"
Bh
343,400.00
5
4"
Bh
457,800.00
1
Konektor HDPE
2
1
Male Elbow HDPE
2"
Bh
174,300.00 -
1
Male Adaptor HDPE (Drat Lu 3"
Bh
114,500.00
2
2"
Bh
109,200.00
3
1,5"
Bh
83,000.00
4
1"
Bh
58,800.00
NO
UPAH DAN BAHAN
5
1/2"
SATUAN Bh
HSBGN 2023 (Rp) 46,200.00 -
Female Adaptor HDPE (Drat 3"
Bh
127,000.00
2"
Bh
121,800.00
3
1,5"
Bh
90,300.00
4
1"
Bh
66,200.00
5
1/2"
Bh
53,600.00
1 2
1
Pengadaan pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3
Unit
46,784,900.00
2
Pengadaan pompa Submersible type Centrifugal kapasitas 5 Ltr/Dtk, H 120, 3
Unit
60,821,300.00
3
Kontrol Panel Auto
Unit
9,975,000.00
4
Pengadaan Kabel NYYHY Ø 4 x 2,5 mm
m
51,500.00
5
Pengadaan Kabel NYYHY Ø 3 x 0,75 mm
m
31,500.00
6
Pengadaan Water Level Control (WLC)
Bh
52,500.00
7
Pengadaan Cord Holder (Pengikat Kabel)
Bungkus
126,000.00
8
Pengadaan Pipa Pelindung Kabel
m
33,600.00
9
Pemasangan dan Set Up Pompa
Set
3,937,500.00
10
Kawat Sling
12 mm
m
30,500.00
11
8 mm
m
24,200.00
12
6 mm
m
23,100.00
12 mm
m
9,500.00
14
8 mm
m
8,400.00
15
6 mm
m
6,300.00
12 mm
Bh
579,600.00
17
8 mm
Bh
411,600.00
18
6 mm
Bh
148,000.00
12 mm
Bh
77,700.00
20
8 mm
Bh
55,700.00
21
6 mm
Bh
34,700.00
22 mm
Bh
22,600.00
Bh
7,400.00
Bh
13,100.00
13
16
19
Pemasangan Kawat Sling
Stelan seling
Pengunci seling
22
Angker Besi
23
Pekerjaan Snai Pipa
24
Coupling GI
1/2"
1
Verlop Ring water Tank Ø 2" 3/4" x 1/2"
Bh
66,200.00
2
1" x 3/4"
Bh
94,500.00
3
1,5" x 1"
Bh
129,200.00 -
1
Double Nepel GI
3"
Bh
57,500.00
2
2,5"
Bh
39,900.00
3
2"
Bh
34,700.00
4
1,5"
Bh
30,500.00
5
1"
Bh
25,200.00
6
1/2"
Bh
21,000.00
7
Water Mur
1,5"
Bh
105,000.00
8
Double Nepel PVC
1/2"
Bh
7,400.00
9
Knee PVC drat dalam
1/2"
Bh
11,000.00
10
Knee PVC
1/2"
Bh
5,800.00
11
Tap Kran
Bh
34,700.00
12
Plugh Kran 1/2"
Bh
73,500.00
13
Box Water Meter
Bh
72,500.00
14
Pemasangan Meteran Air
Unit
29,400.00
1/2" 1/2"
MATERIAL
HARGA KONSTRUKSI
(Rp) 4
150,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 190,000.00 230,000.00 160,000.00 160,000.00 230,000.00 160,000.00 190,000.00 230,000.00 230,000.00 200,000.00 160,000.00 190,000.00 160,000.00 190,000.00 200,000.00 160,000.00 160,000.00 160,000.00 190,000.00 190,000.00 190,000.00 230,000.00 140,000.00 140,000.00 230,000.00 230,000.00 190,000.00 170,000.00 250,000.00 300,000.00 18,000.00
245,000.00 230,000.00 500,000.00 570,000.00
HARGA KONSTRUKSI
(Rp)
510,000.00 590,000.00 575,000.00 750,000.00 540,000.00 570,000.00 355,000.00 345,000.00 795,000.00 285,000.00 230,000.00 240,000.00 345,000.00 450.00 800,000.00 925,000.00 720,000.00 250,000.00 950.00 850.00 1,600,000.00 19,000.00 355,000.00 225,000.00 195,000.00 240,000.00 121,000.00 192,000.00 58,000.00
15,000.00 15,000.00 1,700.00 1,700.00 1,700.00 1,700.00 1,650.00 1,650.00 1,650.00 15,700.00 15,700.00 938,000.00 4,500.00 5,000.00 5,200.00 2,000.00 49,500.00 66,500.00 38,000.00 6,000.00 3,000.00 5,000.00
HARGA KONSTRUKSI
(Rp)
3,000.00 40,000.00 8,000.00 7,000.00 6,000.00
2,800.00 1,800.00 6,800.00 5,500.00 3,900.00 45,000.00 17,000.00 15,000.00 21,000.00 10,000.00 6,900.00 7,900.00 6,600.00 8,800.00 31,000.00 17,000.00 35,000.00 14,000.00 70,000.00 75,000.00 80,000.00 85,000.00 65,000.00 70,000.00 193,000.00 193,000.00 7,000.00 90,000.00 13,000.00 68,000.00 47,300.00 29,000.00 69,000.00 199,000.00 55,000.00 95,000.00 68,000.00 80,000.00 85,000.00 75,000.00 50,000.00 76,000.00 105,000.00 120,000.00 85,000.00 135,000.00
HARGA KONSTRUKSI
(Rp)
65,000.00 75,000.00 94,000.00 104,000.00 75,000.00 87,000.00 100,000.00 110,000.00 125,000.00 266,000.00 7,000.00 203,000.00 100,000.00 60,000.00 60,000.00 13,000.00 91,000.00 420,000.00 17,000.00 90,000.00 30,000.00 19,000.00 35,000.00 25,000.00 9,000.00 7,500.00 7,000.00 500.00 400.00
5,480,000.00 3,750,000.00 2,600,000.00 5,350,000.00 3,650,000.00 2,600,000.00 11,000.00 3,262,000.00 3,182,000.00 3,715,000.00 3,150,000.00 8,500.00 9,000.00 12,000.00 14,000.00 17,000.00 200,000.00 40,000.00 34,000.00 27,500.00 57,000.00 32,000.00 35,000.00
HARGA KONSTRUKSI
(Rp)
50,000.00
15,000.00 15,500.00 20,000.00 50,000.00 75,000.00 90,000.00 110,000.00 125,000.00 130,000.00 150,000.00 175,000.00 4,500.00 80,000.00 65,000.00 110,000.00 165,000.00 200,000.00 244,000.00 265,000.00 45,000.00 55,000.00 56,000.00 18,000.00 220,000.00 1,100,000.00 127,000.00 122,000.00 132,000.00 165,000.00 125,000.00 1,800,000.00 2,000,000.00
63,000.00 74,000.00 80,000.00 80,000.00 85,000.00 83,000.00 450,000.00 380,000.00 320,000.00 82,000.00 82,000.00 32,000.00 25,000.00 140,000.00 770,000.00 140,000.00 120,000.00
HARGA KONSTRUKSI
(Rp)
130,000.00 90,000.00 140,000.00 120,000.00 130,000.00 90,000.00 160,000.00 13,000.00 600,000.00 650,000.00 400,000.00 1,000,000.00 800,000.00 3,000,000.00 103,000.00 13,000.00 30,000.00 1,900.00 1,900.00 2,600.00 10,000.00 16,000.00 720,000.00 230,000.00 195,000.00 86,700.00 25,000.00 100,000.00 25,000.00 75,000.00
19,000.00 16,000.00 250,000.00 200,000.00 1,350,000.00 315,000.00 700,000.00 1,300,000.00 185,000.00 185,000.00 1,650,000.00 350,000.00 1,500,000.00 200,000.00 18,800,000.00 110,000.00 130,000.00 750,000.00 38,000.00 38,000.00 600,000.00
HARGA KONSTRUKSI
(Rp)
35,000.00 2,150,000.00 95,000.00 110,000.00 1,100,000.00 1,150,000.00 1,100,000.00 1,200,000.00 60,000.00 15,000.00 85,000.00 95,000.00 33,000.00 29,000.00 35,000.00 100,000.00 40,000.00 160,000.00 35,000.00 26,000.00 23,000.00 90,000.00 50,000.00 35,000.00 600,000.00 300,000.00 1,750,000.00 500,000.00 550,000.00 800,000.00 550,000.00 1,600,000.00 35,000.00 23,000.00 59,000.00 32,000.00 26,000.00 13,000.00 110,000.00 39,000.00 69,000.00 44,000.00 43,000.00 94,000.00 32,000.00 132,000.00 230,000.00 350,000.00 485,000.00 574,000.00 282,000.00 2,850,000.00 4,450,000.00 2,320,000.00 1,938,000.00
HARGA KONSTRUKSI
(Rp)
2,190,000.00 1,630,000.00 3,130,000.00 2,380,000.00 4,250,000.00 800,000.00 21,500.00 29,000.00 36,000.00 50,000.00 58,000.00 140,000.00 1,300.00 32,000.00 210,000.00 220,000.00 35,000.00 570,000.00 140,000.00 1,700,000.00 1,250,000.00 33,000.00 250,000.00 24,000.00 35,000.00 540,000.00 480,000.00 453,000.00 900,000.00 800,000.00 795,000.00 850,000.00 2,000.00 250,000.00 85,000.00 57,000.00 1,350,000.00 37,000.00 66,000.00 105,000.00 110,000.00 120,000.00 130,000.00 210,000.00
27,000.00 54,000.00 67,000.00 103,000.00 106,000.00 159,000.00 240,000.00 330,000.00 135,000.00
HARGA KONSTRUKSI
(Rp)
222,000.00 100,000.00 250,000.00 280,000.00 155,000.00 80,000.00 195,000.00 270,000.00 220,000.00 220,000.00 130,000.00 159,000.00 24,000.00 53,000.00 40,000.00 5,500.00 55,000.00 55,000.00 55,000.00 30,000.00 9,500.00 25,000.00 35,000.00 85,000.00 3,000.00 6,000.00 6,000.00 2,000.00 15,000.00 55,000.00 132,000.00 165,000.00 330,000.00
141,000.00 115,000.00 170,000.00 200,000.00 215,000.00 137,000.00 165,000.00 169,000.00 130,000.00 1,000,000.00 1,250,000.00 1,500,000.00 1,100,000.00 1,800,000.00 2,000,000.00 2,500,000.00
9,000.00 29,000.00
HARGA KONSTRUKSI
(Rp)
29,000.00 35,000.00 250,000.00 66,000.00 20,000.00 20,000.00 25,000.00 18,000.00 35,000.00 35,000.00 72,000.00 90,000.00 60,000.00 127,000.00 35,000.00 55,000.00 70,000.00 42,000.00 50,000.00 37,000.00 36,000.00 37,000.00 39,000.00 110,000.00 92,000.00 130,000.00 37,000.00 29,000.00 36,000.00 50,000.00 55,000.00 85,000.00 65,000.00 44,000.00 170,000.00 160,000.00 26,000.00 57,000.00 110,000.00 120,000.00
164,000.00 555,000.00 105,000.00 165,000.00 115,000.00 137,000.00 860,000.00 14,000.00 10,000.00 24,000.00 14,000.00 21,000.00 17,000.00
HARGA KONSTRUKSI
(Rp)
104,000.00 64,000.00 270,000.00 245,000.00 245,000.00 65,000.00 90,000.00 70,000.00 42,000.00 89,000.00
830,000.00 126,000.00 260,000.00 2,400,000.00 485,000.00 2,730,000.00 1,400,000.00 2,200,000.00 3,660,000.00 120,000.00 27,000.00 395,000.00 530,000.00 650,000.00 3,890,000.00 5,350,000.00 7,650,000.00 525,000.00 1,250,000.00 530,000.00 485,000.00 475,000.00 363,000.00 19,000.00 22,000.00 40,000.00 27,000.00 45,000.00 6,000.00 80,000.00 35,000.00 155,000.00 1,430,000.00 2,100,000.00 10,155,000.00 13,685,000.00 19,910,000.00 22,000,000.00 39,850,000.00 55,100,000.00 65,710,000.00 2,750,000.00 150,000.00
HARGA KONSTRUKSI
(Rp)
69,000.00 135,000.00 170,000.00 813,000.00 565,000.00 594,000.00 160,000.00 940,000.00 455,000.00 700,000.00 1,480,000.00 245,000.00 69,000.00 850,000.00 1,555,000.00 6,800,000.00 1,570,000.00 690,000.00 3,880,000.00 270,000.00 82,000.00 11,000,000.00 67,000.00 400,000.00 360,000.00 215,000.00 1,760,000.00
33,000.00 28,000.00 28,000.00 28,000.00 35,000.00 400.00 45,000.00 45,000.00 35,000.00 35,000.00 38,000.00 5,000.00 6,000.00 7,000.00 8,000.00 10,000.00 39,000.00 39,000.00 35,000.00 85,000.00 6,000.00 35,000.00 35,000.00 35,000.00 22,000.00
HARGA KONSTRUKSI
(Rp)
75,000.00
285,000.00 210,000.00 227,000.00 39,000.00 39,000.00 420,000.00 570,000.00 710,000.00 60,000.00 49,000.00 35,000.00 25,000.00 97,000.00 95,000.00 162,000.00 165,000.00 192,000.00 710,000.00 300,000.00 577,000.00 705,000.00 577,000.00 577,000.00 396,000.00 1,650,000.00 2,675,000.00 390,000.00 55,000.00 45,000.00 22,000.00 42,000.00 32,000.00 12,000,000.00 5,850,000.00 1,100,000.00 395,000.00 70,000.00 66,000.00 2,600.00 1,600.00 14,803,000.00 11,150,000.00 7,450,000.00 166,000.00 155,000.00 30,000.00 12,000.00 50,000.00 50,000.00 130,000.00 110,000.00 152,000.00
HARGA KONSTRUKSI
(Rp)
95,000.00 40,000.00 25,000.00 300,000.00 39,000.00 350,000.00 300,000.00 270,000.00 3,580,000.00 1,200,000.00 3,000.00 535,000.00 1,100,000.00 720,000.00 315,000.00 25,000,000.00 12,500,000.00
74,000.00 15,000.00 11,000.00 22,000.00 16,000.00 36,000.00 990,000.00 155,000.00 145,000.00 290,000.00 1,100,000.00 415,000.00 410,000.00 750,000.00 750,000.00 1,500,000.00 1,250,000.00 1,880,000.00 130,000.00 19,000.00 832,000.00 1,900,000.00 565,000.00 876,000.00 1,188,000.00 813,000.00 1,065,000.00 1,065,000.00 880,000.00 545,000.00 1,465,000.00 940,000.00 680,000.00 188,000.00 107,000.00 157,000.00
HARGA KONSTRUKSI
(Rp)
1,888,000.00 1,750,000.00 565,000.00 100,000.00 63,000.00 53,000.00 313,000.00 169,000.00 94,000.00 19,000.00 22,000.00 44,000.00 44,000.00 19,000.00 88,000.00 19,000.00 13,000.00 73,000.00 9,400.00 13,000.00 25,000.00 19,000.00 95,000.00 25,000.00 32,000.00 38,000.00 47,000.00 11,500.00 11,000.00 28,000.00 44,000.00 8,500.00 13,000.00 19,000.00 25,000.00 63,000.00 150,000.00 120,000.00 135,000.00 25,000.00 65,000.00 420,000.00 11,000.00 730,000.00 42,000.00 150,000.00 53,000.00 125,000.00 53,000.00 788,000.00 263,000.00 21,000.00 781,000.00
HARGA KONSTRUKSI
(Rp)
260,000.00 158,000.00 32,000.00 30,000.00
40,000.00 47,000.00 38,000.00 51,000.00 65,000.00 75,000.00 3,100,000.00 1,855,000.00 2,163,000.00 12,000.00 198,000.00 170,000.00 210,000.00 410,000.00 410,000.00 9,000.00 3,395,000.00 3,395,000.00
10,000.00 14,700.00 120,000.00 68,000.00 46,000.00 17,000,000.00 1,132,000.00 1,132,000.00 1,600.00 57,000.00 120,000.00 114,000.00 12,000.00 550,000.00 550,000.00 24,600,000.00 1,120,000.00 850,000.00 400,000.00 200,000.00 28,800,000.00 8,865,000.00 25,905,000.00 23,350,000.00 7,351,000.00 9,615,000.00 42,000.00
HARGA KONSTRUKSI
(Rp)
60,000.00 77,000.00 3,700,000.00 1,130,000.00 15,110,000.00 13,200,000.00 18,000.00 13,000.00 8,000.00 22,500.00 203,600,000.00 8,660,000.00 283,000.00 283,000.00 680,000.00 630,000.00 170,000.00 29,100,000.00 14,200,000.00 2,500,000.00
7,400.00 9,000.00 11,400.00 18,400.00 23,900.00 35,500.00 45,600.00 65,100.00 94,900.00 149,800.00 197,900.00 307,900.00 437,500.00 625,100.00 879,500.00 1,099,400.00 24,500.00 31,500.00 48,300.00 63,800.00 73,200.00 100,000.00 127,500.00 164,500.00 238,200.00 320,700.00 381,700.00 676,300.00
HARGA KONSTRUKSI
(Rp)
9,000.00 16,600.00 20,600.00 23,100.00 30,900.00 45,200.00 66,200.00 91,500.00 133,400.00 281,200.00 457,600.00 736,500.00 34,300.00 43,100.00 70,600.00 98,200.00 112,500.00 120,300.00 166,600.00 198,500.00 280,100.00 446,600.00 689,200.00 8,900.00 19,900.00 43,100.00 59,600.00 94,900.00 136,800.00 204,100.00 427,800.00 496,200.00
151,100.00 195,200.00 279,000.00 322,000.00 743,100.00 1,306,600.00 2,930,500.00 5,645,900.00 139,000.00 195,200.00 243,600.00 279,000.00 322,000.00 637,300.00
HARGA KONSTRUKSI
(Rp)
1,110,300.00 2,690,100.00 5,315,100.00 60,700.00 57,330.00 54,000.00 80,600.00 119,000.00 196,300.00 278,900.00 584,400.00 1,051,800.00 1,851,200.00 3,202,900.00 90,400.00 103,700.00 175,400.00 245,900.00 531,400.00 908,500.00 1,689,000.00 2,890,800.00 90,400.00 162,200.00 227,200.00 441,000.00 765,100.00 1,396,900.00 2,332,900.00 283,400.00 331,800.00 367,200.00 391,500.00 523,800.00 841,300.00 1,303,200.00 321,900.00 350,600.00 385,900.00 406,900.00 549,000.00 887,600.00 1,388,100.00 244,800.00 314,300.00 356,200.00 375,900.00 497,300.00 793,800.00
HARGA KONSTRUKSI
(Rp)
1,217,200.00 283,400.00 331,800.00 361,600.00 391,400.00 523,700.00 841,300.00 1,302,000.00 8,300.00 216,100.00 4,900.00 6,100.00 263,600.00 306,500.00 350,600.00 406,900.00 549,000.00 887,600.00 1,388,100.00 6,600.00 7,200.00 9,900.00 19,800.00 27,600.00 50,700.00 73,900.00 123,500.00 379,300.00 663,700.00 5,600.00 8,300.00 13,200.00 18,800.00 25,300.00 50,700.00 70,600.00 89,300.00 173,200.00 347,300.00 40,800.00 82,700.00 87,200.00 101,400.00 129,000.00 170,900.00 198,500.00 213,900.00 255,800.00 297,700.00 370,400.00
HARGA KONSTRUKSI
(Rp)
454,200.00 520,400.00 565,600.00 714,400.00 812,600.00 871,000.00 1,051,800.00 1,851,200.00 1,779,400.00 2,176,300.00 2,403,500.00 6,186,200.00 7,238,000.00 8,085,800.00 91,600.00 40,900.00 45,200.00 54,100.00 110,300.00 129,000.00 167,600.00 171,000.00 180,800.00 285,600.00 292,200.00 454,300.00 462,000.00 531,400.00 1,058,400.00 1,006,600.00 948,200.00 1,584,300.00 1,428,800.00 5,944,700.00 6,300.00 17,600.00 28,700.00 87,200.00 175,400.00 216,100.00 162,100.00 200,700.00 292,200.00 492,900.00 940,500.00 1,084,900.00 1,493,900.00 2,209,400.00 2,435,500.00 83,800.00 91,600.00
HARGA KONSTRUKSI
(Rp)
97,000.00 122,400.00 207,300.00 195,200.00 454,200.00 492,900.00 973,600.00 549,000.00 726,600.00 952,600.00 1,098,100.00 1,461,900.00 2,435,500.00 4,235,800.00 6,075,900.00 8,673,400.00 1,949,200.00 35,300.00 60,700.00 63,900.00 66,200.00 70,600.00 81,600.00 110,300.00 130,100.00 136,700.00 151,100.00 759,700.00 841,300.00 6,195,000.00 9,154,100.00 12,252,100.00 5,847,600.00 368,200.00 584,300.00 1,104,700.00 1,657,110.00 2,313,000.00 2,963,500.00 3,768,300.00 262,400.00 62,900.00 98,200.00 243,600.00 437,700.00 643,900.00 1,036,400.00 1,357,500.00
HARGA KONSTRUKSI
(Rp)
2,058,400.00 110,300.00 110,300.00 145,500.00 145,500.00 262,400.00 379,300.00 642,800.00 928,300.00 1,110,300.00 1,695,600.00 3,099,200.00 3,800,400.00 74,900.00 63,900.00 87,200.00 391,600.00 585,500.00 778,400.00 1,271,200.00 1,728,700.00 153,300.00 186,400.00 218,300.00 270,200.00 379,300.00 407,900.00 44,000.00 453,200.00 500,500.00 531,400.00 589,900.00 647,200.00 729,900.00 822,500.00 951,500.00 1,001,100.00 1,269,000.00 1,328,600.00 1,380,300.00 1,563,300.00 5,600.00 26,500.00 63,900.00 87,200.00 104,800.00 111,300.00 86,000.00 59,500.00
HARGA KONSTRUKSI
(Rp)
39,700.00 34,200.00 24,300.00 17,600.00 17,700.00 18,300.00 19,300.00 25,600.00 39,900.00 54,200.00 90,200.00 175,400.00 521,200.00 17,200.00 17,700.00 18,800.00 25,400.00 39,700.00 54,100.00 89,300.00 175,400.00 520,400.00 18,800.00 28,700.00 38,700.00 61,800.00 97,000.00 187,500.00 559,000.00 109,200.00 124,700.00 141,200.00 156,600.00 365,000.00 726,600.00 113,600.00 145,600.00 221,600.00 186,400.00 372,700.00 432,200.00 751,900.00 600,900.00 526,000.00 333,000.00 169,800.00 164,400.00 306,500.00
HARGA KONSTRUKSI
(Rp)
362,800.00 379,300.00 395,900.00 428,900.00 568,900.00 656,000.00 446,600.00 884,200.00 1,011,100.00 761,900.00 2,251,300.00 168,700.00 198,500.00 232,700.00 262,400.00 314,300.00 320,900.00 584,400.00 175,400.00 140,000.00 118,000.00 180,800.00 285,600.00 650,500.00 890,800.00 2,038,600.00 93,800.00 163,200.00 270,200.00 625,200.00 844,500.00 1,953,700.00 113,600.00 180,800.00 212,900.00 38,700.00 413,500.00 744,300.00 116,900.00 186,400.00 233,800.00 350,600.00 467,500.00 178,600.00 116,900.00 111,300.00 85,000.00 60,700.00
HARGA KONSTRUKSI
(Rp)
47,500.00 130,100.00 124,700.00 92,700.00 68,400.00 55,200.00 49,124,000.00 63,862,000.00 10,220,000.00 48,500.00 34,300.00 46,300.00 100,400.00 34,300.00 3,974,600.00 30,900.00 24,300.00 23,100.00 9,900.00 8,800.00 6,600.00 590,900.00 420,000.00 151,100.00 79,400.00 57,400.00 36,500.00 23,100.00 6,100.00 13,300.00 68,400.00 97,000.00 132,300.00 54,100.00 37,500.00 32,000.00 28,700.00 23,100.00 19,900.00 99,300.00 7,200.00 10,500.00 5,600.00 34,300.00 72,800.00 71,800.00 28,700.00
REKAPITULASI NAMA DINAS/ INSTANSI
: : -
NAMA KEGIATAN NAMA PEKERJAAN
: : -
LOKASI PEKERJAAN SUMBER DANA
: : 2023
TAHUN ANGGARAN
No.
AITEM JENIS PEKERJAAN
JUMLAH
2
3
1 A.
PEKERJAAN PENDAHULUAN
I A.
PEKERJAAN PERSIAPAN JUMLAH PEKERJAAN PENDAHULUAN
B.
PEKERJAAN PEMBANGUNAN LANTAI - 1
Rp Jumlah
276,556.50
Rp
276,556.50
I
PEKERJAAN TANAH
Rp
-
II
PEKERJAAN PONDASI
Rp
-
III
PEKERJAAN BETON
Rp
-
IV
PEKERJAAN BESI DAN ALUMINIUM
Rp
-
V
PEKERJAAN PASANGAN DINDING
Rp
-
VI
PEKERJAAN PLESTERAN
Rp
-
VII
PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
Rp
-
VIII
PEKERJAAN LANGIT-LANGIT (PLAFOND)
Rp
-
IX
PEKERJAAN PENUTUP ATAP
Rp
-
X
PEKERJAAN KAYU
Rp
-
XI
PEKERJAAN KUNCI DAN KACA
Rp
-
XII
PEKERJAAN PENGECATAN
Rp
-
XIII
PEKERJAAN SANITASI DALAM GEDUNG
Rp
-
XIV
PEKERJAAN INSTALASI LISTRIK
Rp
-
XV
PEKERJAAN VEGETASI TANAMAN
Rp
-
XVI B.
PEKERJAAN TAMBAHAN JUMLAH PEKERJAAN PEMBANGUNAN LANTAI - 1
Rp
-
Jumlah
Rp
-
JUMLAH ( REAL COST )
Rp
276,556.50
DIBULATKAN
Rp
276,000.00
Terbilang : ……. rupiah Dompu,
2023
Diperiksa/ Disetujui oleh : Pejabat Fungsional Penata Kelola Bangunan Gedung dan Kawasan Pemukiman Ahli Muda Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Dompu
Dibuat oleh : CV. ………………………. Konsultan
MOH. SIRAJUDDIN, ST NIP. 19810713 201001 1 012
……………………… ………….
Menyetujui/ Mengetahui : Kepala Bidang Cipta Karya Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Dompu
WAHIDIN, ST NIP. 19760522 200801 1 013
Kuasa Pengguna Anggaran (KPA) ………………………………………. Kabupaten Dompu
……………………… ……………………………..
RENCANA ANGGARAN BIAYA ( RAB ) NAMA DINAS/ INSTANSI
:
NAMA KEGIATAN
:
NAMA PEKERJAAN
:
LOKASI PEKERJAAN
:
SUMBER DANA
: -
TAHUN ANGGARAN
: 2023
No.
AITEM JENIS PEKERJAAN
VOLUME
SAT
KODE ANALISA
2
3
4
5
1 A.
PEKERJAAN PENDAHULUAN
HARGA SATUAN PAJAK PEKERJAAN (11 %) 6
JUMLAH HARGA PEKERJAAN
7 = (6 x 11%)
8 = 3 x (6 + 7)
I
PEKERJAAN PERSIAPAN
1
Pembongkaran, Pembersihan awal dan akhir pekerjaan
1.00
kgt
Ls
2
Pembuatan pagar sementara dari kayu tinggi 2 meter
-
m²
1. 1.1.1.1.
366,531.00
40,318.41
-
3
Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
-
m²
1. 1.1.1.2.
535,381.00
58,891.91
-
4
Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter
-
m²
1. 1.1.1.3.
96,866.00
10,655.26
-
5
Pengukuran dan pemasangan Bouwplank
-
m'
1. 1.1.1.4.
96,261.00
10,588.71
-
6
Pembuatan kantor sementara lantai plesteran
-
m²
1. 1.1.1.5.
1,953,919.00
214,931.09
-
7
Pembuatan rumah jaga (konstruksi kayu )
-
m²
1. 1.1.1.6.
1,574,320.00
173,175.20
-
8
Pembuatan gudang semen dan peralatan
-
m²
1. 1.1.1.7.
1,562,110.00
171,832.10
-
9
Pembuatan bedeng pekerja
-
m²
1. 1.1.1.8.
1,657,975.00
182,377.25
-
10
Pembersihan lapangan dan perataan
-
m²
1. 1.1.1.9.
177,650.00
19,541.50
-
11
Pembuatan steger/perancah dari bambu
-
m²
1. 1.1.1.10.
12
Pembuatan kotak adukan ukuran 40cm x50cm x25cm
-
bh
1. 1.1.1.11.
205,744.00
22,631.84
-
13
Pembuatan jalan sementara
-
m²
1. 1.1.1.12.
231,935.00
25,512.85
-
14
Pembongkaran beton bertulang
-
m³
1. 1.1.1.13.
1,184,304.00
130,273.44
-
15
Pembongkaran dinding tembok bata
-
m³
1. 1.1.1.14.
118,430.40
13,027.34
-
16
Pemasangan pagar kawat jaring galvanis panjang 240 cm
-
m²
1. 1.1.1.15.
22,526.02
2,477.86
-
17
Pemasangan panel beton pracetak 5x50x213 cm
-
m²
1.1.1.1.16.
1
Pembuatan Papan nama Proyek 0,8 x 1,2 cm
1.00
bh
SNI.3
249,150.00
27,406.50
276,556.50
2
Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m
-
m²
SNI.4b
407,693.00
44,846.23
-
3
Bongkar Usuk + Reng Untuk Dipakai Kembali
-
m²
SNI.8
45,980.00
5,057.80
-
4
Pembongkaran Atap Seng Gelombang
-
m²
SNI.9
18,271.00
2,009.81
-
A.
JUMLAH PEKERJAAN PENDAHULUAN
B.
PEKERJAAN PEMBANGUNAN LANTAI - 1
I
PEKERJAAN TANAH
1
Penggalian tanah biasa sedalam 1 m
-
m³
1. 1.5.1.1.
130,075.00
14,308.25
-
2
Penggalian tanah biasa sedalam 2 m
-
m³
1. 1.5.1.2.
159,885.00
17,587.35
-
3
Menggali tanah biasa sedalam 3 m
-
m³
1. 1.5.1.3.
190,201.00
20,922.11
-
4
Menggali tanah keras sedalam 1 m
-
m³
1. 1.5.1.4.
173,096.00
19,040.56
-
5
Menggali tanah cadas sedalam 1 m
-
m³
1. 1.5.1.5.
262,680.00
28,894.80
-
6
Menggali tanah lumpur sedalam 1 m
-
m³
1. 1.5.1.6.
209,385.00
23,032.35
-
7
Pengerjaan stripping tanah tebing setinggi 1 meter
-
m²
1. 1.5.1.7.
9,515.00
1,046.65
-
8
Pembuangan tanah sejauh 30 meter
-
m³
1. 1.5.1.8.
56,980.00
6,267.80
-
9
Pengurugan kembali galian tanah
-
m³
1. 1.5.1.9.
43,358.33
4,769.42
-
10
Pemadatan tanah tanah ( per 20 cm)
-
m³
1. 1.5.1.10.
95,150.00
10,466.50
-
11
Pengurugan dengan pasir urug
-
m³
1. 1.5.1.11.
309,430.00
34,037.30
-
12
Pemasangan lapisan pudel campuran 1KP:3PP:7TL
-
m³
1. 1.5.1.12.
406,333.40
44,696.67
-
13
Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan
-
m²
1. 1.5.1.13.
219,945.00
24,193.95
-
14
Pengurugan 1 m3 sirtu padat
-
m³
1. 1.5.1.14.
364,375.00
40,081.25
-
15
Pengurugan 1 m3 tanah padat
-
m³
1. 1.5.1.15.
301,015.00
33,111.65
-
1
Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan mengunakan alat berat
-
m³
SNI.10.b
137,555.00
15,131.05
-
2 3
Galian Tanah Biasa sedalam 2 M' - Dengan mengunakan alat berat Urugan Tanah Biasa tampa pemadatan
-
m³ m³
SNI.11.b SNI.20
167,365.00 207,295.00
18,410.15 22,802.45
-
II
PEKERJAAN PONDASI
1
Pemasangan pondasi batu belah campuran 1SP : 3PP
-
m³
3. 3.1.1.1.
1,263,377.50
138,971.53
-
2
Pemasangan pondasi batu belah campuran 1SP : 4PP
-
m³
3. 3.1.1.2.
1,199,110.00
131,902.10
-
3
Pemasangan pondasi batu belah campuran 1SP : 5PP
-
m³
3. 3.1.1.3.
1,154,560.00
127,001.60
-
4
Pemasangan pondasi batu belah campuran 1SP : 6PP
-
m³
3. 3.1.1.4.
1,123,237.50
123,556.13
-
5
Pemasangan pondasi batu belah campuran 1SP : 8PP
-
m³
3. 3.1.1.5.
1,080,310.00
118,834.10
-
6
Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP
-
m³
3. 3.1.1.6.
851,189.90
93,630.89
-
7
Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP
-
m³
3. 3.1.1.7.
1,002,410.20
110,265.12
-
8
Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP
-
m³
3. 3.1.1.8.
972,577.10
106,983.48
-
9
Pemasangan batu kosong (anstamping)
-
m³
3. 3.1.1.9.
646,008.00
71,060.88
-
10
Pemasangan pondasi sumuran, diameter 100 cm
-
m³
3. 3.1.1.10.
3,993,517.00
439,286.87
-
11
Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40%
-
m³
3. 3.1.1.11.
1,512,874.00
166,416.14
-
III
PEKERJAAN BETON
-
-
-
-
-
-
-
-
-
Sub Total
276,556.50
Jumlah Total
276,556.50
Sub Total
Sub Total
-
-
1
Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.1.
2,266,091.93
249,270.11
-
2
Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.2.
2,315,320.86
254,685.29
-
3
Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.3.
2,352,716.93
258,798.86
-
4
Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/
-
m³
4. 4.1.1.4.
2,107,588.21
231,834.70
-
5
Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.5.
2,398,268.71
263,809.56
-
6
Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.6.
2,439,789.79
268,376.88
-
7
Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.7.
2,474,035.14
272,143.87
-
8
Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.8.
2,492,711.57
274,198.27
-
9
Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.9.
2,525,185.14
277,770.37
-
10
Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.10.
2,534,963.36
278,845.97
-
11
Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.11.
2,670,352.14
293,738.74
-
12
Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87
-
m³
4. 4.1.1.12.
2,683,375.36
295,171.29
-
13
Membuat beton kedap air dengan strorox – 100
-
m³
4. 4.1.1.13.
1,944,910.00
213,940.10
-
14
Pemasangan PVC Waterstop lebar 150 mm
-
m'
4. 4.1.1.14.
-
-
-
15
Pemasangan PVC Waterstop lebar 200 mm
-
m'
4. 4.1.1.15.
-
-
-
16
Membuat PVC Waterstop lebar 230 mm – 320 mm
-
m'
4. 4.1.1.16.
-
-
-
17
Pembesian dengan besi polos atau besi ulir
-
10 kg
4. 4.1.1.17.
253,858.00
27,924.38
-
18
Pemasangan kabel presstressed polos/strands
-
kg
4. 4.1.1.18.
243,804.00
26,818.44
-
19
Pemasangan jaring kawat baja (wiremesh), 6 mm
-
kg
4. 4.1.1.19.
53,438.00
5,878.18
-
20
Pemasangan bekisting untuk pondasi
-
m²
4. 4.1.1.20.
278,916.00
30,680.76
-
21
Pemasangan bekisting untuk dinding
-
m²
4. 4.1.1.25.
22
Pemasangan bekisting untuk tangga
-
m²
4. 4.1.1.26.
423,973.00
46,637.03
-
23
Pemasangan jembatan untuk pengecoran beton
-
m²
4. 4.1.1.27.
138,523.00
15,237.53
-
24
Membuat pondasi beton bertulang (150 kg besi + bekisting)
-
m³
4. 4.1.1.28.
6,903,061.00
759,336.71
-
25
Membuat sloof beton bertulang (200 kg besi + bekisting)
-
m³
4. 4.1.1.29.
8,452,323.00
929,755.53
-
26
Membuat kolom beton bertulang (300 kg besi + bekisting)
-
m³
4. 4.1.1.30.
12,879,603.00
1,416,756.33
-
27
Membuat balok beton bertulang (200 kg besi + bekisting)
-
m³
4. 4.1.1.31.
9,881,498.00
1,086,964.78
-
28
Membuat kolom beton bertulang (150 kg besi + bekisting)
-
m³
4. 4.1.1.32.
8,543,260.00
939,758.60
-
29
Membuat dinding beton bertulang (150 kg besi + bekisting)
-
m³
4. 4.1.1.33.
8,331,301.00
916,443.11
-
30
Membuat dinding beton bertulang (200 kg besi + bekisting)
-
m³
4. 4.1.1.34.
9,344,753.00
1,027,922.83
-
31
Membuat kolom praktis beton bertulang (11 x 11) cm
-
m'
4. 4.1.1.35.
131,862.50
14,504.88
-
32
Membuat ring balok beton bertulang (10 x 15) cm
-
m'
4. 4.1.1.36.
185,476.50
20,402.42
-
1
Membuat Beton Dengan Mutu K-250
-
m³
SNI.77.a
2,928,805.00
322,168.55
-
2
Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K250
-
m³
SNI.78.a
6,311,415.00
694,255.65
-
3
Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250
-
m³
SNI.79.a
6,787,341.00
746,607.51
-
4
Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K250
-
m³
SNI.80.a
7,011,218.50
771,234.04
-
5
Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250
-
m³
SNI.81.a
7,606,126.00
836,673.86
-
6
Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K250
-
m³
SNI.82.a
8,795,941.00
967,553.51
-
7
Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250
-
m³
SNI.83.a
9,224,853.00
1,014,733.83
-
8
Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250
-
m³
SNI.84.a
10,414,668.00
1,145,613.48
-
9
Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-250
-
m³
SNI.85.a
11,604,483.00
1,276,493.13
-
10
Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250
-
m³
SNI.86.a
8,524,345.50
937,678.01
-
11
Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250
-
m³
SNI.87.a
9,119,253.00
1,003,117.83
-
12
Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250
-
m³
SNI.88.a
10,309,068.00
1,133,997.48
-
13
Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250
-
m³
SNI.89.a
8,480,345.50
932,838.01
-
14
Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250
-
m³
SNI.90.a
9,075,253.00
998,277.83
-
1
Membuat Beton Dengan Mutu K-225
-
m³
SNI.77.b
2,913,438.00
320,478.18
-
2
Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225
-
m³
SNI.78.b
6,177,066.50
679,477.32
-
3
Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225
-
m³
SNI.79.b
6,771,974.00
744,917.14
-
4
Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225
-
m³
SNI.80.b
6,995,851.50
769,543.67
-
5
Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225
-
m³
SNI.81.b
7,590,759.00
834,983.49
-
6
Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K225
-
m³
SNI.82.b
8,780,574.00
965,863.14
-
7
Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
-
m³
SNI.83.b
9,209,486.00
1,013,043.46
-
8
Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225
-
m³
SNI.84.b
10,399,301.00
1,143,923.11
-
9
Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-225
-
m³
SNI.85.b
11,589,116.00
1,274,802.76
-
10
Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225
-
m³
SNI.86.b
8,508,978.50
935,987.64
-
11
Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
-
m³
SNI.87.b
9,103,886.00
1,001,427.46
-
12
Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225
-
m³
SNI.88.b
10,293,701.00
1,132,307.11
-
13
Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225
-
m³
SNI.89.b
8,464,978.50
931,147.64
-
14
Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
-
m³
SNI.90.b
9,059,886.00
996,587.46
-
1
Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Tebal = 5 Cm)
-
m²
SNI.151
1,039,962.00
114,395.82
-
2
Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr
-
m³
SNI.152
2,239,430.60
246,337.37
-
3
Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr
-
m³
SNI.153
2,255,764.50
248,134.10
-
4
Pekerjaan Bekisting Sloof
-
m²
SNI.155.a
293,216.00
32,253.76
-
5
Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.156
5,650,760.50
621,583.66
-
6
Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.157
5,138,353.00
565,218.83
-
7
Pekerjaan Sloof Beton Bertulang ( 120 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.158
5,035,871.50
553,945.87
-
8
Pekerjaan Sloof Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.159
4,625,945.50
508,854.01
-
9
Pekerjaan Bekisting Kolom
-
m²
SNI.160.a
476,663.00
52,432.93
-
10
Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.162
6,757,080.00
743,278.80
-
11
Pekerjaan Lantai Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.163
7,632,295.00
839,552.45
-
12
Pekerjaan Bekisting Lantai
-
m²
SNI.163.a
525,063.00
57,756.93
-
13
Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.164
7,119,887.50
783,187.63
-
14
Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.164.a2lp
3,794,312.50
417,374.38
-
15
Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi ) BT, 1 Pc : 2 Ps : 3 Kr
-
m³
SNI.164.b1lp
3,616,938.60
397,863.25
-
16
Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.164.c1lp
3,039,933.60
334,392.70
-
17
Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.164.1lp.a
5,164,555.00
568,101.05
-
18
Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.164.1lp.b
4,652,147.50
511,736.23
-
19
Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.165
8,188,702.50
900,757.28
-
20
Pekerjaan Bekisting Balok
-
m²
SNI.165.a
489,863.00
53,884.93
-
21
Pekerjaan Balok Beton Bertulang (175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.166
7,676,295.00
844,392.45
-
22
Pekerjaan Balok Beton Bertulang (150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.167
7,163,887.50
788,027.63
-
23
Pekerjaan Balok Beton Bertulang (125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.168
6,651,480.00
731,662.80
-
24
Pekerjaan Balok Beton Bertulang (110 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K
-
m³
SNI.169
6,344,035.50
697,843.91
-
25
Pek Dinding Plat Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3
-
m³
SNI.170
6,998,887.50
769,877.63
-
26
Pek Bekisting Dinding Plat
-
m²
SNI.170.a
482,163.00
53,037.93
-
27
Pek Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
-
m³
SNI.171
7,676,295.00
844,392.45
-
28
Pembesian dengan Besi Polos
-
kg
SNI.173.1
21,920.80
2,411.29
-
-
-
-
29
Pembesian dengan Besi Ulir
-
kg
SNI.173.2
25,385.80
2,792.44
-
30
Memasang Jaring Kawat Baja / Wiremesh 8 mm
-
m²
SNI.173.3b
85,976.00
9,457.36
-
31
Memasang Jaring Kawat Baja / Wiremesh 10 mm
-
m²
SNI.173.3c
129,734.00
14,270.74
-
32
Memasang Plat lantai sistem Bondex 0.65 mm
-
m'
SNI.173.4a
343,431.00
37,777.41
-
33
Memasang Plat lantai sistem Bondex 0.70 mm
-
m'
SNI.173.4b
354,761.00
39,023.71
-
34
Memasang Plat lantai sistem Bondex 0.75 mm
-
m'
SNI.173.4c
366,091.00
40,270.01
-
35
Memasang Plat lantai sistem Bondex 0.100 mm
-
m'
SNI.173.4d
456,731.00
50,240.41
-
PEKERJAAN BETON PRACETAK 1
Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2
-
m²
4.4.1.2.1.
192,321.80
21,155.40
-
2
Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ±
-
m²
4.4.1.2.2.
240,443.50
26,448.79
-
3
Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ±
-
m²
4.4.1.2.3.
275,266.20
30,279.28
-
4
Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ±
-
m²
4.4.1.2.4.
360,665.25
39,673.18
-
5
Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai)
-
m²
4.4.1.2.5.
-
-
-
6
Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai)
-
m²
4.4.1.2.6.
-
-
-
7
Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai)
-
m²
4.4.1.2.7.
-
-
-
8
Pemasangan dan membuka bekisting komponen plat beton pracetak
-
bh
4.4.1.2.8.
13,772.00
1,514.92
-
9
Pemasangan dan membuka bekisting komponen balok beton pracetak
-
bh
4.4.1.2.9.
22,220.00
2,444.20
-
10
Pemasangan dan membuka bekisting komponen Kolom beton pracetak
-
bh
4.4.1.2.10.
17,996.00
1,979.56
-
11
Penuangan/menebar beton untuk komponen plat pracetak
-
bh
4.4.1.2.11.
-
-
-
12
Penuangan/menebar beton untuk komponen balok pracetak
-
bh
4.4.1.2.12.
-
-
-
13
Penuangan/menebar beton untuk komponen kolom pracetak
-
bh
4.4.1.2.13.
-
-
-
14
Mendirikan komponen plat pracetak
-
bh
4.4.1.2.14.
-
-
-
15
Mendirikan komponen balok pracetak
-
bh
4.4.1.2.15.
-
-
-
16
Mendirikan komponen kolom pracetak
-
bh
4.4.1.2.16.
-
-
-
17
Melangsir komponen plat pracetak ( ± 20 m)
-
bh
4.4.1.2.17.
-
-
-
18
Melangsir komponen balok pracetak ( ± 20 m)
-
bh
4.4.1.2.18.
-
-
-
19
Melangsir komponen kolom pracetak ( ± 20 m)
-
bh
4.4.1.2.19.
-
-
-
20
Bahan grouting campuran
-
m³
4.4.1.2.20.
-
-
-
21
Bahan grouting tidak campuran
-
m³
4.4.1.2.21.
-
-
-
22
Upah melakukan grouting pada join pracetak
-
ttk
4.4.1.2.22.
104,786.00
11,526.46
-
23
Pemasangan Bekisting join pracetak
-
ttk
4.4.1.2.23.
113,929.20
12,532.21
-
24
Upah Join dengan Sling
-
ttk
4.4.1.2.24.
140,723.00
15,479.53
-
IV
PEKERJAAN BESI DAN ALUMINIUM
Sub Total
-
1
Pemasangan besi profil
-
kg
4.4.2.1.1.
72,787.00
8,006.57
-
2
Pemasangan rangka kuda-kuda baja IWF
-
kg
4.4.2.1.2.
72,787.00
8,006.57
-
3
Pengerjaan pekerjaan perakitan
-
kg
4.4.2.1.3.
96,382.00
10,602.02
-
4
Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
-
m²
4.4.2.1.4.
2,258,861.00
248,474.71
-
5
Pengerjaan pengelasan dengan las listrik
-
cm
4.4.2.1.5.
95,998.10
10,559.79
-
6
Pembuatan rangka jendela besi scuare tube (25 x 5) cm
-
m²
4.4.2.1.6.
7 8
Pemasangan pintu rolling door besi Pemasangan pintu lipat (folding door) bahan plastik/PVC
-
m² m²
4.4.2.1.7. 4.4.2.1.8.
2,405,678.00 -
-
-
264,624.58 -
-
9
Pemasangan sunscreen alluminium
-
m²
4.4.2.1.9.
751,652.00
82,681.72
-
10
Pemasangan rolling door alluminium
-
m²
4.4.2.1.10.
1,071,950.00
117,914.50
-
11
Pemasangan kusen pintu alluminium
-
m'
4.4.2.1.11.
201,511.20
22,166.23
-
12
Pemasangan pintu alluminium strip lebar 8 cm
-
m²
4.4.2.1.12.
1,531,003.10
168,410.34
-
13
Pemasangan pintu kaca rangka alluminium
-
m²
4.4.2.1.13.
-
-
-
14
Pemasangan venetions blinds dan Vertical blinds
-
m²
4.4.2.1.14.
-
-
-
15
Pemasangan terali besi strip (2 x 3) mm
-
m²
4.4.2.1.15.
1,150,451.34
126,549.65
-
16
Pemasangan kawat nyamuk
-
m²
4.4.2.1.16.
242,681.88
26,695.01
-
17
Pemasangan jendela nako & tralis
-
m²
4.4.2.1.17.
455,323.00
50,085.53
-
18
Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm
-
m'
4.4.2.1.18.
257,262.50
28,298.88
-
19
Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
-
m'
4.4.2.1.19.
189,689.50
20,865.85
-
20
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding part
-
m²
4.4.2.1.20.
585,262.33
64,378.86
-
21
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
-
m²
4.4.2.1.21.
695,335.67
76,486.92
-
1
Memasang Rangka Kanal - C
-
kg
SNI.241.a
72,787.00
8,006.57
-
2
Pasang Handrail dan Railing
-
m'
SNI.241.b
504,357.70
55,479.35
-
3
Pasang Galvanis Steel 3/4"
-
m'
SNI.241.c
119,247.70
13,117.25
-
4
Pasang Railing Stainless
-
m'
SNI.241.d
919,002.70
101,090.30
-
5
Pasang Tangga Hollow 5x5 cm
-
m'
SNI.241.e
368,287.70
40,511.65
-
6
Pasang Syntetic Grass
-
m²
SNI.241.1
38,720.00
4,259.20
-
7
Pasang WPC 5x5 cm
-
m'
SNI.241.2
159,720.00
17,569.20
-
8
Pasang WPC 10x5 cm
-
m'
SNI.241.3
278,300.00
30,613.00
-
9
Pasang WPC 15x5 cm
-
m'
SNI.241.4
423,500.00
46,585.00
-
10
Pasang WPC 20x5 cm
-
m'
SNI.241.5
586,850.00
64,553.50
-
11
Pasang WPC Panel W15 x H2,5 cm
-
m'
SNI.241.6
694,540.00
76,399.40
-
12
Pasang Floor hardener 3 Kg/m2
-
m²
SNI.241.7
166,320.00
18,295.20
-
13
Pasang Efoxy waterbased flooring non slip anti abrasion
-
m²
SNI.241.8
304,920.00
33,541.20
-
14
Pasang Floor hardener 3 Kg/m2 + ceramic stepnoosing 100 x 200 mm
-
m²
SNI.241.9
606,320.00
66,695.20
-
15
Pasang Floor hardener 7 Kg/m2 + grove line 2 cm
-
m²
SNI.241.10
295,020.00
32,452.20
-
16
Pasang GRC Rosters 300x300x150
-
m²
SNI.241.11
334,264.15
36,769.06
-
17
Pasang Kisi-kisi 50x100 mm UPVC Motif Kayu
-
m²
SNI.241.12
1,518,308.00
167,013.88
-
18
Memasang kusen pintu alluminium Natural
-
m'
SNI.247
183,373.85
20,171.12
-
19
Memasang Dinding kusen alluminium Natural + Kaca polos 8 mm
-
m²
SNI.247.a
787,525.75
86,627.83
-
20
Memasang Dinding kusen alluminium Natural + Kaca temreat 8 mm, polos
-
m²
SNI.247.b
1,755,525.75
193,107.83
-
21
Memasang Dinding kusen alluminium Natural + Kaca temreat 8 mm, warna
-
m²
SNI.247.c
1,876,525.75
206,417.83
-
22
Memasang kusen pintu alluminium Warna
-
m'
SNI.248
201,523.85
22,167.62
-
23
Memasang Dinding kusen alluminium Warna + Kaca polos 8 mm
-
m²
SNI.248.a
842,823.85
92,710.62
-
24
Memasang Dinding kusen alluminium Warna + Kaca temreat 8 mm, polos
-
m²
SNI.248.b
1,810,823.85
199,190.62
-
25
Memasang Dinding kusen alluminium Warna + Kaca temreat 8 mm, warna
-
m²
SNI.248.c
1,949,125.75
214,403.83
-
26
Memasang Besi Hollow + Kaca tempreat 12 mm, warna
-
m²
SNI.248.12
2,389,565.75
262,852.23
-
27
Memasang Kaca temreat 8 mm, polos
-
m²
SNI.248.T8p
1,247,325.75
137,205.83
-
28
Memasang Kaca temreat 8 mm, Warna
-
m²
SNI.248.T8w
1,368,325.75
150,515.83
-
29
Memasang Kaca mati 5 mm, polos
-
m²
SNI.248.5p
243,025.75
26,732.83
-
30
Memasang Kaca mati 8 mm, polos
-
m²
SNI.248.8p
279,325.75
30,725.83
-
31
Memasang Kaca mati Riben 5 mm
-
m²
SNI.248.R
236,975.75
26,067.33
-
32
Memasang Kaca mati Buram/Es 5 mm
-
m²
SNI.248.B/E
297,475.75
32,722.33
-
33
Pasang Cermin ex. TOTO TS 119 AS5
-
bh
SNI.249.a
242,299.75
26,652.97
-
34
Memasang Mirror 100x120 cm
-
bh
SNI.41.5
372,619.50
40,988.15
-
35
Pasang Kaca Laminasi tebal 12 mm
-
bh
SNI.249.b
1,852,809.75
203,809.07
-
36
Pasang kaca green glass 12 mm
-
m²
SNI.249.c
2,217,644.00
243,940.84
-
37
Pasang kaca green glass tebal 8 mm
-
m²
SNI.249.d
1,370,644.00
150,770.84
-
38
Pasang Pintu Engineering door / WPC
-
bh
SNI.249.e
456,857.50
50,254.33
-
39
Pasang Pintu Green glass
-
bh
SNI.249.f
554,482.50
60,993.08
-
40
Pasang Pintu siku alumunium powder coating
-
bh
SNI.249.g
109,945.00
12,093.95
-
41
Pemasangan Kusen plat baja uk. 15x9x0,2 cm
-
m'
SNI.249.1
573,309.00
63,063.99
-
42
Pemasangan Kusen Steel Frame Hollow Galvanis 150x40x3 mm
-
m'
SNI.249.2
105,039.00
11,554.29
-
43
Pemasangan Kusen alumunium 4" YKK finishing powder coating
-
m'
SNI.249.3
290,279.00
31,930.69
-
44
Mengerjakan pintu double UGD type P-01
-
unit
SNI.249.4a
21,213,291.88
2,333,462.11
-
45
Mengerjakan pintu type P-02
-
unit
SNI.249.4b
5,777,689.28
635,545.82
-
46
Mengerjakan pintu type P-03
-
unit
SNI.249.4c
4,624,264.21
508,669.06
-
47
Mengerjakan pintu type P-04A
-
unit
SNI.249.4d
3,693,069.82
406,237.68
-
48
Mengerjakan pintu type P-04B
-
unit
SNI.249.4e
3,693,069.82
406,237.68
-
49
Mengerjakan pintu type P-04C
-
unit
SNI.249.4f
3,567,608.44
392,436.93
-
50
Mengerjakan pintu type P-05
-
unit
SNI.249.4g
2,998,939.13
329,883.30
-
51
Mengerjakan pintu type P-06
-
unit
SNI.249.4h
3,700,222.24
407,024.45
-
52
Mengerjakan pintu type P-07
-
unit
SNI.249.4i
3,712,047.24
408,325.20
-
53
Mengerjakan pintu type P-08
-
unit
SNI.249.4j
1,874,186.71
206,160.54
-
54
Mengerjakan pintu type P-09
-
unit
SNI.249.4k
4,686,098.42
515,470.83
-
55
Mengerjakan pintu type P-10
-
unit
SNI.249.4l
4,494,514.28
494,396.57
-
56
Mengerjakan pintu type P-11
-
unit
SNI.249.4m
30,052,254.84
3,305,748.03
-
57
Mengerjakan pintu type P-12
-
unit
SNI.249.4n
4,624,264.21
508,669.06
-
58
Mengerjakan pintu type P-S
-
unit
SNI.249.4o
1,005,667.44
110,623.42
-
59
Memasang Daun pintu kaca 5 mm rangka alluminium, (natural)
-
m²
SNI.250.N5
1,245,015.75
136,951.73
-
60
Memasang Daun pintu kaca 8 mm rangka alluminium, (natural)
-
m²
SNI.250.N8
1,245,015.75
136,951.73
-
61
Memasang Daun pintu kaca 5 mm rangka alluminium, (warna)
-
m²
SNI.250.W5
1,300,015.75
143,001.73
-
62
Memasang Daun pintu kaca 8 mm rangka alluminium, (warna)
-
m²
SNI.250.W8
1,355,015.75
149,051.73
-
63
Memasang jendela kaca 5 mm rangka alluminium, (natural)
-
m²
SNI.251.N
1,245,015.75
136,951.73
-
64
Memasang jendela kaca 8 mm rangka alluminium, (natural)
-
m²
SNI.251.N8
1,245,015.75
136,951.73
-
65
Memasang jendela kaca 5 mm rangka alluminium, (warna)
-
m²
SNI.251.W
1,300,015.75
143,001.73
-
66
Memasang jendela kaca 8 mm rangka alluminium, (warna)
-
m²
SNI.251.W8
1,355,015.75
149,051.73
-
67
Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.100
-
m²
SNI.251.75.a
429,632.50
47,259.58
-
68
Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75
-
m²
SNI.251.75.b
378,086.50
41,589.52
-
69
Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) Usuk C 75
-
m²
SNI.251.75.c
291,005.00
32,010.55
-
70
Rangka Reng Aluzing Aluminium (Baja ringan) Reng U 0.45
-
m²
SNI.251.75.d
87,081.50
9,578.97
-
71
Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.100
-
m²
SNI.251.80.a
453,062.50
49,836.88
-
72
Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.75
-
m²
SNI.251.80.b
406,202.50
44,682.28
-
73
Rangka dan Penutup Alluminium Composit Panel (ACP), Interior
-
m²
SNI.251.ACP.a
893,942.50
98,333.68
-
74
Rangka dan Penutup Alluminium Composit Panel (ACP), Exterior
-
m²
SNI.251.ACP.b
1,196,442.50
131,608.68
-
75
Rangka dan Penutup Wood Panel Composit (WPC), Exterior
-
m²
SNI.251.ACP.c
808,142.50
88,895.68
-
76
Pekerjaan Dinding Double Gypsum 9 mm + Rangka profil C
-
m²
SNI.251.DG
443,630.00
48,799.30
-
77
Pekerjaan Dinding Double Calsiboart 6 mm + Rangka profil C
-
m²
SNI.251.DC
567,930.00
62,472.30
-
1
Pekerjaan Pasang Kawat Gerawang
-
m²
SNI.210
68,612.50
7,547.38
-
2
Pekerjaan Pasang Jeruji Besi Pintu
-
m²
SNI.211
794,978.25
87,447.61
-
3
Pekerjaan Pasang Kawat Duri
-
m²
SNI.212
292,336.00
32,156.96
-
4
Pekerjaan Pagar besi Hollow (stenlistail)
-
m²
SNI.213
1,618,493.25
178,034.26
-
5
Pekerjaan Pagar besi Hollow
-
m²
SNI.214
749,493.25
82,444.26
-
6
Pekerjaan Pagar/ Dinding besi Hollow 100 x 50 mm
-
m²
SNI.214.1
1,134,493.25
124,794.26
-
7
Pekerjaan Pintu Pagar besi (dia. 16 mm)
-
m²
SNI.214.A
1,410,593.25
155,165.26
-
8
Pekerjaan Pagar besi (dia. 16 mm)
-
m²
SNI.214.B
1,300,593.25
143,065.26
-
V
PEKERJAAN PASANGAN DINDING
1
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2
-
m²
4. 4.4.1.1.
385,495.00
42,404.45
-
2
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3
-
m²
4. 4.4.1.2.
368,489.00
40,533.79
-
3
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4
-
m²
4. 4.4.1.3.
357,016.00
39,271.76
-
4
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5
-
m²
4. 4.4.1.4.
351,109.00
38,621.99
-
5
Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6
-
m²
4. 4.4.1.5.
349,140.00
38,405.40
-
6
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3
-
m²
4. 4.4.1.6.
326,274.85
35,890.23
-
7
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
-
m²
4. 4.4.1.7.
187,016.50
20,571.82
-
8
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
-
m²
4. 4.4.1.8.
178,946.90
19,684.16
-
9
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4
-
m²
4.4.4.1.9.
174,322.50
19,175.48
-
10
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5
-
m²
4. 4.4.1.10.
171,414.10
18,855.55
-
11
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6
-
m²
4. 4.4.1.11.
169,860.90
18,684.70
-
12
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8
-
m²
4. 4.4.1.12.
166,705.00
18,337.55
-
13
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3
-
m²
4. 4.4.1.13.
163,064.00
17,937.04
-
14
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1
-
m²
4. 4.4.1.14.
147,045.80
16,175.04
-
15
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM :
-
m²
4. 4.4.1.15.
149,428.40
16,437.12
-
16
Pemasangan dinding conblock HB20 campuran 1SP : 3PP
-
m²
4. 4.4.1.16.
449,255.40
49,418.09
-
17
Pemasangan dinding conblock HB20 campuran 1SP :4PP
-
m²
4. 4.4.1.17.
448,813.20
49,369.45
-
18
Pemasangan dinding conblock HB15 campuran 1SP :3PP
-
m²
4. 4.4.1.18.
396,876.70
43,656.44
-
19
Pemasangan dinding conblock HB15 campuran 1SP :4PP
-
cm²
4. 4.4.1.19.
396,306.90
43,593.76
-
20
Pemasangan dinding conblock HB10 campuran 1SP :3PP
-
cm²
4. 4.4.1.20.
365,092.20
40,160.14
-
21
Pemasangan dinding conblock HB10 campuran 1SP :4PP
-
cm²
4. 4.4.1.21.
365,366.10
40,190.27
-
22
Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
-
cm²
4. 4.4.1.22.
699,957.50
76,995.33
-
23
Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
-
cm²
4. 4.4.1.23.
699,957.50
76,995.33
-
24
Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
-
cm²
4. 4.4.1.24.
1,508,540.00
165,939.40
-
Sub Total
-
1
Pasangan Dinding bata berongga / roster (10 x 20)
-
m²
SNI.27
617,540.00
67,929.40
-
2
Pemasangan dinding bata ringan tebal 10 X 20 X 60 cm + dengan mortar
-
m²
SNI.29.R
593,291.60
65,262.08
-
3
Pasangan Dinding Batako 1 Pc : 4 Psr
-
m²
SNI.32
141,968.75
15,616.56
-
4
Pasangan Rollag 1 Bata Merah 1 Pc : 3 Ps
-
m²
SNI.33
259,796.90
28,577.66
-
Sub Total VI
-
PEKERJAAN PLESTERAN
1
Pemasangan plesteran 1SP : 1PP tebal 15 mm.
-
m²
4.4.4.2.1.
121,392.48
13,353.17
-
2
Pemasangan plesteran 1SP : 2PP tebal 15 mm.
-
m²
4.4.4.2.2.
112,508.88
12,375.98
-
3
Pemasangan plesteran 1SP : 3PP tebal 15mm.
-
m²
4.4.4.2.3.
108,673.62
11,954.10
-
4
Pemasangan plesteran 1SP : 4PP tebal 15 mm
-
m²
4.4.4.2.4.
106,048.80
11,665.37
-
5
Pemasangan plesteran 1SP : 5PP tebal 15 mm
-
m²
4.4.4.2.5.
104,569.08
11,502.60
-
6
Pemasangan plesteran 1SP : 6PP tebal 15 mm.
-
m²
4.4.4.2.6.
103,380.42
11,371.85
-
7
Pemasangan plesteran 1SP : 7PP tebal 15 mm
-
m²
4.4.4.2.7.
102,730.32
11,300.34
-
8
Pemasangan plesteran 1SP : 8PP tebal 15 mm
-
m²
4.4.4.2.8.
102,080.22
11,228.82
-
9
Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm
-
m²
4.4.4.2.9.
106,078.50
11,668.64
-
10
Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm
-
m²
4.4.4.2.10.
102,663.00
11,292.93
-
11
Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm
-
m²
4.4.4.2.11.
94,373.73
10,381.11
-
12
Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm
-
m²
4.4.4.2.12.
95,841.79
10,542.60
-
13
Pemasangan plesteran 1SP : 1PP tebal 20 mm
-
m²
4.4.4.2.13.
150,600.34
16,566.04
-
14
Pemasangan plesteran 1SP : 3PP tebal 20 mm
-
m²
4.4.4.2.14.
120,109.66
13,212.06
-
15
Pemasangan plesteran 1SP : 4PP tebal 20 mm.
-
m²
4.4.4.2.15.
141,904.40
15,609.48
-
16
Pemasangan plesteran 1SP : 5PP tebal 20 mm
-
m²
4.4.4.2.16.
140,013.94
15,401.53
-
17
Pemasangan plesteran 1SP : 6PP tebal 20 mm
-
m²
4.4.4.2.17.
138,346.56
15,218.12
-
18
Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm
-
m²
4.4.4.2.18.
134,243.23
14,766.76
-
19
Pemasangan berapen 1SP : 5PP tebal 15 mm
-
m²
4.4.4.2.19.
60,602.08
6,666.23
-
20
Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm
-
m'
4.4.4.2.20.
112,084.50
12,329.30
-
21
Pemasangan plesteran granit 1SP : 2 granit tebal 1cm
-
m²
4.4.4.2.21.
-
-
-
22
Pemasangan plesteran traso 1SP : 2 traso tebal 1cm
-
m²
4.4.4.2.22.
-
-
-
23
Pemasangan plesteran ciprat 1SP : 2PP
-
m²
4.4.4.2.23.
86,288.40
9,491.72
-
24
Pemasangan finishing siar pasangan bata merah
-
m²
4.4.4.2.24.
50,284.96
5,531.35
-
25
Pemasangan finishing siar pasangan conblock ekspose
-
m²
4.4.4.2.25.
23,881.00
2,626.91
-
26
Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP.
-
m²
4.4.4.2.26.
103,265.80
11,359.24
-
27
Pemasangan acian.
-
m²
4.4.4.2.27.
65,037.50
7,154.13
-
1
Plesteran + Acian halus dinding bata ringan/Hebel
-
m²
SNI.34.b
197,483.00
21,723.13
-
2
Plesteran dinding bata ringan/Hebel
-
m²
SNI.34.c
120,648.00
13,271.28
-
3
Plesteran Beton 1 PC : 2 Ps Tebal 15 mm
-
m²
SNI.34.d
114,895.00
12,638.45
-
4
Plesteran Beton 1 PC : 3 Ps Tebal 15 mm
-
m²
SNI.34.e
111,467.40
12,261.41
-
1
Pasang Kanstin Cetak 600x150x250
-
m²
SNI.41
363,728.75
40,010.16
-
2
Lapisan Geotextile
-
m²
SNI.41.1
292,600.00
32,186.00
-
3
Lapisan Drainagecell
-
m²
SNI.41.2
94,710.00
10,418.10
-
4
Pasang Buis beton Ø20 cm, spesi 1 PC : 4 PP
-
m'
SNI.42.a
232,485.00
25,573.35
-
5
Pasang Buis beton Ø 30 cm, spesi 1 PC : 4 PP
-
m'
SNI.42.b
265,485.00
29,203.35
-
6
Pasang Buis beton Ø 40 cm, spesi 1 PC : 4 PP
-
m'
SNI.42.c
309,485.00
34,043.35
-
7
Pasang Buis beton Ø 50 cm, spesi 1 PC : 4 PP
-
m'
SNI.43
362,422.50
39,866.48
-
8
Pasang Buis beton Ø 60 cm, spesi 1 PC : 4 PP
-
m'
SNI.44
373,422.50
41,076.48
-
9
Pasang Buis beton Ø 80 cm, spesi 1 PC : 4 PP
-
m'
SNI.45
417,422.50
45,916.48
-
Sub Total VII
-
PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1
Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm
-
m²
4.4.4.3.1.
177,075.80
19,478.34
-
2
Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm
-
m²
4.4.4.3.2.
178,215.40
19,603.69
-
3
Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm
-
m²
4.4.4.3.3.
186,224.50
20,484.70
-
4
Pemasangan lantai ubin warna ukuran 40cm x40 cm
-
m²
4.4.4.3.4.
218,216.90
24,003.86
-
5
Pemasangan lantai ubin warna ukuran 30cm x30cm
-
m²
4.4.4.3.5.
298,365.10
32,820.16
-
6
Pemasangan lantai ubin warna ukuran 20cm x20cm
-
m²
4.4.4.3.6.
510,284.50
56,131.30
-
7
Pemasangan lantai ubin teraso ukuran 40cm x40cm
-
m²
4.4.4.3.7.
224,051.30
24,645.64
-
8
Pemasangan lantai ubin teraso ukuran 30cm x30cm
-
m²
4.4.4.3.8.
231,774.40
25,495.18
-
9
Pemasangan lantai ubin granit ukuran 40cm x40cm
-
m²
4.4.4.3.9.
649,962.50
71,495.88
-
10
Pemasangan lantai ubin granit ukuran 30cm x30cm
-
m²
4.4.4.3.10.
660,044.00
72,604.84
-
11
Pemasangan lantai ubin teralux ukuran 40cm x40cm
-
m²
4.4.4.3.11.
824,994.50
90,749.40
-
12
Pemasangan lantai ubin teralux ukuran 30cm x30cm
-
m²
4.4.4.3.12.
836,313.50
91,994.49
-
13
Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm
-
m²
4.4.4.3.13.
861,151.50
94,726.67
-
14
Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm
-
m²
4.4.4.3.14.
824,994.50
90,749.40
-
15
Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm
-
m²
4.4.4.3.15.
836,313.50
91,994.49
-
16
Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm
-
m²
4.4.4.3.16.
52,354.50
5,759.00
-
17
Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm
-
m²
4.4.4.3.17.
47,641.00
5,240.51
-
18
Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm
-
m²
4.4.4.3.18.
47,842.30
5,262.65
-
19
Pemasangan plint ubin warna ukuran 10cm x 20cm
-
m²
4.4.4.3.19.
46,390.30
5,102.93
-
20
Pemasangan plint ubin warna ukuran 10cm x 30cm
-
m²
4.4.4.3.20.
51,045.50
5,615.01
-
21
Pemasangan plint ubin warna ukuran 10cm x 40cm
-
m²
4.4.4.3.21.
51,054.30
5,615.97
-
22
Pemasangan plint ubin teraso ukuran 10cm x 30cm
-
m²
4.4.4.3.22.
51,627.95
5,679.07
-
23
Pemasangan plint ubin teraso ukuran 10cm x 40cm
-
m²
4.4.4.3.23.
51,637.30
5,680.10
-
24
Pemasangan plint ubin granit ukuran 10cm x 40cm
-
m²
4.4.4.3.24.
94,196.30
10,361.59
-
25
Pemasangan plint ubin granit ukuran 10cm x 30cm
-
m²
4.4.4.3.25.
94,146.80
10,356.15
-
26
Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm
-
m²
4.4.4.3.26.
111,158.30
12,227.41
-
27
Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm
-
m²
4.4.4.3.27.
111,620.30
12,278.23
-
28
Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm
-
m²
4.4.4.3.28.
109,046.30
11,995.09
-
29
Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm
-
m²
4.4.4.3.29.
111,686.30
12,285.49
-
30
Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm
-
m²
4.4.4.3.30.
111,620.30
12,278.23
-
31
Pemasangan lantai teraso cor di tempat, tebal 3cm
-
m²
4.4.4.3.31.
32
Pemasangan lantai keramik artistik 10cm x 20cm
-
m²
4.4.4.3.32.
1,036,087.80
113,969.66
-
33
Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
-
m²
4.4.4.3.33.
1,801,412.80
198,155.41
-
34
Pemasangan lantai keramik ukuran 40cm x 40cm
-
m²
4.4.4.3.35.a
424,187.50
46,660.63
-
35
Pemasangan lantai keramik ukuran 33cm x 33cm
-
m²
4.4.4.3.34.
427,248.80
46,997.37
-
36
Pemasangan lantai keramik ukuran 30cm x 30cm
-
m²
4.4.4.3.35.
425,465.70
46,801.23
-
37
Pemasangan lantai keramik ukuran 20cm x 20cm
-
m²
4.4.4.3.36.
426,915.50
46,960.71
-
38
Pemasangan lantai keramik ukuran 10cm x 33cm untuk variasi/border
-
m²
4.4.4.3.37.
579,067.50
63,697.43
-
39
Pemasangan lantai keramik mozaik ukuran 30cm x 30cm
-
m²
4.4.4.3.38.
1,303,711.75
143,408.29
-
40
Pemasangan plint keramik ukuran 10cm x 20cm
-
m'
4.4.4.3.39.
122,856.80
13,514.25
-
41
Pemasangan plint keramik ukuran 10cm x 10cm
-
m'
4.4.4.3.40.
63,803.30
7,018.36
-
42
Pemasangan plint keramik ukuran 5cm x 20cm
-
m'
4.4.4.3.41.
53,593.65
5,895.30
-
43
Pemasangan plint internal cove artistik 5cm x 5cm x 20cm
-
m'
4.4.4.3.42.
44
Pemasangan lantai marmer ukuran 100cm x 100cm
-
m²
4.4.4.3.43.
943,137.80
103,745.16
-
45
Pemasangan lantai karpet
-
m²
4.4.4.3.44.
120,208.00
13,222.88
-
46
Pemasangan underlayer (pelapis bawah karpet)
-
m²
4.4.4.3.45.
47
Pemasangan lantai parquet kayu
-
m²
4.4.4.3.46.
1,397,660.00
153,742.60
-
48
Pemasangan lantai kayu gymfloor
-
m²
4.4.4.3.47.
1,397,660.00
153,742.60
-
49
Pemasangan dinding porslen 11cm x 11cm
-
m²
4.4.4.3.48.
478,755.20
52,663.07
-
50
Pemasangan dinding porslen 10cm x 20cm
-
m²
4.4.4.3.49.
472,461.00
51,970.71
-
51
Pemasangan dinding porslen 20cm x 20cm
-
m²
4.4.4.3.50.
456,456.00
50,210.16
-
52
Pemasangan dinding keramik artistik 10cm x 20cm
-
m²
4.4.4.3.51.
495,781.00
54,535.91
-
53
Pemasangan dinding keramik artistik 5cm x 20cm
-
m²
4.4.4.3.52.
498,256.00
54,808.16
-
54
Pemasangan dinding keramik 10cm x 20cm
-
m²
4.4.4.3.53.
495,781.00
54,535.91
-
55
Pemasangan dinding keramik 20cm x 20cm
-
m²
4.4.4.3.54.
482,416.00
53,065.76
-
56
Pemasangan dinding keramik 30cm x 30cm
-
m²
4.4.4.3.54a.
487,036.00
53,573.96
-
57
Pemasangan dinding keramik 40cm x 40cm
-
m²
4.4.4.3.54b.
617,593.78
67,935.32
-
58
Pemasangan dinding marmer 100cm x 100cm
-
m²
4.4.4.3.55.
1,216,339.30
133,797.32
-
59
Pemasangan dinding bata pelapis 3cm x 7cm x 24cm
-
m²
4.4.4.3.56.
435,460.30
47,900.63
-
60
Pemasangan dinding batu paras
-
m²
4.4.4.3.57.
505,395.00
55,593.45
-
61
Pemasangan dinding batu tempel hitam
-
m²
4.4.4.3.58.
528,495.00
58,134.45
-
62
Pemasangan lantai vynil ukuran 30cm x 30cm
-
m²
4.4.4.3.59.
846,928.50
93,162.14
-
63
Pemasangan wallpaper lebar 50 cm
-
m²
4.4.4.3.60.
122,323.67
13,455.60
-
64
Pemasangan floor harderner
-
m²
4.4.4.3.61.
269,434.00
29,637.74
-
65
Pemasangan plint vynil 15cm x 30cm
-
m²
4.4.4.3.62.
812,196.00
89,341.56
-
66
Pemasangan plint kayu tebal 2 cm lebar 10 cm
-
m²
4.4.4.3.63.
69,443.00
7,638.73
-
67
Memasang Paving blok tebal 8 cm
-
m²
4.4.4.3.64.
197,120.00
21,683.20
-
1
Pas. Lantai Tegel Abu-abu
-
m²
SNI.46
136,580.40
15,023.84
-
2
Pas. Lantai Granite Kw I
-
m²
SNI.47.a
602,287.40
66,251.61
-
3
Pas. Lantai Granite Kw II
-
m²
SNI.47.b
525,287.40
57,781.61
-
4
Pasangan Lantai Keramik ( KW I Polos )
-
m²
SNI.48
402,523.00
44,277.53
-
5
Pasangan Lantai Keramik ( KW II Polos )
-
m²
SNI.49
379,423.00
41,736.53
-
6
Pasangan Lantai Keramik ( KW I Motif )
-
m²
SNI.50
437,173.00
48,089.03
-
7
Pasangan Lantai Keramik ( KW II Motif )
-
m²
SNI.51
414,815.50
45,629.71
-
8
Pasangan Lantai Marmer
-
m²
SNI.52
928,023.80
102,082.62
-
9
Pasangan Lantai Keramik Anti Slip
-
m²
SNI.52.a
414,815.50
45,629.71
-
10
Pasangan dinding keramik ( Kw I Motif )
-
m²
SNI.53
480,876.00
52,896.36
-
11
Pas. Dinding Keramik ( Kw II Motf )
-
m²
SNI.54
457,776.00
50,355.36
-
12
Pas. Dinding Keramik ( Kw I polos )
-
m²
SNI.55
469,326.00
51,625.86
-
13
Pas. Dinding Keramik ( Kw II Polos )
-
m²
SNI.56
292,391.00
32,163.01
-
14
Pas. Lantai Keramik Cating Motif
-
m²
SNI.57.a
386,606.00
42,526.66
-
15
Pas. Lantai Coral Sikat
-
m²
SNI.57.b
317,306.00
34,903.66
-
16
Pas. Lantai Coral Sikat, Warna
-
m²
SNI.57.c
386,606.00
42,526.66
-
17
Pas. Dinding batu paras/Palimanan
-
m²
SNI.58
518,815.00
57,069.65
-
18
Pas. Dinding batu tempel hitam bergaris
-
m²
SNI.59
557,645.00
61,340.95
-
19
Pas. Paving Blok bata . T 8 cm
-
m²
SNI.60.B
288,858.90
31,774.48
-
20
Pas. Paving Blok bata . T 8 cm, Press
-
m²
SNI.60.P
383,293.90
42,162.33
-
21
Pas. Paving Blok bata . T 6 cm
-
m²
SNI.61
272,193.90
29,941.33
-
22
Pas. Paving Blok persegi/berlian
-
m²
SNI.62
422,178.90
46,439.68
-
23
Memasang ornamen terawang custom bahan GRC
-
m²
SNI.62.1
1,335,317.50
146,884.93
-
24
Memasang acian motif tali air
-
m²
SNI.62.2
65,037.50
7,154.13
-
25
Memasang plint ukuran (60 x 10x 4 ) cm
-
m'
SNI.62.3
195,066.30
21,457.29
-
26
Memasang stepnose tangga ukuran (10 x 40) cm
-
m'
SNI.62.4
129,676.80
14,264.45
-
27
Memasang lantai parquete ukuran (30 x 30) cm KL II
-
m'
SNI.62.7
553,146.00
60,846.06
-
28
Pasang conblock tipe segi-empat warna 8 cm, K-300
-
m²
SNI.62.W
299,475.00
32,942.25
-
29
Pasang conblock tipe segi-empat abu-abu 8 cm, K-300
-
m²
SNI.62.A
293,975.00
32,337.25
-
30
Pasang kansten beton
-
m'
SNI.62.7
213,552.90
23,490.82
-
31
Pasang grassblocksegi 8 tebal 8 cm
-
m²
SNI.62.8
312,125.00
34,333.75
-
-
-
-
-
Sub Total VIII
-
-
-
PEKERJAAN LANGIT-LANGIT (PLAFOND)
1
Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
-
m²
4.4.5.1.1.
79,959.00
8,795.49
-
2
Pemasangan langit-langit akustik ukuran (30 x 30) cm
-
m²
4.4.5.1.2.
562,749.00
61,902.39
-
3
Pemasangan langit-langit akustik ukuran (30 x 60) cm
-
m²
4.4.5.1.3.
545,699.00
60,026.89
-
4
Pemasangan langit-langit akustik ukuran (60 x 120) cm
-
m²
4.4.5.1.4.
554,510.00
60,996.10
-
5
Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm &
-
m²
4.4.5.1.5.
69,921.50
7,691.37
-
6
Pemasangan langit-langit lambrisering kayu, tebal 9 mm
-
m²
4.4.5.1.6.
391,220.50
43,034.26
-
7
Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
-
m²
4.4.5.1.7.
73,755.00
8,113.05
-
8
Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka allumini
-
m²
4.4.5.1.8.
791,766.25
87,094.29
-
9
Pemasangan list langit-langit kayu profil
-
m'
4.4.5.1.9.
37,202.00
4,092.22
-
1
Mengerjakan Plafond Gypsum Board, tebal 9 mm + rangka kayu
-
m²
SNI.232
212,311.00
23,354.21
-
2
Mengerjakan List Plafond Gypsum Board Type I
-
m'
SNI.233.a
71,965.30
7,916.18
-
3
Mengerjakan List Plafond Gypsum Board Type II
-
m'
SNI.233.b
56,950.30
6,264.53
-
4
Mengerjakan Plafond Gypsum Rangka Hollow 40x40 Zincromate
-
m²
SNI.234
279,504.50
30,745.50
-
5
Memasang langit-langit WPC , rangka metal furing
-
m²
SNI.234.a
991,795.61
109,097.52
-
6
Pasang Atap Kaca Laminasi / Laminated 12 mm rangka hollow
-
m²
SNI.234.b
2,611,752.00
287,292.72
-
7
Pasang Kaca Tempered Clear T=10
-
m²
SNI.234.c
1,714,152.00
188,556.72
-
8
Pasang Atap Kanopi GRC gelombang
-
m²
SNI.234.d
305,602.00
33,616.22
-
9
Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Putih polos
-
m²
SNI.234.SP.1
516,202.50
56,782.28
-
10
Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Warna
-
m²
SNI.234.SP.2
559,102.50
61,501.28
-
11
Mengerjakan Plafond Akustik Rangka Alumunium
-
m²
SNI.234.AQ
455,207.50
50,072.83
-
12
Pekerjaan Plafond Tripleks 3 mm + Rangka kayu
-
m²
SNI.235.a
196,218.00
21,583.98
-
13
Pekerjaan Plafond Tripleks 5 mm + Rangka kayu
-
m²
SNI.235.b
212,305.50
23,353.61
-
14
Pekerjaan Rangka Langit-langit
-
m²
SNI.235.c
146,094.67
16,070.41
-
15
Pekerjaan Plafond Tripleks 5 mm
-
m²
SNI.235.d
66,210.83
7,283.19
-
16
Pekerjaan Plafond Miring Tripleks 3 mm + Rangka kayu
-
m²
SNI.236.a
164,802.00
18,128.22
-
17
Pekerjaan Plafond Miring Tripleks 5 mm + Rangka kayu
-
m²
SNI.236.b
180,889.50
19,897.85
-
18
Pekerjaan List Plafond Kayu Profil 4/4 cm
-
m'
SNI.238
37,257.00
4,098.27
-
19
Pekerjaan List Plafond Kayu Profil 2/4 cm
-
m'
SNI.239
31,482.00
3,463.02
-
IX
PEKERJAAN PENUTUP ATAP
Sub Total 93,846.50 195,723.00
-
1 2
Pemasangan atap genteng palentong kecil Pemasangan atap genteng kodok
-
m² m²
4.4.5.2.1. 4.4.5.2.2.
10,323.12 21,529.53
3
Pemasangan atap genteng palentong besar/super
-
m²
4.4.5.2.3.
4
Pemasangan bubung genteng palentong
-
m'
4.4.5.2.4.
174,196.00
19,161.56
-
5
Pemasangan bubung genteng kodok glazuur
-
m'
4.4.5.2.5.
172,546.00
18,980.06
-
6
Pemasangan bubung genteng palentong besar
-
m'
4.4.5.2.6.
174,966.00
19,246.26
-
7
Pemasangan roof light fibreglass 90x180
-
m²
4.4.5.2.7.
124,960.00
13,745.60
-
8
Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm
-
m²
4.4.5.2.8.
101,893.00
11,208.23
-
9
Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm
-
m²
4.4.5.2.9.
99,767.80
10,974.46
-
10
Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm
-
m²
4.4.5.2.10.
92,549.60
10,180.46
-
11
Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm
-
m²
4.4.5.2.11.
104,137.00
11,455.07
-
12
Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm
-
m²
4.4.5.2.12.
142,980.75
15,727.88
-
13
Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm
-
m²
4.4.5.2.13.
123,827.00
13,620.97
-
14
Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm
-
m²
4.4.5.2.14.
106,666.32
11,733.30
-
15
Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm
-
m²
4.4.5.2.15.
104,639.47
11,510.34
-
16
Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm
-
m²
4.4.5.2.16.
133,004.67
14,630.51
-
17
Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm
-
m²
4.4.5.2.17.
-
-
-
18
Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm
-
m²
4.4.5.2.18.
-
-
-
19
Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm
-
m²
4.4.5.2.19.
-
-
-
20
Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm
-
m²
4.4.5.2.20.
-
-
-
21
Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm
-
m²
4.4.5.2.21.
-
-
-
22
Pemasangan bubung stel gelombang 0,92m
-
m'
4.4.5.2.22.
-
-
-
23
Pemasangan bubung stel gelombang 1,05m
-
m'
4.4.5.2.23.
-
-
-
24
Pemasangan bubung stel gelombang 1,08m
-
m'
4.4.5.2.24.
-
-
-
25
Pemasangan nok paten 0,92m
-
m'
4.4.5.2.25.
-
-
-
26
Pemasangan nok paten 1,05m
-
m'
4.4.5.2.26.
-
-
-
27
Pemasangan nok paten 1,08m
-
m'
4.4.5.2.27.
-
-
-
28
Pemasangan nok stel rata 0,92m
-
m'
4.4.5.2.28.
241,901.00
26,609.11
-
29
Pemasangan nok stel rata 1,05m
-
m'
4.4.5.2.29.
257,118.07
28,282.99
-
30
Pemasangan genteng beton
-
m²
4.4.5.2.30.
-
-
-
31
Pemasangan genteng aspal
-
m²
4.4.5.2.31.
-
-
-
32
Pemasangan genteng metal
-
m²
4.4.5.2.32.
-
-
-
33
Pemasangan atap sirap kayu
-
m²
4.4.5.2.33.
-
-
-
34
Pemasangan nok genteng beton
-
m'
4.4.5.2.34.
-
-
-
35
Pemasangan nok genteng aspal
-
m'
4.4.5.2.35.
-
-
-
36
Pemasangan nok genteng metal
-
m'
4.4.5.2.36.
166,199.00
18,281.89
-
37
Pemasangan nok sirap
-
m'
4.4.5.2.37.
164,540.20
18,099.42
-
38
Pemasangan atap seng gelombang
-
m²
4.4.5.2.38.
176,919.60
19,461.16
-
39
Pemasangan nok atap seng
-
m'
4.4.5.2.39.
104,471.40
11,491.85
-
40
Pemasangan atap alumunium
-
m²
4.4.5.2.40.
-
-
-
41
Pemasangan nok alumunium
-
m'
4.4.5.2.41.
-
-
-
42
Pemasangan alumunium foil/sisalation
-
m²
4.4.5.2.42.
1
Pekerjaan Atap Genteng Lokal
-
m²
2
Pekerjaan Bubungan Genteng Lokal
-
m²
3
Pekerjaan Atap Genteng Pejaten Bali
-
4
Pasang Atap Genteng Bitumen Monoleyer model gelombang ex. Onduline
5
-
-
-
53,504.00
5,885.44
-
SNI.215
95,953.00
10,554.83
-
SNI.216
181,786.00
19,996.46
-
m²
SNI.217
151,723.00
16,689.53
-
-
m²
SNI.217,a
364,724.98
40,119.75
-
Pekerjaan Bubungan Genteng Pejaten Bali
-
m²
SNI.218
184,646.00
20,311.06
-
6
Pemasangan nok bitumen Monolayer
-
m'
SNI.218.a
7,300,084.00
803,009.24
-
7
Pekerjaan Atap Trimdeck 0.25 TCT (Spandek)
-
m²
SNI.219.0.25
242,715.00
26,698.65
-
8
Pekerjaan Atap Trimdeck 0.30 TCT (Spandek)
-
m²
SNI.219.0.30
254,815.00
28,029.65
-
9
Pekerjaan Atap Trimdeck 0.35 TCT (Spandek)
-
m²
SNI.219.0.35
277,805.00
30,558.55
-
10
Pekerjaan Memasang Bubungan Trimdeck 0.35 TCT (Spandek)
-
m'
SNI.220
131,004.50
14,410.50
-
11
Pekerjaan Atap Genteng Kodok
-
m²
SNI.221.a
195,723.00
21,529.53
-
12
Pekerjaan Atap Genteng kanmuri full flat
-
m²
SNI.221.b
310,123.00
34,113.53
-
13
Pekerjaan Bubungan Genteng Kodok
-
m²
SNI.222.a
172,546.00
18,980.06
-
14
Pekerjaan Bubungan Genteng kanmuri full flat
-
m²
SNI.222.b
328,746.00
36,162.06
-
15
Pekerjaan Atap Seng Gelombang BJLS 20
-
m²
SNI.223
156,200.00
17,182.00
-
16
Memasang Bubungan Seng BJLS 20
-
m'
SNI.224
131,450.00
14,459.50
-
17
Pekerjaan Atap Asbes Gelombang Kecil
-
m²
SNI.225
120,076.00
13,208.36
-
18
Memasang Bubungan Asbes Gelombang Kecil
-
m'
SNI.226
107,085.00
11,779.35
-
19
Mengerjakan atap genteng Metalroof ( Tebal 2.5 mm ) lapisan butiran
-
m²
SNI.227
169,543.00
18,649.73
-
20
Mengerjakan bubungan Genteng Metal roof ( Tebal 2.5 mm ) lap. Butiran
-
m'
SNI.228
139,348.00
15,328.28
-
21
Mengerjakan atap genteng Metalroof ( Tebal 3 mm ) lapisan butiran
-
m²
SNI.229.a
186,043.00
20,464.73
-
22
Mengerjakan bubungan Genteng Metal roof ( Tebal 3 mm ) lap. Butiran
-
m'
SNI.229.b
151,448.00
16,659.28
-
23
Mengerjakan atap genteng Metal ( Tebal 2.5 mm ) Sakura
-
m²
SNI.230
172,733.00
19,000.63
-
24
Mengerjakan bubungan Genteng Metal ( Tebal 2.5 mm )
-
m'
SNI.231
133,298.00
14,662.78
-
Sub Total
-
X
PEKERJAAN KAYU
1
Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I
-
m³
4.4.6.1.1.
12,736,350.00
1,400,998.50
-
2
Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II
-
m³
4.4.6.1.2.
10,992,300.00
1,209,153.00
-
3
Pembuatan dan pemasangan pintu klamp standar, kayu kelas II
-
m²
4.4.6.1.3.
496,859.00
54,654.49
-
4
Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III
-
m²
4.4.6.1.4.
424,259.00
46,668.49
-
5
Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II
-
m²
4.4.6.1.5.
1,097,800.00
120,758.00
-
6
Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II
-
m²
4.4.6.1.6.
834,790.00
91,826.90
-
7
Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas II
-
m²
4.4.6.1.7.
1,210,000.00
133,100.00
-
8
Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar s
-
m²
4.4.6.1.8.
907,599.00
99,835.89
-
9
Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II
-
m²
4.4.6.1.9.
907,690.00
99,845.90
-
10
Pemasangan jalusi kusen, kayu kelas I atau II
-
m²
4.4.6.1.10.
949,850.00
104,483.50
-
11
Pemasangan teakwood rangkap, rangka expose kayu kelas I
-
m²
4.4.6.1.11.
1,013,804.00
111,518.44
-
12
Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas II
-
m²
4.4.6.1.12.
855,844.00
94,142.84
-
13
Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II dan III benta
-
m³
4.4.6.1.13.
9,381,680.00
1,031,984.80
-
14
Pemasangan konstruksi kuda-kuda expose, kayu kelas I
-
m³
4.4.6.1.14.
13,678,665.00
1,504,653.15
-
15
Pemasangan konstruksi gordeng, kayu kelas II
-
m³
4.4.6.1.15.
11,679,085.00
1,284,699.35
-
16
Pemasangan rangka atap genteng keramik, kayu kelas II
-
m²
4.4.6.1.16.
129,195.00
14,211.45
-
17
Pemasangan rangka atap genteng beton, kayu kelas II
-
m²
4.4.6.1.17.
137,857.50
15,164.33
-
18
Pemasangan rangka atap sirap, kayu kelas II
-
m²
4.4.6.1.18.
68,723.60
7,559.60
-
19
Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III
-
m²
4.4.6.1.19.
69,179.00
7,609.69
-
20
Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III
-
m²
4.4.6.1.20.
160,138.00
17,615.18
-
21
Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
-
m'
4.4.6.1.21.
118,195.00
13,001.45
-
22
Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
-
m'
4.4.6.1.22.
117,590.00
12,934.90
-
23
Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
-
m²
4.4.6.1.23.
197,190.00
21,690.90
-
24
Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas II
-
m²
4.4.6.1.24.
509,729.00
56,070.19
-
25
Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas II
-
m²
4.4.6.1.25.
553,630.00
60,899.30
-
26
Pemasangan dinding lambrisering dari papan kayu kelas I
-
m²
4.4.6.1.26.
578,380.00
63,621.80
-
27
Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm
-
m²
4.4.6.1.27.
120,692.00
13,276.12
-
28
Pemasangan dinding bilik, rangka kayu kelas III atau IV
-
m²
4.4.6.1.28.
152,417.65
16,765.94
-
1
Mengerjakan / Memasang Usuk 5/7, Reng 2/3
-
m²
SNI.174
98,615.00
10,847.65
-
2
Mengerjakan / Memasang Usuk 5/7, Reng 2/3 ( Expose )
-
m²
SNI.174.a
130,927.50
14,402.03
-
3
Mengerjakan / Memasang Usuk 5/7, Reng 3/4
-
m²
SNI.175
107,415.00
11,815.65
-
4
Mengerjakan / Memasang Usuk 5/7, Reng 3/4 ( Expose )
-
m²
SNI.175.a
139,727.50
15,370.03
-
5
Mengerjakan / Memasang Usuk 5/7 cm
-
m²
SNI.176.a
75,190.50
8,270.96
-
6
Mengerjakan / Memasang Kembali Usuk 5/7 cm
-
m²
SNI.176.b
32,070.50
3,527.76
-
7
Mengerjakan / Memasang Reng 3/4 cm
-
m²
SNI.176.c
32,224.50
3,544.70
-
8
Mengerjakan / Memasang Kembali Usuk 5/7 cm
-
m²
SNI.176.d
13,744.50
1,511.90
-
9
Pekerjaan Papan Lisplank Dua Lapis ( 2 x 3/20 ) Kayu Klas II
-
m'
SNI.178
171,935.50
18,912.91
-
10
Pekerjaan Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II
-
m'
SNI.179
119,020.00
13,092.20
-
11
Memasang Kembali Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II
-
m'
SNI.179
77,275.00
8,500.25
-
12
Pekerjaan Papan Reuter (2/20)
-
m'
SNI.180
73,920.00
8,131.20
-
13
Mengerjakan Talang Karet
-
m'
SNI.181
274,505.00
30,195.55
-
14
Mengerjakan Talang datar/ jurai Seng BjLs 20
-
m'
SNI.182.a
257,180.00
28,289.80
-
15
Mengerjakan Talang 1/2 lingkaran Seng BjLs 20
-
m'
SNI.182.b
204,556.00
22,501.16
-
16
Pekerjaan Kayu Kuda - Kuda, Gording Kayu Klas II (Expose)
-
m³
SNI.184
9,788,240.00
1,076,706.40
-
17
Pekerjaan Kayu Konsol, Tiang Kayu Klas II
-
m³
SNI.185
9,408,740.00
1,034,961.40
-
18
Pasang Kasiplank ukuran (0.8x20), 1 Lapis
-
m'
SNI.186
96,415.00
10,605.65
-
19
Pasang Kasiplank ukuran (0.8x20), 2 Lapis
-
m'
SNI.187
144,622.50
15,908.48
-
20
Pekerjaan Kayu Konsol, Tiang Kayu Klas II (Expose)
-
m³
SNI.188
9,872,940.00
1,086,023.40
-
21
Pekerjaan Kayu Kusen Pintu dan Jendela
-
m³
SNI.189
10,712,900.00
1,178,419.00
-
22
Pekerjaan Daun Pintu dan Jendela Kaca 3 mm
-
m²
SNI.190
868,494.00
95,534.34
-
23
Pekerjaan Daun Pintu dan Jendela Kaca 5 mm
-
m²
SNI.191
928,994.00
102,189.34
-
24
Pekerjaan Memasang Kaca Mati 3 mm Pintu / Jendela
-
m²
SNI.192
177,575.75
19,533.33
-
25
Pekerjaan Memasang Kaca Mati 5 mm Pintu / Jendela
-
m²
SNI.193
244,125.75
26,853.83
-
26
Pekerjaan Memasang Kaca Mati 8 mm Pintu / Jendela
-
m²
SNI.193.8
280,425.75
30,846.83
-
1
Pekerjaan Memasang Alumunium strip 8 mm
-
m²
SNI.194
862,824.88
94,910.74
-
2
Pekerjaan Daun Pintu dan Jendela Kaca Tempered 8 mm
-
m²
SNI.195
1,841,994.00
202,619.34
-
3
Pekerjaan Memasang Kaca Cermin 5 mm
-
m²
SNI.195.a
242,299.75
26,652.97
-
4
Pekerjaan Memasang Glass Blok
-
m²
SNI.196
1,581,584.40
173,974.28
-
5
Pekerjaan Memasang Kaca Mati Riben 5 mm Pintu / Jendela
-
m²
SNI.197
238,075.75
26,188.33
-
6
Pekerjaan Memasang Kaca Mati Buram 5 mm Pintu / Jendela
-
m²
SNI.197.a
298,575.75
32,843.33
-
7
Pekerjaan Memasang Kaca Mati Tempered 8 mm Pintu / Jendela
-
m²
SNI.198
1,248,425.75
137,326.83
-
8
Pekerjaan Daun Pintu Panil dan Krepyak Kayu Klas II Lap. Formika
-
m²
SNI.200
1,011,890.00
111,307.90
-
9
Pekerjaan Ram Jalusi
-
m²
SNI.201
1,274,900.00
140,239.00
-
10
Pekerjaan Ram Jalusi Mati Kusen
-
m²
SNI.202
843,370.00
92,770.70
-
11
Mengerjakan Daun Pintu Double Teakwood 3 mm
-
m²
SNI.204
988,834.00
108,771.74
-
12
Pekerjaan Pintu Double Tripleks 3 mm
-
m²
SNI.206
1,051,754.00
115,692.94
-
13
Pekerjaan Pintu Teakwood Lapis Formika
-
m²
SNI.208
1,243,484.00
136,783.24
-
14
Pekerjaan Pintu Triplek Lapis Formika
-
m²
SNI.209
709,104.00
78,001.44
-
XI
PEKERJAAN KUNCI DAN KACA
Sub Total
-
1
Pemasangan kunci tanam antik
-
bh
4.4.6.2.1.
761,739.00
83,791.29
-
2
Pemasangan kunci tanam biasa
-
bh
4.4.6.2.2.
301,565.00
33,172.15
-
3
Pemasangan kunci kamar mandi
-
bh
4.4.6.2.3.
269,434.00
29,637.74
-
4
Pemasangan kunci silinder
-
bh
4.4.6.2.4.
189,134.00
20,804.74
-
5
Pemasangan engsel pintu
-
bh
4.4.6.2.5.
60,922.40
6,701.46
-
6
Pemasangan engsel jendela kupu-kupu
-
bh
4.4.6.2.6.
36,756.50
4,043.22
-
7
Pemasangan engsel angin
-
bh
4.4.6.2.7.
71,186.50
7,830.52
-
8
Pemasangan spring knip
-
bh
4.4.6.2.8.
9
Pemasangan kait angin
-
bh
4.4.6.2.9.
50,644.00
5,570.84
-
10
Pemasangan door closer
-
bh
4.4.6.2.10.
395,659.00
43,522.49
-
11
Pemasangan kunci slot
-
bh
4.4.6.2.11.
201,113.00
22,122.43
-
-
-
-
12
Pemasangan Door holder
-
bh
4.4.6.2.12.
395,659.00
43,522.49
-
13
Pemasangan door stop
-
bh
4.4.6.2.13.
97,845.00
10,762.95
-
-
bh
4.4.6.2.14.
197,439.00
21,718.29
-
14
Pemasangan rel pintu sorong
15
Pemasangan kunci lemari
-
bh
4.4.6.2.15.
-
-
16
Pemasangan kaca tebal 3 mm
-
m²
4.4.6.2.16.
178,897.40
19,678.71
-
17
Pemasangan kaca tebal 5 mm
-
m²
4.4.6.2.17.
245,447.40
26,999.21
-
18
Pemasangan kaca tebal 8 mm
-
m²
4.4.6.2.18.
287,558.70
31,631.46
-
19
Pemasangan kaca buram tebal 12 mm
-
m²
4.4.6.2.19.
20
Pemasangan kaca cermin tebal 5 mm
-
m²
4.4.6.2.20.
202,994.00
22,329.34
-
21
Pemasangan kaca cermin tebal 8 mm
-
m²
4.4.6.2.21.
249,403.00
27,434.33
-
22
Pemasangan kaca wireglassed tebal 5 mm
-
m²
4.4.6.2.22.
-
-
-
23
Pemasangan kaca patri tebal 5 mm
-
m²
4.4.6.2.23.
-
-
-
24
Pemasangan kaca tebal 8 mm
-
m²
4.4.6.2.17.A.
221,247.40
24,337.21
-
1
Pasang Kunci Tanam Mutu Menengah
-
bh
SNI.265.b
290,345.00
31,937.95
-
2
Pasang Kunci Tanam Mutu Tinggi
-
bh
SNI.265.c
720,445.00
79,248.95
-
3
Pasang Grendel Besar
-
bh
SNI.268.1
51,606.50
5,676.72
-
4
Pasang Grendel Kecil
-
bh
SNI.268.2
40,606.50
4,466.72
-
5
Pasang Kait Angin Besar
-
bh
SNI.269
53,209.75
5,853.07
-
6
Pasang Kait Angin Kecil
-
bh
SNI.270
137,032.50
15,073.58
-
7
Pasang Kunci Selot Besar
-
bh
SNI.271
124,206.50
13,662.72
-
8
Pasang Kunci Selot Kecil
-
bh
SNI.272
127,413.00
14,015.43
-
9
Pasang Beugel U
-
bh
SNI.273
45,564.75
5,012.12
-
10
Pasang Beugel Plat
-
bh
SNI.274
45,564.75
5,012.12
-
11
Pasang Angker Dia 12 MM
-
bh
SNI.275
9,264.75
1,019.12
-
12
Pas. Baut Mur
-
bh
SNI.276.a
8,164.75
898.12
-
13
Pas. Baut Mur 12 mm
-
bh
SNI.276.b
9,264.75
1,019.12
-
14
Pas. Baut Mur 16 mm
-
bh
SNI.276.c
10,364.75
1,140.12
-
15
Pas. Baut Mur 18 mm
-
bh
SNI.276.d
11,464.75
1,261.12
-
16
Pas. Baut Mur 22 mm
-
bh
SNI.276.e
13,664.75
1,503.12
-
17
Pasang Pintu Feber glass (Wc)
-
bh
SNI.282
1,060,463.25
116,650.96
-
XII
PEKERJAAN PENGECATAN
-
-
Sub Total
-
-
-
1
Pengikisan/pengerokan permukaan cat lama
-
m²
4.4.7.1.1.
29,139.00
3,205.29
-
2
Pencucian bidang permukaan tembok yang pernah dicat
-
m²
4.4.7.1.2.
26,609.00
2,926.99
-
3
Pengerokan karat pada permukaan baja cara manual
-
m²
4.4.7.1.3.
27,874.00
3,066.14
-
4
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat pe
-
m²
4.4.7.1.4.
65,791.00
7,237.01
-
5
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat pe
-
m²
4.4.7.1.5.
92,477.00
10,172.47
-
6
Pelaburan bidang kayu dengan teak oil
-
m²
4.4.7.1.6.
46,365.00
5,100.15
-
7
Pelaburan bidang kayu dengan politur
-
m²
4.4.7.1.7.
64,992.40
7,149.16
-
8
Pelaburan bidang kayu dengan cat residu dan ter
-
m²
4.4.7.1.8.
27,643.00
3,040.73
-
9
Pelaburan bidang kayu dengan vernis
-
m²
4.4.7.1.9.
73,337.00
8,067.07
-
10
Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup
-
m²
4.4.7.1.10.
38,179.90
4,199.79
-
11
Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
-
m²
4.4.7.1.11.
26,769.60
2,944.66
-
12
Pelaburan tembok dengan kalkarium
-
m²
4.4.7.1.12.
15,791.60
1,737.08
-
13
Pelaburan tembok dengan kapur sirih
-
m²
4.4.7.1.13.
-
-
-
14
Pelaburan tembok lama dengan kapur sirih (pemeliharaan)
-
m²
4.4.7.1.14.
-
-
-
15
Pemasangan wallpaper
-
m²
4.4.7.1.15.
128,892.50
14,178.18
-
16
Pengecatan permukaan baja dengan menie besi
-
m²
4.4.7.1.16.
54,917.50
6,040.93
-
17
Pengecatan permukaan baja dengan menie besi dengan perancah
-
m²
4.4.7.1.17.
106,139.00
11,675.29
-
18
Pengecatan permukaan baja galvanis secara manual 4 lapis
-
m²
4.4.7.1.18.
114,717.90
12,618.97
-
19
Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
-
m²
4.4.7.1.19.
50,039.00
5,504.29
-
20
Pengecatan permukaan baja galvanis secara manual sistem 3 lapis
-
m²
4.4.7.1.20.
286,924.00
31,561.64
-
21
Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhi
-
m²
4.4.7.1.21.
258,599.00
28,445.89
-
1
Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Eksterior)
-
m²
SNI.252
74,485.40
8,193.39
-
2
Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Interior)
-
m²
SNI.252.a
47,953.40
5,274.87
-
3
Pekerjaan Cat Plafond Baru 1 x Dasar, 2 x Cat
-
m²
SNI.252.b
80,795.00
8,887.45
-
4
Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen)
-
m²
SNI.252.c
37,283.40
4,101.17
-
5
Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen)
-
m²
SNI.252.d
252,718.40
27,799.02
-
6
Pengecatan Tembok Baru anti bakteri ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat
-
m²
SNI.252.e
89,445.40
9,838.99
-
7
Memasang pelapis tembok dengan plat timbal hitam tebal 3 mm rangka hollow
-
m²
SNI.252.f
1,314,713.40
144,618.47
-
8
Measang pelapis tembak dengan HPL
-
m²
SNI.252.g
138,637.40
15,250.11
-
9
Pemasangan Wall Paper
-
m²
SNI.252.h
188,093.40
20,690.27
-
10
Pengecatan Cat Tekstur Fin. Kamprot Halus
-
m²
SNI.252.i
513,693.40
56,506.27
-
11
Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Eksterior
-
m²
SNI.253
112,498.10
12,374.79
-
12
Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Interior
-
m²
SNI.253.a
90,388.10
9,942.69
-
13
Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Eksterior
-
m²
SNI.254
59,797.10
6,577.68
-
14
Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Interior
-
m²
SNI.254.a
36,213.10
3,983.44
-
15
Pekerjaan Cat Plafond Lama 1 x Dasar, 2 x Cat
-
m²
SNI.254.b
72,655.00
7,992.05
-
16
Pekerjaan cat Genteng
-
m²
SNI.255
92,776.20
10,205.38
-
17
Pekerjaan Cat Kayu 1 x Meni, 2 x Cat
-
m²
SNI.256
67,710.50
7,448.16
-
18
Pekerjaan Cat Kayu, 1 x Cat
-
m²
SNI.257
64,834.00
7,131.74
-
19
Pekerjaan Cat paving Blok
-
m²
SNI.258
50,606.60
5,566.73
-
20
Mendempul dan Menggosok Kayu
-
m²
SNI.259
22,874.50
2,516.20
-
21
Pekerjaan Politur 2 Kali
-
m²
SNI.260
58,100.90
6,391.10
-
22
Mengecat Besi 1 x Meni, 2 x Cat
-
m²
SNI.261
74,470.00
8,191.70
-
23
Mengecat Atap Seng Gelombang
-
m²
SNI.262
63,151.00
6,946.61
-
24
Pekerjaan Pelaburan Bidang Kayu dengan Teak Oil
-
m²
SNI.263
29,121.40
3,203.35
-
25
Mengeter Kayu 2x
-
m²
SNI.264
48,851.00
5,373.61
-
Sub Total XIII
-
PEKERJAAN SANITASI DALAM GEDUNG
1
Pemasangan closet duduk/monoblock
-
bh
5.5.1.1.1.
5,902,380.00
649,261.80
-
2
Pemasangan closet jongkok porslen
-
bh
5.5.1.1 2.
856,625.00
94,228.75
-
3
Pemasangan closet jongkok teraso
-
bh
5.5.1.1 3.
687,940.00
75,673.40
-
4
Pemasangan urinoir
-
bh
5.5.1.1 4.
605,825.00
66,640.75
-
5
Pemasangan wastafel
-
bh
5.5.1.1 5.
4,052,675.00
445,794.25
-
6
Pemasangan bathcuip porselen
-
bh
5.5.1.1 6.
9,164,859.00
1,008,134.49
-
7
Pemasangan bak fibreglass vol 1 m3
-
bh
5.5.1.1 7.
3,215,850.00
353,743.50
-
8
Pemasangan bak mandi batu bata vol 0,30 m3
-
bh
5.5.1.1 8.
2,909,214.00
320,013.54
-
9
Pemasangan bak mandi teraso vol 0,30 m3
-
bh
5.5.1.1 9.
2,273,370.00
250,070.70
-
10
Pemasangan bak air fibreglass vol 1 m3
-
bh
5.5.1.1 10.
805,530.00
88,608.30
-
11
Pemasangan bak beton volume 1 m3
-
bh
5.5.1.1 11.
12
Pemasangan bak cuci piring stainlessteel
-
bh
5.5.1.1 12.
691,735.00
76,090.85
-
13
Pemasangan bak cuci piring teraso
-
bh
5.5.1.1 13.
794,200.00
87,362.00
-
14
Pemasangan floor drain
-
bh
5.5.1.1 14.
56,045.00
6,164.95
-
15
Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm
-
bh
5.5.1.1 15.
760,364.00
83,640.04
-
16
Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
-
bh
5.5.1.1 16.
1,110,241.00
122,126.51
-
17
Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
-
bh
5.5.1.1 17.
1,301,817.00
143,199.87
-
18
Pemasangan pipa galvanis diameter ½”
-
m'
5.5.1.1 18.
49,445.00
5,438.95
-
19
Pemasangan kran diameter ½” atau 3/4”
-
bh
5.5.1.1 19.
121,000.00
13,310.00
-
20
Pemasangan pipa galvanis diameter 3/4”
-
m'
5.5.1.1 20.
52,173.00
5,739.03
-
21
Pemasangan pipa galvanis diameter 1”
-
m'
5.5.1.1 21.
56,265.00
6,189.15
-
22
Pemasangan pipa galvanis diameter 1 ½”
-
m'
5.5.1.1 22.
102,008.50
11,220.94
-
23
Pemasangan pipa galvanis diameter 3”
-
m'
5.5.1.1 23.
187,885.50
20,667.41
-
24
Pemasangan pipa galvanis diameter 4”
-
m'
5.5.1.1 24.
238,694.50
26,256.40
-
25
Pemasangan pipa PVC tipe AW diameter 1/2”
-
m'
5.5.1.1 25.
26
Pemasangan pipa PVC tipe AW diameter 3/4”
-
m'
5.5.1.1 26.
48,807.00
5,368.77
-
27
Pemasangan pipa PVC tipe AW diameter 1”
-
m'
5.5.1.1 27.
55,627.00
6,118.97
-
-
-
-
-
-
-
28
Pemasangan pipa PVC tipe AW diameter 11/2”
-
m'
5.5.1.1 28.
83,440.50
9,178.46
-
29
Pemasangan pipa PVC tipe AW diameter 2”
-
m'
5.5.1.1 29.
107,822.00
11,860.42
-
30
Pemasangan pipa PVC tipe AW diameter 21/2”
-
m'
5.5.1.1 30.
158,878.50
17,476.64
-
31
Pemasangan pipa PVC tipe AW diameter 3”
-
m'
5.5.1.1 31.
202,015.00
22,221.65
-
32 33
Pemasangan pipa PVC tipe AW diameter 4” Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm
-
m' m'
5.5.1.1 32. 5.5.1.1 33.
273,454.50 -
30,080.00 -
-
34
Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm
-
m'
5.5.1.1 34.
35
Pemasangan pipa beton diameter 15 – 20 cm
-
m'
5.5.1.1 35.
249,135.65
27,404.92
-
36
Pemasangan pipa beton diameter 30 – 100 cm
-
m'
5.5.1.1.36.
379,497.25
41,744.70
-
1
Memasang Kloset Duduk Biasa
-
bh
SNI.283.B
1,782,913.00
196,120.43
-
2
Memasang Kloset Duduk (KW 1 Super)
-
bh
SNI.283.K
5,082,693.00
559,096.23
-
3
Memasang Wastafel Biasa
-
bh
SNI.284
1,175,515.00
129,306.65
-
4
Memasang Urinoir ex. TOTO U 57 M
-
bh
SNI.286
3,621,475.00
398,362.25
-
-
bh
SNI.286.a
1,566,345.00
172,297.95
-
5
Memasang Pembatas Urinoir ex. TOTO A 100
-
-
-
6
Memasang Kitchen Sink Stainless Steel ex. TOTO
-
bh
SNI.286.b
2,769,492.00
304,644.12
-
7
Memasang Kitchen Sink 1 Bowl GS 5844
-
bh
SNI.41.3
2,561,619.50
281,778.15
-
8
Memasang Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1
-
bh
SNI.41.4
5,102,619.50
561,288.15
-
9
Memasang Bak Cuci Piring Logam, 1 lubang
-
bh
SNI.286.1
734,519.50
80,797.15
-
10
Memasang Bak Cuci Piring Logam, 2 lubang
-
bh
SNI.286.2
866,519.50
95,317.15
-
11
Memasang Bak Mandi Teraso
-
bh
SNI.287
1,095,985.00
120,558.35
-
12
Memasang Bak Mandi Fiberglass
-
bh
SNI.288
1,707,200.00
187,792.00
-
13
Memasang Bak Mandi Plastik
-
bh
SNI.289
1,713,690.00
188,505.90
-
-
bh
SNI.290.a
425,810.00
46,839.10
-
-
bh
SNI.291
56,045.00
6,164.95
-
-
bh
SNI.291.a
70,345.00
7,737.95
-
-
bh
SNI.292
158,345.00
17,417.95
-
14 15 16 17
Memasang Kran ex. TOTO T2613 Memasang Floor Drain Memasang Floor Drain ex. TOTO TX 1 BV 3 Memasang Saringan Air Besi
18
Memasang Shower spray ex. TOTO TX 403 SBPIV
-
bh
SNI.292.1
920,810.00
101,289.10
-
19
Memasang Spoel hoek
-
bh
SNI.292.2
12,256,310.00
1,348,194.10
-
20
Memasang shower ex. TOTO TR 309 SZ
-
bh
SNI.292.3
648,010.00
71,281.10
-
21
Memasang Paper Holder ex. TOTO TIPE TS116R
-
bh
SNI.292.4
679,745.00
74,771.95
-
22
Memasang soap holder ex. TOTO S 156N
-
bh
SNI.292.5
202,345.00
22,257.95
-
23
Memasang hand railing stainless steel ex. TOTO TX 3A2
-
bh
SNI.292.6
1,060,345.00
116,637.95
-
24
Memasang Tandon Air kap. 500 Liter
-
bh
SNI.293.a
1,599,345.00
175,927.95
-
25
Memasang Tandon Air kap. 1000 Liter
-
bh
SNI.293.b
2,336,345.00
256,997.95
-
26
Memasang Pipa GI dia 1/2"
-
m'
SNI.294.G
81,627.88
8,979.07
-
27
Memasang Pipa GI dia 2"
-
m'
SNI.298.Ga
164,677.88
18,114.57
-
Sub Total XIV
-
PEKERJAAN INSTALASI LISTRIK
1
Titik Lampu
-
bh
Ls
285,000.00
31,350.00
-
2
Stop Kontak Tanam
-
bh
Ls
210,000.00
23,100.00
-
3
Stop Kontak Luar
-
bh
Ls
227,000.00
24,970.00
-
4
Saklar Double
-
bh
Ls
39,000.00
4,290.00
-
5
Saklar Tunggal
-
bh
Ls
39,000.00
4,290.00
-
6
Zekering Boxes 1 Group
-
bh
Ls
420,000.00
46,200.00
-
7
Zekering Boxes 2 Group
-
bh
Ls
570,000.00
62,700.00
-
8
Zekering Boxes 3 Group
-
bh
Ls
710,000.00
78,100.00
-
9
Lampu Philip 18 W
-
bh
Ls
60,000.00
6,600.00
-
10
Lampu Philip 14 W
-
bh
Ls
49,000.00
5,390.00
-
11
Lampu Philip 5 W
-
bh
Ls
35,000.00
3,850.00
-
12
Lampu Pijar 25 W
-
bh
Ls
25,000.00
2,750.00
-
13
Lampu TL 40 W
-
bh
Ls
97,000.00
10,670.00
-
14
Lampu TL 2 x 18 W
-
bh
Ls
95,000.00
10,450.00
-
15
Lampu TL 2 x 36 W
-
bh
Ls
162,000.00
17,820.00
-
16
Lampu TL 2 x 40 W
-
bh
Ls
165,000.00
18,150.00
-
17
Lampu LED 2 x 14 W
-
bh
Ls
192,000.00
21,120.00
-
18
Lampu Sorot (Sejenis Mercury)
-
bh
Ls
710,000.00
78,100.00
-
19
Kabel NYA 2,5 mm
-
roll/50
Ls
300,000.00
33,000.00
-
20
Kabel NGA 2 x 2,5 mm
-
roll/50
Ls
577,000.00
63,470.00
-
21
Kabel NYM 3 x 2,5 mm
-
roll/50
Ls
705,000.00
77,550.00
-
22
Kabel NYM 3 x 1,5 mm
-
roll/50
Ls
577,000.00
63,470.00
-
23
Kabel NYM 2 x 2,5 mm
-
roll/50
Ls
577,000.00
63,470.00
-
24
Kabel NYM 2 x 1,5 mm
-
roll/50
Ls
396,000.00
43,560.00
-
25
Kabel NYM 4 x 6 mm
-
roll/50
Ls
1,650,000.00
181,500.00
-
26
Kabel NYM 4 x 10 mm
-
roll/50
Ls
2,675,000.00
294,250.00
-
27
Kabel NYY 4 x 50 mm
-
m'
Ls
390,000.00
42,900.00
-
28
Kabel BC 50 mm
-
m'
Ls
55,000.00
6,050.00
-
29
Kabel BC 35 mm
-
m'
Ls
45,000.00
4,950.00
-
30
Fiting Lampu
-
bh
Ls
22,000.00
2,420.00
-
31
Fiting Lampu Tanam Dia. 4 "
-
bh
Ls
42,000.00
4,620.00
-
32
Fiting Lampu Tanam Dia. 3 "
-
bh
Ls
32,000.00
3,520.00
-
33
Box Panel 3 Phase, Comlite (80x120x25)
-
set
Ls
12,000,000.00
1,320,000.00
-
34
Box Panel 3 Phase, Comlite (50x70x20)
-
set
Ls
5,850,000.00
643,500.00
-
35
Box Panel 3 Phase, (30x40x15)
-
bh
Ls
1,100,000.00
121,000.00
-
36
Box Panel PVC 4 MCB, (40x60x20)
-
bh
Ls
395,000.00
43,450.00
-
37
MCB 6 A
-
bh
Ls
70,000.00
7,700.00
-
38
MCB 4 A
-
bh
Ls
66,000.00
7,260.00
-
39
Pemasukan Daya listrk
-
kwh
Ls
2,600.00
286.00
-
40
Pemasangan Daya listrk
-
va
Ls
1,600.00
176.00
-
41
AC (Air Conditioner) Kapasiitas 2 PK
-
unit
Ls
-
-
-
42
AC (Air Conditioner) Kapasiitas 1 PK
-
unit
Ls
-
-
-
43
AC (Air Conditioner) Kapasiitas 1/2 PK
-
unit
Ls
-
-
-
44
Pas pengisap debu ruangan (Blower) + asisories complit
-
bh
Ls
166,000.00
18,260.00
-
45
Pas Lampu darurat + asisories complit
-
bh
Ls
155,000.00
17,050.00
-
46
Kabel Telepone 4 x 0.5 mm
-
m'
Ls
30,000.00
3,300.00
-
47
Isolasi
-
bh
Ls
12,000.00
1,320.00
-
48
Outle TV
-
bh
Ls
50,000.00
5,500.00
-
49
Outle Telephone
-
bh
Ls
50,000.00
5,500.00
-
50
Dow ligth / PCL 13 W
-
bh
Ls
130,000.00
14,300.00
-
51
Dow ligth / PCL 8 W
-
bh
Ls
110,000.00
12,100.00
-
52
Dow ligth / LED 14 W
-
bh
Ls
152,000.00
16,720.00
-
53
Dow ligth / LED 7 W
-
bh
Ls
95,000.00
10,450.00
-
54
Dow ligth / LED 3 W
-
bh
Ls
40,000.00
4,400.00
-
55
Lampu Tempel / LED 14 W
-
bh
Ls
25,000.00
2,750.00
-
56
Lampu spot light/ LED 7 W
-
bh
Ls
300,000.00
33,000.00
-
57
Lampu strip light/ LED 7 W
-
m'
Ls
39,000.00
4,290.00
-
58
Electroda Cooper dia. 1 inci
-
m'
Ls
350,000.00
38,500.00
-
59
Lampu Sorot taman spot light (LED), 10 watt
-
bh
Ls
300,000.00
33,000.00
-
60
Lampu taman Tanam (LED), 8 watt
-
bh
Ls
270,000.00
29,700.00
-
61
Bollard Lighting (LED), 9 watt
-
bh
Ls
3,580,000.00
393,800.00
-
62
Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + Pipa GI + Pemasan
-
bh
Ls
1,200,000.00
132,000.00
-
63
Pipa Conduit PVC dia. 20 mm2
-
m'
Ls
3,000.00
330.00
-
64
Exshaust Fan 14 W
-
bh
Ls
535,000.00
58,850.00
-
65
Wall Type Exshaust Fan 2500 CMH
-
bh
Ls
1,100,000.00
121,000.00
-
66
Orbit Fan 60 Watt
-
bh
Ls
720,000.00
79,200.00
-
67
Exshaust Fan 353 CFM/ 34 W
-
bh
Ls
315,000.00
34,650.00
-
68
Pemasangan Penangkal Petir + Arde (Radius min. 50 m)
-
unit
Ls
25,000,000.00
2,750,000.00
-
69
Pemasangan Penangkal Petir + Arde (Radius min. 25 m)
-
unit
Ls
12,500,000.00
1,375,000.00 Sub Total
-
-
XV
PEKERJAAN VEGETASI TANAMAN
1
Tanam Pohon Kamboja tinggi 5 meter
-
bh
SNI.302
2,148,465.00
236,331.15
-
2
Tanam Pohon Tabebuya tinggi 4 meter
-
bh
SNI.302.1
1,730,465.00
190,351.15
-
3
Tanam Pohon Palem raja tinggi 3 meter
-
bh
SNI.302.2
1,455,465.00
160,101.15
-
4
Tanam Pohon Pisang Kipas tinggi 1,5 meter
-
bh
SNI.302.3
223,465.00
24,581.15
-
5
Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter
-
bh
SNI.302.4
67,320.00
7,405.20
-
6
Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter
-
bh
SNI.302.5
70,620.00
7,768.20
-
7
Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter
-
bh
SNI.302.6
64,020.00
7,042.20
-
8
Pohon Damar (Agathis dammara) Tinggi 4m
-
bh
SNI.302.a
929,049.00
102,195.39
-
9
Pohon Pulai (alstonia scholaris) Tinggi 6m
-
bh
SNI.302.b
2,103,849.00
231,423.39
-
10
Pohon Kasia Jawa (Cassia javanica) Tinggi 4m
-
bh
SNI.302.c
635,349.00
69,888.39
-
11
Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m
-
bh
SNI.302.d
977,449.00
107,519.39
-
12
Pohon Flamboyan (Delonix regia) Tinggi 7m
-
bh
SNI.302.e
1,320,649.00
145,271.39
-
13
Pohon Biola Cantik (Ficus lyrata) Tinggi 6m
-
bh
SNI.302.f
908,149.00
99,896.39
-
14
Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m
-
bh
SNI.302.g
1,185,349.00
130,388.39
-
15
Pohon Sosis (Kigelia pinnata) Tinggi 7m
-
bh
SNI.302.h
1,185,349.00
130,388.39
-
16
Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m
-
bh
SNI.302.i
981,849.00
108,003.39
-
17
Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6m
-
bh
SNI.302.j
613,349.00
67,468.39
-
18
Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m
-
bh
SNI.302.k
1,625,349.00
178,788.39
-
19
Pohon Parahiba (Schizolobium parahyba) Tinggi 7m
-
bh
SNI.302.l
1,047,849.00
115,263.39
-
20
Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m
-
bh
SNI.302.m
761,849.00
83,803.39
-
21
Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m
-
bh
SNI.302.n
220,649.00
24,271.39
-
22
Pohon Palem Kuning (Chrysalidacarpus lutescens) Tinggi 1,5m
-
bh
SNI.302.o
838,849.00
92,273.39
-
23
Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m
-
bh
SNI.302.p
131,549.00
14,470.39
-
24
Pohon Palem Kol (Licualis grandis) Tinggi 1,5m
-
bh
SNI.302.q
186,549.00
20,520.39
-
25
Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m
-
bh
SNI.302.r
2,090,649.00
229,971.39
-
26
Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m
-
bh
SNI.302.s
1,938,849.00
213,273.39
-
27
Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m
-
bh
SNI.302.t
635,349.00
69,888.39
-
28
Pohon Pisang Hias (Strelitzia nicolai) Tinggi 1,5m
-
bh
SNI.302.u
635,349.00
69,888.39
-
29
Semak Agave (Agave angustifolia) Tinggi 300-400 mm
-
bh
SNI.302.1a
1,134,265.00
124,769.15
-
30
Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-300mm
-
bh
SNI.302.1b
727,265.00
79,999.15
-
31
Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm
-
bh
SNI.302.1c
617,265.00
67,899.15
-
32
Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500-2500 mm
-
bh
SNI.302.1d
3,477,265.00
382,499.15
-
33
Semak Spineless (Spineless Yucca) Tinggi 800 mm
-
bh
SNI.302.1e
1,893,265.00
208,259.15
-
34
Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm
-
bh
SNI.302.1f
1,068,265.00
117,509.15
-
35
Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm
-
bh
SNI.302.1g
243,265.00
26,759.15
-
36
Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm
-
bh
SNI.302.1h
276,265.00
30,389.15
-
37
Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm
-
bh
SNI.302.1i
518,265.00
57,009.15
-
38
Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm
-
bh
SNI.302.1j
518,265.00
57,009.15
-
39
Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm
-
bh
SNI.302.1k
243,265.00
26,759.15
-
40
Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 700-800mm
-
bh
SNI.302.1l
1,002,265.00
110,249.15
-
41
Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800mm
-
bh
SNI.302.1m
243,265.00
26,759.15
-
42
Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm
-
bh
SNI.302.1n
177,265.00
19,499.15
-
43
Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm
-
bh
SNI.302.1o
837,265.00
92,099.15
-
44
Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 400-500mm
-
bh
SNI.302.1p
137,665.00
15,143.15
-
45
Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300mm
-
bh
SNI.302.1q
177,265.00
19,499.15
-
46
Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300mm
-
bh
SNI.302.1r
309,265.00
34,019.15
-
47
Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 100-150mm
-
bh
SNI.302.1s
243,265.00
26,759.15
-
48
Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm
-
bh
SNI.302.1t
1,079,265.00
118,719.15
-
49
Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm
-
bh
SNI.302.1v
309,265.00
34,019.15
-
50
Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx") Tinggi 200-250mm
-
bh
SNI.302.1x
386,265.00
42,489.15
-
51
Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-600mm
-
bh
SNI.302.1y
452,265.00
49,749.15
-
52
Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300-400mm
-
bh
SNI.302.1z
551,265.00
60,639.15
-
53
Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400mm
-
bh
SNI.302.2a
160,765.00
17,684.15
-
54
Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi 400-500mm
-
bh
SNI.302.2b
155,265.00
17,079.15
-
55
Semak kembang Air Mancur Merah (Russelia equisetiformis) Tinggi 400-500mm
-
bh
SNI.302.2c
342,265.00
37,649.15
-
56
Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-500mm
-
bh
SNI.302.2d
518,265.00
57,009.15
-
57
Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm
-
bh
SNI.302.2e
127,765.00
14,054.15
-
58
Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300
-
bh
SNI.302.2f
177,265.00
19,499.15
-
59
Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-400mm
-
bh
SNI.302.2g
243,265.00
26,759.15
-
60
Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-150
-
bh
SNI.302.2h
309,265.00
34,019.15
-
61
Semak Rumput Manila (Zoysia matrella)
-
m²
SNI.302.3a
101,200.00
11,132.00 Sub Total
-
XVI
-
PEKERJAAN TAMBAHAN
1
Biaya Pengeboran air + Pipa Casing Ø 6''
-
m'
SNI.Ls.1
1,558,535.00
171,438.85
-
2
Biaya Pengeboran air + Pipa Casing Ø 4''
-
m'
SNI.Ls.2
1,091,585.00
120,074.35
-
3
Biaya Pengeboran air + Pipa Casing Ø 3''
-
m'
SNI.Ls.3
547,415.00
60,215.65
-
4
Biaya Pengeboran air + Pipa Casing Ø 2.5''
-
m'
SNI.Ls.4
295,240.00
32,476.40
-
5
Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar )
-
bh
SNI.Ls.5
38,016,000.00
4,181,760.00
-
6
Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Phase
-
bh
SNI.Ls.6
54,036,400.00
5,944,004.00
-
7
Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 Complit pemasa
-
bh
SNI.Ls.7
28,495,500.00
3,134,505.00
-
8
Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1''- 25 Complit
-
bh
SNI.Ls.8
25,685,000.00
2,825,350.00 Sub Total
-
B.
JUMLAH PEKERJAAN PEMBANGUNAN LANTAI - 1
Jumlah Total
-
BAC-UP DATA NAMA DINAS/ INSTANSI NAMA KEGIATAN NAMA PEKERJAAN LOKASI PEKERJAAN SUMBER DANA
: : : : -
: : 2023
TAHUN ANGGARAN
URAIYAN KUANTITAS
No.
AITEM JENIS PEKERJAAN
A.
PEKERJAAN PENDAHULUAN
I
PEKERJAAN PERSIAPAN
VOLUME BAC-UP
SAT
KODE ANALISA
HARGA SATUAN PAJAK PEKERJAAN (10 %)
JUMLAH HARGA SATUAN
L1/B
P/B
L2
T
N/B
JUMLAH
1
Pembongkaran, Pembersihan awal dan akhir pekerjaan
1.00
kgt
Ls
1.00 X
1.00
1.00
1.00
2
Pembuatan pagar sementara dari kayu tinggi 2 meter
-
m²
1. 1.1.1.1.
366,531.00
40,318.41
-
-
X
1.00 X
1.00
1.00
-
3
Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
-
m²
1. 1.1.1.2.
535,381.00
58,891.91
-
-
X
1.00 X
1.00
1.00
-
4
Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter
-
m²
1. 1.1.1.3.
96,866.00
10,655.26
-
-
X
1.00 X
1.00
1.00
-
5
Pengukuran dan pemasangan Bouwplank
-
m'
1. 1.1.1.4.
96,261.00
10,588.71
-
-
X
1.00 X
1.00
1.00
-
6
Pembuatan kantor sementara lantai plesteran
-
m²
1. 1.1.1.5.
1,953,919.00
214,931.09
-
-
X
1.00 X
1.00
1.00
-
7
Pembuatan rumah jaga (konstruksi kayu )
-
m²
1. 1.1.1.6.
1,574,320.00
173,175.20
-
-
X
1.00 X
1.00
1.00
-
8
Pembuatan gudang semen dan peralatan
-
m²
1. 1.1.1.7.
1,562,110.00
171,832.10
-
-
X
1.00 X
1.00
1.00
-
9
Pembuatan bedeng pekerja
-
m²
1. 1.1.1.8.
1,657,975.00
182,377.25
-
-
X
1.00 X
1.00
1.00
-
10
Pembersihan lapangan dan perataan
-
m²
1. 1.1.1.9.
177,650.00
19,541.50
-
-
X
1.00 X
1.00
1.00
-
11
Pembuatan steger/perancah dari bambu
-
m²
1. 1.1.1.10.
-
-
X
1.00 X
1.00
1.00
-
12
Pembuatan kotak adukan ukuran 40cm x50cm x25cm
-
bh
1. 1.1.1.11.
205,744.00
22,631.84
-
-
X
1.00 X
1.00
1.00
-
13
Pembuatan jalan sementara
-
m²
1. 1.1.1.12.
231,935.00
25,512.85
-
-
X
1.00 X
1.00
1.00
-
14
Pembongkaran beton bertulang
-
m³
1. 1.1.1.13.
1,184,304.00
130,273.44
-
-
X
1.00 X
1.00
1.00
-
15
Pembongkaran dinding tembok bata
-
m³
1. 1.1.1.14.
118,430.40
13,027.34
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan pagar kawat jaring galvanis panjang 240 cm
-
m²
1. 1.1.1.15.
22,526.02
2,477.86
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan panel beton pracetak 5x50x213 cm
-
m²
1.1.1.1.16.
-
-
X
1.00 X
1.00
1.00
-
1
Pembuatan Papan nama Proyek 0,8 x 1,2 cm
bh
SNI.3
249,150.00
27,406.50
1.00 X
1.00 X
1.00
1.00
1.00
2
Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m
m²
SNI.4b
407,693.00
44,846.23
-
-
X
1.00 X
1.00
1.00
-
3
Bongkar Usuk + Reng Untuk Dipakai Kembali
m²
SNI.8
45,980.00
5,057.80
-
-
X
1.00 X
1.00
1.00
-
4
Pembongkaran Atap Seng Gelombang
m²
SNI.9
18,271.00
2,009.81
-
-
X
1.00 X
1.00
1.00
-
A.
JUMLAH PEKERJAAN PENDAHULUAN
B.
PEKERJAAN PEMBANGUNAN LANTAI - 1
I
PEKERJAAN TANAH
1.00
-
-
-
-
-
-
-
276,556.50
Sub Total
276,556.50
Jumlah Total
276,556.50
1.00 X
1
Penggalian tanah biasa sedalam 1 m
-
m³
1. 1.5.1.1.
130,075.00
14,308.25
-
-
X
1.00 X
1.00
1.00
-
2
Penggalian tanah biasa sedalam 2 m
-
m³
1. 1.5.1.2.
159,885.00
17,587.35
-
-
X
1.00 X
1.00
1.00
-
3
Menggali tanah biasa sedalam 3 m
-
m³
1. 1.5.1.3.
190,201.00
20,922.11
-
-
X
1.00 X
1.00
1.00
-
4
Menggali tanah keras sedalam 1 m
-
m³
1. 1.5.1.4.
173,096.00
19,040.56
-
-
X
1.00 X
1.00
1.00
-
5
Menggali tanah cadas sedalam 1 m
-
m³
1. 1.5.1.5.
262,680.00
28,894.80
-
-
X
1.00 X
1.00
1.00
-
6
Menggali tanah lumpur sedalam 1 m
-
m³
1. 1.5.1.6.
209,385.00
23,032.35
-
-
X
1.00 X
1.00
1.00
-
7
Pengerjaan stripping tanah tebing setinggi 1 meter
-
m²
1. 1.5.1.7.
9,515.00
1,046.65
-
-
X
1.00 X
1.00
1.00
-
8
Pembuangan tanah sejauh 30 meter
-
m³
1. 1.5.1.8.
56,980.00
6,267.80
-
-
X
1.00 X
1.00
1.00
-
9
Pengurugan kembali galian tanah
-
m³
1. 1.5.1.9.
43,358.33
4,769.42
-
-
X
1.00 X
1.00
1.00
-
10
Pemadatan tanah tanah ( per 20 cm)
-
m³
1. 1.5.1.10.
95,150.00
10,466.50
-
-
X
1.00 X
1.00
1.00
-
11
Pengurugan dengan pasir urug
-
m³
1. 1.5.1.11.
309,430.00
34,037.30
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan lapisan pudel campuran 1KP:3PP:7TL
-
m³
1. 1.5.1.12.
406,333.40
44,696.67
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan
-
m²
1. 1.5.1.13.
219,945.00
24,193.95
-
-
X
1.00 X
1.00
1.00
-
Sub Total II
-
PEKERJAAN PONDASI
1
Pemasangan pondasi batu belah campuran 1SP : 3PP
-
m³
3. 3.1.1.1.
1,263,377.50
138,971.53
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan pondasi batu belah campuran 1SP : 4PP
-
m³
3. 3.1.1.2.
1,199,110.00
131,902.10
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan pondasi batu belah campuran 1SP : 5PP
-
m³
3. 3.1.1.3.
1,154,560.00
127,001.60
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan pondasi batu belah campuran 1SP : 6PP
-
m³
3. 3.1.1.4.
1,123,237.50
123,556.13
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan pondasi batu belah campuran 1SP : 8PP
-
m³
3. 3.1.1.5.
1,080,310.00
118,834.10
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP
-
m³
3. 3.1.1.6.
851,189.90
93,630.89
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP
-
m³
3. 3.1.1.7.
1,002,410.20
110,265.12
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP
-
m³
3. 3.1.1.8.
972,577.10
106,983.48
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan batu kosong (anstamping)
-
m³
3. 3.1.1.9.
646,008.00
71,060.88
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan pondasi sumuran, diameter 100 cm
-
m³
3. 3.1.1.10.
3,993,517.00
439,286.87
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB :
-
m³
3. 3.1.1.11.
1,512,874.00
166,416.14
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
III PEKERJAAN BETON 1
Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm,
-
m³
4. 4.1.1.1.
2,266,091.93
249,270.11
-
-
X
1.00 X
1.00
1.00
-
2
Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm,
-
m³
4. 4.1.1.2.
2,315,320.86
254,685.29
-
-
X
1.00 X
1.00
1.00
-
3
Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm
-
m³
4. 4.1.1.3.
2,352,716.93
258,798.86
-
-
X
1.00 X
1.00
1.00
-
4
Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump
-
m³
4. 4.1.1.4.
2,107,588.21
231,834.70
-
-
X
1.00 X
1.00
1.00
-
5
Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm
-
m³
4. 4.1.1.5.
2,398,268.71
263,809.56
-
-
X
1.00 X
1.00
1.00
-
6
Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm
-
m³
4. 4.1.1.6.
2,439,789.79
268,376.88
-
-
X
1.00 X
1.00
1.00
-
7
Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm
-
m³
4. 4.1.1.7.
2,474,035.14
272,143.87
-
-
X
1.00 X
1.00
1.00
-
8
Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm
-
m³
4. 4.1.1.8.
2,492,711.57
274,198.27
-
-
X
1.00 X
1.00
1.00
-
9
Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm
-
m³
4. 4.1.1.9.
2,525,185.14
277,770.37
-
-
X
1.00 X
1.00
1.00
-
10
Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm
-
m³
4. 4.1.1.10.
2,534,963.36
278,845.97
-
-
X
1.00 X
1.00
1.00
-
11
Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm
-
m³
4. 4.1.1.11.
2,670,352.14
293,738.74
-
-
X
1.00 X
1.00
1.00
-
12
Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm
-
m³
4. 4.1.1.12.
2,683,375.36
295,171.29
-
-
X
1.00 X
1.00
1.00
-
13
Membuat beton kedap air dengan strorox – 100
-
m³
4. 4.1.1.13.
1,944,910.00
213,940.10
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan PVC Waterstop lebar 150 mm
-
m'
4. 4.1.1.14.
-
-
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan PVC Waterstop lebar 200 mm
-
m'
4. 4.1.1.15.
-
-
-
-
X
1.00 X
1.00
1.00
-
16
Membuat PVC Waterstop lebar 230 mm – 320 mm
-
m'
4. 4.1.1.16.
-
-
-
-
X
1.00 X
1.00
1.00
-
17
Pembesian dengan besi polos atau besi ulir
-
10 kg
4. 4.1.1.17.
253,858.00
27,924.38
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan kabel presstressed polos/strands
-
kg
4. 4.1.1.18.
243,804.00
26,818.44
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan jaring kawat baja (wiremesh), 6 mm
-
kg
4. 4.1.1.19.
53,438.00
5,878.18
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan bekisting untuk pondasi
-
m²
4. 4.1.1.20.
278,916.00
30,680.76
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan bekisting untuk dinding
-
m²
4. 4.1.1.25.
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan bekisting untuk tangga
-
m²
4. 4.1.1.26.
423,973.00
46,637.03
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan jembatan untuk pengecoran beton
-
m²
4. 4.1.1.27.
138,523.00
15,237.53
-
-
X
1.00 X
1.00
1.00
-
24
Membuat pondasi beton bertulang (150 kg besi + bekisting)
-
m³
4. 4.1.1.28.
6,903,061.00
759,336.71
-
-
X
1.00 X
1.00
1.00
-
25
Membuat sloof beton bertulang (200 kg besi + bekisting)
-
m³
4. 4.1.1.29.
8,452,323.00
929,755.53
-
-
X
1.00 X
1.00
1.00
-
26
Membuat kolom beton bertulang (300 kg besi + bekisting)
-
m³
4. 4.1.1.30.
12,879,603.00
1,416,756.33
-
-
X
1.00 X
1.00
1.00
-
27
Membuat balok beton bertulang (200 kg besi + bekisting)
-
m³
4. 4.1.1.31.
9,881,498.00
1,086,964.78
-
-
X
1.00 X
1.00
1.00
-
28
Membuat kolom beton bertulang (150 kg besi + bekisting)
-
m³
4. 4.1.1.32.
8,543,260.00
939,758.60
-
-
X
1.00 X
1.00
1.00
-
29
Membuat dinding beton bertulang (150 kg besi + bekisting)
-
m³
4. 4.1.1.33.
8,331,301.00
916,443.11
-
-
X
1.00 X
1.00
1.00
-
30
Membuat dinding beton bertulang (200 kg besi + bekisting)
-
m³
4. 4.1.1.34.
9,344,753.00
1,027,922.83
-
-
X
1.00 X
1.00
1.00
-
31
Membuat kolom praktis beton bertulang (11 x 11) cm
-
m'
4. 4.1.1.35.
131,862.50
14,504.88
-
-
X
1.00 X
1.00
1.00
-
32
Membuat ring balok beton bertulang (10 x 15) cm
-
m'
4. 4.1.1.36.
185,476.50
20,402.42
-
-
X
1.00 X
1.00
1.00
-
-
-
Sub Total
-
PEKERJAAN BETON PRACETAK 1
Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175
-
m²
4.4.1.2.1.
192,321.80
21,155.40
-
-
X
1.00 X
1.00
1.00
-
2
Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 1
-
m²
4.4.1.2.2.
240,443.50
26,448.79
-
-
X
1.00 X
1.00
1.00
-
3
Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 1
-
m²
4.4.1.2.3.
275,266.20
30,279.28
-
-
X
1.00 X
1.00
1.00
-
4
Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 1
-
m²
4.4.1.2.4.
360,665.25
39,673.18
-
-
X
1.00 X
1.00
1.00
-
5
Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai)
-
m²
4.4.1.2.5.
-
-
-
-
X
1.00 X
1.00
1.00
-
6
Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pak
-
m²
4.4.1.2.6.
-
-
-
-
X
1.00 X
1.00
1.00
-
7
Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pa
-
m²
4.4.1.2.7.
-
-
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan dan membuka bekisting komponen plat beton prace
-
bh
4.4.1.2.8.
13,772.00
1,514.92
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan dan membuka bekisting komponen balok beton pra
-
bh
4.4.1.2.9.
22,220.00
2,444.20
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan dan membuka bekisting komponen Kolom beton pr
-
bh
4.4.1.2.10.
17,996.00
1,979.56
-
-
X
1.00 X
1.00
1.00
-
11
Penuangan/menebar beton untuk komponen plat pracetak
-
bh
4.4.1.2.11.
-
-
-
-
X
1.00 X
1.00
1.00
-
12
Penuangan/menebar beton untuk komponen balok pracetak
-
bh
4.4.1.2.12.
-
-
-
-
X
1.00 X
1.00
1.00
-
13
Penuangan/menebar beton untuk komponen kolom pracetak
-
bh
4.4.1.2.13.
-
-
-
-
X
1.00 X
1.00
1.00
-
14
Mendirikan komponen plat pracetak
-
bh
4.4.1.2.14.
-
-
-
-
X
1.00 X
1.00
1.00
-
15
Mendirikan komponen balok pracetak
-
bh
4.4.1.2.15.
-
-
-
-
X
1.00 X
1.00
1.00
-
16
Mendirikan komponen kolom pracetak
-
bh
4.4.1.2.16.
-
-
-
-
X
1.00 X
1.00
1.00
-
17
Melangsir komponen plat pracetak ( ± 20 m)
-
bh
4.4.1.2.17.
-
-
-
-
X
1.00 X
1.00
1.00
-
18
Melangsir komponen balok pracetak ( ± 20 m)
-
bh
4.4.1.2.18.
-
-
-
-
X
1.00 X
1.00
1.00
-
19
Melangsir komponen kolom pracetak ( ± 20 m)
-
bh
4.4.1.2.19.
-
-
-
-
X
1.00 X
1.00
1.00
-
20
Bahan grouting campuran
-
m³
4.4.1.2.20.
-
-
-
-
X
1.00 X
1.00
1.00
-
21
Bahan grouting tidak campuran
-
m³
4.4.1.2.21.
-
-
-
-
X
1.00 X
1.00
1.00
-
22
Upah melakukan grouting pada join pracetak
-
ttk
4.4.1.2.22.
104,786.00
11,526.46
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan Bekisting join pracetak
-
ttk
4.4.1.2.23.
113,929.20
12,532.21
-
-
X
1.00 X
1.00
1.00
-
24
Upah Join dengan Sling
-
ttk
4.4.1.2.24.
140,723.00
15,479.53
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
IV PEKERJAAN BESI DAN ALUMINIUM 1
Pemasangan besi profil
-
kg
4.4.2.1.1.
72,787.00
8,006.57
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan rangka kuda-kuda baja IWF
-
kg
4.4.2.1.2.
72,787.00
8,006.57
-
-
X
1.00 X
1.00
1.00
-
3
Pengerjaan pekerjaan perakitan
-
kg
4.4.2.1.3.
96,382.00
10,602.02
-
-
X
1.00 X
1.00
1.00
-
4
Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja
-
m²
4.4.2.1.4.
2,258,861.00
248,474.71
-
-
X
1.00 X
1.00
1.00
-
5
Pengerjaan pengelasan dengan las listrik
-
cm
4.4.2.1.5.
95,998.10
10,559.79
-
-
X
1.00 X
1.00
1.00
-
6
Pembuatan rangka jendela besi scuare tube (25 x 5) cm
-
m²
4.4.2.1.6.
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan pintu rolling door besi
-
m²
4.4.2.1.7.
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan pintu lipat (folding door) bahan plastik/PVC
-
m²
4.4.2.1.8.
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan sunscreen alluminium
-
m²
4.4.2.1.9.
751,652.00
82,681.72
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan rolling door alluminium
-
m²
4.4.2.1.10.
1,071,950.00
117,914.50
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan kusen pintu alluminium
-
m'
4.4.2.1.11.
201,511.20
22,166.23
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan pintu alluminium strip lebar 8 cm
-
m²
4.4.2.1.12.
1,531,003.10
168,410.34
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan pintu kaca rangka alluminium
-
m²
4.4.2.1.13.
-
-
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan venetions blinds dan Vertical blinds
-
m²
4.4.2.1.14.
-
-
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan terali besi strip (2 x 3) mm
-
m²
4.4.2.1.15.
1,150,451.34
126,549.65
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan kawat nyamuk
-
m²
4.4.2.1.16.
242,681.88
26,695.01
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan jendela nako & tralis
-
m²
4.4.2.1.17.
455,323.00
50,085.53
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm
-
m'
4.4.2.1.18.
257,262.50
28,298.88
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 leba
-
m'
4.4.2.1.19.
189,689.50
20,865.85
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm
-
m²
4.4.2.1.20.
585,262.33
64,378.86
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 c
-
m²
4.4.2.1.21.
695,335.67
76,486.92
-
-
X
1.00 X
1.00
1.00
-
2,405,678.00 -
264,624.58 -
Sub Total V
-
PEKERJAAN PASANGAN DINDING
1
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam
-
m²
4. 4.4.1.1.
385,495.00
42,404.45
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam
-
m²
4. 4.4.1.2.
368,489.00
40,533.79
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam
-
m²
4. 4.4.1.3.
357,016.00
39,271.76
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam
-
m²
4. 4.4.1.4.
351,109.00
38,621.99
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu cam
-
m²
4. 4.4.1.5.
349,140.00
38,405.40
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam
-
m²
4. 4.4.1.6.
326,274.85
35,890.23
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu cam
-
m²
4. 4.4.1.7.
187,016.50
20,571.82
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu cam
-
m²
4. 4.4.1.8.
178,946.90
19,684.16
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu cam
-
m²
4.4.4.1.9.
174,322.50
19,175.48
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam
-
m²
4. 4.4.1.10.
171,414.10
18,855.55
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu camp
-
m²
4. 4.4.1.11.
169,860.90
18,684.70
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam
-
m²
4. 4.4.1.12.
166,705.00
18,337.55
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam
-
m²
4. 4.4.1.13.
163,064.00
17,937.04
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam
-
m²
4. 4.4.1.14.
147,045.80
16,175.04
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu ca
-
m²
4. 4.4.1.15.
149,428.40
16,437.12
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan dinding conblock HB20 campuran 1SP : 3PP
-
m²
4. 4.4.1.16.
449,255.40
49,418.09
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan dinding conblock HB20 campuran 1SP :4PP
-
m²
4. 4.4.1.17.
448,813.20
49,369.45
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan dinding conblock HB15 campuran 1SP :3PP
-
m²
4. 4.4.1.18.
396,876.70
43,656.44
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan dinding conblock HB15 campuran 1SP :4PP
-
cm²
4. 4.4.1.19.
396,306.90
43,593.76
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan dinding conblock HB10 campuran 1SP :3PP
-
cm²
4. 4.4.1.20.
365,092.20
40,160.14
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan dinding conblock HB10 campuran 1SP :4PP
-
cm²
4. 4.4.1.21.
365,366.10
40,190.27
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan dinding terawang (rooster) 12x11x24 campuran 1
-
cm²
4. 4.4.1.22.
699,957.50
76,995.33
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan dinding terawang (rooster) 12x11x24 campuran 1
-
cm²
4. 4.4.1.23.
699,957.50
76,995.33
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan dinding bata berongga ekspose 12x11x24 campura
-
cm²
4. 4.4.1.24.
1,508,540.00
165,939.40
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
VI PEKERJAAN PLESTERAN 1
Pemasangan plesteran 1SP : 1PP tebal 15 mm.
-
m²
4.4.4.2.1.
121,392.48
13,353.17
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan plesteran 1SP : 2PP tebal 15 mm.
-
m²
4.4.4.2.2.
112,508.88
12,375.98
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan plesteran 1SP : 3PP tebal 15mm.
-
m²
4.4.4.2.3.
108,673.62
11,954.10
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan plesteran 1SP : 4PP tebal 15 mm
-
m²
4.4.4.2.4.
106,048.80
11,665.37
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan plesteran 1SP : 5PP tebal 15 mm
-
m²
4.4.4.2.5.
104,569.08
11,502.60
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan plesteran 1SP : 6PP tebal 15 mm.
-
m²
4.4.4.2.6.
103,380.42
11,371.85
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan plesteran 1SP : 7PP tebal 15 mm
-
m²
4.4.4.2.7.
102,730.32
11,300.34
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan plesteran 1SP : 8PP tebal 15 mm
-
m²
4.4.4.2.8.
102,080.22
11,228.82
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm
-
m²
4.4.4.2.9.
106,078.50
11,668.64
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm
-
m²
4.4.4.2.10.
102,663.00
11,292.93
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm
-
m²
4.4.4.2.11.
94,373.73
10,381.11
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm
-
m²
4.4.4.2.12.
95,841.79
10,542.60
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan plesteran 1SP : 1PP tebal 20 mm
-
m²
4.4.4.2.13.
150,600.34
16,566.04
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan plesteran 1SP : 3PP tebal 20 mm
-
m²
4.4.4.2.14.
120,109.66
13,212.06
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan plesteran 1SP : 4PP tebal 20 mm.
-
m²
4.4.4.2.15.
141,904.40
15,609.48
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan plesteran 1SP : 5PP tebal 20 mm
-
m²
4.4.4.2.16.
140,013.94
15,401.53
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan plesteran 1SP : 6PP tebal 20 mm
-
m²
4.4.4.2.17.
138,346.56
15,218.12
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm
-
m²
4.4.4.2.18.
134,243.23
14,766.76
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan berapen 1SP : 5PP tebal 15 mm
-
m²
4.4.4.2.19.
60,602.08
6,666.23
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm
-
m'
4.4.4.2.20.
112,084.50
12,329.30
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan plesteran granit 1SP : 2 granit tebal 1cm
-
m²
4.4.4.2.21.
-
-
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan plesteran traso 1SP : 2 traso tebal 1cm
-
m²
4.4.4.2.22.
-
-
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan plesteran ciprat 1SP : 2PP
-
m²
4.4.4.2.23.
86,288.40
9,491.72
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan finishing siar pasangan bata merah
-
m²
4.4.4.2.24.
50,284.96
5,531.35
-
-
X
1.00 X
1.00
1.00
-
25
Pemasangan finishing siar pasangan conblock ekspose
-
m²
4.4.4.2.25.
23,881.00
2,626.91
-
-
X
1.00 X
1.00
1.00
-
26
Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2
-
m²
4.4.4.2.26.
103,265.80
11,359.24
-
-
X
1.00 X
1.00
1.00
-
27
Pemasangan acian.
-
m²
4.4.4.2.27.
65,037.50
7,154.13
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING 1
Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm
-
m²
4.4.4.3.1.
177,075.80
19,478.34
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm
-
m²
4.4.4.3.2.
178,215.40
19,603.69
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm
-
m²
4.4.4.3.3.
186,224.50
20,484.70
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan lantai ubin warna ukuran 40cm x40 cm
-
m²
4.4.4.3.4.
218,216.90
24,003.86
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan lantai ubin warna ukuran 30cm x30cm
-
m²
4.4.4.3.5.
298,365.10
32,820.16
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan lantai ubin warna ukuran 20cm x20cm
-
m²
4.4.4.3.6.
510,284.50
56,131.30
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan lantai ubin teraso ukuran 40cm x40cm
-
m²
4.4.4.3.7.
224,051.30
24,645.64
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan lantai ubin teraso ukuran 30cm x30cm
-
m²
4.4.4.3.8.
231,774.40
25,495.18
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan lantai ubin granit ukuran 40cm x40cm
-
m²
4.4.4.3.9.
649,962.50
71,495.88
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan lantai ubin granit ukuran 30cm x30cm
-
m²
4.4.4.3.10.
660,044.00
72,604.84
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan lantai ubin teralux ukuran 40cm x40cm
-
m²
4.4.4.3.11.
824,994.50
90,749.40
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan lantai ubin teralux ukuran 30cm x30cm
-
m²
4.4.4.3.12.
836,313.50
91,994.49
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm
-
m²
4.4.4.3.13.
861,151.50
94,726.67
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm
-
m²
4.4.4.3.14.
824,994.50
90,749.40
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm
-
m²
4.4.4.3.15.
836,313.50
91,994.49
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm
-
m²
4.4.4.3.16.
52,354.50
5,759.00
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm
-
m²
4.4.4.3.17.
47,641.00
5,240.51
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm
-
m²
4.4.4.3.18.
47,842.30
5,262.65
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan plint ubin warna ukuran 10cm x 20cm
-
m²
4.4.4.3.19.
46,390.30
5,102.93
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan plint ubin warna ukuran 10cm x 30cm
-
m²
4.4.4.3.20.
51,045.50
5,615.01
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan plint ubin warna ukuran 10cm x 40cm
-
m²
4.4.4.3.21.
51,054.30
5,615.97
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan plint ubin teraso ukuran 10cm x 30cm
-
m²
4.4.4.3.22.
51,627.95
5,679.07
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan plint ubin teraso ukuran 10cm x 40cm
-
m²
4.4.4.3.23.
51,637.30
5,680.10
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan plint ubin granit ukuran 10cm x 40cm
-
m²
4.4.4.3.24.
94,196.30
10,361.59
-
-
X
1.00 X
1.00
1.00
-
25
Pemasangan plint ubin granit ukuran 10cm x 30cm
-
m²
4.4.4.3.25.
94,146.80
10,356.15
-
-
X
1.00 X
1.00
1.00
-
26
Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm
-
m²
4.4.4.3.26.
111,158.30
12,227.41
-
-
X
1.00 X
1.00
1.00
-
27
Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm
-
m²
4.4.4.3.27.
111,620.30
12,278.23
-
-
X
1.00 X
1.00
1.00
-
28
Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm
-
m²
4.4.4.3.28.
109,046.30
11,995.09
-
-
X
1.00 X
1.00
1.00
-
29
Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm
-
m²
4.4.4.3.29.
111,686.30
12,285.49
-
-
X
1.00 X
1.00
1.00
-
30
Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm
-
m²
4.4.4.3.30.
111,620.30
12,278.23
-
-
X
1.00 X
1.00
1.00
-
31
Pemasangan lantai teraso cor di tempat, tebal 3cm
-
m²
4.4.4.3.31.
-
-
X
1.00 X
1.00
1.00
-
32
Pemasangan lantai keramik artistik 10cm x 20cm
-
m²
4.4.4.3.32.
1,036,087.80
113,969.66
-
-
X
1.00 X
1.00
1.00
-
33
Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 2
-
m²
4.4.4.3.33.
1,801,412.80
198,155.41
-
-
X
1.00 X
1.00
1.00
-
34
Pemasangan lantai keramik ukuran 40cm x 40cm
-
m²
4.4.4.3.35.a
424,187.50
46,660.63
-
-
X
1.00 X
1.00
1.00
-
35
Pemasangan lantai keramik ukuran 33cm x 33cm
-
m²
4.4.4.3.34.
427,248.80
46,997.37
-
-
X
1.00 X
1.00
1.00
-
36
Pemasangan lantai keramik ukuran 30cm x 30cm
-
m²
4.4.4.3.35.
425,465.70
46,801.23
-
-
X
1.00 X
1.00
1.00
-
37
Pemasangan lantai keramik ukuran 20cm x 20cm
-
m²
4.4.4.3.36.
426,915.50
46,960.71
-
-
X
1.00 X
1.00
1.00
-
38
Pemasangan lantai keramik ukuran 10cm x 33cm untuk variasi/b
-
m²
4.4.4.3.37.
579,067.50
63,697.43
-
-
X
1.00 X
1.00
1.00
-
39
Pemasangan lantai keramik mozaik ukuran 30cm x 30cm
-
m²
4.4.4.3.38.
1,303,711.75
143,408.29
-
-
X
1.00 X
1.00
1.00
-
40
Pemasangan plint keramik ukuran 10cm x 20cm
-
m'
4.4.4.3.39.
122,856.80
13,514.25
-
-
X
1.00 X
1.00
1.00
-
41
Pemasangan plint keramik ukuran 10cm x 10cm
-
m'
4.4.4.3.40.
63,803.30
7,018.36
-
-
X
1.00 X
1.00
1.00
-
42
Pemasangan plint keramik ukuran 5cm x 20cm
-
m'
4.4.4.3.41.
53,593.65
5,895.30
-
-
X
1.00 X
1.00
1.00
-
43
Pemasangan plint internal cove artistik 5cm x 5cm x 20cm
-
m'
4.4.4.3.42.
-
-
X
1.00 X
1.00
1.00
-
44
Pemasangan lantai marmer ukuran 100cm x 100cm
-
m²
4.4.4.3.43.
943,137.80
103,745.16
-
-
X
1.00 X
1.00
1.00
-
45
Pemasangan lantai karpet
-
m²
4.4.4.3.44.
120,208.00
13,222.88
-
-
X
1.00 X
1.00
1.00
-
46
Pemasangan underlayer (pelapis bawah karpet)
-
m²
4.4.4.3.45.
-
-
X
1.00 X
1.00
1.00
-
47
Pemasangan lantai parquet kayu
-
m²
4.4.4.3.46.
1,397,660.00
153,742.60
-
-
X
1.00 X
1.00
1.00
-
48
Pemasangan lantai kayu gymfloor
-
m²
4.4.4.3.47.
1,397,660.00
153,742.60
-
-
X
1.00 X
1.00
1.00
-
49
Pemasangan dinding porslen 11cm x 11cm
-
m²
4.4.4.3.48.
478,755.20
52,663.07
-
-
X
1.00 X
1.00
1.00
-
50
Pemasangan dinding porslen 10cm x 20cm
-
m²
4.4.4.3.49.
472,461.00
51,970.71
-
-
X
1.00 X
1.00
1.00
-
51
Pemasangan dinding porslen 20cm x 20cm
-
m²
4.4.4.3.50.
456,456.00
50,210.16
-
-
X
1.00 X
1.00
1.00
-
52
Pemasangan dinding keramik artistik 10cm x 20cm
-
m²
4.4.4.3.51.
495,781.00
54,535.91
-
-
X
1.00 X
1.00
1.00
-
53
Pemasangan dinding keramik artistik 5cm x 20cm
-
m²
4.4.4.3.52.
498,256.00
54,808.16
-
-
X
1.00 X
1.00
1.00
-
54
Pemasangan dinding keramik 10cm x 20cm
-
m²
4.4.4.3.53.
495,781.00
54,535.91
-
-
X
1.00 X
1.00
1.00
-
55
Pemasangan dinding keramik 20cm x 20cm
-
m²
4.4.4.3.54.
482,416.00
53,065.76
-
-
X
1.00 X
1.00
1.00
-
56
Pemasangan dinding keramik 30cm x 30cm
-
m²
4.4.4.3.54a.
487,036.00
53,573.96
-
-
X
1.00 X
1.00
1.00
-
57
Pemasangan dinding keramik 40cm x 40cm
-
m²
4.4.4.3.54b.
617,593.78
67,935.32
-
-
X
1.00 X
1.00
1.00
-
58
Pemasangan dinding marmer 100cm x 100cm
-
m²
4.4.4.3.55.
1,216,339.30
133,797.32
-
-
X
1.00 X
1.00
1.00
-
59
Pemasangan dinding bata pelapis 3cm x 7cm x 24cm
-
m²
4.4.4.3.56.
435,460.30
47,900.63
-
-
X
1.00 X
1.00
1.00
-
60
Pemasangan dinding batu paras
-
m²
4.4.4.3.57.
505,395.00
55,593.45
-
-
X
1.00 X
1.00
1.00
-
61
Pemasangan dinding batu tempel hitam
-
m²
4.4.4.3.58.
528,495.00
58,134.45
-
-
X
1.00 X
1.00
1.00
-
62
Pemasangan lantai vynil ukuran 30cm x 30cm
-
m²
4.4.4.3.59.
846,928.50
93,162.14
-
-
X
1.00 X
1.00
1.00
-
63
Pemasangan wallpaper lebar 50 cm
-
m²
4.4.4.3.60.
122,323.67
13,455.60
-
-
X
1.00 X
1.00
1.00
-
64
Pemasangan floor harderner
-
m²
4.4.4.3.61.
269,434.00
29,637.74
-
-
X
1.00 X
1.00
1.00
-
65
Pemasangan plint vynil 15cm x 30cm
-
m²
4.4.4.3.62.
812,196.00
89,341.56
-
-
X
1.00 X
1.00
1.00
-
66
Pemasangan plint kayu tebal 2 cm lebar 10 cm
-
m²
4.4.4.3.63.
69,443.00
7,638.73
-
-
X
1.00 X
1.00
1.00
-
67
Memasang Paving blok tebal 8 cm
-
m²
4.4.4.3.64.
197,120.00
21,683.20
-
-
X
1.00 X
1.00
1.00
-
-
-
-
-
-
-
Sub Total
-
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND) 1
Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan
-
m²
4.4.5.1.1.
79,959.00
8,795.49
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan langit-langit akustik ukuran (30 x 30) cm
-
m²
4.4.5.1.2.
562,749.00
61,902.39
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan langit-langit akustik ukuran (30 x 60) cm
-
m²
4.4.5.1.3.
545,699.00
60,026.89
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan langit-langit akustik ukuran (60 x 120) cm
-
m²
4.4.5.1.4.
554,510.00
60,996.10
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan langit-langit tripleks ukuran (120 x 240) cm, teb
-
m²
4.4.5.1.5.
69,921.50
7,691.37
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan langit-langit lambrisering kayu, tebal 9 mm
-
m²
4.4.5.1.6.
391,220.50
43,034.26
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan langit-langit gypsum board ukuran (120x240x9) m
-
m²
4.4.5.1.7.
73,755.00
8,113.05
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut
-
m²
4.4.5.1.8.
791,766.25
87,094.29
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan list langit-langit kayu profil
-
m'
4.4.5.1.9.
37,202.00
4,092.22
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
IX PEKERJAAN PENUTUP ATAP 1
Pemasangan atap genteng palentong kecil
-
m²
4.4.5.2.1.
93,846.50
10,323.12
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan atap genteng kodok
-
m²
4.4.5.2.2.
195,723.00
21,529.53
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan atap genteng palentong besar/super
-
m²
4.4.5.2.3.
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan bubung genteng palentong
-
m'
4.4.5.2.4.
174,196.00
19,161.56
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan bubung genteng kodok glazuur
-
m'
4.4.5.2.5.
172,546.00
18,980.06
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan bubung genteng palentong besar
-
m'
4.4.5.2.6.
174,966.00
19,246.26
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan roof light fibreglass 90x180
-
m²
4.4.5.2.7.
124,960.00
13,745.60
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm
-
m²
4.4.5.2.8.
101,893.00
11,208.23
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm
-
m²
4.4.5.2.9.
99,767.80
10,974.46
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm
-
m²
4.4.5.2.10.
92,549.60
10,180.46
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm
-
m²
4.4.5.2.11.
104,137.00
11,455.07
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm
-
m²
4.4.5.2.12.
142,980.75
15,727.88
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm
-
m²
4.4.5.2.13.
123,827.00
13,620.97
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm
-
m²
4.4.5.2.14.
106,666.32
11,733.30
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm
-
m²
4.4.5.2.15.
104,639.47
11,510.34
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm
-
m²
4.4.5.2.16.
133,004.67
14,630.51
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm
-
m²
4.4.5.2.17.
-
-
X
1.00 X
1.00
1.00
-
-
-
-
-
18
Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm
-
m²
4.4.5.2.18.
-
-
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm
-
m²
4.4.5.2.19.
-
-
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm
-
m²
4.4.5.2.20.
-
-
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm
-
m²
4.4.5.2.21.
-
-
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan bubung stel gelombang 0,92m
-
m'
4.4.5.2.22.
-
-
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan bubung stel gelombang 1,05m
-
m'
4.4.5.2.23.
-
-
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan bubung stel gelombang 1,08m
-
m'
4.4.5.2.24.
-
-
-
-
X
1.00 X
1.00
1.00
-
25
Pemasangan nok paten 0,92m
-
m'
4.4.5.2.25.
-
-
-
-
X
1.00 X
1.00
1.00
-
26
Pemasangan nok paten 1,05m
-
m'
4.4.5.2.26.
-
-
-
-
X
1.00 X
1.00
1.00
-
27
Pemasangan nok paten 1,08m
-
m'
4.4.5.2.27.
-
-
-
-
X
1.00 X
1.00
1.00
-
28
Pemasangan nok stel rata 0,92m
-
m'
4.4.5.2.28.
241,901.00
26,609.11
-
-
X
1.00 X
1.00
1.00
-
29
Pemasangan nok stel rata 1,05m
-
m'
4.4.5.2.29.
257,118.07
28,282.99
-
-
X
1.00 X
1.00
1.00
-
30
Pemasangan genteng beton
-
m²
4.4.5.2.30.
-
-
-
-
X
1.00 X
1.00
1.00
-
31
Pemasangan genteng aspal
-
m²
4.4.5.2.31.
-
-
-
-
X
1.00 X
1.00
1.00
-
32
Pemasangan genteng metal
-
m²
4.4.5.2.32.
-
-
-
-
X
1.00 X
1.00
1.00
-
33
Pemasangan atap sirap kayu
-
m²
4.4.5.2.33.
-
-
-
-
X
1.00 X
1.00
1.00
-
34
Pemasangan nok genteng beton
-
m'
4.4.5.2.34.
-
-
-
-
X
1.00 X
1.00
1.00
-
35
Pemasangan nok genteng aspal
-
m'
4.4.5.2.35.
-
-
-
-
X
1.00 X
1.00
1.00
-
36
Pemasangan nok genteng metal
-
m'
4.4.5.2.36.
166,199.00
18,281.89
-
-
X
1.00 X
1.00
1.00
-
37
Pemasangan nok sirap
-
m'
4.4.5.2.37.
164,540.20
18,099.42
-
-
X
1.00 X
1.00
1.00
-
38
Pemasangan atap seng gelombang
-
m²
4.4.5.2.38.
176,919.60
19,461.16
-
-
X
1.00 X
1.00
1.00
-
39
Pemasangan nok atap seng
-
m'
4.4.5.2.39.
104,471.40
11,491.85
-
-
X
1.00 X
1.00
1.00
-
40
Pemasangan atap alumunium
-
m²
4.4.5.2.40.
-
-
-
-
X
1.00 X
1.00
1.00
-
41
Pemasangan nok alumunium
-
m'
4.4.5.2.41.
-
-
-
-
X
1.00 X
1.00
1.00
-
42
Pemasangan alumunium foil/sisalation
-
m²
4.4.5.2.42.
-
-
X
1.00 X
1.00
1.00
-
53,504.00
5,885.44
Sub Total X
-
PEKERJAAN KAYU
1
Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu
-
m³
4.4.6.1.1.
12,736,350.00
1,400,998.50
-
-
X
1.00 X
1.00
1.00
-
2
Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu
-
m³
4.4.6.1.2.
10,992,300.00
1,209,153.00
-
-
X
1.00 X
1.00
1.00
-
3
Pembuatan dan pemasangan pintu klamp standar, kayu kelas II
-
m²
4.4.6.1.3.
496,859.00
54,654.49
-
-
X
1.00 X
1.00
1.00
-
4
Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas I
-
m²
4.4.6.1.4.
424,259.00
46,668.49
-
-
X
1.00 X
1.00
1.00
-
5
Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau
-
m²
4.4.6.1.5.
1,097,800.00
120,758.00
-
-
X
1.00 X
1.00
1.00
-
6
Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I
-
m²
4.4.6.1.6.
834,790.00
91,826.90
-
-
X
1.00 X
1.00
1.00
-
7
Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I
-
m²
4.4.6.1.7.
1,210,000.00
133,100.00
-
-
X
1.00 X
1.00
1.00
-
8
Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tert
-
m²
4.4.6.1.8.
907,599.00
99,835.89
-
-
X
1.00 X
1.00
1.00
-
9
Pembuatan pintu plywood rangkap, rangka expose kayu kelas I a
-
m²
4.4.6.1.9.
907,690.00
99,845.90
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan jalusi kusen, kayu kelas I atau II
-
m²
4.4.6.1.10.
949,850.00
104,483.50
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan teakwood rangkap, rangka expose kayu kelas I
-
m²
4.4.6.1.11.
1,013,804.00
111,518.44
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan teakwood rangkap lapis formika, rangka expose kay
-
m²
4.4.6.1.12.
855,844.00
94,142.84
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II
-
m³
4.4.6.1.13.
9,381,680.00
1,031,984.80
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan konstruksi kuda-kuda expose, kayu kelas I
-
m³
4.4.6.1.14.
13,678,665.00
1,504,653.15
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan konstruksi gordeng, kayu kelas II
-
m³
4.4.6.1.15.
11,679,085.00
1,284,699.35
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan rangka atap genteng keramik, kayu kelas II
-
m²
4.4.6.1.16.
129,195.00
14,211.45
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan rangka atap genteng beton, kayu kelas II
-
m²
4.4.6.1.17.
137,857.50
15,164.33
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan rangka atap sirap, kayu kelas II
-
m²
4.4.6.1.18.
68,723.60
7,559.60
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II
-
m²
4.4.6.1.19.
69,179.00
7,609.69
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II a
-
m²
4.4.6.1.20.
160,138.00
17,615.18
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas
-
m'
4.4.6.1.21.
118,195.00
13,001.45
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas
-
m'
4.4.6.1.22.
117,590.00
12,934.90
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II
-
m²
4.4.6.1.23.
197,190.00
21,690.90
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan dinding pemisah teakwood rangkap, rangka kayu ke
-
m²
4.4.6.1.24.
509,729.00
56,070.19
-
-
X
1.00 X
1.00
1.00
-
25
Pemasangan dinding pemisah plywood rangkap, rangka kayu kel
-
m²
4.4.6.1.25.
553,630.00
60,899.30
-
-
X
1.00 X
1.00
1.00
-
26
Pemasangan dinding lambrisering dari papan kayu kelas I
-
m²
4.4.6.1.26.
578,380.00
63,621.80
-
-
X
1.00 X
1.00
1.00
-
27
Pemasangan dinding lambrisering dari plywood ukuran (120 x
-
m²
4.4.6.1.27.
120,692.00
13,276.12
-
-
X
1.00 X
1.00
1.00
-
28
Pemasangan dinding bilik, rangka kayu kelas III atau IV
-
m²
4.4.6.1.28.
152,417.65
16,765.94
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
XI PEKERJAAN KUNCI DAN KACA 1
Pemasangan kunci tanam antik
-
bh
4.4.6.2.1.
761,739.00
83,791.29
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan kunci tanam biasa
-
bh
4.4.6.2.2.
301,565.00
33,172.15
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan kunci kamar mandi
-
bh
4.4.6.2.3.
269,434.00
29,637.74
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan kunci silinder
-
bh
4.4.6.2.4.
189,134.00
20,804.74
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan engsel pintu
-
bh
4.4.6.2.5.
60,922.40
6,701.46
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan engsel jendela kupu-kupu
-
bh
4.4.6.2.6.
36,756.50
4,043.22
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan engsel angin
-
bh
4.4.6.2.7.
71,186.50
7,830.52
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan spring knip
-
bh
4.4.6.2.8.
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan kait angin
-
bh
4.4.6.2.9.
50,644.00
5,570.84
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan door closer
-
bh
4.4.6.2.10.
395,659.00
43,522.49
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan kunci slot
-
bh
4.4.6.2.11.
201,113.00
22,122.43
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan Door holder
-
bh
4.4.6.2.12.
395,659.00
43,522.49
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan door stop
-
bh
4.4.6.2.13.
97,845.00
10,762.95
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan rel pintu sorong
-
bh
4.4.6.2.14.
197,439.00
21,718.29
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan kunci lemari
-
bh
4.4.6.2.15.
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan kaca tebal 3 mm
-
m²
4.4.6.2.16.
178,897.40
19,678.71
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan kaca tebal 5 mm
-
m²
4.4.6.2.17.
245,447.40
26,999.21
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan kaca tebal 8 mm
-
m²
4.4.6.2.18.
287,558.70
31,631.46
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan kaca buram tebal 12 mm
-
m²
4.4.6.2.19.
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan kaca cermin tebal 5 mm
-
m²
4.4.6.2.20.
-
-
X
1.00 X
1.00
1.00
-
-
-
202,994.00
-
-
22,329.34
21
Pemasangan kaca cermin tebal 8 mm
-
m²
4.4.6.2.21.
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan kaca wireglassed tebal 5 mm
-
m²
4.4.6.2.22.
-
-
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan kaca patri tebal 5 mm
-
m²
4.4.6.2.23.
-
-
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan kaca tebal 8 mm
-
m²
4.4.6.2.17.A.
-
-
X
1.00 X
1.00
1.00
-
249,403.00
221,247.40
27,434.33
24,337.21
Sub Total
-
XII PEKERJAAN PENGECATAN 1
Pengikisan/pengerokan permukaan cat lama
-
m²
4.4.7.1.1.
29,139.00
3,205.29
-
-
X
1.00 X
1.00
1.00
-
2
Pencucian bidang permukaan tembok yang pernah dicat
-
m²
4.4.7.1.2.
26,609.00
2,926.99
-
-
X
1.00 X
1.00
1.00
-
3
Pengerokan karat pada permukaan baja cara manual
-
m²
4.4.7.1.3.
27,874.00
3,066.14
-
-
X
1.00 X
1.00
1.00
-
4
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar,
-
m²
4.4.7.1.4.
65,791.00
7,237.01
-
-
X
1.00 X
1.00
1.00
-
5
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar,
-
m²
4.4.7.1.5.
92,477.00
10,172.47
-
-
X
1.00 X
1.00
1.00
-
6
Pelaburan bidang kayu dengan teak oil
-
m²
4.4.7.1.6.
46,365.00
5,100.15
-
-
X
1.00 X
1.00
1.00
-
7
Pelaburan bidang kayu dengan politur
-
m²
4.4.7.1.7.
64,992.40
7,149.16
-
-
X
1.00 X
1.00
1.00
-
8
Pelaburan bidang kayu dengan cat residu dan ter
-
m²
4.4.7.1.8.
27,643.00
3,040.73
-
-
X
1.00 X
1.00
1.00
-
9
Pelaburan bidang kayu dengan vernis
-
m²
4.4.7.1.9.
73,337.00
8,067.07
-
-
X
1.00 X
1.00
1.00
-
10
Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 la
-
m²
4.4.7.1.10.
38,179.90
4,199.79
-
-
X
1.00 X
1.00
1.00
-
11
Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
-
m²
4.4.7.1.11.
26,769.60
2,944.66
-
-
X
1.00 X
1.00
1.00
-
12
Pelaburan tembok dengan kalkarium
-
m²
4.4.7.1.12.
15,791.60
1,737.08
-
-
X
1.00 X
1.00
1.00
-
13
Pelaburan tembok dengan kapur sirih
-
m²
4.4.7.1.13.
-
-
-
-
X
1.00 X
1.00
1.00
-
14
Pelaburan tembok lama dengan kapur sirih (pemeliharaan)
-
m²
4.4.7.1.14.
-
-
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan wallpaper
-
m²
4.4.7.1.15.
128,892.50
14,178.18
-
-
X
1.00 X
1.00
1.00
-
16
Pengecatan permukaan baja dengan menie besi
-
m²
4.4.7.1.16.
54,917.50
6,040.93
-
-
X
1.00 X
1.00
1.00
-
17
Pengecatan permukaan baja dengan menie besi dengan perancah
-
m²
4.4.7.1.17.
106,139.00
11,675.29
-
-
X
1.00 X
1.00
1.00
-
18
Pengecatan permukaan baja galvanis secara manual 4 lapis
-
m²
4.4.7.1.18.
114,717.90
12,618.97
-
-
X
1.00 X
1.00
1.00
-
19
Pengecatan permukaan baja galvanis secara manual sistem 1 lapi
-
m²
4.4.7.1.19.
50,039.00
5,504.29
-
-
X
1.00 X
1.00
1.00
-
20
Pengecatan permukaan baja galvanis secara manual sistem 3 lap
-
m²
4.4.7.1.20.
286,924.00
31,561.64
-
-
X
1.00 X
1.00
1.00
-
21
Pengecatan permukaan baja galvanis secara semprot sistem 3 lap
-
m²
4.4.7.1.21.
258,599.00
28,445.89
-
-
X
1.00 X
1.00
1.00
-
Sub Total
-
XIII PEKERJAAN SANITASI DALAM GEDUNG 1
Pemasangan closet duduk/monoblock
-
bh
5.5.1.1.1.
5,902,380.00
649,261.80
-
-
X
1.00 X
1.00
1.00
-
2
Pemasangan closet jongkok porslen
-
bh
5.5.1.1 2.
856,625.00
94,228.75
-
-
X
1.00 X
1.00
1.00
-
3
Pemasangan closet jongkok teraso
-
bh
5.5.1.1 3.
687,940.00
75,673.40
-
-
X
1.00 X
1.00
1.00
-
4
Pemasangan urinoir
-
bh
5.5.1.1 4.
605,825.00
66,640.75
-
-
X
1.00 X
1.00
1.00
-
5
Pemasangan wastafel
-
bh
5.5.1.1 5.
4,052,675.00
445,794.25
-
-
X
1.00 X
1.00
1.00
-
6
Pemasangan bathcuip porselen
-
bh
5.5.1.1 6.
9,164,859.00
1,008,134.49
-
-
X
1.00 X
1.00
1.00
-
7
Pemasangan bak fibreglass vol 1 m3
-
bh
5.5.1.1 7.
3,215,850.00
353,743.50
-
-
X
1.00 X
1.00
1.00
-
8
Pemasangan bak mandi batu bata vol 0,30 m3
-
bh
5.5.1.1 8.
2,909,214.00
320,013.54
-
-
X
1.00 X
1.00
1.00
-
9
Pemasangan bak mandi teraso vol 0,30 m3
-
bh
5.5.1.1 9.
2,273,370.00
250,070.70
-
-
X
1.00 X
1.00
1.00
-
10
Pemasangan bak air fibreglass vol 1 m3
-
bh
5.5.1.1 10.
805,530.00
88,608.30
-
-
X
1.00 X
1.00
1.00
-
11
Pemasangan bak beton volume 1 m3
-
bh
5.5.1.1 11.
-
-
X
1.00 X
1.00
1.00
-
12
Pemasangan bak cuci piring stainlessteel
-
bh
5.5.1.1 12.
691,735.00
76,090.85
-
-
X
1.00 X
1.00
1.00
-
13
Pemasangan bak cuci piring teraso
-
bh
5.5.1.1 13.
794,200.00
87,362.00
-
-
X
1.00 X
1.00
1.00
-
14
Pemasangan floor drain
-
bh
5.5.1.1 14.
56,045.00
6,164.95
-
-
X
1.00 X
1.00
1.00
-
15
Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm
-
bh
5.5.1.1 15.
760,364.00
83,640.04
-
-
X
1.00 X
1.00
1.00
-
16
Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50
-
bh
5.5.1.1 16.
1,110,241.00
122,126.51
-
-
X
1.00 X
1.00
1.00
-
17
Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65
-
bh
5.5.1.1 17.
1,301,817.00
143,199.87
-
-
X
1.00 X
1.00
1.00
-
18
Pemasangan pipa galvanis diameter ½”
-
m'
5.5.1.1 18.
49,445.00
5,438.95
-
-
X
1.00 X
1.00
1.00
-
19
Pemasangan kran diameter ½” atau 3/4”
-
bh
5.5.1.1 19.
121,000.00
13,310.00
-
-
X
1.00 X
1.00
1.00
-
20
Pemasangan pipa galvanis diameter 3/4”
-
m'
5.5.1.1 20.
52,173.00
5,739.03
-
-
X
1.00 X
1.00
1.00
-
21
Pemasangan pipa galvanis diameter 1”
-
m'
5.5.1.1 21.
56,265.00
6,189.15
-
-
X
1.00 X
1.00
1.00
-
22
Pemasangan pipa galvanis diameter 1 ½”
-
m'
5.5.1.1 22.
102,008.50
11,220.94
-
-
X
1.00 X
1.00
1.00
-
23
Pemasangan pipa galvanis diameter 3”
-
m'
5.5.1.1 23.
187,885.50
20,667.41
-
-
X
1.00 X
1.00
1.00
-
24
Pemasangan pipa galvanis diameter 4”
-
m'
5.5.1.1 24.
238,694.50
26,256.40
-
-
X
1.00 X
1.00
1.00
-
25
Pemasangan pipa PVC tipe AW diameter 1/2”
-
m'
5.5.1.1 25.
-
-
X
1.00 X
1.00
1.00
-
26
Pemasangan pipa PVC tipe AW diameter 3/4”
-
m'
5.5.1.1 26.
48,807.00
5,368.77
-
-
X
1.00 X
1.00
1.00
-
27
Pemasangan pipa PVC tipe AW diameter 1”
-
m'
5.5.1.1 27.
55,627.00
6,118.97
-
-
X
1.00 X
1.00
1.00
-
28
Pemasangan pipa PVC tipe AW diameter 11/2”
-
m'
5.5.1.1 28.
83,440.50
9,178.46
-
-
X
1.00 X
1.00
1.00
-
29
Pemasangan pipa PVC tipe AW diameter 2”
-
m'
5.5.1.1 29.
107,822.00
11,860.42
-
-
X
1.00 X
1.00
1.00
-
30
Pemasangan pipa PVC tipe AW diameter 21/2”
-
m'
5.5.1.1 30.
158,878.50
17,476.64
-
-
X
1.00 X
1.00
1.00
-
31
Pemasangan pipa PVC tipe AW diameter 3”
-
m'
5.5.1.1 31.
202,015.00
22,221.65
-
-
X
1.00 X
1.00
1.00
-
32
Pemasangan pipa PVC tipe AW diameter 4”
-
m'
5.5.1.1 32.
273,454.50
30,080.00
-
-
X
1.00 X
1.00
1.00
-
33
Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm
-
m'
5.5.1.1 33.
-
-
-
-
X
1.00 X
1.00
1.00
-
34
Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm
-
m'
5.5.1.1 34.
-
-
-
-
X
1.00 X
1.00
1.00
-
35
Pemasangan pipa beton diameter 15 – 20 cm
-
m'
5.5.1.1 35.
249,135.65
27,404.92
-
-
X
1.00 X
1.00
1.00
-
36
Pemasangan pipa beton diameter 30 – 100 cm
-
m'
5.5.1.1.36.
379,497.25
41,744.70
-
-
X
1.00 X
1.00
1.00
-
-
-
-
-
Sub Total
-
XIV PEKERJAAN INSTALASI LISTRIK 1
Titik Lampu
-
bh
Ls
285,000.00
31,350.00
-
-
X
1.00 X
1.00
1.00
-
2
Stop Kontak Tanam
-
bh
Ls
210,000.00
23,100.00
-
-
X
1.00 X
1.00
1.00
-
3
Stop Kontak Luar
-
bh
Ls
227,000.00
24,970.00
-
-
X
1.00 X
1.00
1.00
-
4
Saklar Double
-
bh
Ls
39,000.00
4,290.00
-
-
X
1.00 X
1.00
1.00
-
5
Saklar Tunggal
-
bh
Ls
39,000.00
4,290.00
-
-
X
1.00 X
1.00
1.00
-
6
Zekering Boxes 1 Group
-
bh
Ls
420,000.00
46,200.00
-
-
X
1.00 X
1.00
1.00
-
7
Zekering Boxes 2 Group
-
bh
Ls
570,000.00
62,700.00
-
-
X
1.00 X
1.00
1.00
-
8
Zekering Boxes 3 Group
-
bh
Ls
710,000.00
78,100.00
-
-
X
1.00 X
1.00
1.00
-
9
Lampu Philip 18 W
-
bh
Ls
60,000.00
6,600.00
-
-
X
1.00 X
1.00
1.00
-
10
Lampu Philip 14 W
-
bh
Ls
49,000.00
5,390.00
-
-
X
1.00 X
1.00
1.00
-
11
Lampu Philip 5 W
-
bh
Ls
35,000.00
3,850.00
-
-
X
1.00 X
1.00
1.00
-
12
Lampu Pijar 25 W
-
bh
Ls
25,000.00
2,750.00
-
-
X
1.00 X
1.00
1.00
-
13
Lampu TL 40 W
-
bh
Ls
97,000.00
10,670.00
-
-
X
1.00 X
1.00
1.00
-
14
Lampu TL 2 x 18 W
-
bh
Ls
95,000.00
10,450.00
-
-
X
1.00 X
1.00
1.00
-
15
Lampu TL 2 x 36 W
-
bh
Ls
162,000.00
17,820.00
-
-
X
1.00 X
1.00
1.00
-
16
Lampu TL 2 x 40 W
-
bh
Ls
165,000.00
18,150.00
-
-
X
1.00 X
1.00
1.00
-
17
Lampu LED 2 x 14 W
-
bh
Ls
192,000.00
21,120.00
-
-
X
1.00 X
1.00
1.00
-
18
Lampu Sorot (Sejenis Mercury)
-
bh
Ls
710,000.00
78,100.00
-
-
X
1.00 X
1.00
1.00
-
19
Kabel NYA 2,5 mm
-
roll/50
Ls
300,000.00
33,000.00
-
-
X
1.00 X
1.00
1.00
-
20
Kabel NGA 2 x 2,5 mm
-
roll/50
Ls
577,000.00
63,470.00
-
-
X
1.00 X
1.00
1.00
-
21
Kabel NYM 3 x 2,5 mm
-
roll/50
Ls
705,000.00
77,550.00
-
-
X
1.00 X
1.00
1.00
-
22
Kabel NYM 3 x 1,5 mm
-
roll/50
Ls
577,000.00
63,470.00
-
-
X
1.00 X
1.00
1.00
-
23
Kabel NYM 2 x 2,5 mm
-
roll/50
Ls
577,000.00
63,470.00
-
-
X
1.00 X
1.00
1.00
-
24
Kabel NYM 2 x 1,5 mm
-
roll/50
Ls
396,000.00
43,560.00
-
-
X
1.00 X
1.00
1.00
-
25
Kabel NYM 4 x 6 mm
-
roll/50
Ls
1,650,000.00
181,500.00
-
-
X
1.00 X
1.00
1.00
-
26
Kabel NYM 4 x 10 mm
-
roll/50
Ls
2,675,000.00
294,250.00
-
-
X
1.00 X
1.00
1.00
-
27
Kabel NYY 4 x 50 mm
-
m'
Ls
390,000.00
42,900.00
-
-
X
1.00 X
1.00
1.00
-
28
Kabel BC 50 mm
-
m'
Ls
55,000.00
6,050.00
-
-
X
1.00 X
1.00
1.00
-
29
Kabel BC 35 mm
-
m'
Ls
45,000.00
4,950.00
-
-
X
1.00 X
1.00
1.00
-
30
Fiting Lampu
-
bh
Ls
22,000.00
2,420.00
-
-
X
1.00 X
1.00
1.00
-
31
Fiting Lampu Tanam Dia. 4 "
-
bh
Ls
42,000.00
4,620.00
-
-
X
1.00 X
1.00
1.00
-
32
Fiting Lampu Tanam Dia. 3 "
-
bh
Ls
32,000.00
3,520.00
-
-
X
1.00 X
1.00
1.00
-
33
Box Panel 3 Phase, Comlite (80x120x25)
-
set
Ls
12,000,000.00
1,320,000.00
-
-
X
1.00 X
1.00
1.00
-
34
Box Panel 3 Phase, Comlite (50x70x20)
-
set
Ls
5,850,000.00
643,500.00
-
-
X
1.00 X
1.00
1.00
-
35
Box Panel 3 Phase, (30x40x15)
-
bh
Ls
1,100,000.00
121,000.00
-
-
X
1.00 X
1.00
1.00
-
36
Box Panel PVC 4 MCB, (40x60x20)
-
bh
Ls
395,000.00
43,450.00
-
-
X
1.00 X
1.00
1.00
-
37
MCB 6 A
-
bh
Ls
70,000.00
7,700.00
-
-
X
1.00 X
1.00
1.00
-
38
MCB 4 A
-
bh
Ls
66,000.00
7,260.00
-
-
X
1.00 X
1.00
1.00
-
39
Pemasukan Daya listrk
-
kwh
Ls
2,600.00
286.00
-
-
X
1.00 X
1.00
1.00
-
40
Pemasangan Daya listrk
-
va
Ls
1,600.00
176.00
-
-
X
1.00 X
1.00
1.00
-
41
AC (Air Conditioner) Kapasiitas 2 PK
-
unit
Ls
-
-
-
-
X
1.00 X
1.00
1.00
-
42
AC (Air Conditioner) Kapasiitas 1 PK
-
unit
Ls
-
-
-
-
X
1.00 X
1.00
1.00
-
43
AC (Air Conditioner) Kapasiitas 1/2 PK
-
unit
Ls
-
-
-
-
X
1.00 X
1.00
1.00
-
44
Pas pengisap debu ruangan (Blower) + asisories complit
-
bh
Ls
166,000.00
18,260.00
-
-
X
1.00 X
1.00
1.00
-
45
Pas Lampu darurat + asisories complit
-
bh
Ls
155,000.00
17,050.00
-
-
X
1.00 X
1.00
1.00
-
46
Kabel Telepone 4 x 0.5 mm
-
m'
Ls
30,000.00
3,300.00
-
-
X
1.00 X
1.00
1.00
-
47
Isolasi
-
bh
Ls
12,000.00
1,320.00
-
-
X
1.00 X
1.00
1.00
-
48
Outle TV
-
bh
Ls
50,000.00
5,500.00
-
-
X
1.00 X
1.00
1.00
-
49
Outle Telephone
-
bh
Ls
50,000.00
5,500.00
-
-
X
1.00 X
1.00
1.00
-
50
Dow ligth / PCL 13 W
-
bh
Ls
130,000.00
14,300.00
-
-
X
1.00 X
1.00
1.00
-
51
Dow ligth / PCL 8 W
-
bh
Ls
110,000.00
12,100.00
-
-
X
1.00 X
1.00
1.00
-
52
Dow ligth / LED 14 W
-
bh
Ls
152,000.00
16,720.00
-
-
X
1.00 X
1.00
1.00
-
53
Dow ligth / LED 7 W
-
bh
Ls
95,000.00
10,450.00
-
-
X
1.00 X
1.00
1.00
-
54
Dow ligth / LED 3 W
-
bh
Ls
40,000.00
4,400.00
-
-
X
1.00 X
1.00
1.00
-
55
Lampu Tempel / LED 14 W
-
bh
Ls
25,000.00
2,750.00
-
-
X
1.00 X
1.00
1.00
-
56
Lampu spot light/ LED 7 W
-
bh
Ls
300,000.00
33,000.00
-
-
X
1.00 X
1.00
1.00
-
57
Lampu strip light/ LED 7 W
-
m'
Ls
39,000.00
4,290.00
-
-
X
1.00 X
1.00
1.00
-
58
Electroda Cooper dia. 1 inci
-
m'
Ls
350,000.00
38,500.00
-
-
X
1.00 X
1.00
1.00
-
59
Lampu Sorot taman spot light (LED), 10 watt
-
bh
Ls
300,000.00
33,000.00
-
-
X
1.00 X
1.00
1.00
-
60
Lampu taman Tanam (LED), 8 watt
-
bh
Ls
270,000.00
29,700.00
-
-
X
1.00 X
1.00
1.00
-
61
Bollard Lighting (LED), 9 watt
-
bh
Ls
3,580,000.00
393,800.00
-
-
X
1.00 X
1.00
1.00
-
62
Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + P
-
bh
Ls
1,200,000.00
132,000.00
-
-
X
1.00 X
1.00
1.00
-
63
Pipa Conduit PVC dia. 20 mm2
-
m'
Ls
3,000.00
330.00
-
-
X
1.00 X
1.00
1.00
-
64
Exshaust Fan 14 W
-
bh
Ls
535,000.00
58,850.00
-
-
X
1.00 X
1.00
1.00
-
65
Wall Type Exshaust Fan 2500 CMH
-
bh
Ls
1,100,000.00
121,000.00
-
-
X
1.00 X
1.00
1.00
-
66
Orbit Fan 60 Watt
-
bh
Ls
720,000.00
79,200.00
-
-
X
1.00 X
1.00
1.00
-
67
Exshaust Fan 353 CFM/ 34 W
-
bh
Ls
315,000.00
34,650.00
-
-
X
1.00 X
1.00
1.00
-
68
Pemasangan Penangkal Petir + Arde (Radius min. 50 m)
-
unit
Ls
25,000,000.00
2,750,000.00
-
-
X
1.00 X
1.00
1.00
-
69
Pemasangan Penangkal Petir + Arde (Radius min. 25 m)
-
unit
Ls
12,500,000.00
1,375,000.00
-
-
X
1.00 X
1.00
1.00
-
Sub Total XV
-
PEKERJAAN VEGETASI TANAMAN
1
Tanam Pohon Kamboja tinggi 5 meter
-
bh
SNI.302
2,148,465.00
236,331.15
-
-
X
1.00 X
1.00
1.00
-
2
Tanam Pohon Tabebuya tinggi 4 meter
-
bh
SNI.302.1
1,730,465.00
190,351.15
-
-
X
1.00 X
1.00
1.00
-
3
Tanam Pohon Palem raja tinggi 3 meter
-
bh
SNI.302.2
1,455,465.00
160,101.15
-
-
X
1.00 X
1.00
1.00
-
4
Tanam Pohon Pisang Kipas tinggi 1,5 meter
-
bh
SNI.302.3
223,465.00
24,581.15
-
-
X
1.00 X
1.00
1.00
-
5
Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter
-
bh
SNI.302.4
67,320.00
7,405.20
-
-
X
1.00 X
1.00
1.00
-
6
Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter
-
bh
SNI.302.5
70,620.00
7,768.20
-
-
X
1.00 X
1.00
1.00
-
7
Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter
-
bh
SNI.302.6
64,020.00
7,042.20
-
-
X
1.00 X
1.00
1.00
-
8
Pohon Damar (Agathis dammara) Tinggi 4m
-
bh
SNI.302.a
929,049.00
102,195.39
-
-
X
1.00 X
1.00
1.00
-
9
Pohon Pulai (alstonia scholaris) Tinggi 6m
-
bh
SNI.302.b
2,103,849.00
231,423.39
-
-
X
1.00 X
1.00
1.00
-
10
Pohon Kasia Jawa (Cassia javanica) Tinggi 4m
-
bh
SNI.302.c
635,349.00
69,888.39
-
-
X
1.00 X
1.00
1.00
-
11
Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m
-
bh
SNI.302.d
977,449.00
107,519.39
-
-
X
1.00 X
1.00
1.00
-
12
Pohon Flamboyan (Delonix regia) Tinggi 7m
-
bh
SNI.302.e
1,320,649.00
145,271.39
-
-
X
1.00 X
1.00
1.00
-
13
Pohon Biola Cantik (Ficus lyrata) Tinggi 6m
-
bh
SNI.302.f
908,149.00
99,896.39
-
-
X
1.00 X
1.00
1.00
-
14
Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m
-
bh
SNI.302.g
1,185,349.00
130,388.39
-
-
X
1.00 X
1.00
1.00
-
15
Pohon Sosis (Kigelia pinnata) Tinggi 7m
-
bh
SNI.302.h
1,185,349.00
130,388.39
-
-
X
1.00 X
1.00
1.00
-
16
Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m
-
bh
SNI.302.i
981,849.00
108,003.39
-
-
X
1.00 X
1.00
1.00
-
17
Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6
-
bh
SNI.302.j
613,349.00
67,468.39
-
-
X
1.00 X
1.00
1.00
-
18
Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m
-
bh
SNI.302.k
1,625,349.00
178,788.39
-
-
X
1.00 X
1.00
1.00
-
19
Pohon Parahiba (Schizolobium parahyba) Tinggi 7m
-
bh
SNI.302.l
1,047,849.00
115,263.39
-
-
X
1.00 X
1.00
1.00
-
20
Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m
-
bh
SNI.302.m
761,849.00
83,803.39
-
-
X
1.00 X
1.00
1.00
-
21
Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m
-
bh
SNI.302.n
220,649.00
24,271.39
-
-
X
1.00 X
1.00
1.00
-
22
Pohon Palem Kuning (Chrysalidacarpus lutescens) Tinggi 1,5m
-
bh
SNI.302.o
838,849.00
92,273.39
-
-
X
1.00 X
1.00
1.00
-
23
Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m
-
bh
SNI.302.p
131,549.00
14,470.39
-
-
X
1.00 X
1.00
1.00
-
24
Pohon Palem Kol (Licualis grandis) Tinggi 1,5m
-
bh
SNI.302.q
186,549.00
20,520.39
-
-
X
1.00 X
1.00
1.00
-
25
Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m
-
bh
SNI.302.r
2,090,649.00
229,971.39
-
-
X
1.00 X
1.00
1.00
-
26
Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m
-
bh
SNI.302.s
1,938,849.00
213,273.39
-
-
X
1.00 X
1.00
1.00
-
27
Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m
-
bh
SNI.302.t
635,349.00
69,888.39
-
-
X
1.00 X
1.00
1.00
-
28
Pohon Pisang Hias (Strelitzia nicolai) Tinggi 1,5m
-
bh
SNI.302.u
635,349.00
69,888.39
-
-
X
1.00 X
1.00
1.00
-
29
Semak Agave (Agave angustifolia) Tinggi 300-400 mm
-
bh
SNI.302.1a
1,134,265.00
124,769.15
-
-
X
1.00 X
1.00
1.00
-
30
Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-30
-
bh
SNI.302.1b
727,265.00
79,999.15
-
-
X
1.00 X
1.00
1.00
-
31
Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm
-
bh
SNI.302.1c
617,265.00
67,899.15
-
-
X
1.00 X
1.00
1.00
-
32
Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500
-
bh
SNI.302.1d
3,477,265.00
382,499.15
-
-
X
1.00 X
1.00
1.00
-
33
Semak Spineless (Spineless Yucca) Tinggi 800 mm
-
bh
SNI.302.1e
1,893,265.00
208,259.15
-
-
X
1.00 X
1.00
1.00
-
34
Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm
-
bh
SNI.302.1f
1,068,265.00
117,509.15
-
-
X
1.00 X
1.00
1.00
-
35
Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm
-
bh
SNI.302.1g
243,265.00
26,759.15
-
-
X
1.00 X
1.00
1.00
-
36
Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm
-
bh
SNI.302.1h
276,265.00
30,389.15
-
-
X
1.00 X
1.00
1.00
-
37
Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm
-
bh
SNI.302.1i
518,265.00
57,009.15
-
-
X
1.00 X
1.00
1.00
-
38
Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm
-
bh
SNI.302.1j
518,265.00
57,009.15
-
-
X
1.00 X
1.00
1.00
-
39
Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm
-
bh
SNI.302.1k
243,265.00
26,759.15
-
-
X
1.00 X
1.00
1.00
-
40
Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 70
-
bh
SNI.302.1l
1,002,265.00
110,249.15
-
-
X
1.00 X
1.00
1.00
-
41
Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800
-
bh
SNI.302.1m
243,265.00
26,759.15
-
-
X
1.00 X
1.00
1.00
-
42
Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm
-
bh
SNI.302.1n
177,265.00
19,499.15
-
-
X
1.00 X
1.00
1.00
-
43
Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm
-
bh
SNI.302.1o
837,265.00
92,099.15
-
-
X
1.00 X
1.00
1.00
-
44
Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 40
-
bh
SNI.302.1p
137,665.00
15,143.15
-
-
X
1.00 X
1.00
1.00
-
45
Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300m
-
bh
SNI.302.1q
177,265.00
19,499.15
-
-
X
1.00 X
1.00
1.00
-
46
Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300
-
bh
SNI.302.1r
309,265.00
34,019.15
-
-
X
1.00 X
1.00
1.00
-
47
Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 10
-
bh
SNI.302.1s
243,265.00
26,759.15
-
-
X
1.00 X
1.00
1.00
-
48
Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm
-
bh
SNI.302.1t
1,079,265.00
118,719.15
-
-
X
1.00 X
1.00
1.00
-
49
Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm
-
bh
SNI.302.1v
309,265.00
34,019.15
-
-
X
1.00 X
1.00
1.00
-
50
Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx")
-
bh
SNI.302.1x
386,265.00
42,489.15
-
-
X
1.00 X
1.00
1.00
-
51
Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-6
-
bh
SNI.302.1y
452,265.00
49,749.15
-
-
X
1.00 X
1.00
1.00
-
52
Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300
-
bh
SNI.302.1z
551,265.00
60,639.15
-
-
X
1.00 X
1.00
1.00
-
53
Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400
-
bh
SNI.302.2a
160,765.00
17,684.15
-
-
X
1.00 X
1.00
1.00
-
54
Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi
-
bh
SNI.302.2b
155,265.00
17,079.15
-
-
X
1.00 X
1.00
1.00
-
55
Semak kembang Air Mancur Merah (Russelia equisetiformis)
-
bh
SNI.302.2c
342,265.00
37,649.15
-
-
X
1.00 X
1.00
1.00
-
56
Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-50
-
bh
SNI.302.2d
518,265.00
57,009.15
-
-
X
1.00 X
1.00
1.00
-
57
Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm
-
bh
SNI.302.2e
127,765.00
14,054.15
-
-
X
1.00 X
1.00
1.00
-
58
Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300
-
bh
SNI.302.2f
177,265.00
19,499.15
-
-
X
1.00 X
1.00
1.00
-
59
Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-40
-
bh
SNI.302.2g
243,265.00
26,759.15
-
-
X
1.00 X
1.00
1.00
-
60
Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-15
-
bh
SNI.302.2h
309,265.00
34,019.15
-
-
X
1.00 X
1.00
1.00
-
61
Semak Rumput Manila (Zoysia matrella)
-
m²
SNI.302.3a
101,200.00
11,132.00
-
-
X
1.00 X
1.00
1.00
-
Sub Total XVI
-
PEKERJAAN TAMBAHAN
1
Biaya Pengeboran air + Pipa Casing Ø 6''
-
m'
SNI.Ls.1
1,558,535.00
171,438.85
-
-
X
1.00 X
1.00
1.00
-
2
Biaya Pengeboran air + Pipa Casing Ø 4''
-
m'
SNI.Ls.2
1,091,585.00
120,074.35
-
-
X
1.00 X
1.00
1.00
-
3
Biaya Pengeboran air + Pipa Casing Ø 3''
-
m'
SNI.Ls.3
547,415.00
60,215.65
-
-
X
1.00 X
1.00
1.00
-
4
Biaya Pengeboran air + Pipa Casing Ø 2.5''
-
m'
SNI.Ls.4
295,240.00
32,476.40
-
-
X
1.00 X
1.00
1.00
-
5
Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar
-
bh
SNI.Ls.5
38,016,000.00
4,181,760.00
-
-
X
1.00 X
1.00
1.00
-
6
Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100,
-
bh
SNI.Ls.6
54,036,400.00
5,944,004.00
-
-
X
1.00 X
1.00
1.00
-
7
Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30
-
bh
SNI.Ls.7
28,495,500.00
3,134,505.00
-
-
X
1.00 X
1.00
1.00
-
8
Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1
-
bh
SNI.Ls.8
25,685,000.00
2,825,350.00
-
-
X
1.00 X
1.00
1.00
-
Sub Total B.
JUMLAH PEKERJAAN PEMBANGUNAN LANTAI - 1
Jumlah Total
0
HARGA SATUAN BAHAN DAN MATERIAL KABUPATEN DOMPU TAHUN ANGGARAN 2023 NO.
BAHAN DAN MATERIAL
SATUAN
1
2
3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Bahan dan Material Air Akustik 30 cm x 30 cm Akustik 30 cm x 60 cm Akustik 60 cm x 120 cm Alluminium strip Amplas Asbes semen Bak mandi Sudut fibre Bambu Æ 6-8/600 cm Bata merah Bata pelapis dinding Batu belah 10/15 Batu paras Batu pecah 5/7 Batu tempel hitam Besi baja IWF Besi beton polos Besi beton ulir Besi plat baja Besi profil Besi Hollow 40. 40. 2 Besi strip 2 x 3 mm Bilik bambu Cat dasar Cat Catylac 5kg Cat Kayu Emko Cat meni Cat meni besi Cat penutup Cermin wastafel Dolken (kaso), φ (8-10) cm, panjang 4 m Dolken kayu galam, φ (8-10) cm, panjang 4 m Engsel jendela nilon Engsel pintu nilon Floor drain Floor hardener
Liter Lembar Lembar Lembar m’ Lbr m2 buah Bt Buah Buah m3 m2 m3 m2 Kg kg kg Kg Kg m kg m2 kg kg kg kg kg Kg m2 Batang Batang set set bh kg
HARGA 2023 (Rp) 4 3,000.00 38,750.00 77,500.00 310,000.00 60,000.00 9,000.00 47,300.00 525,000.00 27,500.00 850.00 950.00 245,000.00 244,000.00 230,000.00 265,000.00 38,000.00 16,000.00 19,000.00 33,000.00 38,000.00 26,000.00 26,000.00 50,000.00 72,000.00 35,000.00 70,000.00 35,000.00 35,000.00 72,000.00 135,000.00 11,000.00 11,000.00 10,500.00 21,000.00 27,000.00 40,000.00
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
Formika BAHAN DAN MATERIAL Gorong-gorong diameter 20 Gorong-gorong diameter 30 Gypsum board 9 mm Handel pintu Ijuk Jaring kawat baja dilas, 6 mm Jendela nako (rangka + kaca 5 mm) Kaca Tebal 3 mm Kaca Tebal 5 mm Kait angin AMIK Kapur Padam Karpet Kawat beton Kawat diameter 4 mm Kawat duri (rol 40 m) kawat las Kawat nyamuk Kayu jati kayu kls I Kayu kamper kayu kruwing kayu tahun Keramik artistik Kerikil (Batu Pecah 2-3 cm manual) Kerikil (maksimum 30 mm) Kitchen sink 1 lubang Royal Kloset duduk/monoblok Kloset jongkok porselin Kloset jongkok teraso Koral beton Kran Air Kunci tanam artistik Lem Lem kayu Lem vinyl List kayu 2/4 List kayu 4/4 profil Marmer Meni besi Minyak bekisting Minyak pelumas Mosaik Paku Paku 1 cm - 2,5 cm
Lembar SATUAN m1 m1 Lembar buah kg kg m2 m2 m2 psng m3 m3 m2 kg kg rol kg m2 m3 m3 m3 m3 Buah m3 kg buah bh bh Bh m3 bh bh kg Kg kg m’ m’ m2 Kg liter Liter Buah kg kg
HARGA 195,000.00 150,000.00 180,000.00 100,000.00 245,000.00 29,000.00 37,000.00 141,000.00 115,000.00 170,000.00 10,000.00 6,000.00 6,000.00 25,000.00 33,000.00 85,000.00 100,000.00 160,000.00 29,000.00 5,350,000.00 5,480,000.00 4,250,000.00 2,600,000.00 13,000.00 570,000.00 450.00 530,000.00 3,660,000.00 260,000.00 126,000.00 345,000.00 22,000.00 555,000.00 55,000.00 55,000.00 55,000.00 8,500.00 14,000.00 600,000.00 35,000.00 18,000.00 47,000.00 140,000.00 28,000.00 33,000.00
82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126
Paku 10 cm BAHAN DAN MATERIAL Paku 12 cm Paku 5 cm - 10 cm Paku 5 cm - 12 cm Paku 5 cm - 7 cm Paku 5 cm dan 10 cm Paku 5 cm dan 7 cm Paku 5 cm sampai 10 cm Paku 7 cm – 10 cm Paku biasa Paku biasa 1/2" - 1" Paku biasa 2"- 5" Paku Pancing60x230 Paku Sekrup Paku Seng (paku payung) Paku skrup Paku skrup 1 cm – 2,5 cm Paku skrup 10 cm Paku tripleks Paku usuk/reng Parquet kw I Parquet kw II Pasir beton (hodo) Pasir beton (hodo) Pasir pasang Pasir urug Paving blok sakura warna Pintu gulung besi Plamur / Dempul kayu Plamur / Dempul tembok Plint Ubin 15 x 20 cm Plint Ubin 10 x 30 cm Plint Ubin 10 x 40 cm Plint ubin Portland Semen warna 10 x 20 cm Plint ubin Portland Semen warna 10 x 30 cm Plint ubin Portland Semen warna 10 x 40 cm Plitur jadi Plywood tebal 4 mm, ukuran 120 cm x 240 cm Plywood tebal 4 mm Ukuran (90 x 220) cm Triplek tebal 9 mm, ukuran 120 cm x 240 cm Politur jadi Porselin kw I, motif Porselin kw II, motif PC. Merk Tiga Roda Profil alluminium, warna
Kg SATUAN kg kg kg Kg kg kg kg kg kg kg Kg kg kg kg kg Buah kg kg kg m2 m2 m3 kg m3 m3 m2 m2 kg kg Buah Buah Buah Buah Buah Buah liter Lembar Lembar Lbr Ltr Buah Buah kg m
HARGA 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 33,000.00 28,000.00 45,000.00 35,000.00 45,000.00 35,000.00 400.00 35,000.00 33,000.00 28,000.00 1,000,000.00 800,000.00 355,000.00 260.00 225,000.00 195,000.00 75,000.00 1,750,000.00 29,000.00 50,000.00 1,900.00 1,900.00 2,600.00 1,600.00 2,400.00 3,200.00 37,000.00 220,000.00 130,000.00 159,000.00 37,000.00 140,000.00 120,000.00 1,700.00 110,000.00
127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171
Profil Alluminium "T"BAHAN DAN MATERIAL Profil kaca Ramset Reng (2 x 3) cm panjang 4 m Residu Rolling door alluminium 0,8 mm Roster 10 x 25 Sabun Seal tape Sealant Semen Merah Semen warna Seng BJLS 0,2 mm lebar 90 cm Seng BJLS 0,30 mm lebar 55 cm Seng gelombang bljs 32 Seng plat Sewa Alat Las Listrik Sirtu (Tak Diayak) skrup fixer Slot pintu kuda terbang 2 x kunci Slot pintu Yale Soda api Solar Strorox – 100 Sunscreen alluminium Tanah Liat Teakwood tebal 4 mm, Ukuran 120 cm x 240 cm Tripleks 120 x 240 tebal 3mm Thinner Super Ubin granit 40 x 40cm Ubin granit 30 x 30cm Ubin teraso 40 x 40cm Ubin teraso 30 x 30cm Ubin warna Ubin abu-abu 20 x 20 cm Ubin abu-abu 30 x 30 cm Ubin abu-abu 40 x 40 cm Ubin teralux kerang 30 x 30 cm Ubin teralux kerang 40 x 40 cm Ubin teralux marmer 30 x 30 cm Ubin teralux marmer 40 x 40 cm Ubin teralux marmer 60 x 60 cm Vinyl kw I Vinyl kw II Vinyl karet
m’ SATUAN m Buah m3 Lt m2 buah kg bh Tube kg kg m' m' Lbr m’ Jam m3 buah buah buah kg Liter kg m2 m3 Lembar Lembar #REF! Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah
HARGA 15,000.00 95,000.00 750.00 3,750,000.00 25,000.00 600,000.00 18,000.00 20,000.00 6,000.00 35,000.00 15,000.00 15,000.00 76,000.00 67,500.00 120,000.00 135,000.00 51,300.00 240,000.00 22,000.00 137,000.00 165,000.00 66,000.00 6,500.00 40,000.00 500,000.00 58,000.00 220,000.00 67,000.00 39,000.00 72,000.00 40,500.00 13,600.00 x 12,800.00 2,600.00 5,700.00 10,100.00 54,000.00 96,000.00 54,000.00 96,000.00 216,000.00 58,500.00 36,000.00 400,000.00
172 173 174 175 176 177
Wall paper BAHAN DAN MATERIAL Wastafel Door closer ex. Cisa Door stoper ex. Cisa Kuas Eterna 3" hak angin
m SATUAN bh set set buah buah
HARGA 50,000.00 2,400,000.00 245,000.00 65,000.00 25,000.00 7,000.00
HARGA SATUAN UPAH DAN BAHAN MATERIAL LOKASI TAHUN ANGGARAN
: :
KABUPATEN DOMPU 2023
NO
UPAH DAN BAHAN
SATUAN
1
2
3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Upah Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Batu Tukang Kayu Kepala Tukang Kayu Tukang Besi Beton Kepala Tukang Besi Beton Tukang alumnium Kepala Tukang alumunium Tukang Las Kepala Tukang Las Tukang Politur Tukang Cat Kepala Tukang Cat Pemecah Batu Penggergaji Mandor pengisi Bronjong pengisi Bronjong Penganyam Bronjong Kepala Penganyam Bronjong Mandor Sopir Pembantu Sopir Mekanik Pembantu Mekanik Operator Alat Ringan Operator Alat Berat Pembantu Operator Pemasak Aspal Penunjuk Jalan Tukang Pipa Tukang Bor Tukang Listrik Kepala Tukang Listrik Penjaga Malam Penggosok Tegel Kepala Tukang Politur Kepala Tukang Pipa Tukang Cor Pekerja Cor Tukang Interior Kepala Tukang Interior
1
IMB
1 2 3 4 5 6 7 8 9 10
Bahan Pasangan Batu Kali Belah 15-20 cm Batu Kali Alam Kerikil Pecah 5/7 cm Kerikil 5/7 cm (Stone Crusher) Kerikil Pecah 3/5 cm Kerikil 3/5 cm (Stone Crusher) Kerikil Pecah 2/3 cm Kerikil 2/3 cm (Stone Crusher) Kerikil Alam 0,5/1 Cm Kerikil Alam 2/3
IMB
HARGA SATUAN ( Rp. ) 4
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
150,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 230,000.00 190,000.00 190,000.00 230,000.00 160,000.00 160,000.00 230,000.00 160,000.00 190,000.00 230,000.00 230,000.00 200,000.00 160,000.00 190,000.00 160,000.00 190,000.00 200,000.00 160,000.00 160,000.00 160,000.00 190,000.00 190,000.00 190,000.00 230,000.00 140,000.00 140,000.00 230,000.00 230,000.00 190,000.00 170,000.00 250,000.00 300,000.00
m2
18,000.00
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
245,000.00 230,000.00 500,000.00 570,000.00 510,000.00 590,000.00 575,000.00 750,000.00 540,000.00 570,000.00
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Kerikil Sungai - Riyalti Kerikil Beton (Maks 3 cm) Kerikil Pecah 1/2 cm Batu Kali Keping / Tempel Kerikil Alam 5/7 Kerikil Alam 3/5 Kerikil Alam 2/3 Cm Kerikil (maksimum 30 mm) Agregate Kasar (Stone Crusher) Agregate Halus (Stone Crusher) Agregate Klas B (20% Agg.Hls:80% Agg.Ksr) Batu Apung Batu Bata Kelas I (Press) Batu Bata Kelas II (Lokal) Bata ringan/Hebel, 10X20X60 Bata ringan/Hebel, 10X20X60 Pasir Beton ( Pasir Hodo ) Pasir Pasang Pasir Urug Sirtu Tanah Urug biasa Tanah Urug Pilihan Tanah Liat (TL) Bahan Pengikat campuran/Semen Semen Merah (SM) Semen Warna PC. Merk Tiga Roda PC. Merk Gresik PC. Merk Tonasa PC. Merk Holcim PC. Merk Basuwa PC. Merk Padang PC. Merk Singa Merah Semen Warna Butiran Halus Semen Warna Butiran Kasar Ornamen terawang custom
M³ M³ M³ M³ M³ M³ M³ Kg M³ M³ M³ Kg Buah Buah m3 bh M³ M³ M³ M³ M³ M³ M³
355,000.00 345,000.00 795,000.00 285,000.00 230,000.00 240,000.00 345,000.00 450.00 800,000.00 925,000.00 720,000.00 250,000.00 950.00 850.00 1,600,000.00 19,000.00 355,000.00 225,000.00 195,000.00 240,000.00 121,000.00 192,000.00 58,000.00
Acian Mild Kalsium Acian Mild Kapur Pengeras Beton Perekat Beton
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg m2 Kg Kg Kg Kg Kg Kg
15,000.00 15,000.00 1,700.00 1,700.00 1,700.00 1,700.00 1,650.00 1,650.00 1,650.00 15,700.00 15,700.00 938,000.00 4,500.00 5,000.00 5,200.00 2,000.00 49,500.00 66,500.00
1 2 3 4
Rumput Gebalan Kapur Gamping/Labur Kapur Biasa Fuller (Abu Batu)
M² Kg Kg Kg
38,000.00 6,000.00 3,000.00 5,000.00
1 2 3 4 5
Air kerja Strorox - 100 Dinding Hollow Block (HB 20) Dinding Hollow Block (HB 15) Dinding Hollow Block (HB 10)
Liter Kg Bh Bh Bh
3,000.00 40,000.00 8,000.00 7,000.00 6,000.00
1 2 3 4 5 6 7 8 9 10
Bahan Atap Sirap Kalimantan Genteng Lokal Genteng Beton /Pres Genteng Karang Pilang/ Kodok Genteng Pejaten Sudah di cat Genteng Kaca Genteng Keramik / 25bh Genteng Keramik Glazur / 15bh Genteng Kanmuri Full Flat, Natural Genteng Karang Pilang Type Keramik
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
2,800.00 1,800.00 6,800.00 5,500.00 3,900.00 45,000.00 17,000.00 15,000.00 21,000.00 10,000.00
Semen-MU 380 (Plesteran), 40kg Semen-MU 200 (acian), 40kg
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74
Genteng Aspal Genteng Bubungan Lokal Genteng Bubungan Beton Genteng Bubungan Silang Genteng Bubungan Pejaten Genteng Bubungan Keramik / 4bh Genteng Bubungan Keramik Glazur / 4bh Bubungan Genteng kanmuri Full Flat, Natura Bubungan Karang Pilang/ Kodok Genteng Bubungan Aspal Genteng Metal roof 0,25 mm (Lapis Butiran) Bubungan Metal Roof (Lapis Butiran) Genteng Metal roof 0,3 mm (Lapis Butiran) Bubungan Metal Roof (Lapis Butiran) Genteng Metal roof 0,25 mm (Tanpa Lapis Butiran) Sakura Bubungan Metal (Tanpa Lapis Butiran) Atap bitumen gelombang H : 3,0 mm Atap bitumen gelombang H : 3,0 mm Paku fiser bitumen Nok / Ridge Onduline Sekrup / Paku Asbes Type Genteng (tyluq) Asbes semen Ijuk Atap Asbes Gelombang Kecil 92 x 180 cm Asbes Gelombang Besar 105 x 240 cm Bubungan Asbes Gelombang Kecil 92 cm Bubungan Asbes Gelombang Besar 105 cm Seng.Glb Besar BJL.S 20 Seng.Glb Besar BJL.S 25 Seng.Glb Besar BJL.S 30 Seng.Glb Kecil BJL.S 20 Seng Plat BJL.S 18 lebar 90 cm Seng Plat BJL.S 20 lebar 90 cm Seng Plat BJL.S 25 lebar 90 cm Seng Plat BJL.S 28 lebar 90 cm Flashing (List Seng Lipat, 2.10.62x120 cm) Seng Plat BJL.S 30 lebar 90 cm Seng Spandek 0.25 mm lebar 80 cm Seng Spandek 0.3 mm lebar 80 cm Seng Spandek 0.35 mm lebar 80 cm Seng Spandek 0.4 mm lebar 80 cm Seng Spandek 0.25 mm lebar 80 cm, Warna Seng Spandek 0.3 mm lebar 80 cm, Warna Seng Spandek 0.35 mm lebar 80 cm, Warna Seng Spandek 0,4 mm lebar 80 cm, Warna Atap Roof Fiber Glass Rangka Atap Roof Fiber Glass Plastik Aerator Atap Polycarbonat Atap Trimdeck 0.40 TCT (Spandek) Bubungan Trimdeck 0.40 TCT (Spandek) Bubungan Trimdeck 0.40 TCT (Spandek) Alumunium Foil Karet Talang Atap Polycarbonate (210 x 1180 cm) Atap Polycarbonate GRC Board bergelombang Profil C 75.100 Profil C 75.75 Profil C 80.100 Profil C 80.75 Reng U 0.55 Reng U 0.45 Reng U 0.40 Baut Truss
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Lbr M' Lbr M' Lbr M' lbr lbr bh Lbr bh Lembar M² kg Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar M' M' M' M' Bh M' M' M' M' M' M' M' M' M' Lbr M² M² Lbr M² M' M' M² M' Lembar m2 m2 M' M' M' M' M' M' M' Bh
6,900.00 7,900.00 6,600.00 8,800.00 31,000.00 17,000.00 35,000.00 14,000.00 70,000.00 75,000.00 80,000.00 85,000.00 65,000.00 70,000.00 193,000.00 193,000.00 7,000.00 90,000.00 13,000.00 68,000.00 47,300.00 29,000.00 69,000.00 199,000.00 55,000.00 95,000.00 68,000.00 80,000.00 85,000.00 75,000.00 50,000.00 76,000.00 105,000.00 120,000.00 85,000.00 135,000.00 65,000.00 75,000.00 94,000.00 104,000.00 75,000.00 87,000.00 100,000.00 110,000.00 125,000.00 266,000.00 7,000.00 203,000.00 100,000.00 60,000.00 60,000.00 13,000.00 91,000.00 420,000.00 17,000.00 90,000.00 30,000.00 19,000.00 35,000.00 25,000.00 9,000.00 7,500.00 7,000.00 500.00
Baut Reng
1 2 3 4 5 6 7 8 9
Bahan Kayu dan Bambu Papan Kayu Klas I Papan Kayu Klas II Papan Kayu Klas III Balok Kayu Klas I Balok Kayu Klas II Balok Kayu Klas III Dolken / Perancah Dia. 7 Cm - 4 m Papan Kayu Begisting Balok Kayu Begisting
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Lumbersering Kayu Kelas I Lumbersering Kayu Kelas II List Plafond List Plafond 2/4 Profil List Plafond 3/3 Profil List Plafond 4/4 Profil List Plafond 5/5 Profil Papan Nama Bambu (Dia 12.5 cm, P 6 m) Bambu (Dia 10 cm, P 6 m) Bambu (Dia 7 cm, P 6 m) Bedek Kulitan Bedek Biasa Bedek Pagar Bilik Bambu
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Bahan Cetak Lubang Angin 10x20 Cm Lubang Angin 20x20 Cm Lubang Angin 20x30 Cm Buis Beton Dia. 10 Cm Buis Beton Dia. 20 Cm Buis Beton Dia. 30 Cm Buis Beton Dia. 40 Cm Buis Beton Dia. 50 Cm Buis Beton Dia. 60 Cm Buis Beton Dia. 80 Cm Penutup Buis Beton Dia. 80 Cm Batako 10 x 20 x 40 Cm Paving Blok Persegi (t = 8 cm) Paving Blok Persegi (t = 6 cm) Paving Blok Persegi (warna) Paving Blok Persegi (t = 8 cm), Press Paving Blok Tiga Berlian Batu paras/Palimanan Batu Sisir/ Bergaris, hitam Lubang Angin Keramik 20 x 20 cm Lubang Angin Keramik 30 x 30 cm Glass Block Roster Terawang (15 X 20 ) Roster 30 x 30 Wall Line GRC + Rangka Hollow (Terpasang) Conblock tipe segi-empat abu-abu 8 cm, K-300 Conblock tipe segi-enam abu-abu 8 cm, K-300 Kisi-kisi 50x100 mm UPVC Motif Kayu Kanstein/Kerb T=30 cm, P=60 cm (jalan) Kanstein/Kerb T=40 cm, P=60 cm (taman) Udith (Beton pracetak), lebar 80 cm, tebal = 12 cm Udith (Beton pracetak), lebar 100 cm, tebal = 12 cm
1 2
Bahan Lantai Tegel Abu-abu 20 x 20 Tegel Bergaris Abu 20 x 20 Cm
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Bh
400.00
M³ M³ M³ M³ M³ M³ Batang M³ M³
5,480,000.00 4,250,000.00 2,600,000.00 5,350,000.00 4,000,000.00 2,600,000.00 11,000.00 3,090,000.00 2,720,000.00
M³ M³ M' M' M' M' M' Bh Btg Btg Btg M² M² M² M²
3,715,000.00 3,150,000.00 8,500.00 9,000.00 12,000.00 14,000.00 17,000.00 200,000.00 40,000.00 34,000.00 27,500.00 57,000.00 32,000.00 35,000.00 50,000.00
Bh Bh Bh Bh,L= 0,5M Bh,L= 0,5M Bh,L= 0,5M Bh,L= 0,5M Bh,L= 0,5M Bh,L= 0,5M Bh,L= 0,5M Bh Bh M2 M2 M2 M2 M2 M2 M2 Bh Bh Bh Bh m2 M2 m2 m2 m1 m1 m1 Bh,P=1,2M Bh,P=1,2M
15,000.00 15,500.00 20,000.00 50,000.00 75,000.00 90,000.00 110,000.00 125,000.00 130,000.00 150,000.00 175,000.00 4,500.00 80,000.00 65,000.00 110,000.00 165,000.00 200,000.00 244,000.00 265,000.00 45,000.00 55,000.00 56,000.00 18,000.00 220,000.00 1,100,000.00 127,000.00 122,000.00 132,000.00 165,000.00 125,000.00 1,800,000.00 2,000,000.00
M² M²
63,000.00 74,000.00
3 4 5 6 7 8 9 10 11 12 13 14 15
Tegel Warna 20 x 20 Cm Tegel Bergaris Warna 20 x 20 Cm Tegel Traso Klas I 30 x 30 Tegel Traso Klas II 30 x 30 Granite Kw I Granite Kw II Geotextile Drainagecell Hospital plint 60 x 10 x 4 Stepnose tangga 10x40 cm Karpet grassblock tebal 8 cm Lantai conwood deck 12" T-lock + Pengecetan
M² M² M² M² M² M² m2 m2 Buah Buah kg m2 M²
80,000.00 80,000.00 85,000.00 83,000.00 450,000.00 380,000.00 320,000.00 82,000.00 82,000.00 32,000.00 25,000.00 140,000.00 770,000.00
1 2 3 4
Keramik Keramik Keramik Keramik
Dinding Dinding Dinding Dinding
M² M² M² M²
140,000.00 120,000.00 130,000.00 90,000.00
1 2 3 4
Keramik Keramik Keramik Keramik
Lantai Lantai Lantai Lantai
M² M² M² M²
140,000.00 120,000.00 110,000.00 90,000.00
1
11 12 13 14 15 16 17 18 19 20
Keramik cutting Motif Keramik artistik Lantai Marmer Lantai Vinyl Kw I Lantai Vinyl Kw II Lantai parquete (dreamwood), Kw I Lantai parquete (dreamwood), Kw II Beton grid Pracetak K225, ( 5x40x240) Porselin Kualitas I (Polos) Plint Keramik Plint Granite Plint Ubin 15 x 20 cm Plint Ubin 10 x 30 cm Plint Ubin 10 x 40 cm Coral sikat Coral sikat, Warna Dinding Kalsiplank 8" Jati+ Rangka Holow + Pengecetan Dinding Bahan HPL, Motif Dinding Bahan HPL, Polos Bahan HPL, Polos Kapur Sirih Wall Paper Perekat Kanstin
M² Bh M² M² M² M² M² M3 M² Bh Bh Bh Bh Bh Kg Kg M² M² M² m2 Kg m2 Kg m2
160,000.00 13,000.00 600,000.00 650,000.00 400,000.00 1,000,000.00 800,000.00 3,000,000.00 103,000.00 13,000.00 30,000.00 1,900.00 1,900.00 2,600.00 10,000.00 16,000.00 720,000.00 230,000.00 195,000.00 86,700.00 25,000.00 100,000.00 25,000.00 75,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bahan Besi Besi Beton Ulir Besi Beton polos Rangka Plafond Metal Furing Rangka Plafond Besi Hollow, (galvanis) Plat baja tebal 8 mm 4 feet x 8 feet plat baja 15x9x9,2 cm Plat stainless steel Pull Handle ex. Dekson type 01 Lock Case ex. Dekson Lever Handle ex. Dekson Engsel Floor hange Dexson Door Closer ex dekson Slide Handle ex. Dekson Engsel sliding Pintu plat baja tebal 5,5 mm lapis timah hitam ex. Bostinco Flush bolt ex. Dekson
Kg Kg m2 m2 lbr m1 m2 bh bh bh bh bh bh bh bh bh
19,000.00 16,000.00 250,000.00 200,000.00 1,350,000.00 315,000.00 700,000.00 1,300,000.00 185,000.00 185,000.00 1,650,000.00 350,000.00 1,500,000.00 200,000.00 18,800,000.00 110,000.00
2 3 4 5 6 7 8 9 10
Kw Kw Kw Kw
I (Motif) II (Motif) I (Polos) II (Polos)
Kualitas Kualitas Kualitas Kualitas
I (Motif) II (Motif) I (Polos) II (Polos)
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82
Engsel kupu ex. Dekson Plat timbah hitam 3 m Besi Profil (Siku), kanal C Besi Baja IWF Pipa Black Steel Spaner Curtain Wall + kaca templet 8 mm Kusen Alumunium Natural Kusen Alumunium Warna Daun pintu/jendela alumunium + kaca 5 mm, (natural) Daun pintu/jendela alumunium + kaca 5 mm, (warna) Daun pintu/jendela alumunium + kaca 8 mm, (natural) Daun pintu/jendela alumunium + kaca 8 mm, (warna) Alumunium Strip Alumunium "T" Kawat f 4 mm Profil kaca Alumunium Kawat Ikat Beton Kawat Nyamuk Besi Kawat Saringan Pasir Kawat Duri Kawat Bronjong digalvanisir Kawat Las Besi Strip Tebal 5 mm Besi Strip Tebal 3 x 2 mm Besi Strip Tebal 2 x 2 mm Besi Stainles Diameter 2" Besi Stainles Diameter 1" Besi Stainles Diameter 1/2" Daun Pintu Roling door alumunium Rangka Roling door alumunium Pintu Harmonika, Complet Sunscreen alluminium Alluminium Composit Panel (ACP) 0,30 mm, (Interior) Alluminium Composit Panel (ACP) 0,30 mm,(Exterior) Wood Panel Composit (WPC) tebal 15mm Pintu WCP, Complit sealent Kawat Gerawang Besi Hollow 100 x 50 Zincromate L = 6m Besi Hollow 50 x 50 Zincromate L = 6m Besi Hollow 40 x 40 Zincromate L = 6m Besi Hollow 40 x 20 Zincromate L = 6m Besi Hollow 40 x 40 Stenlistail L = 6m Besi Hollow 20 x 20 Stenlistail L = 6m Pipa 2" black steel di cat duco Pipa 1"black steel dicat duco Galvanis Steel 3/4" Besi Stainless Ø 3/4' Syntetic Grass WPC 5x5 cm WPC 10x5 cm WPC 15x5 cm WPC 20x5 cm WPC Panel W15 x H2,5 cm WPC door type 02 include kaca 5 mm WPC door type 03 include kaca 5 mm WPC door type 04b include kaca 5 mm WPC door type 04c include kaca 5 mm WPC door type 06 uk. 2,2 x 0,8 m WPC door type 08 uk. 1.1 x 0,6 m WPC door type 09 uk. 2,2 x 1,5 m WPC door type 10 uk. 2,2 x 0,9 m WPC door type 11 uk. 2,2 x 1,3 m Kalsiboard rangka alumunium Besi Hollow / Square Bars 20 x 40 mm
bh m2 Kg Kg Kg Kg m2 M' M' m2 m2 m2 m2 M' M' M' M' Kg M² M² 50/Rol Kg Kotak Kg Kg Kg M' M' M' M² M' M² M² M² M² M² Unit tube M² M' M' M' M' M' M' m1 m1 m1 m1 m2 m1 m1 m1 m1 m1 bh bh bh bh bh bh bh bh bh set M'
130,000.00 750,000.00 38,000.00 38,000.00 600,000.00 35,000.00 2,150,000.00 95,000.00 110,000.00 1,100,000.00 1,150,000.00 1,100,000.00 1,200,000.00 60,000.00 15,000.00 85,000.00 95,000.00 33,000.00 29,000.00 35,000.00 100,000.00 40,000.00 160,000.00 35,000.00 26,000.00 23,000.00 90,000.00 50,000.00 35,000.00 600,000.00 300,000.00 1,750,000.00 500,000.00 550,000.00 800,000.00 550,000.00 1,600,000.00 35,000.00 23,000.00 59,000.00 32,000.00 26,000.00 13,000.00 110,000.00 39,000.00 69,000.00 44,000.00 43,000.00 94,000.00 32,000.00 132,000.00 230,000.00 350,000.00 485,000.00 574,000.00
83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19 20 21 22 23
Besi Hollow / Square Bars 40 x 40 mm Besi Hollow / Square Bars 40 x 60 mm Besi Hollow / Square Bars 50 x 50 mm Besi Hollow / Square Bars 40 x 80 mm Besi Hollow / Square Bars 50 x 100 mm Besi Hollow / Square Bars 100 x 100 mm pengelasan Steel Frame Hollow Galvanis 150x40x3 mm Alumunium 4" Dark Gray ex. YKK Kunci Pintu Alumunium Textile Tape Siku Pintu Otomatis Karet Kaca Besi Plat 3 mm Besi Plat 2 mm Besi plat baja Pintu kawat harmonika + Besi Siku Plat baja, ukuran 120 x 240 cm Jarum Keras Pintu Jeruji Besi Rangka besi siku 40.40.4 + Asisories Pintu Besi Pagar Pagar Besi Pintu Besi Pagar (dia. 16 mm) Pagar Besi (dia. 16 mm) Pagar Besi Pipa GI Pintu Pagar Besi Pipa GI Baut Sekrup Anti Karat Ventilasi Siku Mata Kater Roda Pintu Dorong Mesin Bor Listirk Wiremesh M6/ (34,76)kg Wiremesh M8/ (61,79)kg Wiremesh M10/ (96,54)kg Bondek tebal 0.65 mm Bondek tebal 0.70 mm Bondek tebal 0.75 mm Bondek tebal 1.00 mm
M' M' M' M' M' M' cm1 m1 m1 Bh M' Bh Set Lembar Lembar Kg M² Kg Bh M² M² M² M² M² M² M² Bh M2 Bh Bh Unit Kg Kg Kg M2 M2 M2 M2
21,500.00 29,000.00 36,000.00 50,000.00 58,000.00 140,000.00 1,300.00 32,000.00 210,000.00 220,000.00 35,000.00 570,000.00 140,000.00 1,700,000.00 1,250,000.00 33,000.00 250,000.00 24,000.00 35,000.00 540,000.00 480,000.00 453,000.00 900,000.00 800,000.00 795,000.00 850,000.00 2,000.00 250,000.00 85,000.00 57,000.00 1,350,000.00 37,000.00 66,000.00 105,000.00 110,000.00 120,000.00 130,000.00 210,000.00
Bahan Langit-Langit Eternit 100 x 100 Cm Triplek 120 x 240 x 2 mm Triplek 120 x 240 x 3 mm Triplek 120 x 240 x 4 mm Triplek 120 x 240 x 6 mm Triplek 120 x 240 x 9 mm Triplek 120 x 240 x 12 mm Triplek 120 x 240 x 18 mm Calsiboard 1200 x 240 x 3.5 mm Calsiboard 1200 x 240 x 6 mm Gypsum board 1200 x 2400 x 9 mm PVC Plafond, 10 mm, Putih Polos PVC Plafond, 10 mm, Warna Plafond Akustik 600 x 600 Plafond Papan Kayu Kls II, 2 cm Formika Putih 120 x 240 mm Formika Warna 120 x 240 mm Mega Teakwood 120 x 240 x 3 mm Plywood tebal 4 mm, ukuran 120 cm x 240 cm Plywood tebal 4 mm Ukuran (90 x 220) cm Triplek tebal 9 mm, ukuran 120 cm x 240 cm List Gypsum List Plafond Gypsum Type I List Plafond Gypsum Type II List Plafond Shadow Line, aluminium 0.30 mm Lem Kayu
Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar M2 M2 M2 M2 M2 Lembar Lembar Lembar Lembar Lembar Lembar M' M' M' M' Kg
27,000.00 54,000.00 67,000.00 103,000.00 106,000.00 159,000.00 240,000.00 330,000.00 135,000.00 222,000.00 100,000.00 250,000.00 280,000.00 155,000.00 80,000.00 195,000.00 270,000.00 220,000.00 220,000.00 130,000.00 159,000.00 24,000.00 53,000.00 40,000.00 5,500.00 55,000.00
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Lem Lem vinyl/perquete Lem Gypsum List Plafond Shadow Line, aluminium 0.30 mm Kasiplank (0.8 x 20) Top Cross Rail 250FX Furring Chanel PN 205 Furring Chanel PN 208 Suspension Spring Clip 223SS 4 mm Soft Galv Suspension Rod PN 225 Angle Bracket PN 220 Wall Angle 252FX Paper Tape Steel Tape UB Cote Read Mix Papan WPC teval 7 mm
Kg Kg Kg M' M' btg btg bh bh bh bh bh roll roll kg lbr
55,000.00 55,000.00 30,000.00 9,500.00 25,000.00 35,000.00 85,000.00 3,000.00 6,000.00 6,000.00 2,000.00 15,000.00 55,000.00 132,000.00 165,000.00 330,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bahan Kaca Kaca Nako 5 mm Kaca Polos 3 mm Kaca Polos 5 mm Kaca Polos 8 mm Kaca Buram (ES) 5 mm Komplit Kaca Riben 3 mm Kaca Riben 5 mm Kaca Cermin 5 mm Acrilic 2mm Bening 2mmx122cmx244cm Kaca Tempreat 8 mm, Polos Kaca Tempreat 10 mm, Polos Kaca Tempreat 12 mm, Polos Kaca Tempreat 8 mm, Warna Kaca Tempreat 12 mm, Warna Kaca Lengkung 10 mm, Polos Kaca Lengkung 12 mm, Polos
M² M² M² M² M² M² M² M² Lembar M² m2 M² M² M² M² M²
141,000.00 115,000.00 170,000.00 200,000.00 215,000.00 137,000.00 165,000.00 169,000.00 130,000.00 1,000,000.00 1,250,000.00 1,500,000.00 1,100,000.00 1,800,000.00 2,000,000.00 2,500,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Bahan Finishing Amplas Plamir Kayu Spritus Dempul Batu Apung Soda api Sabun Minyak Cat Residu Minyak Bekisting Meni Besi Meni Kayu Cat Kayu Mutu Menengah Cat Kayu Mutu Tinggi Cat Tembok Mutu Tinggi, (Interior) Cat Tembok Mutu Tinggi, (Exterior) Cat Tembok Mutu Menengah, (Interior) Cat Tembok Mutu Menengah, (Exterior) Cat Besi Cat Genteng Plamir Tembok/ Plafond Teer Politur Politur Jadi Minyak Cat A Spesial Cat Marka Jalan Scalato Cat Marka Jalan Biasa Cat Zigromeat Vernis Kuas 5 Cm
Lembar Kg Liter Kg Kg Liter Kg Liter Liter Liter Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Liter Liter Liter Kg Kg Kg Ltr Bh
9,000.00 29,000.00 29,000.00 35,000.00 250,000.00 66,000.00 20,000.00 20,000.00 25,000.00 18,000.00 35,000.00 35,000.00 72,000.00 90,000.00 60,000.00 127,000.00 35,000.00 55,000.00 70,000.00 42,000.00 50,000.00 37,000.00 36,000.00 37,000.00 39,000.00 110,000.00 92,000.00 130,000.00 37,000.00 29,000.00
31 32 33 34 35 36 37 38 39 40 41 42
Rol Cat Glassbeads Roadline thener Cat Roadline paint Water Proofing Floor hardener 3 Kg/m2 Cat Epoxy ceramic stepnoosing 100 x 200 mm Grooe line 2 cm Floor hardener 7 Kg/m2 Fiber Bakar Cat tembok dulux Watersilt Pro
Bh Kg Ltr Ltr Kg m2 Liter m1 m2 m2 m2 Kg
36,000.00 50,000.00 55,000.00 85,000.00 65,000.00 44,000.00 170,000.00 160,000.00 26,000.00 57,000.00 110,000.00 120,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Bahan Pengunci kunci pintu mutu menengah kunci pintu mutu tinggi Yale 1 Slag Yale 2 Slag Kuda Terbang 1 Slag Kuda Terbang 2 Slag Royal Haag Angin Besar Haag Angin Kecil Grendel Besar Grendel Kecil Engsel Nylon Engsel H (biasa) Expagnolet Kunci Silinder Pegangan Pintu KW I Door Holder Door Closer Door Stoper Kunci Selot Besar Kunci Selot Kecil Rel Pintu Dorong Lubang Pintu Intip (Door Viewer)
Bh Bh Bh Bh Bh Bh Stel Stel Stel Bh Bh Pas Pas Bh Bh Bh Bh Bh Bh Bh Bh M' Bh
164,000.00 555,000.00 105,000.00 165,000.00 115,000.00 137,000.00 860,000.00 14,000.00 10,000.00 24,000.00 14,000.00 21,000.00 17,000.00 104,000.00 64,000.00 270,000.00 245,000.00 245,000.00 65,000.00 90,000.00 70,000.00 42,000.00 89,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Bahan Sanitaire Closet Duduk Biasa Closet Jongkok Teraso Closet Jongkok Porselin Wastapel (KW 1 Super) Wastapel Biasa Urinoir Porselin (KW 1 Super) Pembatas urinoir ex. TOTO A 100 Kitchen Sink Stainless Steel ex. TOTO Closet Duduk (KW 1 Super) Saringan Air Besi Saringan Air Plastik Bak Cuci Piring Teraso Bak Cuci Piring Logam, 1 lubang Bak Cuci Piring Logam, 2 lubang Resesvoir Fybg Kapasitas 1 M3 Septictank Kapasitas 1 M3 + peresapan Septictank Kapasitas 2 M3 + peresapan Bak Fiberglass Kap 0.5 M3 Bak Fiberglass Kap 1.0 M3 Bak Mandi Plastik Kap. 0,5 M3 Bak Mandi Teraso 50 x 50 cm Bak Mandi Poseslin KW I Kran Shower Kran Air 1/2" Kran Air 3/4" Floor Drain ex. TOTO TX 1 BV 3 Floor Drain
Bh Bh Bh Bh Bh Bh bh bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh bh Bh Bh bh Bh
830,000.00 126,000.00 260,000.00 2,400,000.00 485,000.00 2,730,000.00 1,400,000.00 2,200,000.00 3,660,000.00 120,000.00 27,000.00 395,000.00 530,000.00 650,000.00 3,890,000.00 5,350,000.00 7,650,000.00 525,000.00 1,250,000.00 530,000.00 485,000.00 475,000.00 363,000.00 19,000.00 22,000.00 40,000.00 27,000.00
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Roof Drain Metal Seal Tape Lem Pipa Klep 3/4" Plampung Air Otomatis Tandon Air Fyberglass Kapasitas 500 Liter vertikal Tandon Air Fyberglass Kapasitas 1000 Liter vertikal Tandon Air Fyberglass Kapasitas 2000 Liter vertikal Tandon Air Fyberglass Kapasitas 3000 Liter vertikal Tandon Air Fyberglass Kapasitas 4000 Liter vertikal Tandon Air Fyberglass Kapasitas 5000 Liter vertikal Tandon Air Fyberglass Kapasitas 1000 Liter horisontal Tandon Air Fyberglass Kapasitas 2000 Liter horisontal Tandon Air Fyberglass Kapasitas 3000 Liter horisontal Tandon Air Fyberglass Kapasitas 4000 Liter horisontal Wastapel Merk Ina (KW I Super) Tempat Sabun (KW I) Cermin + Acessories (Antik) Gantungan Handuk + Acessories Shower spray ex. TOTO TX 403 SBPIV Shower ex. TOTO TR 309 SZ Paper Holder ex. TOTO TIPE TS116R soap holder ex. TOTO S 156N hand railing stainless steel ex. TOTO TX 3A2 Shower Splay + Acessories Shower Set + Acessories Hand Dryer + Acessories Gantungan Baju + Acessories Water Drain + Acesories Pintu Fiber Glass (Wc) Pembuatan dan Pemasangan Pintu jeruji besi Ø12mm + Rangka kosen besi siku 40 Bath Tub Kitchen Sink 1 Bowl GS 5844 Kran + asesories + Seal Tape Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA Mirror 100x120 cm Siku alumunium Spoel hoek Kran Air Antik Kran Zink Kitchenzink Kran Dinding sumur pompa tangan terpasang Bahan Paku Paku panjang 1 - 5 Cm Paku panjang 5 - 7 Cm Paku panjang 7 - 10 Cm Paku panjang 10 - 12 Cm Paku Sekrup Paku Sekrup Paku Seng Paku Asbes Skrup/Piles 1,5 Cm Skrup/Piles 2,0 Cm Paku Sumbat Baut Mur Mur baut 12 mm Mur baut 16 mm Baut Mur 18 mm Baut Mur 22 mm Besi Beugel U + Baut Mur Besi Beugel Plat + Baut Mur Paku Calsiboth Paku Baja Angker Kusen
Bh Bh Kg Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh bh bh bh bh bh Bh Bh Bh Bh Bh Bh M2 Bh bh set bh bh m1 bh Bh Bh Bh Bh Bh
Kg Kg Kg Kg Kg Bh Kg Kg Doos Kecil Doos Kecil Bh Bh Bh Bh Bh Bh Bh Bh Kg Kg Bh
45,000.00 6,000.00 80,000.00 35,000.00 155,000.00 1,430,000.00 2,100,000.00 10,155,000.00 13,685,000.00 19,910,000.00 22,000,000.00 39,850,000.00 55,100,000.00 65,710,000.00 2,750,000.00 150,000.00 69,000.00 135,000.00 170,000.00 813,000.00 565,000.00 594,000.00 160,000.00 940,000.00 455,000.00 700,000.00 1,480,000.00 245,000.00 69,000.00 850,000.00 1,555,000.00 6,800,000.00 1,570,000.00 690,000.00 3,880,000.00 270,000.00 82,000.00 11,000,000.00 67,000.00 400,000.00 360,000.00 215,000.00 1,760,000.00
33,000.00 28,000.00 28,000.00 28,000.00 35,000.00 400.00 45,000.00 45,000.00 35,000.00 35,000.00 38,000.00 5,000.00 6,000.00 7,000.00 8,000.00 10,000.00 39,000.00 39,000.00 35,000.00 85,000.00 6,000.00
21 22 23 24 25
Paku Sekrup 5 cm Paku Sekrup 10 cm Paku Sekrup 1- 2,5 cm Skrup Fixer Ramset/ Dinabolt
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
Bahan Instalasi Listrik Titik Lampu Stop Kontak Tanam Stop Kontak Luar Saklar Double Saklar Tunggal Zekering Boxes 1 Group Zekering Boxes 2 Group Zekering Boxes 3 Group Lampu Philip 18 W Lampu Philip 14 W Lampu Philip 5 W Lampu Pijar 25 W Lampu TL 40 W Lampu TL 2 x 18 W Lampu TL 2 x 36 W Lampu TL 2 x 40 W Lampu LED 2 x 14 W Lampu Sorot (Sejenis Mercury) Kabel NYA 2,5 mm Kabel NGA 2 x 2,5 mm Kabel NYM 3 x 2,5 mm Kabel NYM 3 x 1,5 mm Kabel NYM 2 x 2,5 mm Kabel NYM 2 x 1,5 mm Kabel NYM 4 x 6 mm Kabel NYM 4 x 10 mm Kabel NYY 4 x 50 mm Kabel BC 50 mm Kabel BC 35 mm Fiting Lampu Fiting Lampu Tanam Dia. 4 " Fiting Lampu Tanam Dia. 3 " Box Panel 3 Phase, Comlite (80x120x25) Box Panel 3 Phase, Comlite (50x70x20) Box Panel 3 Phase, (30x40x15) Box Panel PVC 4 MCB, (40x60x20) MCB 6 A MCB 4 A Pemasukan Daya listrk Pemasangan Daya listrk AC (Air Conditioner) Kapasiitas 2 PK AC (Air Conditioner) Kapasiitas 1 PK AC (Air Conditioner) Kapasiitas 1/2 PK Pas pengisap debu ruangan (Blower) + asisories complit Pas Lampu darurat + asisories complit Kabel Telepone 4 x 0.5 mm Isolasi Outle TV Outle Telephone Dow ligth / PCL 13 W Dow ligth / PCL 8 W Dow ligth / LED 14 W Dow ligth / LED 7 W Dow ligth / LED 3 W Lampu Tempel / LED 14 W Lampu spot light/ LED 7 W Lampu strip light/ LED 7 W Electroda Cooper dia. 1 inci Lampu Sorot taman spot light (LED), 10 watt
Kg Kg Kg Bh Kg
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Roll/50 Roll/50 Roll/50 Roll/50 Roll/50 Roll/50 Roll/50 Roll/50 M' M' M' Bh Bh Bh Set Set Bh Bh Bh Bh KWH VA Unit Unit Unit Bh Bh M' Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M' M' Bh
35,000.00 35,000.00 35,000.00 22,000.00 75,000.00
285,000.00 210,000.00 227,000.00 39,000.00 39,000.00 420,000.00 570,000.00 710,000.00 60,000.00 49,000.00 35,000.00 25,000.00 97,000.00 95,000.00 162,000.00 165,000.00 192,000.00 710,000.00 300,000.00 577,000.00 705,000.00 577,000.00 577,000.00 396,000.00 1,650,000.00 2,675,000.00 390,000.00 55,000.00 45,000.00 22,000.00 42,000.00 32,000.00 12,000,000.00 5,850,000.00 1,100,000.00 395,000.00 70,000.00 66,000.00 2,600.00 1,600.00
166,000.00 155,000.00 30,000.00 12,000.00 50,000.00 50,000.00 130,000.00 110,000.00 152,000.00 95,000.00 40,000.00 25,000.00 300,000.00 39,000.00 350,000.00 300,000.00
60 61 62 63 64 65 66 67 68 69
Lampu taman Tanam (LED), 8 watt Bollard Lighting (LED), 9 watt Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + Pipa GI + Pemasanga Pipa Conduit PVC dia. 20 mm2 Exshaust Fan 14 W Wall Type Exshaust Fan 2500 CMH Orbit Fan 60 Watt Exshaust Fan 353 CFM/ 34 W Pemasangan Penangkal Petir + Arde (Radius min. 50 m) Pemasangan Penangkal Petir + Arde (Radius min. 25 m)
Bh Bh Bh M' bh bh bh bh Unit Unit
270,000.00 3,580,000.00 1,200,000.00 3,000.00 535,000.00 1,100,000.00 720,000.00 315,000.00 25,000,000.00 12,500,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Pekerjaan Vegetasi Tanaman Lempengan Rumput Sirih Gading Bakung Lele Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter Adam Hawa Sikas (tinggi ± 50 cm) Pucuk Merah (tinggi ± 60 - 70 cm) Pisang Hias (tinggi ± 50 - 100 cm) Palem Phoenix (tinggi ± 80 - 100 cm) Pandan Bali (tinggi ± 80 - 100 cm) Bugenvil (tinggi ± 80 - 100 cm) Ketappang Kencana (tinggi ± 200 cm) Palem Putri (tinggi ± 200 - 300 cm) Palem Kuning (tinggi ± 150 - 200 cm) Tabebuya Kuning tinggi 4 meter Tanam Pohon Palem raja tinggi 3 meter Tanam Pohon Kamboja tinggi 5 meter Tanam Pohon Pisang Kipas tinggi 1,5 meter Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter Pohon Damar (Agathis dammara) Tinggi 4m Pohon Pulai (alstonia scholaris) Tinggi 6m Pohon Kasia Jawa (Cassia javanica) Tinggi 4m Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m Pohon Flamboyan (Delonix regia) Tinggi 7m Pohon Biola Cantik (Ficus lyrata) Tinggi 6m Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m Pohon Sosis (Kigelia pinnata) Tinggi 7m Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6m Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m Pohon Parahiba (Schizolobium parahyba) Tinggi 7m Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m Pohon Palem Kol (Licualis grandis) Tinggi 1,5m Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m
M² Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
74,000.00 15,000.00 11,000.00 22,000.00 16,000.00 36,000.00 990,000.00 155,000.00 145,000.00 290,000.00 1,100,000.00 415,000.00 410,000.00 750,000.00 750,000.00 1,500,000.00 1,250,000.00 1,880,000.00 130,000.00 19,000.00 832,000.00 1,900,000.00 565,000.00 876,000.00 1,188,000.00 813,000.00 1,065,000.00 1,065,000.00 880,000.00 545,000.00 1,465,000.00 940,000.00 680,000.00 188,000.00 107,000.00 157,000.00 1,888,000.00 1,750,000.00 565,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
100,000.00 63,000.00 53,000.00 313,000.00 169,000.00 94,000.00 19,000.00 22,000.00 44,000.00 44,000.00 19,000.00 88,000.00 19,000.00 13,000.00
Agave (Agave angustifolia) Tinggi 300-400 mm Paku Sarang Burung (Asplenium nidus) Tinggi 250-300mm Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm Giant Arum (Typhonodarum lindleyanum) Tinggi 1500-2500 mm Spineless (Spineless Yucca) Tinggi 800 mm Sente (Alocosia macrorrhiza) Tinggi 700-800mm Honje Merah (Alpinia purpurata) Tinggi 700-800mm Kacang Emas (Arachis pintai) Tinggi 50-100mm Bromelia Merah (Bromelia sp.) Tinggi 150-200mm Pisang Hias (Calathea lutea) Tinggi 700-800mm Kalatea Belang (Calathea zebrina) Tinggi 250-300mm Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 700-800mm hanjuang Merah (Cordyline frusticosa) Tinggi 700-800mm Pacing Merah (Costus woodsonii) Tinggi 400-500mm
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak Semak
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Sirih Gading (Epipremnum aureum) Tinggi 300-500mm Heliconia Bunga Pink (Heliconia chartacea) Tinggi 400-500mm Bakung Lele (Hymenocallis littoralis) Tinggi 250-300mm Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300mm Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 100-150mm Aralia (Osmoxylon lineare) Tinggi 400-500mm Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm Daun Philo "Burle Marx" (Philadendron "Burle Marx") Tinggi 200-250mm Daun Philo Besar (Philadendron sellaum) Tinggi 500-600mm Daun Philo Xenadu (Philadendron xenadu) Tinggi 300-400mm Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400mm Melati Jepang (Pseuderanthemum reticulatum) Tinggi 400-500mm kembang Air Mancur Merah (Russelia equisetiformis) Tinggi 400-500mm Wali Songo Var. (Schefflera arbaricola) Tinggi 400-500mm Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm Lili Brazil (Dianella tasmanica) Tinggi 250-300 Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-400mm Kembang Coklat (Zephyranthes candida) Tinggi 100-150 Rumput Manila (Zoysia matrella)
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M²
73,000.00 9,400.00 13,000.00 25,000.00 19,000.00 95,000.00 25,000.00 32,000.00 38,000.00 47,000.00 11,500.00 11,000.00 28,000.00 44,000.00 8,500.00 13,000.00 19,000.00 25,000.00 63,000.00
Tanaman Cemara Tanaman Karambosa hijau Tanaman Karambosa Karigata Tanaman Batang Merah Tanaman Erpah Kembang pukul sembilan Kembang rumput kuning Bunga Agave Bunga Andong Bunga Asoka Bunga Brokoli Bunga Kembang Puring Bunga Lidah mertua mini Bunga Lidah Rumpun mertua mini Bunga Puring kerupuk Bunga Rumpun sansevieria Bunga Soft india Bunga Kembang sepatu Pupuk daun dan kembang Pupuk kandang Insektisida / Furadan
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Zak kg kg
150,000.00 120,000.00 135,000.00 25,000.00 65,000.00 420,000.00 11,000.00 730,000.00 42,000.00 150,000.00 53,000.00 125,000.00 53,000.00 788,000.00 263,000.00 21,000.00 781,000.00 260,000.00 158,000.00 32,000.00 30,000.00
Bahan Tambahan Flux Oil Minyak pelumas Olie SAE 100 Olie SAE 30 Olie SAE 40 Olie SAE 90 Sambungan Rumah 1" Sambungan Rumah 1/2" Sambungan Rumah 3/4" Aspal (AC) Kayu Bakar Sewa Stamper Sewa Alat Bor Sewa Genset Sewa Mesin Las Aspal Emulsi Alat Bantu Bina Marga Alat Bantu Pengairan Minyak tanah Solar Bensin Pertalite Pertamax
Ltr Ltr Ltr Ltr Ltr Ltr Set Set Set Kg M³ Hari Hari Hari Hari Kg Set Set Ltr Ltr Ltr Ltr Ltr
40,000.00 47,000.00 38,000.00 51,000.00 65,000.00 75,000.00 3,100,000.00 1,855,000.00 2,163,000.00 12,000.00 198,000.00 170,000.00 210,000.00 410,000.00 410,000.00 9,000.00 3,395,000.00 3,395,000.00 6,000.00 6,500.00 6,500.00 7,800.00 9,500.00
24 25 26 27 28 29 30 31 32 33 34 35 36 37
Pagar BRC tinggi 1,20 m Tiang BRC dia. 1,50 m Three Colour Mesin Las Bor Listrik Mesin Pemotong Besi KWH Listrik Mata Bor Pelicin/Lubrican Alat Bantu Penyetelan (Trucker) Alat batu pekerja Blower Excause Van Passbox
M' Buah Btg Unit Unit Bh Kwh Bh Kg Set Ls Bh Bh Bh
120,000.00 68,000.00 46,000.00 17,000,000.00 1,132,000.00 1,132,000.00 1,600.00 57,000.00 120,000.00 114,000.00 12,000.00 550,000.00 550,000.00 24,600,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Pengeboran air + Pipa Casing Ø 6'' Pengeboran air + Pipa Casing Ø 4'' Pengeboran air + Pipa Casing Ø 3'' Pengeboran air + Pipa Casing Ø 2.5'' Mesin disel 6.5 . HP + Pompa Ebara ØINT 3'' OUT 3'' Mesin Pompa air 5 . HP Pompa ØINT OUT 2'' Mesin disel+Pompa Outo matis Jet pam ØINT OUT1.5'' - 30 Complit Mesin disel+Pompa Outo matis ( setara sanyo ) ØINT 1''- 20 Complit Mesin pompa air 5 . PK /type Hoda Mesin pompa air 8 . PK /type Hoda Slang Veleksibel Ø2.'' Slang Veleksibel Ø2.5.'' Slang Veleksibel Ø3.'' Mesin Jet Pump Kap. 250 watt Mesin Pompa Tekan Kap. 150 watt Sand Filter 520 ltr/mnt, (31.2 m3/jam), 2Hp - 3Hp, V 900 watt Sand Filter, (24.9 m3/jam), 2Hp - 3Hp, V 800 watt
m m m m Unit Unit Unit Unit Unit Unit m m m Unit Unit Unit Unit
1,120,000.00 850,000.00 400,000.00 200,000.00 28,800,000.00 8,700,000.00 25,905,000.00 23,350,000.00 7,351,000.00 9,400,000.00 42,000.00 60,000.00 77,000.00 3,700,000.00 1,130,000.00 15,110,000.00 13,200,000.00
1 2 3 4
Tulisan Tulisan Tulisan Tulisan
cm cm cm cm
18,000.00 13,000.00 8,000.00 22,500.00
1 2 3 4 5 6 7 8 9 10
Genzet Outomatis zellent complit asisories 50 PK + pemasangan Pompa Ebara ØINT 3'' OUT 3'' Sewa Molen Kpst 0.3 m3 Mobilisasi Alat berat Alat Berat Galian dan keprasan Alat berat Pemadatan Penatahalaman dan pembuatan taman + Bunga Contaner ( tong sampah ). 2.5 X 3 x 1.5 m Alat bantu (Sewa Cren Kpst 7 ton) Mesin kompresor
Unit Bh Hari Km Jam Jam m2 Bh Hari Bh
203,600,000.00 8,660,000.00 283,000.00 283,000.00 680,000.00 630,000.00 170,000.00 29,100,000.00 14,200,000.00 2,500,000.00
Papan Papan Papan Papan
Nama, (Staenlis) - t = 1 cm + Pemasangan Nama, (Galvanil) - t = 1 cm + Pemasangan Nama, (Fiber) - t = 1 cm Nama/ Logo, (Akrilik + lampu LED) - t = 1 cm
HARGA BAHAN MATERIAL TIDAK BERTEKANAN 1 2 3 4 5 6 7 8 9 10 11
Bahan Pipa Pipa PVC
½" ¾" 1" 1 1/4" 1½" 2" 2,5" 3" 4" 5" 6"
m m m m m m m m m m m
7,400.00 9,000.00 11,400.00 18,400.00 23,900.00 35,500.00 45,600.00 65,100.00 94,900.00 149,800.00 197,900.00
12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12
Pipa GI
8" 10" 12" 14" 16"
m m m m m
307,900.00 437,500.00 625,100.00 879,500.00 1,099,400.00
1/2" 3/4" 1" 1 1/4" 1½" 2" 2½" 3" 4" 5" 6" 8"
m m m m m m m m m m m m
24,500.00 31,500.00 48,300.00 63,800.00 73,200.00 100,000.00 127,500.00 164,500.00 238,200.00 320,700.00 381,700.00 676,300.00
HARGA BAHAN MATERIAL BERTEKANAN 1 2 3 4 5 6 7 8 9 10 11 12
Bahan Pipa Pipa PVC
½" ¾" 1" 1 1/4" 1½" 2" 2,5" 3" 4" 6" 8" 10"
m m m m m m m m m m m m
9,000.00 16,600.00 20,600.00 23,100.00 30,900.00 45,200.00 66,200.00 91,500.00 133,400.00 281,200.00 457,600.00 736,500.00
1 2 3 4 5 6 7 8 9 10 11
Pipa GI Medium
1/2" 3/4" 1" 1 1/4" 1½" 2" 2½" 3" 4" 6" 8"
m m m m m m m m m m m
34,300.00 43,100.00 70,600.00 98,200.00 112,500.00 120,300.00 166,600.00 198,500.00 280,100.00 446,600.00 689,200.00
1 2 3 4 5 6 7 8 9
Pipa HDPE
1/2" 1" 1½" 2" 2.5" 3" 4" 6" 8"
m m m m m m m m m
8,900.00 19,900.00 43,100.00 59,600.00 94,900.00 136,800.00 204,100.00 427,800.00 496,200.00
1,5" 2" 3" 4" 6"
Bh Bh Bh Bh Bh
151,100.00 195,200.00 279,000.00 322,000.00 743,100.00
1 2 3 4 5
Jenis Barang Flange Socket PVC
6 7 8
8" 10" 12"
Bh Bh Bh
1,306,600.00 2,930,500.00 5,645,900.00
1 2 3 4 5 6 7 8 9
Flange Spigot PVC
1,5" 2" 2,5" 3" 4" 6" 8" 10" 12"
Bh Bh Bh Bh Bh Bh Bh Bh Bh
139,000.00 195,200.00 243,600.00 279,000.00 322,000.00 637,300.00 1,110,300.00 2,690,100.00 5,315,100.00
1 2 3 4 5 6 7 8 9 10 11
Bend PVC RR/SP/S-12,5 Bend PVC RR/SP/S-12,6
1"x90° 3/4"x90° ½"x90° 1½"x90° 2"x90° 3"x90° 4"x90° 6"x90° 8"x90° 10"x90° 12"x90°
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
60,700.00 57,330.00 54,000.00 80,600.00 119,000.00 196,300.00 278,900.00 584,400.00 1,051,800.00 1,851,200.00 3,202,900.00
1 2 3 4 5 6 7 8
Bend PVC RR/SP/S-12,5
1,5"x45° 2"x45° 3"x45° 4"x45° 6"x45° 8"x45° 10"x45° 12"x45°
Bh Bh Bh Bh Bh Bh Bh Bh
90,400.00 103,700.00 175,400.00 245,900.00 531,400.00 908,500.00 1,689,000.00 2,890,800.00
1 2 3 4 5 6 7
Bend PVC RR/SP/S-12,5
2"x22,5° 3"x22,5° 4"x22,5° 6"x22,5° 8"x22,5° 10"x22,5° 12"x22,5°
Bh Bh Bh Bh Bh Bh Bh
90,400.00 162,200.00 227,200.00 441,000.00 765,100.00 1,396,900.00 2,332,900.00
1 2 3 4 5 6 7
Bend GI All Flange
1½"x45° 2"x45° 2,5"x45° 3"x45° 4"x45° 6"x45° 8"x45°
Bh Bh Bh Bh Bh Bh Bh
283,400.00 331,800.00 367,200.00 391,500.00 523,800.00 841,300.00 1,303,200.00
1 2 3 4 5 6 7
Bend GI All Flange
1½"x90° 2"x90° 2,5"x90° 3"x90° 4"x90° 6"x90° 8"x90°
Bh Bh Bh Bh Bh Bh Bh
321,900.00 350,600.00 385,900.00 406,900.00 549,000.00 887,600.00 1,388,100.00
1 2 3 4 5 6 7
Bend GI All Flange
1½"x22,5° 2"x22,5° 2,5"x22,5° 3"x22,5° 4"x22,5° 6"x22,5° 8"x22,5°
Bh Bh Bh Bh Bh Bh Bh
244,800.00 314,300.00 356,200.00 375,900.00 497,300.00 793,800.00 1,217,200.00
Bend PVC RR/SP/S-12,5
1 2 3 4 5 6 7
Bend Drat GI
1½"x45° 2"x45° 2,5"x45° 3"x45° 4"x45° 6"x45° 8"x45°
Bh Bh Bh Bh Bh Bh Bh
283,400.00 331,800.00 361,600.00 391,400.00 523,700.00 841,300.00 1,302,000.00
1 2 3 4 5 6 7 8 9 10 11
Bend Drat GI
3/4"x90° 1"x90° ½"x90° ½"x90° 1½"x90° 2"x90° 2,5"x90° 3"x90° 4"x90° 6"x90° 8"x90°
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
8,300.00 216,100.00 4,900.00 6,100.00 263,600.00 306,500.00 350,600.00 406,900.00 549,000.00 887,600.00 1,388,100.00
1 2 3 4 5 6 7 8 9 10
Sock Drat GI
½" ¾" 1" 1½" 2" 2½" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
6,600.00 7,200.00 9,900.00 19,800.00 27,600.00 50,700.00 73,900.00 123,500.00 379,300.00 663,700.00
1 2 3 4 5 6 7 8 9 10
Sock PVC Drat Luar
½" ¾" 1" 1½" 2" 2½" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
5,600.00 8,300.00 13,200.00 18,800.00 25,300.00 50,700.00 70,600.00 89,300.00 173,200.00 347,300.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Tee All Socket PVC / RR
1"x½" 1"x1" 1½"x½" 1½"x3/4" 1½"x1" 1½"x1½" 2"x 1" 2"x2" 3"x1" 3"x2" 3"x3" 4"x2" 4"x3" 4"x4" 6"x2" 6"x3" 6"x4" 6"x6" 8"x3" 8"x4" 8"x6" 8"x8" 10"x6"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
40,800.00 82,700.00 87,200.00 101,400.00 129,000.00 170,900.00 198,500.00 213,900.00 255,800.00 297,700.00 370,400.00 454,200.00 520,400.00 565,600.00 714,400.00 812,600.00 871,000.00 1,051,800.00 1,851,200.00 1,779,400.00 2,176,300.00 2,403,500.00 6,186,200.00
Bend Drat GI/Knee GI Long Bend Female dan Male GI Bend Drat GI
24 25
10"x8" 10"x10"
Bh Bh
7,238,000.00 8,085,800.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Reduser All Socket PVC / RR
1½"x1" ½"x1" 1" x 3/4" 1" x 1 1/4" 2"x1" 2"x1½" 2"x2" 3"x1" 3"x2" 4"x2" 4"x3" 6"x2" 6"x3" 6"x4" 8"x3" 8"x4" 8"x6" 10"x6" 10"x8" 12"x10"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
91,600.00 40,900.00 45,200.00 54,100.00 110,300.00 129,000.00 167,600.00 171,000.00 180,800.00 285,600.00 292,200.00 454,300.00 462,000.00 531,400.00 1,058,400.00 1,006,600.00 948,200.00 1,584,300.00 1,428,800.00 5,944,700.00
1 2 3 4 5 6
Dop GI
½" 1" 1½" 2" 3" 4"
Bh Bh Bh Bh Bh Bh
6,300.00 17,600.00 28,700.00 87,200.00 175,400.00 216,100.00
1 2 3 4 5 6 7 8 9
Gilbout Joint CI
2" 3" 4" 6" 8" 10" 12" 14" 16"
Bh Bh Bh Bh Bh Bh Bh Bh Bh
162,100.00 200,700.00 292,200.00 492,900.00 940,500.00 1,084,900.00 1,493,900.00 2,209,400.00 2,435,500.00
1 2 3 4 5 6 7 8 9
Flange Las
2" 2,5" 3" 4" 6" 8" 10" 12" 16"
Bh Bh Bh Bh Bh Bh Bh Bh Bh
83,800.00 91,600.00 97,000.00 122,400.00 207,300.00 195,200.00 454,200.00 492,900.00 973,600.00
1 2 3 4 5 6 7 8 9 10
Gate Valve CI
1½" 2" 2,5" 3" 4" 6" 8" 10" 12" 16"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
549,000.00 726,600.00 952,600.00 1,098,100.00 1,461,900.00 2,435,500.00 4,235,800.00 6,075,900.00 8,673,400.00 1,949,200.00
1 2 3 4
Clamp Sadel CI
1½"x½" 2"x ½" 2"x 3/4" 2"x 1"
Bh Bh Bh Bh
35,300.00 60,700.00 63,900.00 66,200.00
5 6 7 8 9 10 11 12
3"x ½" 4"x ½" 4"x 2" 6"x½" 6"x 1" 6"x 2" 8"x 2" 8"x 3"
Bh Bh Bh Bh Bh Bh Bh Bh
70,600.00 81,600.00 110,300.00 130,100.00 136,700.00 151,100.00 759,700.00 841,300.00
1 2 3
Hidran Umum Fiberglass
1000 lt 2000 lt 3000 lt
Bh Bh Bh
6,195,000.00 9,154,100.00 12,252,100.00
1
Profile Tank
2200 lt
Bh
5,847,600.00
1 2 3 4 5 6 7
Water Meter
1/2" 3/4" 1" 2" 3" 4" 6"
Bh Bh Bh Bh Bh Bh Bh
368,200.00 584,300.00 1,104,700.00 1,657,110.00 2,313,000.00 2,963,500.00 3,768,300.00
1
Manometer
1/2"
Bh
262,400.00
1 2 3 4 5 6 7 8
Stop Kran
1/2" 3/4" 1" 1½" 2" 3" 4" 6"
Bh Bh Bh Bh Bh Bh Bh Bh
62,900.00 98,200.00 243,600.00 437,700.00 643,900.00 1,036,400.00 1,357,500.00 2,058,400.00
1 2 3 4 5
Streetbox
2" 3" 4" 6" 8"
Bh Bh Bh Bh Bh
110,300.00 110,300.00 145,500.00 145,500.00 262,400.00
1 2 3 4 5 6 7
Chek Valve
1,5" 2" 2,5" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh Bh
379,300.00 642,800.00 928,300.00 1,110,300.00 1,695,600.00 3,099,200.00 3,800,400.00
1 2 3
Valve socket
1 1/4" 1" 2"
Bh Bh Bh
74,900.00 63,900.00 87,200.00
1 2 3 4 5
Singel Air Valve
½" ¾" 1" 2" 3"
Bh Bh Bh Bh Bh
391,600.00 585,500.00 778,400.00 1,271,200.00 1,728,700.00
1 2 3 4 5 6 7 8
Tee GI All Flange
1½"x¾" 1½"x1" 1½"x1½" 2"x1½" 2"x2" 2½"x2" 2½"x2½" 3"x2"
Bh Bh Bh Bh Bh Bh Bh Bh
153,300.00 186,400.00 218,300.00 270,200.00 379,300.00 407,900.00 44,000.00 453,200.00
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Tee GI
3"x3" 4"x2" 4"x3" 4"x4" 6"x2" 6"x3" 6"x4" 6"x6" 8"x3" 8"x4" 8"x6" 8"x8" 1/2" x 1/2" 1" x 1/2" 1" x 1 " 1,5" x 1,5 " 2" x 2"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
500,500.00 531,400.00 589,900.00 647,200.00 729,900.00 822,500.00 951,500.00 1,001,100.00 1,269,000.00 1,328,600.00 1,380,300.00 1,563,300.00 5,600.00 26,500.00 63,900.00 87,200.00 104,800.00
1 2 3 4 5 6 7
Packing Rubber
8" 6" 4" 3" 2,5" 2" 1,5"
Bh Bh Bh Bh Bh Bh Bh
111,300.00 86,000.00 59,500.00 39,700.00 34,200.00 24,300.00 17,600.00
1 2 3 4 5 6 7 8 9
Socket PVC
½" 1" 1½" 2" 2½" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh Bh Bh Bh
17,700.00 18,300.00 19,300.00 25,600.00 39,900.00 54,200.00 90,200.00 175,400.00 521,200.00
1 2 3 4 5 6 7 8 9
Socket PVC Drat Dalam
½" 1" 1½" 2" 2½" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh Bh Bh Bh
17,200.00 17,700.00 18,800.00 25,400.00 39,700.00 54,100.00 89,300.00 175,400.00 520,400.00
1 2 3 4 5 6 7
Dop PVC
1" 1½" 2" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh Bh
18,800.00 28,700.00 38,700.00 61,800.00 97,000.00 187,500.00 559,000.00
1 2 3 4 5 6
Stud Flange
1,5" 2" 3" 4" 6" 8"
Bh Bh Bh Bh Bh Bh
109,200.00 124,700.00 141,200.00 156,600.00 365,000.00 726,600.00
1 2 3 4 5
Reduser HDPE
2" 2" 3" 3" 2"
Bh Bh Bh Bh Bh
113,600.00 145,600.00 221,600.00 186,400.00 372,700.00
x x x x x
1" 1.5" 2" 1,5" 4"
6 7 8 9
4" 6" 6" 6"
x x x x
3" 2" 3" 4"
Bh Bh Bh Bh
432,200.00 751,900.00 600,900.00 526,000.00
1 2 3
Tee Coupling HDPE
1,5" x 1" 1" x 1" 1" x 1/2"
Bh Bh Bh
333,000.00 169,800.00 164,400.00
1 2 3 4 5 6 7 8 9 10 11 12
Tee HDPE
1,5" x 1,5" 2" x 1" 2" x 1,5" 2" x 2" 2" x 3" 2" x 4" 3" x 4" 3" x 3" 4" x 4" 6" x 4" 6" x 3" 8" x 2"
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
306,500.00 362,800.00 379,300.00 395,900.00 428,900.00 568,900.00 656,000.00 446,600.00 884,200.00 1,011,100.00 761,900.00 2,251,300.00
1 2 3 4 5 6 7 8 9
Reduser GI
1,5" x 2" 2" x 3" 2,5" x 2" 2,5" x 3" 2" x 4" 3" x 4" 4" x 6" 1 1/2" x 1 1/4 1 1/2" x 1
Bh Bh Bh Bh Bh Bh Bh Bh Bh
168,700.00 198,500.00 232,700.00 262,400.00 314,300.00 320,900.00 584,400.00 175,400.00 140,000.00
1 2 3 4 5 6
Bend HDPE
1,5"x90° 2"x90° 3"x90° 4"x90° 6"x90° 8"x90°
Bh Bh Bh Bh Bh Bh
118,000.00 180,800.00 285,600.00 650,500.00 890,800.00 2,038,600.00
1 2 3 4 5 6
Bend HDPE
1,5"x45° 2"x45° 3"x45° 4"x45° 6"x45° 8"x45°
Bh Bh Bh Bh Bh Bh
93,800.00 163,200.00 270,200.00 625,200.00 844,500.00 1,953,700.00
1 2 3 4 5 6
Dop HDPE
1" 1,5" 2" 3" 4" 6"
Bh Bh Bh Bh Bh Bh
113,600.00 180,800.00 212,900.00 38,700.00 413,500.00 744,300.00
1 2 3 4 5
Konektor HDPE
1" 1,5" 2" 3" 4"
Bh Bh Bh Bh Bh
116,900.00 186,400.00 233,800.00 350,600.00 467,500.00
1
Male Elbow HDPE
2"
Bh
178,600.00
1 2 3 4 5
Male Adaptor HDPE (Drat Luar)
3" 2" 1,5" 1" 1/2"
Bh Bh Bh Bh Bh
116,900.00 111,300.00 85,000.00 60,700.00 47,500.00
1 2 3 4 5
Female Adaptor HDPE (Drat Dalam)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Pengadaan pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Pha Pengadaan pompa Submersible type Centrifugal kapasitas 5 Ltr/Dtk, H 120, 3 Pha Kontrol Panel Auto Pengadaan Kabel NYYHY Ø 4 x 2,5 mm Pengadaan Kabel NYYHY Ø 3 x 0,75 mm Pengadaan Water Level Control (WLC) Pengadaan Cord Holder (Pengikat Kabel) Pengadaan Pipa Pelindung Kabel Pemasangan dan Set Up Pompa Kawat Sling 12 mm 8 mm 6 mm Pemasangan Kawat Sling 12 mm 8 mm 6 mm Stelan seling 12 mm 8 mm 6 mm Pengunci seling 12 mm 8 mm 6 mm Angker Besi 22 mm Pekerjaan Snai Pipa Coupling GI 1/2"
1 2 3
Verlop Ring water Tank Ø 2"
3/4" x 1/2" 1" x 3/4" 1,5" x 1"
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Double Nepel GI
3" 2,5" 2" 1,5" 1" 1/2" 1,5" 1/2" 1/2" 1/2"
Water Mur Double Nepel PVC Knee PVC drat dalam Knee PVC Tap Kran Plugh Kran 1/2" Box Water Meter Pemasangan Meteran Air
3" 2" 1,5" 1" 1/2"
1/2" 1/2"
Bh Bh Bh Bh Bh Unit Unit Unit m m Bh Bungkus m Set m m m m m m Bh Bh Bh Bh Bh Bh Bh Bh Bh
130,100.00 124,700.00 92,700.00 68,400.00 55,200.00 49,124,000.00 63,862,000.00 10,220,000.00 48,500.00 34,300.00 46,300.00 100,400.00 34,300.00 3,974,600.00 30,900.00 24,300.00 23,100.00 9,900.00 8,800.00 6,600.00 590,900.00 420,000.00 151,100.00 79,400.00 57,400.00 36,500.00 23,100.00 6,100.00 13,300.00
Bh Bh Bh
68,400.00 97,000.00 132,300.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Unit
54,100.00 37,500.00 32,000.00 28,700.00 23,100.00 19,900.00 99,300.00 7,200.00 10,500.00 5,600.00 34,300.00 72,800.00 71,800.00 28,700.00
DAFTAR HARGA SATUAN PEKERJAAN KABUPATEN DOMPU
TAHUN ANGGARAN 2023
NO
URAIAN PEKERJAAN
SATUAN
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
1
2
3
4
5
I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1. 1.1.1. HARGA SATUAN PEKERJAAN PERSIAPAN Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter Pengukuran dan pemasangan 1 m’ Bouwplank Pembuatan 1 m2 kantor sementara lantai plesteran Pembuatan 1 m2 rumah jaga (konstruksi kayu ) Pembuatan 1 m2 gudang semen dan peralatan Pembuatan 1 m2 bedeng pekerja Pembersihan 1 m2 lapangan dan perataan Pembuatan 1 m2 steger/perancah dari bambu Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm Pembuatan 1 m2 jalan sementara Pembongkaran 1 m3 beton bertulang Pembongkaran 1 m3 dinding tembok bata Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm Pemasangan 1 m2 panel beton pracetak 5x50x213 cm
m² m² m² m' m² m² m² m² m² m² bh m² m³ m³ m² m²
1. 1.1.1.1. 1. 1.1.1.2. 1. 1.1.1.3. 1. 1.1.1.4. 1. 1.1.1.5. 1. 1.1.1.6. 1. 1.1.1.7. 1. 1.1.1.8. 1. 1.1.1.9. 1. 1.1.1.10. 1. 1.1.1.11. 1. 1.1.1.12. 1. 1.1.1.13. 1. 1.1.1.14. 1. 1.1.1.15. 1.1.1.1.16.
1 2 3 4
1 Bh Pembuatan Papan nama Proyek 0,8 x 1,2 cm 1 m2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m 1 m2 Bongkar Usuk + Reng Untuk Dipakai Kembali 1 M2 Pembongkaran Atap Seng Gelombang
bh m² m² m²
SNI.3 SNI.4b SNI.8 SNI.9
249,150.00 407,693.00 45,980.00 18,271.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1. 1.5.1. HARGA SATUAN PEKERJAAN TANAH Penggalian 1 m3 tanah biasa sedalam 1 m Penggalian 1 m3 tanah biasa sedalam 2 m Menggali 1 m3 tanah biasa sedalam 3 m Menggali 1 m3 tanah keras sedalam 1 m Menggali 1 m3 tanah cadas sedalam 1 m Menggali 1 m3 tanah lumpur sedalam 1 m Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter Pembuangan 1 m3 tanah sejauh 30 meter Pengurugan kembali 1 m3 galian tanah Pemadatan tanah 1 m3 tanah ( per 20 cm) Pengurugan 1 m3 dengan pasir urug Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan Pengurugan 1 m3 sirtu padat Pengurugan 1 m3 tanah padat
m³ m³ m³ m³ m³ m³ m² m³ m³ m³ m³ m³ m² m³ m³
1. 1.5.1.1. 1. 1.5.1.2. 1. 1.5.1.3. 1. 1.5.1.4. 1. 1.5.1.5. 1. 1.5.1.6. 1. 1.5.1.7. 1. 1.5.1.8. 1. 1.5.1.9. 1. 1.5.1.10. 1. 1.5.1.11. 1. 1.5.1.12. 1. 1.5.1.13. 1. 1.5.1.14. 1. 1.5.1.15.
130,075.00 159,885.00 190,201.00 173,096.00 262,680.00 209,385.00 9,515.00 56,980.00 43,358.33 95,150.00 309,430.00 406,333.40 219,945.00 364,375.00 301,015.00
II
366,531.00 535,381.00 96,866.00 96,261.00 1,953,919.00 1,574,320.00 1,562,110.00 1,657,975.00 177,650.00 205,744.00 231,935.00 1,184,304.00 118,430.40 22,526.02 -
1
1 M3 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan mengunakan alat berat
m³
SNI.10.b
137,555.00
2
1 M3 Galian Tanah Biasa sedalam 2 M' - Dengan mengunakan alat berat
m³
SNI.11.b
167,365.00
3 4
1 M3 Galian Tanah Biasa sedalam 3 M' 1 M3 Urugan Tanah Biasa tampa pemadatan
m³ m³
SNI.12 SNI.20
190,201.00 207,295.00
NO
URAIAN PEKERJAAN
SATUAN
KODE ANALISA
1 5
2
3 m³
4 SNI.21
m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³
3. 3.1.1.1. 3. 3.1.1.2. 3. 3.1.1.3. 3. 3.1.1.4. 3. 3.1.1.5. 3. 3.1.1.6. 3. 3.1.1.7. 3. 3.1.1.8. 3. 3.1.1.9. 3. 3.1.1.10. 3. 3.1.1.11.
III
1 M3 Urug dengan pasir urug
1 2 3 4 5 6 7 8 9 10 11
3. 3.1.1. HARGA SATUAN PEKERJAAN PONDASI Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP Pemasangan 1 m3 batu kosong (anstamping) Pemasangan 1 m3 pondasi sumuran, diameter 100 cm Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
1
1 M2 Pasangan Dinding bata berongga / roster (10 x 20)
1
4. 4.1.1. HARGA SATUAN PEKERJAAN BETON Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
IV
SNI.27
HARGA SATUAN 2023 (Rp.) 5 309,430.00
1,263,377.50 1,199,110.00 1,154,560.00 1,123,237.50 1,080,310.00 851,189.90 1,002,410.20 972,577.10 646,008.00 3,993,517.00 1,512,874.00
617,540.00
m³
4. 4.1.1.1.
2,266,091.93
2
Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.2.
2,315,320.86
3
Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.3.
2,352,716.93
4
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.4.
2,107,588.21
5
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.5.
2,398,268.71
6
Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.6.
2,439,789.79
7
Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.7.
2,474,035.14
8
Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.8.
2,492,711.57
9
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.9.
2,525,185.14
10
Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.10.
2,534,963.36
11
Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.11.
2,670,352.14
12
Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87
m³
4. 4.1.1.12.
2,683,375.36
13 14 15 16 17 18 19 20
Membuat 1 m3 beton kedap air dengan strorox – 100 Pemasangan 1 m’ PVC Waterstop lebar 150 mm Pemasangan 1 m’ PVC Waterstop lebar 200 mm Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm Pembesian 10 kg dengan besi polos atau besi ulir Pemasangan 10 kg kabel presstressed polos/strands Pemasangan 10 kg jaring kawat baja (wiremesh), 6 mm Pemasangan 1 m2 bekisting untuk pondasi
m³ m' m' m' kg kg kg m²
4. 4.1.1.13. 4. 4.1.1.14. 4. 4.1.1.15. 4. 4.1.1.16. 4. 4.1.1.17. 4. 4.1.1.18. 4. 4.1.1.19. 4. 4.1.1.20.
1,944,910.00 253,858.00 243,804.00 53,438.00 278,916.00
NO
URAIAN PEKERJAAN
HARGA SATUAN 2023 (Rp.)
SATUAN
KODE ANALISA
3 m² m² m² m² m² m² m² m³ m³ m³ m³ m³ m³ m³ m' m'
4 4. 4.1.1.21. 4. 4.1.1.22. 4. 4.1.1.23. 4. 4.1.1.24. 4. 4.1.1.25. 4. 4.1.1.26. 4. 4.1.1.27. 4. 4.1.1.28. 4. 4.1.1.29. 4. 4.1.1.30. 4. 4.1.1.31. 4. 4.1.1.32. 4. 4.1.1.33. 4. 4.1.1.34. 4. 4.1.1.35. 4. 4.1.1.36.
5 97,738.67 151,187.67 154,047.67 167,321.00 423,973.00 138,523.00 6,903,061.00 8,452,323.00 12,879,603.00 9,881,498.00 8,543,260.00 8,331,301.00 9,344,753.00 131,862.50 185,476.50
1 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
2 Pemasangan 1 m2 bekisting untuk sloof (3 x Pakai) Pemasangan 1 m2 bekisting untuk kolom (3 x Pakai) Pemasangan 1 m2 bekisting untuk balok (3 x Pakai) Pemasangan 1 m2 bekisting untuk lantai (3 x Pakai) Pemasangan 1 m2 bekisting untuk dinding Pemasangan 1 m2 bekisting untuk tangga Pemasangan 1 m2 jembatan untuk pengecoran beton Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
1 2
1 M3 Membuat Beton Dengan Mutu K-250 1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K250
SNI.77.a SNI.78.a
2,928,805.00 6,311,415.00
3
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250
SNI.79.a
6,787,341.00
4
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K250
SNI.80.a
7,011,218.50
5
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250
SNI.81.a
7,606,126.00
6
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K250
SNI.82.a
8,795,941.00
7
1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250
SNI.83.a
9,224,853.00
8
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250
SNI.84.a
10,414,668.00
9
1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-250
SNI.85.a
11,604,483.00
10
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250
SNI.86.a
8,524,345.50
11
1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250
SNI.87.a
9,119,253.00
12
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250
SNI.88.a
10,309,068.00
13
1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250
SNI.89.a
8,480,345.50
14
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250
SNI.90.a
9,075,253.00
1 2
1 M3 Membuat Beton Dengan Mutu K-225 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225
SNI.77.b SNI.78.b
2,913,438.00 6,177,066.50
3
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225
SNI.79.b
6,771,974.00
NO
URAIAN PEKERJAAN
SATUAN 3
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
4 SNI.80.b
5 6,995,851.50
1 4
2 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225
5
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225
SNI.81.b
7,590,759.00
6
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K225
SNI.82.b
8,780,574.00
7
1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
SNI.83.b
9,209,486.00
8
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225
SNI.84.b
10,399,301.00
9
1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-225
SNI.85.b
11,589,116.00
10
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225
SNI.86.b
8,508,978.50
11
1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
SNI.87.b
9,103,886.00
12
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225
SNI.88.b
10,293,701.00
13
1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225
SNI.89.b
8,464,978.50
14
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
SNI.90.b
9,059,886.00
1 2 3 4 5
1 M2 Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Tebal = 5 Cm) 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr 1 M2 Pekerjaan Bekisting Sloof 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.151 SNI.152 SNI.153 SNI.155.a SNI.156
1,039,962.00 2,239,430.60 2,255,764.50 293,216.00 5,650,760.50
6
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.157
5,138,353.00
7
1 M3 Pekerjaan Sloof Beton Bertulang ( 120 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.158
5,035,871.50
8
1 M3 Pekerjaan Sloof Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.159
4,625,945.50
9 10
1 M2 Pekerjaan Bekisting Kolom 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.160.a SNI.162
476,663.00 6,757,080.00
11
1 M3 Pekerjaan Lantai Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.163
7,632,295.00
12 13
1 M2 Pekerjaan Bekisting Lantai 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.163.a SNI.164
525,063.00 7,119,887.50
14
1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.164.a2lp
3,794,312.50
15
1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi ) BT, 1 Pc : 2 Ps : 3 Kr
SNI.164.b1lp
3,616,938.60
16
1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.164.c1lp
3,039,933.60
17
1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.164.1lp.a
5,164,555.00
NO
URAIAN PEKERJAAN
1 18
2 1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
19
SATUAN 3
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
4 SNI.164.1lp.b
5 4,652,147.50
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.165
8,188,702.50
20 21
1 M2 Pekerjaan Bekisting Balok 1 M3 Pekerjaan Balok Beton Bertulang (175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.165.a SNI.166
489,863.00 7,676,295.00
22
1 M3 Pekerjaan Balok Beton Bertulang (150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.167
7,163,887.50
23
1 M3 Pekerjaan Balok Beton Bertulang (125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.168
6,651,480.00
24
1 M3 Pekerjaan Balok Beton Bertulang (110 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.169
6,344,035.50
25
1 M3 Pek Dinding Plat Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.170
6,998,887.50
26 27
1 M2 Pek Bekisting Dinding Plat 1 M3 Pek Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
SNI.170.a SNI.171
482,163.00 7,676,295.00
28 29 30 31 32 33 34 35 36
10 Kg Pembesian dengan Besi Polos 10 Kg Pembesian dengan Besi Ulir Memasang 1 M2 Jaring Kawat Baja / Wiremesh 6 mm Memasang 1 M2 Jaring Kawat Baja / Wiremesh 8 mm Memasang 1 M2 Jaring Kawat Baja / Wiremesh 10 mm Memasang 1 M Plat lantai sistem Bondex 0.65 mm Memasang 1 M Plat lantai sistem Bondex 0.70 mm Memasang 1 M Plat lantai sistem Bondex 0.75 mm Memasang 1 M Plat lantai sistem Bondex 100 mm
SNI.173.1 SNI.173.2 SNI.173.3a SNI.173.3b SNI.173.3c SNI.173.4a SNI.173.4b SNI.173.4c SNI.173.4d
21,920.80 25,385.80 53,438.00 85,976.00 129,734.00 343,431.00 354,761.00 366,091.00 456,731.00
1
4.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
m²
4.4.1.2.1.
192,321.80
2
Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
m²
4.4.1.2.2.
240,443.50
3
Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
m²
4.4.1.2.3.
275,266.20
4
Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
m²
4.4.1.2.4.
360,665.25
5 6
Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai) Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
m² m²
4.4.1.2.5. 4.4.1.2.6.
-
7
Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
m²
4.4.1.2.7.
-
8
Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
bh
4.4.1.2.8.
13,772.00
9
Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
bh
4.4.1.2.9.
22,220.00
10
Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
bh
4.4.1.2.10.
17,996.00
11 12
Penuangan/menebar beton untuk 1 buah komponen plat pracetak Penuangan/menebar beton untuk 1 buah komponen balok pracetak
bh bh
4.4.1.2.11. 4.4.1.2.12.
-
NO
URAIAN PEKERJAAN
SATUAN
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
1 13
2 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak
3 bh
4 4.4.1.2.13.
14 15 16 17 18 19 20 21 22 23 24
Mendirikan 1 buah komponen plat pracetak Mendirikan 1 buah komponen balok pracetak Mendirikan 1 buah komponen kolom pracetak Melangsir 1 buah komponen plat pracetak ( ± 20 m) Melangsir 1 buah komponen balok pracetak ( ± 20 m) Melangsir 1 buah komponen kolom pracetak ( ± 20 m) Bahan 1 m3 grouting campuran Bahan 1 m3 grouting tidak campuran Upah melakukan 1 titik grouting pada join pracetak Pemasangan 1 titik Bekisting join pracetak Upah 1 titik Join dengan Sling
bh bh bh bh bh bh m³ m³ ttk ttk ttk
4.4.1.2.14. 4.4.1.2.15. 4.4.1.2.16. 4.4.1.2.17. 4.4.1.2.18. 4.4.1.2.19. 4.4.1.2.20. 4.4.1.2.21. 4.4.1.2.22. 4.4.1.2.23. 4.4.1.2.24.
104,786.00 113,929.20 140,723.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
4.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM Pemasangan 1 kg besi profil Pemasangan 1 kg rangka kuda-kuda baja IWF Pengerjaan 100 kg pekerjaan perakitan Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Pengerjaan 10 cm pengelasan dengan las listrik Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm Pemasangan 1 m2 pintu rolling door besi Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC Pemasangan 1 m2 sunscreen alluminium Pemasangan 1 m2 rolling door alluminium Pemasangan 1 m kusen pintu alluminium Pemasangan 1 m2 pintu alluminium strip lebar 8 cm Pemasangan 1 m2 pintu kaca rangka alluminium Pemasangan 1 m2 venetions blinds dan Vertical blinds Pemasangan 1 m2 terali besi strip (2 x 3) mm Pemasangan 1 m2 kawat nyamuk Pemasangan 1 m2 jendela nako & tralis Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
kg kg kg m² cm m² m² m² m² m² m' m² m² m² m² m² m² m' m' m²
4.4.2.1.1. 4.4.2.1.2. 4.4.2.1.3. 4.4.2.1.4. 4.4.2.1.5. 4.4.2.1.6. 4.4.2.1.7. 4.4.2.1.8. 4.4.2.1.9. 4.4.2.1.10. 4.4.2.1.11. 4.4.2.1.12. 4.4.2.1.13. 4.4.2.1.14. 4.4.2.1.15. 4.4.2.1.16. 4.4.2.1.17. 4.4.2.1.18. 4.4.2.1.19. 4.4.2.1.20.
72,787.00 72,787.00 96,382.00 2,258,861.00 95,998.10 2,405,678.00 751,652.00 1,071,950.00 201,511.20 1,531,003.10 1,150,451.34 242,681.88 455,323.00 257,262.50 189,689.50 585,262.33
m²
4.4.2.1.21.
695,335.67
SNI.241.a SNI.241.b SNI.241.c SNI.241.d SNI.241.e SNI.241.1 SNI.241.2 SNI.241.3 SNI.241.4 SNI.241.5 SNI.241.6 SNI.241.7
72,787.00 504,357.70 119,247.70 919,002.70 368,287.70 38,720.00 159,720.00 278,300.00 423,500.00 586,850.00 694,540.00 166,320.00
V
21
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
1 2 3 4 5 6 7 8 9 10 11 12
Memasang 1 Kg Rangka Kanal - C Pasang 1 m Handrail dan Railing Pasang 1 m Galvanis Steel 3/4" Pasang 1 m Railing Stainless Pasang 1 m Tangga Hollow 5x5 cm 1 m2 Pasang Syntetic Grass 1 m Pasang WPC 5x5 cm 1 m Pasang WPC 10x5 cm 1 m Pasang WPC 15x5 cm 1 m Pasang WPC 20x5 cm 1 m Pasang WPC Panel W15 x H2,5 cm 1 m2 Pasang Floor hardener 3 Kg/m2
5 -
NO
URAIAN PEKERJAAN
SATUAN 3
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
4 SNI.241.8 SNI.241.9
5 304,920.00 606,320.00
1 13 14
2 1 m2 Pasang Efoxy waterbased flooring non slip anti abrasion 1 m2 Pasang Floor hardener 3 Kg/m2 + ceramic stepnoosing 100 x 200 mm
15 16 17 18 19
1 m2 Pasang Floor hardener 7 Kg/m2 + grove line 2 cm Pasang GRC Rosters 300x300x150 Pasang Kisi-kisi 50x100 mm UPVC Motif Kayu Memasang 1 m kusen pintu alluminium Natural Memasang 1 m2 Dinding kusen alluminium Natural + Kaca polos 8 mm
SNI.241.10 SNI.241.11 SNI.241.12 SNI.247 SNI.247.a
295,020.00 334,264.15 1,518,308.00 183,373.85 787,525.75
20
Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, polos
SNI.247.b
1,755,525.75
21
Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, warna
SNI.247.c
1,876,525.75
22 23
Memasang 1 m kusen pintu alluminium Warna Memasang 1 m2 Dinding kusen alluminium Warna + Kaca polos 8 mm
SNI.248 SNI.248.a
201,523.85 842,823.85
24
Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, polos
SNI.248.b
1,810,823.85
25
Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, warna
SNI.248.c
1,949,125.75
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Memasang 1 m2 Besi Hollow + Kaca tempreat 12 mm, warna Memasang 1 m2 Kaca temreat 8 mm, polos Memasang 1 m2 Kaca temreat 8 mm, Warna Memasang 1 m2 Kaca mati 5 mm, polos Memasang 1 m2 Kaca mati 8 mm, polos Memasang 1 m2 Kaca mati Riben 5 mm Memasang 1 m2 Kaca mati Buram/Es 5 mm Pasang 1 Buah Cermin ex. TOTO TS 119 AS5 Pasang 1 Buah Kaca Laminasi tebal 12 mm Pasang 1 m2 kaca green glass 12 mm Pasang 1 m2 kaca green glass tebal 8 mm Pasang 1 bh Pintu Engineering door / WPC Pasang 1 bh Pintu Green glass Pasang 1 bh Pintu siku alumunium powder coating Pemasangan 1 m1 Kusen plat baja uk. 15x9x0,2 cm Pemasangan 1 m1 Kusen Steel Frame Hollow Galvanis 150x40x3 mm Pemasangan 1 m1 Kusen alumunium 4" YKK finishing powder coating Mengerjakan 1 Unit pintu double UGD type P-01 Mengerjakan 1 Unit pintu type P-02 Mengerjakan 1 Unit pintu type P-03 Mengerjakan 1 Unit pintu type P-04A Mengerjakan 1 Unit pintu type P-04B Mengerjakan 1 Unit pintu type P-04C Mengerjakan 1 Unit pintu type P-05 Mengerjakan 1 Unit pintu type P-06 Mengerjakan 1 Unit pintu type P-07 Mengerjakan 1 Unit pintu type P-08 Mengerjakan 1 Unit pintu type P-09 Mengerjakan 1 Unit pintu type P-10 Mengerjakan 1 Unit pintu type P-11 Mengerjakan 1 Unit pintu type P-12
SNI.248.12 SNI.248.T8p SNI.248.T8w SNI.248.5p SNI.248.8p SNI.248.R SNI.248.B/E SNI.249.a SNI.249.b SNI.249.c SNI.249.d SNI.249.e SNI.249.f SNI.249.g SNI.249.1 SNI.249.2 SNI.249.3 SNI.249.4a SNI.249.4b SNI.249.4c SNI.249.4d SNI.249.4e SNI.249.4f SNI.249.4g SNI.249.4h SNI.249.4i SNI.249.4j SNI.249.4k SNI.249.4l SNI.249.4m SNI.249.4n
2,389,565.75 1,247,325.75 1,368,325.75 243,025.75 279,325.75 236,975.75 297,475.75 242,299.75 1,852,809.75 2,217,644.00 1,370,644.00 456,857.50 554,482.50 109,945.00 573,309.00 105,039.00 290,279.00 21,213,291.88 5,777,689.28 4,624,264.21 3,693,069.82 3,693,069.82 3,567,608.44 2,998,939.13 3,700,222.24 3,712,047.24 1,874,186.71 4,686,098.42 4,494,514.28 30,052,254.84 4,624,264.21
NO
URAIAN PEKERJAAN
SATUAN
1 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76
2
3
Mengerjakan 1 Unit pintu type P-S Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (natural) Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (natural) Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (warna) Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (warna) Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (natural) Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (natural) Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (warna) Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (warna) 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.100 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) Usuk C 75 1 M2 Rangka Reng Aluzing Aluminium (Baja ringan) Reng U 0.45 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.100 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.75 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Interior 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Exterior 1 M2 Rangka dan Penutup Wood Panel Composit (WPC), Exterior 1 M2 Pekerjaan Dinding Double Gypsum 9 mm + Rangka profil C 1 M2 Pekerjaan Dinding Double Calsiboart 6 mm + Rangka profil C
1 2 3 4 5 6 7 8
1 M2 Pekerjaan 1 M2 Pekerjaan 1 M2 Pekerjaan 1 M2 Pekerjaan 1 M2 Pekerjaan 1 M2 Pekerjaan 1 M2 Pekerjaan 1 M2 Pekerjaan
1
4.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
VI
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
4 SNI.249.4o SNI.250.N5 SNI.250.N8 SNI.250.W5 SNI.250.W8 SNI.251.N SNI.251.N8 SNI.251.W SNI.251.W8 SNI.251.75.a SNI.251.75.b SNI.251.75.c SNI.251.75.d SNI.251.80.a SNI.251.80.b SNI.251.ACP.a SNI.251.ACP.b SNI.251.ACP.c SNI.251.DG SNI.251.DC
5 1,005,667.44 1,245,015.75 1,245,015.75 1,300,015.75 1,355,015.75 1,245,015.75 1,245,015.75 1,300,015.75 1,355,015.75 429,632.50 378,086.50 291,005.00 87,081.50 453,062.50 406,202.50 893,942.50 1,196,442.50 808,142.50 443,630.00 567,930.00
SNI.210 SNI.211 SNI.212 SNI.213 SNI.214 SNI.214.1 SNI.214.A SNI.214.B
68,612.50 794,978.25 292,336.00 1,618,493.25 749,493.25 1,134,493.25 1,410,593.25 1,300,593.25
m²
4. 4.4.1.1.
385,495.00
Pasang Kawat Gerawang Pasang Jeruji Besi Pintu Pasang Kawat Duri Pagar besi Hollow (stenlistail) Pagar besi Hollow Pagar/ Dinding besi Hollow 100 x 50 mm Pintu Pagar besi (dia. 16 mm) Pagar besi (dia. 16 mm)
2
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
m²
4. 4.4.1.2.
368,489.00
3
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
m²
4. 4.4.1.3.
357,016.00
4
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
m²
4. 4.4.1.4.
351,109.00
5
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
m²
4. 4.4.1.5.
349,140.00
6
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
m²
4. 4.4.1.6.
326,274.85
7
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
m²
4. 4.4.1.7.
187,016.50
8
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
m²
4. 4.4.1.8.
178,946.90
9
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
m²
4.4.4.1.9.
174,322.50
10
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP
m²
4. 4.4.1.10.
171,414.10
NO
URAIAN PEKERJAAN
SATUAN
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
1 11
2 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
3 m²
4 4. 4.4.1.11.
5 169,860.90
12
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
m²
4. 4.4.1.12.
166,705.00
13
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
m²
4. 4.4.1.13.
163,064.00
14
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
m²
4. 4.4.1.14.
147,045.80
15
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
m²
4. 4.4.1.15.
149,428.40
16 17 18 19 20 21 22 23 24
Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
m² m² m² cm² cm² cm² cm² cm² cm²
4. 4.4.1.16. 4. 4.4.1.17. 4. 4.4.1.18. 4. 4.4.1.19. 4. 4.4.1.20. 4. 4.4.1.21. 4. 4.4.1.22. 4. 4.4.1.23. 4. 4.4.1.24.
449,255.40 448,813.20 396,876.70 396,306.90 365,092.20 365,366.10 699,957.50 699,957.50 1,508,540.00
1 2 3 4 5 6
1 M2 Pasangan Dinding bata berongga / roster (10 x 20) Pemasangan 1 m2 dinding bata ringan tebal 10 X 20 X 60 cm + dengan mortar 1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 3 PP 1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 4 PP 1 M2 Pasangan Dinding Batako 1 Pc : 4 Psr 1 M2 Pasangan Rollag 1 Bata Merah 1 Pc : 3 Ps
VII 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
4.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm Pemasangan 1 m2 plesteran ciprat 1SP : 2PP
m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m' m² m² m²
SNI.27 SNI.29.R SNI.30 SNI.31 SNI.32 SNI.33
617,540.00 593,291.60 383,889.00 372,416.00 141,968.75 259,796.90
4.4.4.2.1. 4.4.4.2.2. 4.4.4.2.3. 4.4.4.2.4. 4.4.4.2.5. 4.4.4.2.6. 4.4.4.2.7. 4.4.4.2.8. 4.4.4.2.9. 4.4.4.2.10. 4.4.4.2.11. 4.4.4.2.12. 4.4.4.2.13. 4.4.4.2.14. 4.4.4.2.15. 4.4.4.2.16. 4.4.4.2.17. 4.4.4.2.18. 4.4.4.2.19. 4.4.4.2.20. 4.4.4.2.21. 4.4.4.2.22. 4.4.4.2.23.
121,392.48 112,508.88 108,673.62 106,048.80 104,569.08 103,380.42 102,730.32 102,080.22 106,078.50 102,663.00 94,373.73 95,841.79 150,600.34 120,109.66 141,904.40 140,013.94 138,346.56 134,243.23 60,602.08 112,084.50 86,288.40
NO
URAIAN PEKERJAAN
HARGA SATUAN 2023 (Rp.)
SATUAN
KODE ANALISA
3 m² m² m² m²
4 4.4.4.2.24. 4.4.4.2.25. 4.4.4.2.26. 4.4.4.2.27.
5 50,284.96 23,881.00 103,265.80 65,037.50
1 24 25 26 27
2 Pemasangan 1 m2 finishing siar pasangan bata merah Pemasangan 1 m2 finishing siar pasangan conblock ekspose Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. Pemasangan 1 m2 acian.
1 2 3 4 5 6 7
1 M2 Acian halus dengan Pc 1 M2 Plesteran + Acian halus dinding bata ringan/Hebel 1 M2 Plesteran dinding bata ringan/Hebel 1 M2 Plesteran Beton 1 PC : 2 Ps Tebal 15 mm 1 M2 Plesteran Beton 1 PC : 3 Ps Tebal 15 mm 1 M2 Siar Pas batu Kali 1 m2 Finishing Siar pasangan bata merah
SNI.34.a SNI.34.b SNI.34.c SNI.34.d SNI.34.e SNI.35.a SNI.35.b
65,037.50 197,483.00 120,648.00 114,895.00 111,467.40 103,265.80 50,284.96
1 2 3 4 5
Pasang Kanstin Cetak 600x150x250 Lapisan Geotextile Lapisan Drainagecell Memasang Kitchen Sink 1 Bowl GS 5844 Memasang Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA
SNI.41 SNI.41.1 SNI.41.2 SNI.41.3 SNI.41.4
363,728.75 292,600.00 94,710.00 2,561,619.50 5,102,619.50
6 7 8 9 10 11 12
Memasang Mirror 100x120 cm 1 m1 Pasang Buis beton Ø20 cm, spesi 1 PC : 4 PP 1 m1 Pasang Buis beton Ø 30 cm, spesi 1 PC : 4 PP 1 m1 Pasang Buis beton Ø 40 cm, spesi 1 PC : 4 PP 1 m1 Pasang Buis beton Ø 50 cm, spesi 1 PC : 4 PP 1 m1 Pasang Buis beton Ø 60 cm, spesi 1 PC : 4 PP 1 m1 Pasang Buis beton Ø 80 cm, spesi 1 PC : 4 PP
SNI.41.5 SNI.42.a SNI.42.b SNI.42.c SNI.43 SNI.44 SNI.45
372,619.50 232,485.00 265,485.00 309,485.00 362,422.50 373,422.50 417,422.50
4.4.4.3.1. 4.4.4.3.2. 4.4.4.3.3. 4.4.4.3.4. 4.4.4.3.5. 4.4.4.3.6. 4.4.4.3.7. 4.4.4.3.8. 4.4.4.3.9. 4.4.4.3.10. 4.4.4.3.11. 4.4.4.3.12. 4.4.4.3.13. 4.4.4.3.14. 4.4.4.3.15. 4.4.4.3.16. 4.4.4.3.17. 4.4.4.3.18. 4.4.4.3.19. 4.4.4.3.20. 4.4.4.3.21. 4.4.4.3.22. 4.4.4.3.23.
177,075.80 178,215.40 186,224.50 218,216.90 298,365.10 510,284.50 224,051.30 231,774.40 649,962.50 660,044.00 824,994.50 836,313.50 861,151.50 824,994.50 836,313.50 52,354.50 47,641.00 47,842.30 46,390.30 51,045.50 51,054.30 51,627.95 51,637.30
VIII 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
4.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm
m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m²
NO
URAIAN PEKERJAAN
1 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
2 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm Pemasangan 1m2 lantai keramik artistik 10cm x 20cm Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm Pemasangan 1 m2 lantai karpet Pemasangan 1 m2 underlayer (pelapis bawah karpet) Pemasangan 1 m2 lantai parquet kayu Pemasangan 1 m2 lantai kayu gymfloor Pemasangan 1 m2 dinding porslen 11cm x 11cm Pemasangan 1 m2 dinding porslen 10cm x 20cm Pemasangan 1 m2 dinding porslen 20cm x 20cm Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm Pemasangan 1 m2 dinding keramik 10cm x 20cm Pemasangan 1 m2 dinding keramik 20cm x 20cm Pemasangan 1 m2 dinding keramik 30cm x 30cm Pemasangan 1 m2 dinding keramik 40cm x 40cm Pemasangan 1 m2 dinding marmer 100cm x 100cm Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm Pemasangan 1 m2 dinding batu paras Pemasangan 1 m2 dinding batu tempel hitam Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm Pemasangan 1 m2 wallpaper lebar 50 cm Pemasangan 1m2 floor harderner Pemasangan 1 m’ plint vynil 15cm x 30cm Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm Memasang 1 m2 Paving blok tebal 8 cm
1 2 3 4 5 6
1 M2 Pas. Lantai Tegel Abu-abu 1 M2 Pas. Lantai Granite Kw I 1 M2 Pas. Lantai Granite Kw II 1 M2 Pasangan Lantai Keramik ( KW I Polos ) 1 M2 Pasangan Lantai Keramik ( KW II Polos ) 1 M2 Pasangan Lantai Keramik ( KW I Motif )
SATUAN
KODE ANALISA
3 m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m' m' m' m' m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m²
4 4.4.4.3.24. 4.4.4.3.25. 4.4.4.3.26. 4.4.4.3.27. 4.4.4.3.28. 4.4.4.3.29. 4.4.4.3.30. 4.4.4.3.31. 4.4.4.3.32. 4.4.4.3.33. 4.4.4.3.35.a 4.4.4.3.34. 4.4.4.3.35. 4.4.4.3.36. 4.4.4.3.37. 4.4.4.3.38. 4.4.4.3.39. 4.4.4.3.40. 4.4.4.3.41. 4.4.4.3.42. 4.4.4.3.43. 4.4.4.3.44. 4.4.4.3.45. 4.4.4.3.46. 4.4.4.3.47. 4.4.4.3.48. 4.4.4.3.49. 4.4.4.3.50. 4.4.4.3.51. 4.4.4.3.52. 4.4.4.3.53. 4.4.4.3.54. 4.4.4.3.54a. 4.4.4.3.54b. 4.4.4.3.55. 4.4.4.3.56. 4.4.4.3.57. 4.4.4.3.58. 4.4.4.3.59. 4.4.4.3.60. 4.4.4.3.61. 4.4.4.3.62. 4.4.4.3.63. 4.4.4.3.64. SNI.46 SNI.47.a SNI.47.b SNI.48 SNI.49 SNI.50
HARGA SATUAN 2023 (Rp.) 5 94,196.30 94,146.80 111,158.30 111,620.30 109,046.30 111,686.30 111,620.30 1,036,087.80 1,801,412.80 424,187.50 427,248.80 425,465.70 426,915.50 579,067.50 1,303,711.75 122,856.80 63,803.30 53,593.65 943,137.80 120,208.00 1,397,660.00 1,397,660.00 478,755.20 472,461.00 456,456.00 495,781.00 498,256.00 495,781.00 482,416.00 487,036.00 617,593.78 1,216,339.30 435,460.30 505,395.00 528,495.00 846,928.50 122,323.67 269,434.00 812,196.00 69,443.00 197,120.00 136,580.40 602,287.40 525,287.40 402,523.00 379,423.00 437,173.00
NO
URAIAN PEKERJAAN
1 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 1 M2 Pasangan Lantai Keramik ( KW II Motif ) 1 M2 Pasangan Lantai Marmer 1 M2 Pasangan Lantai Keramik Anti Slip 1 M2 Pasangan dinding keramik ( Kw I Motif ) 1 M2 Pas. Dinding Keramik ( Kw II Motf ) 1 M2 Pas. Dinding Keramik ( Kw I polos ) 1 M2 Pas. Dinding Keramik ( Kw II Polos ) 1 M2 Pas. Lantai Keramik Cating Motif 1 M2 Pas. Lantai Coral Sikat 1 M2 Pas. Lantai Coral Sikat, Warna 1 M2 Pas. Dinding batu paras/Palimanan 1 M2 Pas. Dinding batu tempel hitam bergaris 1 M2 Pas. Paving Blok bata . T 8 cm 1 M2 Pas. Paving Blok bata . T 8 cm, Press 1 M2 Pas. Paving Blok bata . T 6 cm 1 M2 Pas. Paving Blok persegi/berlian 1 m2 Memasang ornamen terawang custom bahan GRC 1 m2 Memasang acian motif tali air 1 m Memasang plint ukuran (60 x 10x 4 ) cm 1 m Memasang stepnose tangga ukuran (10 x 40) cm 1 m2 Memasang lantai karpet 1 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I 1 m2 Memasang lantai parquete ukuran (30 x 30) cm KL II 1 m2 Pasang conblock tipe segi-empat warna 8 cm, K-300 1 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-300 1 m Pasang kansten beton 1 m2 Pasang grassblocksegi 8 tebal 8 cm
1 2 3 4 5
A.4.5.1. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
IX
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
3
4 SNI.51 SNI.52 SNI.52.a SNI.53 SNI.54 SNI.55 SNI.56 SNI.57.a SNI.57.b SNI.57.c SNI.58 SNI.59 SNI.60.B SNI.60.P SNI.61 SNI.62 SNI.62.1 SNI.62.2 SNI.62.3 SNI.62.4 SNI.62.5 SNI.62.6 SNI.62.7 SNI.62.W SNI.62.A SNI.62.7 SNI.62.8
5 414,815.50 928,023.80 414,815.50 480,876.00 457,776.00 469,326.00 292,391.00 386,606.00 317,306.00 386,606.00 518,815.00 557,645.00 288,858.90 383,293.90 272,193.90 422,178.90 1,335,317.50 65,037.50 195,066.30 129,676.80 182,908.00 846,928.50 553,146.00 299,475.00 293,975.00 213,552.90 312,125.00
m² m² m² m² m²
4.4.5.1.1. 4.4.5.1.2. 4.4.5.1.3. 4.4.5.1.4. 4.4.5.1.5.
79,959.00 562,749.00 545,699.00 554,510.00 69,921.50
SATUAN
6 7
Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
m² m²
4.4.5.1.6. 4.4.5.1.7.
391,220.50 73,755.00
8
Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
m²
4.4.5.1.8.
791,766.25
9
Pemasangan 1 m’ list langit-langit kayu profil
m'
4.4.5.1.9.
37,202.00
1
1 m2 Mengerjakan Plafond Gypsum Board, tebal 9 mm + rangka kayu
SNI.232
212,311.00
2 3 4
1 m' Mengerjakan List Plafond Gypsum Board Type I 1 m' Mengerjakan List Plafond Gypsum Board Type II 1 m2 Mengerjakan Plafond Gypsum Rangka Hollow 40x40 Zincromate
SNI.233.a SNI.233.b SNI.234
71,965.30 56,950.30 279,504.50
5 6 7
1 m2 Memasang langit-langit WPC , rangka metal furing 1 m2 Pasang Atap Kaca Laminasi / Laminated 12 mm rangka hollow 1 m2 Pasang Kaca Tempered Clear T=10
SNI.234.a SNI.234.b SNI.234.c
991,795.61 2,611,752.00 1,714,152.00
NO
URAIAN PEKERJAAN
1 8 9
2 1 m2 Pasang Atap Kanopi GRC gelombang 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Putih polos
10
SATUAN
HARGA SATUAN 2023 (Rp.)
4 SNI.234.d SNI.234.SP.1
5 305,602.00 516,202.50
1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Warna
SNI.234.SP.2
559,102.50
11 12 13 14 15 16 17 18 19
1 m2 Mengerjakan Plafond Akustik Rangka Alumunium 1 M2 Pekerjaan Plafond Tripleks 3 mm + Rangka kayu 1 M2 Pekerjaan Plafond Tripleks 5 mm + Rangka kayu 1 M2 Pekerjaan Rangka Langit-langit 1 M2 Pekerjaan Plafond Tripleks 5 mm 1 M2 Pekerjaan Plafond Miring Tripleks 3 mm + Rangka kayu 1 M2 Pekerjaan Plafond Miring Tripleks 5 mm + Rangka kayu 1 M' Pekerjaan List Plafond Kayu Profil 4/4 cm 1 M' Pekerjaan List Plafond Kayu Profil 2/4 cm
SNI.234.AQ SNI.235.a SNI.235.b SNI.235.c SNI.235.d SNI.236.a SNI.236.b SNI.238 SNI.239
455,207.50 196,218.00 212,305.50 146,094.67 66,210.83 164,802.00 180,889.50 37,257.00 31,482.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
4.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP Pemasangan 1 m2 atap genteng palentong kecil Pemasangan 1 m2 atap genteng kodok Pemasangan 1 m2 atap genteng palentong besar/super Pemasangan 1 m’ bubung genteng palentong Pemasangan 1 m’ bubung genteng kodok glazuur Pemasangan 1 m’ bubung genteng palentong besar Pemasangan 1 m2 roof light fibreglass 90x180 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm Pemasangan 1 m’ bubung stel gelombang 0,92m Pemasangan 1 m’ bubung stel gelombang 1,05m Pemasangan 1 m’ bubung stel gelombang 1,08m Pemasangan 1 m’ nok paten 0,92m Pemasangan 1 m’ nok paten 1,05m Pemasangan 1 m’ nok paten 1,08m Pemasangan 1 m’ nok stel rata 0,92m Pemasangan 1 m’ nok stel rata 1,05m Pemasangan 1 m2 genteng beton Pemasangan 1 m2 genteng aspal Pemasangan 1 m2 genteng metal Pemasangan 1 m2 atap sirap kayu Pemasangan 1 m’ nok genteng beton Pemasangan 1 m’ nok genteng aspal
4.4.5.2.1. 4.4.5.2.2. 4.4.5.2.3. 4.4.5.2.4. 4.4.5.2.5. 4.4.5.2.6. 4.4.5.2.7. 4.4.5.2.8. 4.4.5.2.9. 4.4.5.2.10. 4.4.5.2.11. 4.4.5.2.12. 4.4.5.2.13. 4.4.5.2.14. 4.4.5.2.15. 4.4.5.2.16. 4.4.5.2.17. 4.4.5.2.18. 4.4.5.2.19. 4.4.5.2.20. 4.4.5.2.21. 4.4.5.2.22. 4.4.5.2.23. 4.4.5.2.24. 4.4.5.2.25. 4.4.5.2.26. 4.4.5.2.27. 4.4.5.2.28. 4.4.5.2.29. 4.4.5.2.30. 4.4.5.2.31. 4.4.5.2.32. 4.4.5.2.33. 4.4.5.2.34. 4.4.5.2.35.
93,846.50 195,723.00 174,196.00 172,546.00 174,966.00 124,960.00 101,893.00 99,767.80 92,549.60 104,137.00 142,980.75 123,827.00 106,666.32 104,639.47 133,004.67 241,901.00 257,118.07 -
X
3
KODE ANALISA
m² m² m² m' m' m' m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m' m' m' m' m' m' m' m' m² m² m² m² m' m'
HARGA SATUAN 2023 (Rp.)
NO
URAIAN PEKERJAAN
SATUAN
KODE ANALISA
1 36 37 38 39 40 41 42
2
3 m' m' m² m' m² m' m²
4 4.4.5.2.36. 4.4.5.2.37. 4.4.5.2.38. 4.4.5.2.39. 4.4.5.2.40. 4.4.5.2.41. 4.4.5.2.42.
5 166,199.00 164,540.20 176,919.60 104,471.40 53,504.00
SNI.215 SNI.216 SNI.217 SNI.217,a
95,953.00 181,786.00 151,723.00 364,724.98
Pemasangan 1 m’ nok genteng metal Pemasangan 1 m’ nok sirap Pemasangan 1 m2 atap seng gelombang Pemasangan 1 m’nok atap seng Pemasangan 1 m2 atap alumunium Pemasangan 1 m’ nok alumunium Pemasangan 1 m2 alumunium foil/sisalation
1 2 3 4
1 M2 Pekerjaan Atap Genteng Lokal 1 M2 Pekerjaan Bubungan Genteng Lokal 1 M2 Pekerjaan Atap Genteng Pejaten Bali 1m² Pasang Atap Genteng Bitumen Monoleyer model gelombang ex. Onduline
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 M2 Pekerjaan Bubungan Genteng Pejaten Bali 1 m Pemasangan nok bitumen Monolayer 1 M2 Pekerjaan Atap Trimdeck 0.25 TCT (Spandek) 1 M2 Pekerjaan Atap Trimdeck 0.30 TCT (Spandek) 1 M2 Pekerjaan Atap Trimdeck 0.35 TCT (Spandek) 1 M' Pekerjaan Memasang Bubungan Trimdeck 0.35 TCT (Spandek) 1 M2 Pekerjaan Atap Genteng Kodok 1 M2 Pekerjaan Atap Genteng kanmuri full flat 1 M2 Pekerjaan Bubungan Genteng Kodok 1 M2 Pekerjaan Bubungan Genteng kanmuri full flat 1 M2 Pekerjaan Atap Seng Gelombang BJLS 20 1 M' Memasang Bubungan Seng BJLS 20 1 M2 Pekerjaan Atap Asbes Gelombang Kecil 1 M' Memasang Bubungan Asbes Gelombang Kecil 1 m2 Mengerjakan atap genteng Metalroof ( Tebal 2.5 mm ) lapisan butiran
20
1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 2.5 mm ) lap. Butiran
21
SNI.218 SNI.218.a SNI.219.0.25 SNI.219.0.30 SNI.219.0.35 SNI.220 SNI.221.a SNI.221.b SNI.222.a SNI.222.b SNI.223 SNI.224 SNI.225 SNI.226 SNI.227
184,646.00 7,300,084.00 242,715.00 254,815.00 277,805.00 131,004.50 195,723.00 310,123.00 172,546.00 328,746.00 156,200.00 131,450.00 120,076.00 107,085.00 169,543.00
SNI.228
139,348.00
1 m2 Mengerjakan atap genteng Metalroof ( Tebal 3 mm ) lapisan butiran
SNI.229.a
186,043.00
22
1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 3 mm ) lap. Butiran
SNI.229.b
151,448.00
23 24
1 m2 Mengerjakan atap genteng Metal ( Tebal 2.5 mm ) Sakura 1 m' Mengerjakan bubungan Genteng Metal ( Tebal 2.5 mm )
SNI.230 SNI.231
172,733.00 133,298.00
1
4.4.6.1. HARGA SATUAN PEKERJAAN KAYU Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
XI
m³
4.4.6.1.1.
12,736,350.00
2
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
m³
4.4.6.1.2.
10,992,300.00
3 4 5 6
Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
m² m² m² m²
4.4.6.1.3. 4.4.6.1.4. 4.4.6.1.5. 4.4.6.1.6.
496,859.00 424,259.00 1,097,800.00 834,790.00
7 8
Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
m² m²
4.4.6.1.7. 4.4.6.1.8.
1,210,000.00 907,599.00
HARGA SATUAN 2023 (Rp.)
NO
URAIAN PEKERJAAN
SATUAN
KODE ANALISA
1 9 10 11 12 13
2 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
3 m² m² m² m² m³
4 4.4.6.1.9. 4.4.6.1.10. 4.4.6.1.11. 4.4.6.1.12. 4.4.6.1.13.
5 907,690.00 949,850.00 1,013,804.00 855,844.00 9,381,680.00
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Pemasangan 1 m3 konstruksi gordeng, kayu kelas II Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II Pemasangan 1 m2 rangka atap sirap, kayu kelas II Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV
m³ m³ m² m² m² m² m² m' m' m² m² m² m² m² m²
4.4.6.1.14. 4.4.6.1.15. 4.4.6.1.16. 4.4.6.1.17. 4.4.6.1.18. 4.4.6.1.19. 4.4.6.1.20. 4.4.6.1.21. 4.4.6.1.22. 4.4.6.1.23. 4.4.6.1.24. 4.4.6.1.25. 4.4.6.1.26. 4.4.6.1.27. 4.4.6.1.28.
13,678,665.00 11,679,085.00 129,195.00 137,857.50 68,723.60 69,179.00 160,138.00 118,195.00 117,590.00 197,190.00 509,729.00 553,630.00 578,380.00 120,692.00 152,417.65
1 2 3 4 5 6 7 8 9 10 11
1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 ( Expose ) 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 ( Expose ) 1 M2 Mengerjakan / Memasang Usuk 5/7 cm 1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm 1 M2 Mengerjakan / Memasang Reng 3/4 cm 1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm 1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 3/20 ) Kayu Klas II 1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II 1 M' Memasang Kembali Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II
SNI.174 SNI.174.a SNI.175 SNI.175.a SNI.176.a SNI.176.b SNI.176.c SNI.176.d SNI.178 SNI.179 SNI.179
98,615.00 130,927.50 107,415.00 139,727.50 75,190.50 32,070.50 32,224.50 13,744.50 171,935.50 119,020.00 77,275.00
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 M' Pekerjaan Papan Reuter (2/20) 1 M' Mengerjakan Talang Karet 1 M' Mengerjakan Talang datar/ jurai Seng BjLs 20 1 M' Mengerjakan Talang 1/2 lingkaran Seng BjLs 20 1 M3 Pekerjaan Kayu Kuda - Kuda, Gording Kayu Klas II (Expose) 1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II 1 M' Pasang Kasiplank ukuran (0.8x20), 1 Lapis 1 M' Pasang Kasiplank ukuran (0.8x20), 2 Lapis 1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II (Expose) 1 M3 Pekerjaan Kayu Kusen Pintu dan Jendela 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 3 mm 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 5 mm 1 M2 Pekerjaan Memasang Kaca Mati 3 mm Pintu / Jendela 1 M2 Pekerjaan Memasang Kaca Mati 5 mm Pintu / Jendela 1 M2 Pekerjaan Memasang Kaca Mati 8 mm Pintu / Jendela
SNI.180 SNI.181 SNI.182.a SNI.182.b SNI.184 SNI.185 SNI.186 SNI.187 SNI.188 SNI.189 SNI.190 SNI.191 SNI.192 SNI.193 SNI.193.8
73,920.00 274,505.00 257,180.00 204,556.00 9,788,240.00 9,408,740.00 96,415.00 144,622.50 9,872,940.00 10,712,900.00 868,494.00 928,994.00 177,575.75 244,125.75 280,425.75
1
1 M2 Pekerjaan Memasang Alumunium strip 8 mm
SNI.194
862,824.88
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 XII
URAIAN PEKERJAAN 2 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca Tempered 8 mm 1 M2 Pekerjaan Memasang Kaca Cermin 5 mm 1 M2 Pekerjaan Memasang Glass Blok 1 M2 Pekerjaan Memasang Kaca Mati Riben 5 mm Pintu / Jendela 1 M2 Pekerjaan Memasang Kaca Mati Buram 5 mm Pintu / Jendela 1 M2 Pekerjaan Memasang Kaca Mati Tempered 8 mm Pintu / Jendela 1 M2 Pekerjaan Daun Pintu Panil dan Krepyak Kayu Klas II Lap. Formika 1 M2 Pekerjaan Ram Jalusi 1 M2 Pekerjaan Ram Jalusi Mati Kusen 1 M2 Mengerjakan Daun Pintu Double Teakwood 3 mm 1 M2 Pekerjaan Pintu Double Tripleks 3 mm 1 M2 Pekerjaan Pintu Teakwood Lapis Formika 1 M2 Pekerjaan Pintu Triplek Lapis Formika
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
4.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA Pemasangan 1 buah kunci tanam antik Pemasangan 1 buah kunci tanam biasa Pemasangan 1 buah kunci kamar mandi Pemasangan 1 buah kunci silinder Pemasangan 1 buah engsel pintu Pemasangan 1 buah engsel jendela kupu-kupu Pemasangan 1 buah engsel angin Pemasangan 1 buah spring knip Pemasangan 1 buah kait angin Pemasangan 1 buah door closer Pemasangan 1 buah kunci slot Pemasangan 1 buah Door holder Pemasangan 1 buah door stop Pemasangan 1 buah rel pintu sorong Pemasangan 1 buah kunci lemari Pemasangan 1 m2 kaca tebal 3 mm Pemasangan 1 m2 kaca tebal 5 mm Pemasangan 1 m2 kaca tebal 8 mm Pemasangan 1 m2 kaca buram tebal 12 mm Pemasangan 1 m2 kaca cermin tebal 5 mm Pemasangan 1 m2 kaca cermin tebal 8 mm Pemasangan 1 m2 kaca wireglassed tebal 5 mm Pemasangan 1 m2 kaca patri tebal 5 mm Pemasangan 1 m2 kaca tebal 8 mm
1 2 3 4 5 6 7 8 9 10 11
1 Bh. Pasang Kunci Tanam Mutu Menengah 1 Bh. Pasang Kunci Tanam Mutu Tinggi 1 Bh. Pasang Grendel Besar 1 Bh. Pasang Grendel Kecil 1 Bh. Pasang Kait Angin Besar 1 Bh. Pasang Kait Angin Kecil 1 Bh. Pasang Kunci Selot Besar 1 Bh. Pasang Kunci Selot Kecil 1 Bh. Pasang Beugel U 1 Bh. Pasang Beugel Plat 1 Bh. Pasang Angker Dia 12 MM
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
3
4 SNI.195 SNI.195.a SNI.196 SNI.197 SNI.197.a SNI.198 SNI.200 SNI.201 SNI.202 SNI.204 SNI.206 SNI.208 SNI.209
5 1,841,994.00 242,299.75 1,581,584.40 238,075.75 298,575.75 1,248,425.75 1,011,890.00 1,274,900.00 843,370.00 988,834.00 1,051,754.00 1,243,484.00 709,104.00
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m² m² m² m² m² m² m² m² m²
4.4.6.2.1. 4.4.6.2.2. 4.4.6.2.3. 4.4.6.2.4. 4.4.6.2.5. 4.4.6.2.6. 4.4.6.2.7. 4.4.6.2.8. 4.4.6.2.9. 4.4.6.2.10. 4.4.6.2.11. 4.4.6.2.12. 4.4.6.2.13. 4.4.6.2.14. 4.4.6.2.15. 4.4.6.2.16. 4.4.6.2.17. 4.4.6.2.18. 4.4.6.2.19. 4.4.6.2.20. 4.4.6.2.21. 4.4.6.2.22. 4.4.6.2.23. 4.4.6.2.17.A.
761,739.00 301,565.00 269,434.00 189,134.00 60,922.40 36,756.50 71,186.50 50,644.00 395,659.00 201,113.00 395,659.00 97,845.00 197,439.00 178,897.40 245,447.40 287,558.70 202,994.00 249,403.00 221,247.40
SNI.265.b SNI.265.c SNI.268.1 SNI.268.2 SNI.269 SNI.270 SNI.271 SNI.272 SNI.273 SNI.274 SNI.275
290,345.00 720,445.00 51,606.50 40,606.50 53,209.75 137,032.50 124,206.50 127,413.00 45,564.75 45,564.75 9,264.75
SATUAN
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
NO
URAIAN PEKERJAAN
SATUAN
1 12 13 14 15 16 17
2
3
4 SNI.276.a SNI.276.b SNI.276.c SNI.276.d SNI.276.e SNI.282
5 8,164.75 9,264.75 10,364.75 11,464.75 13,664.75 1,060,463.25
XIII 1 2 3 4
4.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN 1 m2 Pengikisan/pengerokan permukaan cat lama 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 1 m2 Pengerokan karat pada permukaan baja cara manual 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
m² m² m² m²
4.4.7.1.1. 4.4.7.1.2. 4.4.7.1.3. 4.4.7.1.4.
29,139.00 26,609.00 27,874.00 65,791.00
5
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
m²
4.4.7.1.5.
92,477.00
6 7 8 9 10
Pelaburan 1 m2 bidang kayu dengan teak oil Pelaburan 1 m2 bidang kayu dengan politur Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Pelaburan 1 m2 bidang kayu dengan vernis Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
m² m² m² m² m²
4.4.7.1.6. 4.4.7.1.7. 4.4.7.1.8. 4.4.7.1.9. 4.4.7.1.10.
46,365.00 64,992.40 27,643.00 73,337.00 38,179.90
11 12 13 14 15 16 17 18 19
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Pelaburan 1 m2 tembok dengan kalkarium Pelaburan 1 m2 tembok dengan kapur sirih Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) Pemasangan 1 m2 wallpaper Pengecatan 1 m2 permukaan baja dengan menie besi Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
m² m² m² m² m² m² m² m² m²
4.4.7.1.11. 4.4.7.1.12. 4.4.7.1.13. 4.4.7.1.14. 4.4.7.1.15. 4.4.7.1.16. 4.4.7.1.17. 4.4.7.1.18. 4.4.7.1.19.
26,769.60 15,791.60 128,892.50 54,917.50 106,139.00 114,717.90 50,039.00
20 21
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
m² m²
4.4.7.1.20. 4.4.7.1.21.
286,924.00 258,599.00
1 2 3 4 5 6
1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Eksterior) 1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Interior) 1 M2 Pekerjaan Cat Plafond Baru 1 x Dasar, 2 x Cat 1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) 1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) 1 m² Pengecatan Tembok Baru anti bakteri ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup anti bakteri)
SNI.252 SNI.252.a SNI.252.b SNI.252.c SNI.252.d SNI.252.e
74,485.40 47,953.40 80,795.00 37,283.40 252,718.40 89,445.40
7
1 m² Memasang pelapis tembok dengan plat timbal hitam tebal 3 mm rangka hollow
SNI.252.f
1,314,713.40
8 9 10 11
1 m² Measang pelapis tembak dengan HPL 1 m² Pemasangan Wall Paper #REF! 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Eksterior
SNI.252.g SNI.252.h SNI.252.i SNI.253
138,637.40 188,093.40 513,693.40 112,498.10
12
1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Interior
SNI.253.a
90,388.10
1 Bh. Pas. Baut Mur 1 Bh. Pas. Baut Mur 12 mm 1 Bh. Pas. Baut Mur 16 mm 1 Bh. Pas. Baut Mur 18 mm 1 Bh. Pas. Baut Mur 22 mm 1 Bh. Pasang Pintu Feber glass (Wc)
NO
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN 2023 (Rp.)
4 SNI.254
5 59,797.10
1 13
2 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Eksterior
14
1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Interior
SNI.254.a
36,213.10
15 16 17 18 19 20 21 22 23 24 25
1 M2 Pekerjaan Cat Plafond Lama 1 x Dasar, 2 x Cat 1 M2 Pekerjaan cat Genteng 1 M2 Pekerjaan Cat Kayu 1 x Meni, 2 x Cat 1 M2 Pekerjaan Cat Kayu, 1 x Cat 1 M2 Pekerjaan Cat paving Blok 1 M2 Mendempul dan Menggosok Kayu 1 M2 Pekerjaan Politur 2 Kali 1 M2 Mengecat Besi 1 x Meni, 2 x Cat 10 M2 Mengecat Atap Seng Gelombang 1 M2 Pekerjaan Pelaburan Bidang Kayu dengan Teak Oil 1 M2 Mengeter Kayu 2x
SNI.254.b SNI.255 SNI.256 SNI.257 SNI.258 SNI.259 SNI.260 SNI.261 SNI.262 SNI.263 SNI.264
72,655.00 92,776.20 67,710.50 64,834.00 50,606.60 22,874.50 58,100.90 74,470.00 63,151.00 29,121.40 48,851.00
5.5.1.1.1. 5.5.1.1 2. 5.5.1.1 3. 5.5.1.1 4. 5.5.1.1 5. 5.5.1.1 6. 5.5.1.1 7. 5.5.1.1 8. 5.5.1.1 9. 5.5.1.1 10. 5.5.1.1 11. 5.5.1.1 12. 5.5.1.1 13. 5.5.1.1 14. 5.5.1.1 15. 5.5.1.1 16. 5.5.1.1 17. 5.5.1.1 18. 5.5.1.1 19. 5.5.1.1 20. 5.5.1.1 21. 5.5.1.1 22. 5.5.1.1 23. 5.5.1.1 24. 5.5.1.1 25. 5.5.1.1 26. 5.5.1.1 27. 5.5.1.1 28. 5.5.1.1 29. 5.5.1.1 30. 5.5.1.1 31. 5.5.1.1 32. 5.5.1.1 33. 5.5.1.1 34.
5,902,380.00 856,625.00 687,940.00 605,825.00 4,052,675.00 9,164,859.00 3,215,850.00 2,909,214.00 2,273,370.00 805,530.00 691,735.00 794,200.00 56,045.00 760,364.00 1,110,241.00 1,301,817.00 49,445.00 121,000.00 52,173.00 56,265.00 102,008.50 187,885.50 238,694.50 48,807.00 55,627.00 83,440.50 107,822.00 158,878.50 202,015.00 273,454.50 -
XIV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
5.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG Pemasangan 1 buah closet duduk/monoblock Pemasangan 1 buah closet jongkok porslen Pemasangan 1 buah closet jongkok teraso Pemasangan 1 buah urinoir Pemasangan 1 buah wastafel Pemasangan 1 buah bathcuip porselen Pemasangan 1 buah bak fibreglass vol 1 m3 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 Pemasangan 1 buah bak mandi teraso vol 0,30 m3 Pemasangan 1 buah bak air fibreglass vol 1 m3 Pemasangan 1 buah bak beton volume 1 m3 Pemasangan 1 buah bak cuci piring stainlessteel Pemasangan 1 buah bak cuci piring teraso Pemasangan 1 buah floor drain Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm Pemasangan 1 m’ pipa galvanis diameter ½” Pemasangan 1 buah kran diameter ½” atau 3/4” Pemasangan 1 m pipa galvanis diameter 3/4” Pemasangan 1 m’ pipa galvanis diameter 1” Pemasangan 1 m’ pipa galvanis diameter 1 ½” Pemasangan 1 m’ pipa galvanis diameter 3” Pemasangan 1 m’ pipa galvanis diameter 4” Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” Pemasangan 1 m’ pipa PVC tipe AW diameter 1” Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” Pemasangan 1 m’ pipa PVC tipe AW diameter 3” Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
3
KODE ANALISA
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m' bh m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
NO
URAIAN PEKERJAAN
HARGA SATUAN 2023 (Rp.)
SATUAN
KODE ANALISA
3 m' m'
4 5.5.1.1 35. 5.5.1.1.36.
5 249,135.65 379,497.25
1 35 36
2 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm Pemasangan 1 m’ pipa beton diameter 30 – 100 cm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Memasang 1 Bh Kloset Duduk Biasa Memasang 1 Bh Kloset Duduk (KW 1 Super) Memasang 1 Bh Wastafel Biasa Memasang 1 buah Urinoir ex. TOTO U 57 M Memasang 1 bh Pembatas Urinoir ex. TOTO A 100 Memasang 1 buah Kitchen Sink Stainless Steel ex. TOTO Memasang 1 Bh Bak Cuci Piring Logam, 1 lubang Memasang 1 Bh Bak Cuci Piring Logam, 2 lubang Memasang 1 Bh Bak Mandi Teraso Memasang 1 Bh Bak Mandi Fiberglass Memasang 1 Bh Bak Mandi Plastik Memasang 1 bh Kran ex. TOTO T2613 Memasang 1 Bh Floor Drain Memasang 1 bh Floor Drain ex. TOTO TX 1 BV 3 Memasang 1 Bh Saringan Air Besi Memasang 1 bh Shower spray ex. TOTO TX 403 SBPIV Memasang 1 bh Spoel hoek Memasang 1 bh shower ex. TOTO TR 309 SZ Memasang 1 bh Paper Holder ex. TOTO TIPE TS116R Memasang 1 bh soap holder ex. TOTO S 156N Memasang 1 bh hand railing stainless steel ex. TOTO TX 3A2 Memasang 1 Bh Tandon Air kap. 500 Liter Memasang 1 Bh Tandon Air kap. 1000 Liter Memasang 1 m' Pipa GI dia 1/2" Memasang 1 m' Pipa GI dia 2"
SNI.283.B SNI.283.K SNI.284 SNI.286 SNI.286.a SNI.286.b SNI.286.1 SNI.286.2 SNI.287 SNI.288 SNI.289 SNI.290.a SNI.291 SNI.291.a SNI.292 SNI.292.1 SNI.292.2 SNI.292.3 SNI.292.4 SNI.292.5 SNI.292.6 SNI.293.a SNI.293.b SNI.294.G SNI.298.Ga
1,782,913.00 5,082,693.00 1,175,515.00 3,621,475.00 1,566,345.00 2,769,492.00 734,519.50 866,519.50 1,095,985.00 1,707,200.00 1,713,690.00 425,810.00 56,045.00 70,345.00 158,345.00 920,810.00 12,256,310.00 648,010.00 679,745.00 202,345.00 1,060,345.00 1,599,345.00 2,336,345.00 81,627.88 164,677.88
PEKERJAAN VEGETASI TANAMAN 1 bh Tanam Pohon Kamboja tinggi 5 meter 1 bh Tanam Pohon Tabebuya tinggi 4 meter 1 bh Tanam Pohon Palem raja tinggi 3 meter 1 bh Tanam Pohon Pisang Kipas tinggi 1,5 meter 1 bh Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter 1 bh Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter 1 bh Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm
SNI.302 SNI.302.1 SNI.302.2 SNI.302.3 SNI.302.4 SNI.302.5 SNI.302.6 SNI.302.a SNI.302.b SNI.302.c SNI.302.d SNI.302.e SNI.302.f SNI.302.g SNI.302.h SNI.302.i SNI.302.j SNI.302.k SNI.302.l SNI.302.m SNI.302.n
2,148,465.00 1,730,465.00 1,455,465.00 223,465.00 67,320.00 70,620.00 64,020.00 929,049.00 2,103,849.00 635,349.00 977,449.00 1,320,649.00 908,149.00 1,185,349.00 1,185,349.00 981,849.00 613,349.00 1,625,349.00 1,047,849.00 761,849.00 220,649.00
XV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
NO 1 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 XVI 1 2 3 4 5 6 7 8
URAIAN PEKERJAAN 2 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 bh Tanam semak , lubang polibag 15 x 15 cm 1 m2 Tanam rumput PEKERJAAN TAMBAHAN 1 M' Biaya Pengeboran air + Pipa Casing Ø 6'' 1 M' Biaya Pengeboran air + Pipa Casing Ø 4'' 1 M' Biaya Pengeboran air + Pipa Casing Ø 3'' 1 M' Biaya Pengeboran air + Pipa Casing Ø 2.5'' 1 Bh' Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar ) 1 Bh' Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Phase 1 Bh' Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 Complit pemasangan 1 Bh' Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1''- 25 Complit pemasangan
SATUAN 3
KODE ANALISA
HARGA SATUAN 2023 (Rp.)
4 SNI.302.o SNI.302.p SNI.302.q SNI.302.r SNI.302.s SNI.302.t SNI.302.u SNI.302.1a SNI.302.1b SNI.302.1c SNI.302.1d SNI.302.1e SNI.302.1f SNI.302.1g SNI.302.1h SNI.302.1i SNI.302.1j SNI.302.1k SNI.302.1l SNI.302.1m SNI.302.1n SNI.302.1o SNI.302.1p SNI.302.1q SNI.302.1r SNI.302.1s SNI.302.1t SNI.302.1v SNI.302.1x SNI.302.1y SNI.302.1z SNI.302.2a SNI.302.2b SNI.302.2c SNI.302.2d SNI.302.2e SNI.302.2f SNI.302.2g SNI.302.2h SNI.302.3a
5 838,849.00 131,549.00 186,549.00 2,090,649.00 1,938,849.00 635,349.00 635,349.00 1,134,265.00 727,265.00 617,265.00 3,477,265.00 1,893,265.00 1,068,265.00 243,265.00 276,265.00 518,265.00 518,265.00 243,265.00 1,002,265.00 243,265.00 177,265.00 837,265.00 137,665.00 177,265.00 309,265.00 243,265.00 1,079,265.00 309,265.00 386,265.00 452,265.00 551,265.00 160,765.00 155,265.00 342,265.00 518,265.00 127,765.00 177,265.00 243,265.00 309,265.00 101,200.00
SNI.Ls.1 SNI.Ls.2 SNI.Ls.3 SNI.Ls.4 SNI.Ls.5 SNI.Ls.6 SNI.Ls.7 SNI.Ls.8
1,558,535.00 1,091,585.00 547,415.00 295,240.00 38,016,000.00 54,036,400.00 28,495,500.00 25,685,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN SNI.3 1 Bh Pembuatan Papan nama Proyek 0,8 x 1,2 cm Koefisen satuan Uraian A BAHAN Bh Papan Nama 1.000 B TENAGA OH Pekerja 0.100 OH Mandor 0.050 C PERALATAN
Harga satuan 200,000.00
200,000.00
150,000.00 230,000.00
15,000.00 11,500.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.4a A
B
C
1 m2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m, (beton cor) Koefisen satuan Uraian TENAGA 0.200 OH Pekerja 0.400 OH Tk Kayu 0.020 OH Kp Tukang 0.020 OH Mandor BAHAN Btg Dolken 1.250 Kg Semen Pc 2.500 Lbr Seng gelombang 1.200 m3 Pasir 0.005 m3 Kerikil 0.009 m3 Kayu 5/7 0.072 Kg Paku 5 - 7 cm 0.060 PERALATAN
226,500.00 22,650.00 249,150.00
Harga satuan
A
B
0
1 m2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m Koefisen satuan Uraian TENAGA 0.150 m3 Pekerja 0.300 m3 Tk Kayu 0.015 m3 Kp Tukang 0.015 m3 Mandor BAHAN Btg Dolken 1.250 Lbr Seng gelombang 1.200 m3 Kayu 5/7 0.072 Kg Paku 5 - 7 cm 0.060 PERALATAN
30,000.00 76,000.00 4,600.00 4,600.00
11,000.00 1,700.00 68,000.00 225,000.00 345,000.00 2,600,000.00 28,000.00
13,750.00 4,250.00 81,600.00 1,125.00 3,105.00 187,200.00 1,680.00 407,910.00 40,791.00 448,701.00
Harga satuan
A
B
C
1 m2 . Pembuatan Direksiket/Kantor sementara Koefisen satuan Uraian TENAGA 1.000 OH Pekerja 1.000 OH Tk Kayu 0.300 OH Kp Tukang 0.050 OH Mandor BAHAN m3 Kayu 5/7 0.168 kg Paku 5 - 7 cm 0.080 lbr seng gelombang 0.250 lbr Triplek 5mm 0.046 kg semen Pc 30.500 m3 Pasir 0.200 m3 Kerikil 0.150 bh Bata merah 30.000 PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah harga
150,000.00 190,000.00 230,000.00 230,000.00
22,500.00 57,000.00 3,450.00 3,450.00
11,000.00 68,000.00 2,600,000.00 28,000.00
13,750.00 81,600.00 187,200.00 1,680.00 370,630.00 37,063.00 407,693.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.5
Jumlah harga
150,000.00 190,000.00 230,000.00 230,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.4b
Jumlah harga
Harga satuan
Jumlah harga
150,000.00 190,000.00 230,000.00 28,000.00
150,000.00 190,000.00 69,000.00 1,400.00
2,600,000.00 28,000.00 68,000.00 106,000.00 1,700.00 225,000.00 345,000.00 850.00
436,800.00 2,240.00 17,000.00 4,876.00 51,850.00 45,000.00 51,750.00 25,500.00 1,045,416.00 104,541.60 1,149,957.60
PEKERJAAN PEMBONGKARAN BANGUNAN LAMA SNI.6 1 M3 Pembongkaran Dinding Tembok Bata Merah Lama Koefisen satuan Uraian A TENAGA OH Pekerja 3.334 OH Mandor 0.333 B BAHAN C
Harga satuan 150,000.00 230,000.00
A
B C
1 M3 Pembongkaran Beton Bertulang Lama Koefisen satuan TENAGA OH Pekerja 6.667 OH Mandor 0.667 BAHAN
576,695.50 57,669.55 634,365.05
Uraian
Harga satuan 150,000.00 230,000.00
B C
PERALATAN
Harga satuan 150,000.00 190,000.00 230,000.00 230,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.9
B
1 M2 Pembongkaran Atap Seng Gelombang Koefisen satuan TENAGA OH Pekerja 0.100 OH Mandor 0.007 BAHAN
C
PERALATAN
A
Uraian
PEKERJAAN TANAH DAN PASIR SNI.10.a 1 M3 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan manual Koefisen satuan Uraian A TENAGA 0.750 OH Pekerja 0.025 OH Mandor B BAHAN
Harga satuan 150,000.00 230,000.00
Jumlah harga 15,000.00 1,610.00
Harga satuan 150,000.00 230,000.00
Jumlah harga 112,500.00 5,750.00
PERALATAN
B
1 M3 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan mengunakan alat berat Koefisen satuan Uraian TENAGA 0.750 OH Pekerja 0.025 OH Mandor BAHAN
C
PERALATAN
A
30,000.00 9,500.00 1,150.00 1,150.00
16,610.00 1,661.00 18,271.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.10.b
Jumlah harga
41,800.00 4,180.00 45,980.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
C
1,000,050.00 153,341.00
1,153,391.00 115,339.10 1,268,730.10
1 m2 Bongkar Usuk + Reng Untuk Dipakai Kembali Koefisen satuan Uraian TENAGA OH Pekerja 0.200 OH 0.050 Tukang Kayu OH 0.005 Kepala Tukang Kayu OH Mandor 0.005 BAHAN
A
Jumlah harga
PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.8
500,025.00 76,670.50
PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.7
Jumlah harga
118,250.00 11,825.00 130,075.00
Harga satuan 150,000.00 230,000.00
Jumlah harga 112,500.00 5,750.00
0.010
Jam
Alat Berat Galian dan keprasan
680,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.11.a
125,050.00 12,505.00 137,555.00
B
1 M3 Galian Tanah Biasa sedalam 2 M', Dengan Manual Koefisen satuan Uraian TENAGA 0.900 OH Pekerja 0.045 OH Mandor BAHAN
C
PERALATAN
A
Harga satuan 150,000.00 230,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.11.b A
B C
Jam
Alat Berat Galian dan keprasan
Harga satuan
B
1 M3 Galian Tanah Biasa sedalam 3 M' Koefisen satuan TENAGA 1.050 OH Pekerja 0.067 OH Mandor BAHAN
C
PERALATAN
A
A B
C
1 M3 Urugan Tanah Biasa tampa pemadatan Koefisen satuan BAHAN 1.200 M³ Tanah Urug TENAGA 0.250 OH Pekerja 0.025 OH Mandor PERALATAN
680,000.00
6,800.00 152,150.00 15,215.00 167,365.00
Uraian
Harga satuan 150,000.00 230,000.00
A B
C
1 M3 Urug dengan pasir urug Koefisen satuan BAHAN 1.200 M³ Pasir Urug TENAGA 0.300 OH Pekerja 0.010 OH Mandor PERALATAN
Jumlah harga 157,500.00 15,410.00
172,910.00 17,291.00 190,201.00
Uraian
Harga satuan
Jumlah harga
121,000.00
145,200.00
150,000.00 230,000.00
37,500.00 5,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.21
Jumlah harga 135,000.00 10,350.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.20
135,000.00 10,350.00
150,000.00 230,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.12
Jumlah harga
145,350.00 14,535.00 159,885.00
1 M3 Galian Tanah Biasa sedalam 2 M' - Dengan mengunakan alat berat Koefisen satuan Uraian TENAGA 0.900 OH Pekerja 0.045 OH Mandor BAHAN PERALATAN 0.010
6,800.00
188,450.00 18,845.00 207,295.00
Uraian
Harga satuan 195,000.00
234,000.00
150,000.00 230,000.00
45,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI SNI.27 1 M2 Pasangan Dinding bata berongga / roster (10 x 20) Koefisen satuan Uraian A BAHAN 30.000 Bh Roster 14.000 Kg Semen
Jumlah harga
281,300.00 28,130.00 309,430.00
Harga satuan 15,000.00 1,700.00
Jumlah harga 450,000.00 23,800.00
0.032
M³
Pasir Pasang
225,000.00
7,200.00
B
TENAGA OH OH OH OH
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 45,000.00 3,450.00
C
0.150 0.015 0.300 0.015 PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.27.b A
B
C
561,400.00 56,140.00 617,540.00
1 M2 Pasangan Dinding bata berongga / roster (20 x 20) Koefisen satuan Uraian BAHAN 30.000 Bh Roster 14.000 Kg Semen 0.032 M³ Pasir Pasang TENAGA 0.150 OH Tukang Batu 0.015 OH Kepala Tukang 0.300 OH Pekerja 0.015 OH Mandor PERALATAN
Harga satuan 15,500.00 1,700.00 225,000.00
465,000.00 23,800.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 45,000.00 3,450.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.27.c A
B
C
576,400.00 57,640.00 634,040.00
1 M2 Pasangan Dinding bata berongga / roster (30 x 30) Koefisen satuan Uraian BAHAN 30.000 Bh Roster 14.000 Kg Semen 0.032 M³ Pasir Pasang TENAGA 0.150 OH Tukang Batu 0.015 OH Kepala Tukang 0.300 OH Pekerja 0.015 OH Mandor PERALATAN
Harga satuan
600,000.00 23,800.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 45,000.00 3,450.00
711,400.00 71,140.00 782,540.00
Pemasangan 1 m2 dinding bata ringan tebal 10 X 20 X 60 cm + dengan mortar
Koefisen BAHAN 8.400 0.063 B TENAGA 1.300 0.130 0.671 0.003 C PERALATAN 0.100 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah harga
20,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.29.R
Jumlah harga
satuan
Uraian
Harga satuan
Jumlah harga
A
SNI.30 A
B
C
Biji Kg
Bata ringan/Hebel, 10X20X60 Mortar siap pakai
19,000.00 5,000.00
159,600.00 316.00
OH OH OH OH
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
247,000.00 29,900.00 100,650.00 690.00
Ls
Alat bantu
12,000.00
1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 3 PP Koefisen satuan Uraian BAHAN 140.000 Biji Bata Merah 32.950 Kg Semen 0.091 M³ Pasir Pasang TENAGA 0.200 OH Tukang Batu 0.020 OH Kepala Tukang 0.600 OH Pekerja 0.030 OH Mandor PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
1,200.00 539,356.00 53,935.60 593,291.60
Jumlah harga
950.00 1,700.00 225,000.00
133,000.00 56,015.00 20,475.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 90,000.00 6,900.00
348,990.00 34,899.00 383,889.00
SNI.31 A
B
C
1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 140.000 Biji Bata Merah 26.550 Kg Semen 0.093 M³ Pasir Pasang TENAGA 0.200 OH Tukang Batu 0.020 OH Kepala Tukang 0.600 OH Pekerja 0.030 OH Mandor PERALATAN
Harga satuan 950.00 1,700.00 225,000.00
133,000.00 45,135.00 20,925.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 90,000.00 6,900.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.32 A
B
C
1 M2 Pasangan Dinding Batako 1 Pc : 4 Psr Koefisen satuan BAHAN 12.500 Biji Batako 5.750 Kg Semen 0.022 M³ Pasir Pasang TENAGA 0.080 OH Tukang Batu 0.008 OH Kepala Tukang 0.256 OH Pekerja 0.012 OH Mandor PERALATAN
338,560.00 33,856.00 372,416.00
Uraian
Harga satuan
A
B
C
1 M2 Pasangan Rollag 1 Bata Merah 1 Pc : 3 Ps Koefisen satuan BAHAN 140.000 Biji Bata Merah 14.370 Kg Semen 0.040 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang 0.300 OH Pekerja 0.015 OH Mandor PERALATAN
56,250.00 9,775.00 4,837.50
190,000.00 230,000.00 150,000.00 230,000.00
15,200.00 1,840.00 38,400.00 2,760.00
129,062.50 12,906.25 141,968.75
Uraian
Harga satuan
A B
C
1 M2 Acian halus dengan Pc Koefisen satuan BAHAN 3.250 Kg Semen Pc TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
133,000.00 24,429.00 9,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 45,000.00 3,450.00
236,179.00 23,617.90 259,796.90
Uraian
Harga satuan
A
B
C
1 M2 Plesteran + Acian halus dinding bata ringan/Hebel Koefisen satuan Uraian BAHAN 6.240 Kg Semen-MU 380 , 40 Kg 3.250 Kg Semen-MU 200 , 40 Kg TENAGA 0.250 OH Tukang Batu 0.025 OH Kepala Tukang Batu 0.500 OH Pekerja 0.025 OH Mandor PERALATAN
Jumlah harga
1,700.00
5,525.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 30,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.34.b
Jumlah harga
950.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.34.a
Jumlah harga
4,500.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.33
Jumlah harga
59,125.00 5,912.50 65,037.50
Harga satuan
Jumlah harga
4,500.00 5,000.00
28,080.00 16,250.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 5,750.00 75,000.00 5,750.00
0.100 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Ls
Alat bantu
1 M2 Plesteran dinding bata ringan/Hebel Koefisen satuan A BAHAN 6.240 Kg Semen-MU 380 , 40 Kg B TENAGA 0.150 OH Tukang Batu 0.015 OH Kepala Tukang Batu 0.300 OH Pekerja 0.015 OH Mandor C PERALATAN 0.100 Ls Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
12,000.00
1,200.00 179,530.00 17,953.00 197,483.00
SNI.34.c
SNI.34.d A
B
C
1 M2 Plesteran Beton 1 PC : 2 Ps Tebal 15 mm Koefisen satuan BAHAN 9.300 Kg Semen Pc 0.018 M3 Pasir Pasang TENAGA 0.200 OH Tukang Batu 0.020 OH Kepala Tukang Batu 0.260 OH Pekerja 0.013 OH Mandor PERALATAN
Uraian
Harga satuan 4,500.00
28,080.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 45,000.00 3,450.00
12,000.00
Uraian
Harga satuan
A
B
C
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 39,000.00 2,990.00
104,450.00 10,445.00 114,895.00
1 M2 Plesteran Beton 1 PC : 3 Ps Tebal 15 mm Koefisen satuan BAHAN 7.070 Kg Semen Pc 0.021 M3 Pasir Pasang TENAGA 0.200 OH Tukang Batu 0.020 OH Kepala Tukang Batu 0.260 OH Pekerja 0.013 OH Mandor PERALATAN
A
B
C
1 M2 Siar Pas batu Kali Koefisen satuan BAHAN 6.340 Kg 0.012 m3 TENAGA 0.150 OH 0.015 OH 0.300 OH 0.015 OH PERALATAN
Uraian
Harga satuan
A B
C
Jumlah harga
1,700.00 225,000.00
12,019.00 4,725.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 39,000.00 2,990.00
101,334.00 10,133.40 111,467.40
Uraian
Harga satuan
Jumlah harga
Semen Pasir Pasang
1,700.00 225,000.00
10,778.00 2,700.00
Tukang Batu Kepala Tukang Batu Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 45,000.00 3,450.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.35.b
Jumlah harga 15,810.00 4,050.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.35.a
1,200.00 109,680.00 10,968.00 120,648.00
1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.34.e
Jumlah harga
1 m2 Finishing Siar pasangan bata merah Koefisen satuan BAHAN 3.108 Kg Semen Portland TENAGA 0.075 OH Tukang Batu 0.008 OH Kepala Tukang Batu 0.150 OH Pekerja 0.008 OH Mandor PERALATAN
93,878.00 9,387.80 103,265.80
Uraian
Harga satuan
Jumlah harga
1,700.00
5,283.60
190,000.00 230,000.00 150,000.00 230,000.00
14,250.00 1,840.00 22,500.00 1,840.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.41 A
B
C
45,713.60 4,571.36 50,284.96
Pasang Kanstin Cetak 600x150x250 Koefisen satuan BAHAN 1.667 m1 Kanstein 0.008 m3 Pasir pasang 0.750 kg PC 0.050 m3 Pasir urug TENAGA 0.050 OH Tukang Batu 0.005 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
Uraian
Harga satuan 165,000.00 225,000.00 1,700.00 195,000.00
275,000.00 1,687.50 1,275.00 9,750.00
190,000.00 230,000.00 150,000.00 230,000.00
9,500.00 1,150.00 30,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.41.1 A B C
Lapisan Geotextile Koefisen satuan BAHAN 1.000 m2 TENAGA 0.050 OH PERALATAN
330,662.50 33,066.25 363,728.75
Uraian
Harga satuan
A B C
Lapisan Drainagecell Koefisen satuan BAHAN 1.000 m2 TENAGA 0.050 OH PERALATAN
320,000.00
250,000.00
Upang pasang
320,000.00
16,000.00
266,000.00 26,600.00 292,600.00
Uraian
Harga satuan
A
B
C
82,000.00
82,000.00
Upang pasang
82,000.00
4,100.00
Memasang Kitchen Sink 1 Bowl GS 5844 Koefisen satuan Uraian BAHAN 1.000 bh Kitchen Sink 1 Bowl GS 5844 1.000 set Kran + asesories + Seal Tape TENAGA 0.300 OH Tukang Batu 0.030 OH Kepala Tukang Batu 0.030 OH Pekerja 0.002 OH Mandor PERALATAN
86,100.00 8,610.00 94,710.00
Harga satuan
A
B
C
1,570,000.00 690,000.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 4,500.00 345.00
Memasang Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA Koefisen satuan Uraian Harga satuan BAHAN 1.000 bh 3,880,000.00 Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen 1.000 set 690,000.00 Kran + asesories + Seal Tape TENAGA 0.300 OH Tukang Batu 190,000.00 0.030 OH Kepala Tukang Batu 230,000.00 0.030 OH Pekerja 150,000.00 0.002 OH Mandor 230,000.00 PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah harga
1,570,000.00 690,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.41.4
Jumlah harga
Drainagecell
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.41.3
Jumlah harga
Geotextile
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.41.2
Jumlah harga
2,328,745.00 232,874.50 2,561,619.50
Jumlah harga 3,880,000.00 690,000.00 57,000.00 6,900.00 4,500.00 345.00
4,638,745.00 463,874.50 5,102,619.50
SNI.41.5 A B
C
Memasang Mirror 100x120 cm Koefisen satuan BAHAN 1.000 bh Mirror 100x120 cm TENAGA 0.300 OH Tukang Batu 0.030 OH Kepala Tukang Batu 0.030 OH Pekerja 0.002 OH Mandor PERALATAN
Uraian
Harga satuan 270,000.00
270,000.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 4,500.00 345.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.42.a A
B
C
1 m1 Pasang Buis beton Ø20 cm, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 2.000 Bh Buis Beton Dia. 20 Cm 1.250 Kg Semen 0.025 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
338,745.00 33,874.50 372,619.50
Harga satuan
A
B
C
1 m1 Pasang Buis beton Ø 30 cm, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 2.000 Bh Buis Beton Dia. 30 Cm 1.250 Kg Semen 0.025 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
150,000.00 2,125.00 5,625.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 30,000.00 2,300.00
211,350.00 21,135.00 232,485.00
Harga satuan
A
B
C
1 m1 Pasang Buis beton Ø 40 cm, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 2.000 Bh Buis Beton Dia. 40 Cm 1.250 Kg Semen 0.025 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
180,000.00 2,125.00 5,625.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 30,000.00 2,300.00
241,350.00 24,135.00 265,485.00
Harga satuan
A
B
1 m1 Pasang Buis beton Ø 50 cm, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 2.000 Bh Buis Beton Dia. 50 Cm 2.500 Kg Semen 0.025 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor
Jumlah harga
110,000.00 1,700.00 225,000.00
220,000.00 2,125.00 5,625.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 30,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.43
Jumlah harga
90,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.42.c
Jumlah harga
75,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.42.b
Jumlah harga
281,350.00 28,135.00 309,485.00
Harga satuan
Jumlah harga
125,000.00 1,700.00 225,000.00
250,000.00 4,250.00 5,625.00
190,000.00 230,000.00 230,000.00 230,000.00
19,000.00 2,300.00 46,000.00 2,300.00
C
PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.44 A
B
C
329,475.00 32,947.50 362,422.50
1 m1 Pasang Buis beton Ø 60 cm, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 2.000 Bh Buis Beton Dia. 60 Cm 2.500 Kg Semen 0.025 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
Harga satuan 130,000.00 1,700.00 225,000.00
260,000.00 4,250.00 5,625.00
190,000.00 230,000.00 230,000.00 230,000.00
19,000.00 2,300.00 46,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.45 A
B
C
339,475.00 33,947.50 373,422.50
1 m1 Pasang Buis beton Ø 80 cm, spesi 1 PC : 4 PP Koefisen satuan Uraian BAHAN 2.000 Bh Buis Beton Dia. 80 Cm 2.500 Kg Semen 0.025 M³ Pasir Pasang TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
Harga satuan
300,000.00 4,250.00 5,625.00
190,000.00 230,000.00 230,000.00 230,000.00
19,000.00 2,300.00 46,000.00 2,300.00
379,475.00 37,947.50 417,422.50
Uraian
Harga satuan
A
B
C
1 M2 Pas. Lantai Granite Kw I Koefisen satuan BAHAN 1.000 m2 Granite Kw I 11.870 kg PC 0.045 M³ Pasir Pasang TENAGA 0.125 OH Tukang Batu 0.013 OH Kepala Tukang 0.250 OH Pekerja 0.013 OH Mandor PERALATAN
63,000.00 20,179.00 10,125.00
190,000.00 230,000.00 150,000.00 230,000.00
6,650.00 2,990.00 18,000.00 3,220.00
124,164.00 12,416.40 136,580.40
Uraian
Harga satuan
A
1 M2 Pas. Lantai Granite Kw II Koefisen satuan BAHAN
Jumlah harga
450,000.00 1,700.00 225,000.00
450,000.00 20,179.00 10,125.00
190,000.00 230,000.00 150,000.00 230,000.00
23,750.00 2,990.00 37,500.00 2,990.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.47.b
Jumlah harga
63,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.47.a
Jumlah harga
150,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN LANTAI & DINDING SNI.46 1 M2 Pas. Lantai Tegel Abu-abu Koefisen satuan A BAHAN 1.000 m2 Tegel Abu-abu 11.870 kg PC 0.045 M³ Pasir Pasang B TENAGA 0.035 OH Tukang Batu 0.013 OH Kepala Tukang 0.120 OH Pekerja 0.014 OH Mandor C PERALATAN
Jumlah harga
547,534.00 54,753.40 602,287.40
Uraian
Harga satuan
Jumlah harga
B
C
1.000 11.870 0.045 TENAGA 0.125 0.013 0.250 0.013 PERALATAN
m2 kg M³
Granite Kw II PC Pasir Pasang
380,000.00 1,700.00 225,000.00
380,000.00 20,179.00 10,125.00
OH OH OH OH
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
23,750.00 2,990.00 37,500.00 2,990.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.48 A
B
C
1 M2 Pasangan Lantai Keramik ( KW I Polos ) Koefisen satuan Uraian BAHAN 1.050 m2 Keramik Lantai Kualitas I (Polos) 14.150 Kg PC 2.000 Kg Semen Warna 0.039 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
477,534.00 47,753.40 525,287.40
Harga satuan 110,000.00 1,700.00 15,000.00 225,000.00
115,500.00 24,055.00 30,000.00 8,775.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.49 A
B
C
1 M2 Pasangan Lantai Keramik ( KW II Polos ) Koefisen satuan Uraian BAHAN 1.050 m2 Keramik Lantai Kualitas II (Polos) 14.150 Kg PC 2.000 Kg Semen Warna 0.039 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
365,930.00 36,593.00 402,523.00
Harga satuan
A
B
C
1 M2 Pasangan Lantai Keramik ( KW I Motif ) Koefisen satuan Uraian BAHAN 1.050 m2 Keramik Lantai Kualitas I (Motif) 14.150 Kg PC 2.000 Kg Semen Warna 0.039 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
94,500.00 24,055.00 30,000.00 8,775.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
344,930.00 34,493.00 379,423.00
Harga satuan
A
B
1 M2 Pasangan Lantai Keramik ( KW II Motif ) Koefisen satuan Uraian BAHAN 1.050 m2 Keramik Lantai Kualitas II (Motif) 14.150 Kg PC 2.000 Kg Semen Warna 0.042 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang
Jumlah harga
140,000.00 1,700.00 15,000.00 225,000.00
147,000.00 24,055.00 30,000.00 8,775.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.51
Jumlah harga
90,000.00 1,700.00 15,000.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.50
Jumlah harga
397,430.00 39,743.00 437,173.00
Harga satuan
Jumlah harga
120,000.00 1,700.00 15,000.00 225,000.00
126,000.00 24,055.00 30,000.00 9,450.00
190,000.00 230,000.00
66,500.00 8,050.00
C
0.700 0.035 PERALATAN
OH OH
Pekerja Mandor
150,000.00 230,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.52 A
B
C
377,105.00 37,710.50 414,815.50
1 M2 Pasangan Lantai Marmer Koefisen satuan BAHAN 1.050 m2 Lantai Marmer 8.190 Kg PC 0.134 Kg Semen Warna 0.045 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
Uraian
Harga satuan
A
B
C
630,000.00 13,923.00 2,010.00 10,125.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
843,658.00 84,365.80 928,023.80
1 M2 Pasangan Lantai Keramik Anti Slip Koefisen satuan Uraian BAHAN 1.050 m2 Keramik Lantai Anti Slip Kualitas II 14.150 Kg PC 2.000 Kg Semen Warna 0.042 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
Harga satuan
A
B
C
126,000.00 24,055.00 30,000.00 9,450.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
377,105.00 37,710.50 414,815.50
1 M2 Pasangan dinding keramik ( Kw I Motif ) Koefisen satuan Uraian BAHAN 1.050 m2 Keramik Dinding Kw I (Motif) 9.300 Kg PC 1.940 Kg Semen Warna 0.018 M³ Pasir Pasang TENAGA 0.450 OH Tukang Batu 0.045 OH Kepala Tukang 0.900 OH Pekerja 0.045 OH Mandor PERALATAN
Harga satuan
A
B
C
1 M2 Pas. Dinding Keramik Koefisen satuan BAHAN 1.050 m2 9.300 Kg 1.940 Kg 0.018 M³ TENAGA 0.450 OH 0.045 OH 0.900 OH 0.045 OH PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 %
Jumlah harga
140,000.00 1,700.00 15,000.00 225,000.00
147,000.00 15,810.00 29,100.00 4,050.00
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 135,000.00 10,350.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.54
Jumlah harga
120,000.00 1,700.00 15,000.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.53
Jumlah harga
600,000.00 1,700.00 15,000.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.52.a
105,000.00 8,050.00
437,160.00 43,716.00 480,876.00 ( Kw II Motf ) Uraian
Harga satuan
Jumlah harga
Keramik Dinding Kw II (Motif) PC Semen Warna Pasir Pasang
120,000.00 1,700.00 15,000.00 225,000.00
126,000.00 15,810.00 29,100.00 4,050.00
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 135,000.00 10,350.00
416,160.00 41,616.00
Jumlah ……………………… SNI.55 A
B
C
1 M2 Pas. Dinding Keramik Koefisen satuan BAHAN 1.050 m2 9.300 Kg 1.940 Kg 0.018 M³ TENAGA 0.450 OH 0.045 OH 0.900 OH 0.045 OH PERALATAN
457,776.00 ( Kw I polos ) Uraian
Harga satuan
Keramik 10 x 20 cm PC Semen Warna Pasir Pasang
130,000.00 1,700.00 15,000.00 225,000.00
136,500.00 15,810.00 29,100.00 4,050.00
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 135,000.00 10,350.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.56 A
B
C
1 M2 Pas. Dinding Keramik Koefisen satuan BAHAN 1.050 m2 9.300 Kg 1.940 Kg 0.018 M³ TENAGA 0.450 OH 0.045 OH 0.100 OH 0.050 OH PERALATAN
426,660.00 42,666.00 469,326.00 ( Kw II Polos ) Uraian
Harga satuan
A
B
C
90,000.00 1,700.00 15,000.00 225,000.00
94,500.00 15,810.00 29,100.00 4,050.00
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 15,000.00 11,500.00
1 M2 Pas. Lantai Keramik Cating Motif Koefisen satuan BAHAN 1.050 m2 Keramik cutting Motif 9.300 Kg PC 2.750 Kg Semen Warna 0.018 M³ Pasir Pasang TENAGA 0.450 OH Tukang Batu 0.045 OH Kepala Tukang 0.100 OH Pekerja 0.050 OH Mandor PERALATAN
265,810.00 26,581.00 292,391.00
Uraian
Harga satuan
A
B
C
1 M2 Pas. Lantai Coral Sikat Koefisen satuan BAHAN 10.500 Kg Coral sikat 9.300 Kg PC 2.750 Kg Semen Warna 0.018 M³ Pasir Pasang TENAGA 0.450 OH Tukang Batu 0.045 OH Kepala Tukang 0.100 OH Pekerja 0.050 OH Mandor PERALATAN
168,000.00 15,810.00 41,250.00 4,050.00
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 15,000.00 11,500.00
351,460.00 35,146.00 386,606.00
Uraian
Harga satuan
A
1 M2 Pas. Lantai Coral Sikat, Warna Koefisen satuan BAHAN 10.500 Kg Coral sikat, Warna
Jumlah harga
10,000.00 1,700.00 15,000.00 225,000.00
105,000.00 15,810.00 41,250.00 4,050.00
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 15,000.00 11,500.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.57.c
Jumlah harga
160,000.00 1,700.00 15,000.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.57.b
Jumlah harga
Keramik Dinding Kw II (Polos) PC Semen Warna Pasir Pasang
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.57.a
Jumlah harga
288,460.00 28,846.00 317,306.00
Uraian
Harga satuan 16,000.00
Jumlah harga 168,000.00
9.300 2.750 0.018
Kg Kg M³
PC Semen Warna Pasir Pasang
1,700.00 15,000.00 225,000.00
15,810.00 41,250.00 4,050.00
B
TENAGA OH OH OH OH
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
85,500.00 10,350.00 15,000.00 11,500.00
C
0.450 0.045 0.100 0.050 PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.58 A
B
C
1 M2 Pas. Dinding batu paras/Palimanan Koefisen satuan BAHAN 1.050 m2 Batu paras/Palimanan 11.750 Kg PC 0.035 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
351,460.00 35,146.00 386,606.00
Uraian
Harga satuan 244,000.00 1,700.00 225,000.00
256,200.00 19,975.00 7,875.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.59 A
B
C
1 M2 Pas. Dinding batu tempel hitam bergaris Koefisen satuan Uraian BAHAN 1.100 m2 Batu Sisir/ Bergaris, hitam 11.750 Kg PC 0.035 M³ Pasir Pasang TENAGA 0.350 OH Tukang Batu 0.035 OH Kepala Tukang 0.700 OH Pekerja 0.035 OH Mandor PERALATAN
471,650.00 47,165.00 518,815.00
Harga satuan
A B
C
1 M2 Pas. Paving Blok bata . T 8 cm Koefisen satuan Uraian BAHAN 1.010 m2 Paving Blok Persegi (t = 8 cm) TENAGA 0.500 OH Tukang Batu 0.050 OH Kepala Tukang 0.500 OH Pekerja 0.001 OH Mandor PERALATAN
291,500.00 19,975.00 7,875.00
190,000.00 230,000.00 150,000.00 230,000.00
66,500.00 8,050.00 105,000.00 8,050.00
506,950.00 50,695.00 557,645.00
Harga satuan
A B
C
1 M2 Pas. Paving Blok bata . T 8 cm, Press Koefisen satuan Uraian BAHAN 1.010 m2 Paving Blok Persegi (t = 8 cm), Press TENAGA 0.500 OH Tukang Batu 0.050 OH Kepala Tukang 0.500 OH Pekerja 0.001 OH Mandor PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah harga
80,000.00
80,800.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 75,000.00 299.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.60.P
Jumlah harga
265,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.60.B
Jumlah harga
262,599.00 26,259.90 288,858.90
Harga satuan
Jumlah harga
165,000.00
166,650.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 75,000.00 299.00
348,449.00 34,844.90 383,293.90
SNI.61 A B
C
1 M2 Pas. Paving Blok bata . T 6 cm Koefisen satuan Uraian BAHAN 1.010 m2 Paving Blok Persegi (t = 6 cm) TENAGA 0.500 OH Tukang Batu 0.050 OH Kepala Tukang 0.500 OH Pekerja 0.001 OH Mandor PERALATAN
Harga satuan 65,000.00
65,650.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 75,000.00 299.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62 A B
C
247,449.00 24,744.90 272,193.90
1 M2 Pas. Paving Blok persegi/berlian Koefisen satuan Uraian BAHAN 1.010 m2 Paving Blok Tiga Berlian TENAGA 0.500 OH Tukang Batu 0.050 OH Kepala Tukang 0.500 OH Pekerja 0.001 OH Mandor PERALATAN
Harga satuan
A
B
C
202,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 75,000.00 299.00
383,799.00 38,379.90 422,178.90
1 m2 Memasang ornamen terawang custom bahan GRC Koefisen satuan Uraian BAHAN 1.050 m2 Ornamen terawang custom 11.000 kg Portland Cement 0.035 m3 Pasir Pasang TENAGA 0.750 OH Tukang Batu 0.050 OH Kepala Tukang 0.300 OH Pekerja 0.015 OH Mandor PERALATAN
Harga satuan
A B
C
1 m2 Memasang acian motif tali air Koefisen satuan BAHAN 3.250 kg Portland Cement TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang 0.200 OH Pekerja 0.010 OH Mandor PERALATAN
984,900.00 18,700.00 7,875.00
190,000.00 230,000.00 150,000.00 230,000.00
142,500.00 11,500.00 45,000.00 3,450.00
1,213,925.00 121,392.50 1,335,317.50
Uraian
Harga satuan
A
B
C
1 m Memasang plint ukuran (60 x 10x 4 ) cm Koefisen satuan Uraian BAHAN 1.700 Buah Hospital plint 60 x 10 x 4 1.140 kg Portland Cement 0.003 m3 Pasir Pasang 0.100 kg Semen warna TENAGA 0.090 OH Tukang Batu 0.009 OH Kepala Tukang 0.090 OH Pekerja 0.005 OH Mandor PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 %
Jumlah harga
1,700.00
5,525.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 30,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.3
Jumlah harga
938,000.00 1,700.00 225,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.2
Jumlah harga
200,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.1
Jumlah harga
59,125.00 5,912.50 65,037.50
Harga satuan
Jumlah harga
82,000.00 1,700.00 225,000.00 15,000.00
139,400.00 1,938.00 675.00 1,500.00
190,000.00 230,000.00 150,000.00 230,000.00
17,100.00 2,070.00 13,500.00 1,150.00
177,333.00 17,733.30
Jumlah ……………………… SNI.62.4 A
B
C
195,066.30
1 m Memasang stepnose tangga ukuran (10 x 40) cm Koefisen satuan Uraian BAHAN 2.650 Buah Stepnose tangga 10x40 cm 1.140 kg Portland Cement 0.003 m3 Pasir Pasang 0.100 kg Semen warna TENAGA 0.010 OH Tukang Batu 0.050 OH Kepala Tukang 0.100 OH Pekerja 0.003 OH Mandor PERALATAN
Harga satuan 32,000.00 1,700.00 225,000.00 15,000.00
84,800.00 1,938.00 675.00 1,500.00
190,000.00 230,000.00 150,000.00 230,000.00
1,900.00 11,500.00 15,000.00 575.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.5 A
B
C
1 m2 Memasang lantai karpet Koefisen satuan BAHAN 1.050 m2 Karpet 0.350 kg Lem TENAGA 0.470 OH Tukang Kayu 0.017 OH Kepala Tukang 0.170 OH Pekerja 0.009 OH Mandor PERALATAN
117,888.00 11,788.80 129,676.80
Uraian
Harga satuan
A
B
C
1 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I Koefisen satuan Uraian BAHAN 11.870 Buah Lantai Vinyl Kw I 0.350 kg Lem vinyl TENAGA 0.150 OH Tukang Batu 0.015 OH Kepala Tukang 0.150 OH Pekerja 0.008 OH Mandor PERALATAN
26,250.00 19,250.00
190,000.00 230,000.00 150,000.00 230,000.00
89,300.00 3,910.00 25,500.00 2,070.00
166,280.00 16,628.00 182,908.00
Harga satuan
A
B
C
1 m2 Memasang lantai parquete ukuran (30 x 30) cm KL II Koefisen satuan Uraian BAHAN 11.870 Buah Lantai Vinyl Kw II 0.350 kg Lem perquete TENAGA 0.150 OH Tukang Batu 0.015 OH Kepala Tukang 0.150 OH Pekerja 0.008 OH Mandor PERALATAN
694,395.00 19,250.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 22,500.00 1,840.00
769,935.00 76,993.50 846,928.50
Harga satuan
A
B
1 m2 Pasang conblock tipe segi-empat warna 8 cm, K-300 Koefisen satuan Uraian BAHAN 1.000 m2 Conblock tipe segi-empat abu-abu 8 cm, K-300 0.050 m3 Pasir urug TENAGA 0.250 OH Tukang Batu 0.025 OH Kepala Tukang 0.500 OH Pekerja 0.025 OH Mandor
Jumlah harga
36,000.00 55,000.00
427,320.00 19,250.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 22,500.00 1,840.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.W
Jumlah harga
58,500.00 55,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.7
Jumlah harga
25,000.00 55,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.6
Jumlah harga
502,860.00 50,286.00 553,146.00
Harga satuan
Jumlah harga
127,000.00 225,000.00
127,000.00 11,250.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 5,750.00 75,000.00 5,750.00
C
PERALATAN
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.A A
B
C
272,250.00 27,225.00 299,475.00
1 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-300 Koefisen satuan Uraian BAHAN 1.000 m2 Conblock tipe segi-enam abu-abu 8 cm, K-300 0.050 m3 Pasir urug TENAGA 0.250 OH Tukang Batu 0.025 OH Kepala Tukang 0.500 OH Pekerja 0.025 OH Mandor PERALATAN
Harga satuan 122,000.00 225,000.00
122,000.00 11,250.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 5,750.00 75,000.00 5,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.7 A
B
C
1 m Pasang kansten beton Koefisen satuan BAHAN 1.667 m2 2.670 m3 0.030 m3 0.050 m3 TENAGA 0.150 OH 0.025 OH 0.050 OH 0.025 OH PERALATAN
267,250.00 26,725.00 293,975.00
Uraian
Harga satuan
A
B
C
75,000.00 1,700.00 245,000.00 195,000.00
125,000.00 4,539.00 7,350.00 9,750.00
Tukang Batu Kepala Tukang Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 5,750.00 7,500.00 5,750.00
1 m2 Pasang grassblocksegi 8 tebal 8 cm Koefisen satuan BAHAN 1.000 m2 grassblock tebal 8 cm 0.050 m3 Pasir urug TENAGA 0.250 OH Tukang Batu 0.025 OH Kepala Tukang 0.500 OH Pekerja 0.025 OH Mandor PERALATAN
194,139.00 19,413.90 213,552.90
Uraian
Harga satuan
PEKERJAAN KONSTRUKSI BETON SNI.63.a 1 M3 Membuat Beton Dengan Mutu K-300 Koefisen satuan Uraian A BAHAN Kg Semen 413.000 M³ Kerikil Pecah 2/3 1.021 M³ Pasir Beton 0.681 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
A
1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K300 Koefisen satuan Uraian BAHAN
Jumlah harga
140,000.00 195,000.00
140,000.00 9,750.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 5,750.00 75,000.00 5,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.64.a
Jumlah harga
Kanstin Semen Batu kali pasir urug
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.62.8
Jumlah harga
283,750.00 28,375.00 312,125.00
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
702,100.00 765,750.00 241,755.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
Harga satuan
70,750.00 2,694,445.00 269,444.50 2,963,889.50
Jumlah harga
1.500 0.400 130.000 2.250 413.000 0.681 1.021 215.000 B TENAGA 2.753 0.189 0.260 0.910 0.136 0.210 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
kg Ltr Kg Kg Kg m3 m3 Ltr
Paku 5 cm - 12 cm Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Air kerja
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,470,000.00 74,250.00 702,100.00 241,755.00 765,750.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
412,950.00 35,910.00 49,400.00 172,900.00 31,280.00 48,300.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 5,769,545.00 576,954.50 6,346,499.50
SNI.65.a
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K300 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K300 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 3.000 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,850,000.00 74,250.00 702,100.00 241,755.00 765,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,202,205.00 620,220.50 6,822,425.50
SNI.66.a
SNI.67.a A
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K300 Koefisen satuan Uraian BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 3.000 Kg Kawat beton
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,375,000.00 99,000.00 702,100.00 241,755.00 765,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 6,405,730.00 640,573.00 7,046,303.00
Harga satuan 2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00
Jumlah harga 702,000.00 56,000.00 10,800.00 2,850,000.00 99,000.00
413.000 0.681 1.021 215.000 B TENAGA 2.893 0.189 0.260 1.050 0.150 0.218 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Kg m3 m3 Ltr
Semen portland Pasir beton Koral beton Air kerja
1,700.00 355,000.00 750,000.00 3,000.00
702,100.00 241,755.00 765,750.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,946,555.00 694,655.50 7,641,210.50
SNI.68.a
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K300 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 3.000 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 3.243 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.400 OH Tukang besi 0.185 OH Kepala Tukang 0.238 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 3,800,000.00 99,000.00 702,100.00 241,755.00 765,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
283,000.00
70,750.00 8,028,205.00 802,820.50 8,831,025.50
SNI.69.a
SNI.70.a A
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 702,100.00 241,755.00 765,750.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,418,125.00 841,812.50 9,259,937.50
Harga satuan 2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00
Jumlah harga 832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00
413.000 0.681 1.021 0.120 2.800 32.000 215.000 B TENAGA 3.383 0.189 0.330 1.400 0.192 0.245 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
702,100.00 241,755.00 765,750.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 9,499,775.00 949,977.50 10,449,752.50
Kg m3 m3 m3 Lbr Btg Ltr
Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.71.a
1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 250.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.733 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.750 OH Tukang besi 0.227 OH Kepala Tukang 0.265 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 4,750,000.00 74,250.00 702,100.00 241,755.00 765,750.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
559,950.00 35,910.00 62,700.00 332,500.00 52,210.00 60,950.00
283,000.00
70,750.00 10,581,425.00 1,058,142.50 11,639,567.50
SNI.72.a
SNI.73.a
1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 702,100.00 241,755.00 765,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,781,300.00 778,130.00 8,559,430.00
Harga satuan
Jumlah harga
A
BAHAN
0.320 3.200 1.600 150.000 2.250 413.000 0.681 1.021 0.140 2.800 16.000 215.000 B TENAGA 3.033 0.189 0.330 1.050 0.157 0.225 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 702,100.00 241,755.00 765,750.00 560,000.00 445,200.00 176,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,322,125.00 832,212.50 9,154,337.50
m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Kayu terentang kelas III Paku biasa 2 " - 5 " Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Kawat beton Dolken dia 8 cm - 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.74.a
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.75.a A
B
C
1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00 702,100.00 241,755.00 765,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 9,403,775.00 940,377.50 10,344,152.50
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 702,100.00 241,755.00 765,750.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-300 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 413.000 Kg Semen portland 0.681 m3 Pasir beton 1.021 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
7,741,300.00 774,130.00 8,515,430.00
SNI.76.a
1 M3 Membuat Beton Dengan Mutu K-275 Koefisen satuan Uraian A BAHAN Kg Semen 406.000 M³ Kerikil Pecah 2/3 1.026 M³ Pasir Beton 0.684 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 702,100.00 241,755.00 765,750.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,282,125.00 828,212.50 9,110,337.50
SNI.63.b
1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K275 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 130.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.753 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.910 OH Tukang besi 0.136 OH Kepala Tukang 0.210 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
690,200.00 769,500.00 242,820.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,687,360.00 268,736.00 2,956,096.00
SNI.64.b
SNI.65.b A
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K275 Koefisen satuan Uraian BAHAN 1.500 kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,470,000.00 74,250.00 690,200.00 242,820.00 769,500.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
412,950.00 35,910.00 49,400.00 172,900.00 31,280.00 48,300.00
283,000.00
70,750.00 5,762,460.00 576,246.00 6,338,706.00
Harga satuan 28,000.00
Jumlah harga 42,000.00
0.400 150.000 2.250 406.000 0.684 1.026 215.000 B TENAGA 2.893 0.189 0.260 1.050 0.150 0.218 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Ltr Kg Kg Kg m3 m3 Ltr
Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Air kerja
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
7,200.00 2,850,000.00 74,250.00 690,200.00 242,820.00 769,500.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,195,120.00 619,512.00 6,814,632.00
SNI.66.b
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K275 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 3.000 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K275 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 3.000 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,375,000.00 99,000.00 690,200.00 242,820.00 769,500.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 6,398,645.00 639,864.50 7,038,509.50
SNI.67.b
SNI.68.b A
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K275 Koefisen satuan Uraian BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 3.000 Kg Kawat beton
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,850,000.00 99,000.00 690,200.00 242,820.00 769,500.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,939,470.00 693,947.00 7,633,417.00
Harga satuan 2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00
Jumlah harga 702,000.00 56,000.00 10,800.00 3,800,000.00 99,000.00
406.000 0.684 1.026 215.000 B TENAGA 3.243 0.189 0.260 1.400 0.185 0.238 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Kg m3 m3 Ltr
Semen portland Pasir beton Koral beton Air kerja
1,700.00 355,000.00 750,000.00 3,000.00
690,200.00 242,820.00 769,500.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,021,120.00 802,112.00 8,823,232.00
SNI.69.b
1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 690,200.00 242,820.00 769,500.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,411,040.00 841,104.00 9,252,144.00
SNI.70.b
SNI.71.b A 1 2
1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00 690,200.00 242,820.00 769,500.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 9,492,690.00 949,269.00 10,441,959.00
Harga satuan 2,600,000.00 28,000.00
Jumlah harga 832,000.00 89,600.00
1.600 250.000 2.250 406.000 0.684 1.026 0.120 2.800 32.000 215.000 B TENAGA 3.733 0.189 0.330 1.750 0.227 0.265 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
28,800.00 4,750,000.00 74,250.00 690,200.00 242,820.00 769,500.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
559,950.00 35,910.00 62,700.00 332,500.00 52,210.00 60,950.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 10,574,340.00 1,057,434.00 11,631,774.00
Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.72.b
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 690,200.00 242,820.00 769,500.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,774,215.00 777,421.50 8,551,636.50
SNI.73.b
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 690,200.00 242,820.00 769,500.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,315,040.00 831,504.00 9,146,544.00
SNI.74.b
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00 690,200.00 242,820.00 769,500.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 9,396,690.00 939,669.00 10,336,359.00
SNI.75.b
SNI.76.b A
B
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-275 Koefisen satuan Uraian BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 406.000 Kg Semen portland 0.684 m3 Pasir beton 1.026 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 690,200.00 242,820.00 769,500.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,734,215.00 773,421.50 8,507,636.50
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 690,200.00 242,820.00 769,500.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00
0.225 PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… C
OH
Mandor
230,000.00
51,750.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,275,040.00 827,504.00 9,102,544.00
SNI.77.a
1 M3 Membuat Beton Dengan Mutu K-250 Koefisen satuan Uraian A BAHAN Kg Semen 384.000 M³ Kerikil Pecah 2/3 1.039 M³ Pasir Beton 0.692 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K250 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 130.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.753 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.910 OH Tukang besi 0.136 OH Kepala Tukang 0.210 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
652,800.00 779,250.00 245,660.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,662,550.00 266,255.00 2,928,805.00
SNI.78.a
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,470,000.00 74,250.00 652,800.00 245,660.00 779,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
412,950.00 35,910.00 49,400.00 172,900.00 31,280.00 48,300.00
283,000.00
70,750.00 5,737,650.00 573,765.00 6,311,415.00
SNI.79.a
SNI.80.a A
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K250 Koefisen satuan Uraian BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,850,000.00 74,250.00 652,800.00 245,660.00 779,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,170,310.00 617,031.00 6,787,341.00
Harga satuan 2,600,000.00 28,000.00
Jumlah harga 702,000.00 56,000.00
0.600 125.000 3.000 384.000 0.692 1.039 215.000 B TENAGA 2.718 0.189 0.260 0.875 0.133 0.208 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Ltr Kg Kg Kg m3 m3 Ltr
Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Air kerja
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
10,800.00 2,375,000.00 99,000.00 652,800.00 245,660.00 779,250.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,373,835.00 637,383.50 7,011,218.50
SNI.81.a
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 3.000 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K250 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 3.000 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 3.243 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.400 OH Tukang besi 0.185 OH Kepala Tukang 0.238 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,850,000.00 99,000.00 652,800.00 245,660.00 779,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,914,660.00 691,466.00 7,606,126.00
SNI.82.a
SNI.83.a A
1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 3,800,000.00 99,000.00 652,800.00 245,660.00 779,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
283,000.00
70,750.00 7,996,310.00 799,631.00 8,795,941.00
Harga satuan 2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00
Jumlah harga 832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00
384.000 0.692 1.039 0.120 2.800 32.000 215.000 B TENAGA 3.033 0.189 0.330 1.050 0.157 0.225 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
652,800.00 245,660.00 779,250.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,386,230.00 838,623.00 9,224,853.00
Kg m3 m3 m3 Lbr Btg Ltr
Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.84.a
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 250.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.733 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.750 OH Tukang besi 0.227 OH Kepala Tukang 0.265 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00 652,800.00 245,660.00 779,250.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 9,467,880.00 946,788.00 10,414,668.00
SNI.85.a
SNI.86.a
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 4,750,000.00 74,250.00 652,800.00 245,660.00 779,250.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
559,950.00 35,910.00 62,700.00 332,500.00 52,210.00 60,950.00
283,000.00
70,750.00 10,549,530.00 1,054,953.00 11,604,483.00
Harga satuan
Jumlah harga
A
BAHAN
0.320 3.200 1.600 125.000 2.250 384.000 0.692 1.039 0.140 2.800 16.000 215.000 B TENAGA 2.858 0.189 0.330 0.875 0.140 0.215 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 652,800.00 245,660.00 779,250.00 560,000.00 445,200.00 176,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,749,405.00 774,940.50 8,524,345.50
m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Kayu terentang kelas III Paku biasa 2 " - 5 " Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Kawat beton Dolken dia 8 cm - 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.87.a
1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.88.a A
B
C
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 652,800.00 245,660.00 779,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,290,230.00 829,023.00 9,119,253.00
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00 652,800.00 245,660.00 779,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
9,371,880.00 937,188.00 10,309,068.00
SNI.89.a
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 384.000 Kg Semen portland 0.692 m3 Pasir beton 1.039 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 652,800.00 245,660.00 779,250.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,709,405.00 770,940.50 8,480,345.50
SNI.90.a
1 M3 Membuat Beton Dengan Mutu K-225 Koefisen satuan Uraian A BAHAN Kg Semen 371.000 M³ Kerikil Pecah 2/3 1.047 M³ Pasir Beton 0.698 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 652,800.00 245,660.00 779,250.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,250,230.00 825,023.00 9,075,253.00
SNI.77.b
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
630,700.00 785,250.00 247,790.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,648,580.00 264,858.00 2,913,438.00
SNI.78.b
1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,375,000.00 74,250.00 630,700.00 247,790.00 785,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,615,515.00 561,551.50 6,177,066.50
SNI.79.b
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 3.000 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,850,000.00 74,250.00 630,700.00 247,790.00 785,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,156,340.00 615,634.00 6,771,974.00
SNI.80.b
SNI.81.b A
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225 Koefisen satuan Uraian BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,375,000.00 99,000.00 630,700.00 247,790.00 785,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 6,359,865.00 635,986.50 6,995,851.50
Harga satuan 2,600,000.00 28,000.00
Jumlah harga 702,000.00 56,000.00
0.600 150.000 3.000 371.000 0.698 1.047 215.000 B TENAGA 2.893 0.189 0.260 1.050 0.150 0.218 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Ltr Kg Kg Kg m3 m3 Ltr
Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Air kerja
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
10,800.00 2,850,000.00 99,000.00 630,700.00 247,790.00 785,250.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,900,690.00 690,069.00 7,590,759.00
SNI.82.b
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K225 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 3.000 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 3.243 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.400 OH Tukang besi 0.185 OH Kepala Tukang 0.238 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 3,800,000.00 99,000.00 630,700.00 247,790.00 785,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
283,000.00
70,750.00 7,982,340.00 798,234.00 8,780,574.00
SNI.83.b
SNI.84.b A
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 630,700.00 247,790.00 785,250.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,372,260.00 837,226.00 9,209,486.00
Harga satuan 2,600,000.00 28,000.00
Jumlah harga 832,000.00 89,600.00
1.600 200.000 2.250 371.000 0.698 1.047 0.120 2.800 32.000 215.000 B TENAGA 3.383 0.189 0.330 1.400 0.192 0.245 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
28,800.00 3,800,000.00 74,250.00 630,700.00 247,790.00 785,250.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 9,453,910.00 945,391.00 10,399,301.00
Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Minyak bekisting Besi beton ulir Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.85.b
1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 250.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.733 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.750 OH Tukang besi 0.227 OH Kepala Tukang 0.265 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 4,750,000.00 74,250.00 630,700.00 247,790.00 785,250.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
559,950.00 35,910.00 62,700.00 332,500.00 52,210.00 60,950.00
283,000.00
70,750.00 10,535,560.00 1,053,556.00 11,589,116.00
SNI.86.b
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 630,700.00 247,790.00 785,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,735,435.00 773,543.50 8,508,978.50
SNI.87.b
1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 630,700.00 247,790.00 785,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,276,260.00 827,626.00 9,103,886.00
SNI.88.b
SNI.89.b A
B
1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,800,000.00 74,250.00 630,700.00 247,790.00 785,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 9,357,910.00 935,791.00 10,293,701.00
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,375,000.00 74,250.00 630,700.00 247,790.00 785,250.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00
0.215 PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… C
OH
Mandor
230,000.00
49,450.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,695,435.00 769,543.50 8,464,978.50
SNI.90.b
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Membuat Beton Dengan Mutu K-200 Koefisen satuan Uraian A BAHAN Kg Semen 352.000 M³ Kerikil Pecah 2/3 1.031 M³ Pasir Beton 0.731 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 630,700.00 247,790.00 785,250.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,236,260.00 823,626.00 9,059,886.00
SNI.91
1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K200 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
598,400.00 773,250.00 259,505.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,615,995.00 261,599.50 2,877,594.50
SNI.92
SNI.93
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K200
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,000,000.00 74,250.00 598,400.00 259,505.00 773,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,207,930.00 520,793.00 5,728,723.00
Koefisen BAHAN 1.500 0.400 150.000 2.250 352.000 0.731 1.031 215.000 B TENAGA 2.893 0.189 0.260 1.050 0.150 0.218 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
satuan
Uraian
Harga satuan
Jumlah harga
A
kg Ltr Kg Kg Kg m3 m3 Ltr
Paku 5 cm - 12 cm Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Air kerja
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,400,000.00 74,250.00 598,400.00 259,505.00 773,250.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 5,673,755.00 567,375.50 6,241,130.50
SNI.94
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K200 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 3.000 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K200 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 3.000 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,000,000.00 99,000.00 598,400.00 259,505.00 773,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,952,280.00 595,228.00 6,547,508.00
SNI.95
SNI.96 A
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K200 Koefisen satuan Uraian BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,400,000.00 99,000.00 598,400.00 259,505.00 773,250.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,418,105.00 641,810.50 7,059,915.50
Harga satuan 2,600,000.00 28,000.00
Jumlah harga 702,000.00 56,000.00
0.600 200.000 3.000 352.000 0.731 1.031 215.000 B TENAGA 3.243 0.189 0.260 1.400 0.185 0.238 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Ltr Kg Kg Kg m3 m3 Ltr
Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Air kerja
18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
10,800.00 3,200,000.00 99,000.00 598,400.00 259,505.00 773,250.00 645,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,349,755.00 734,975.50 8,084,730.50
SNI.97
1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-200 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-200 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 598,400.00 259,505.00 773,250.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,423,850.00 742,385.00 8,166,235.00
SNI.98
SNI.99
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-200 Koefisen satuan Uraian
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 598,400.00 259,505.00 773,250.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 7,889,675.00 788,967.50 8,678,642.50
Harga satuan
Jumlah harga
A
BAHAN
0.320 3.200 1.600 200.000 2.250 352.000 0.731 1.031 0.120 2.800 32.000 215.000 B TENAGA 3.383 0.189 0.330 1.400 0.192 0.245 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 598,400.00 259,505.00 773,250.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,821,325.00 882,132.50 9,703,457.50
m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Kayu Kelas III Paku 5 cm - 12 cm Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.100
1 M3 Pekerjaan Balok Beton Bertulang ( 120 Kg Besi + Bekisting) M-K-200 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 120.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.823 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.840 OH Tukang besi 0.136 OH Kepala Tukang 0.213 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.101 A
B
C
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-200 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 1,920,000.00 74,250.00 598,400.00 259,505.00 773,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
423,450.00 35,910.00 62,700.00 159,600.00 31,280.00 48,990.00
283,000.00
70,750.00 7,234,685.00 723,468.50 7,958,153.50
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 598,400.00 259,505.00 773,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 200 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
7,327,850.00 732,785.00 8,060,635.00
SNI.102
1 M3 Pekerjaan Lantai Beton Bertulang ( 120 Kg Besi + Bekisting) M-K- 200 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 120.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.823 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.840 OH Tukang besi 0.136 OH Kepala Tukang 0.213 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 598,400.00 259,505.00 773,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 8,725,325.00 872,532.50 9,597,857.50
SNI.103
SNI.104 A
B
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 200 Koefisen satuan Uraian BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 352.000 Kg Semen portland 0.731 m3 Pasir beton 1.031 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 1,920,000.00 74,250.00 598,400.00 259,505.00 773,250.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
423,450.00 35,910.00 62,700.00 159,600.00 31,280.00 48,990.00
283,000.00
70,750.00 7,194,685.00 719,468.50 7,914,153.50
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 598,400.00 259,505.00 773,250.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00
454,950.00 35,910.00
0.330 1.050 0.157 0.225 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH
Tukang kayu Tukang besi Kepala Tukang Mandor
190,000.00 190,000.00 230,000.00 230,000.00
62,700.00 199,500.00 36,110.00 51,750.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,753,675.00 775,367.50 8,529,042.50
SNI.105
1 M3 Membuat Beton Dengan Mutu K- 175 Koefisen satuan Uraian A BAHAN Kg Semen 326.000 M³ Kerikil Pecah 2/3 1.029 M³ Pasir Beton 0.760 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 175 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
554,200.00 771,750.00 269,800.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,580,590.00 258,059.00 2,838,649.00
SNI.106
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M- K 175 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,000,000.00 74,250.00 554,200.00 269,800.00 771,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,172,525.00 517,252.50 5,689,777.50
SNI.107
SNI.108
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 175 Koefisen satuan Uraian
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,400,000.00 74,250.00 554,200.00 269,800.00 771,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 5,638,350.00 563,835.00 6,202,185.00
Harga satuan
Jumlah harga
A
BAHAN
0.270 2.000 0.600 125.000 3.000 326.000 0.760 1.029 215.000 B TENAGA 2.718 0.189 0.260 0.875 0.133 0.208 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,000,000.00 99,000.00 554,200.00 269,800.00 771,750.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 5,916,875.00 591,687.50 6,508,562.50
m3 kg Ltr Kg Kg Kg m3 m3 Ltr
Kayu Kelas III (papan) Paku 5 cm - 12 cm Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Air kerja
OH OH OH OH OH OH Hri
SNI.109
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K 175 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 3.000 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K 175 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 3.000 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 3.243 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.400 OH Tukang besi 0.185 OH Kepala Tukang 0.238 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,400,000.00 99,000.00 554,200.00 269,800.00 771,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 6,382,700.00 638,270.00 7,020,970.00
SNI.110
SNI.111 A
1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 3,200,000.00 99,000.00 554,200.00 269,800.00 771,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
283,000.00
70,750.00 7,314,350.00 731,435.00 8,045,785.00
Harga satuan 2,600,000.00 28,000.00
Jumlah harga 832,000.00 89,600.00
1.600 125.000 2.250 326.000 0.760 1.029 0.120 2.800 32.000 215.000 B TENAGA 2.858 0.189 0.330 0.875 0.140 0.215 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
28,800.00 2,000,000.00 74,250.00 554,200.00 269,800.00 771,750.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,388,445.00 738,844.50 8,127,289.50
Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.112
1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang 0.245 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 554,200.00 269,800.00 771,750.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 7,854,270.00 785,427.00 8,639,697.00
SNI.113
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 554,200.00 269,800.00 771,750.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00
283,000.00
70,750.00 8,785,920.00 878,592.00 9,664,512.00
SNI.114
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 554,200.00 269,800.00 771,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 7,292,445.00 729,244.50 8,021,689.50
SNI.115
SNI.116 A
B
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.400 OH Tukang besi 0.192 OH Kepala Tukang
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 554,200.00 269,800.00 771,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 7,758,270.00 775,827.00 8,534,097.00
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 554,200.00 269,800.00 771,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00
0.245 PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… C
OH
Mandor
230,000.00
56,350.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,689,920.00 868,992.00 9,558,912.00
SNI.117
1 M3 Pekerjaan Lantai Beton Bertulang ( 120 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 120.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.823 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.840 OH Tukang besi 0.136 OH Kepala Tukang 0.213 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 175 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 326.000 Kg Semen portland 0.760 m3 Pasir beton 1.029 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 1,920,000.00 74,250.00 554,200.00 269,800.00 771,750.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
423,450.00 35,910.00 62,700.00 159,600.00 31,280.00 48,990.00
283,000.00
70,750.00 7,159,280.00 715,928.00 7,875,208.00
SNI.118
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 554,200.00 269,800.00 771,750.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 7,718,270.00 771,827.00 8,490,097.00
SNI.119 A
B
C Jumlah ( A
1 M3 Membuat Beton Dengan Mutu K- 150 Koefisen satuan Uraian BAHAN Kg Semen 299.000 M³ Kerikil Pecah 2/3 1.017 M³ Pasir Beton 0.799 Ltr Air kerja 215.000 TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 +B+C)
Harga satuan
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
508,300.00 762,750.00 283,645.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,539,535.00
Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 150 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
253,953.50 2,793,488.50
SNI.120
1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M- K 150 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,000,000.00 74,250.00 508,300.00 283,645.00 762,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,131,470.00 513,147.00 5,644,617.00
SNI.121
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 150 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 3.000 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,400,000.00 74,250.00 508,300.00 283,645.00 762,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 5,597,295.00 559,729.50 6,157,024.50
SNI.122
SNI.123
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K 150 Koefisen satuan Uraian
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,000,000.00 99,000.00 508,300.00 283,645.00 762,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,875,820.00 587,582.00 6,463,402.00
Harga satuan
Jumlah harga
A
BAHAN
0.270 2.000 0.600 150.000 3.000 299.000 0.799 1.017 215.000 B TENAGA 2.893 0.189 0.260 1.050 0.150 0.218 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,400,000.00 99,000.00 508,300.00 283,645.00 762,750.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,341,645.00 634,164.50 6,975,809.50
m3 kg Ltr Kg Kg Kg m3 m3 Ltr
Kayu Kelas III (papan) Paku 5 cm - 12 cm Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Air kerja
OH OH OH OH OH OH Hri
SNI.124
1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K 150 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 3.000 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 3.243 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.400 OH Tukang besi 0.185 OH Kepala Tukang 0.238 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.088 OH Tukang besi 0.061 OH Kepala Tukang 0.170 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 3,200,000.00 99,000.00 508,300.00 283,645.00 762,750.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
486,450.00 35,910.00 49,400.00 266,000.00 42,550.00 54,740.00
283,000.00
70,750.00 7,273,295.00 727,329.50 8,000,624.50
SNI.125
SNI.126
1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 508,300.00 283,645.00 762,750.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 16,625.00 13,972.50 39,100.00
283,000.00
70,750.00 7,169,302.50 716,930.25 7,886,232.75
Harga satuan
Jumlah harga
A
BAHAN
0.320 3.200 1.600 150.000 2.250 299.000 0.799 1.017 0.120 2.800 32.000 215.000 B TENAGA 3.033 0.189 0.330 0.105 0.063 0.171 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 508,300.00 283,645.00 762,750.00 480,000.00 445,200.00 352,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 19,950.00 14,375.00 39,330.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,599,510.00 759,951.00 8,359,461.00
m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Ltr
Kayu Kelas III Paku 5 cm - 12 cm Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken kayu galam f (8-10) cm, 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.127
1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.140 OH Tukang besi 0.066 OH Kepala Tukang 0.173 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.128 A
B
C
1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.088 OH Tukang besi 0.061 OH Kepala Tukang 0.170 OH Mandor PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 508,300.00 283,645.00 762,750.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 26,600.00 15,180.00 39,790.00
283,000.00
70,750.00 8,459,925.00 845,992.50 9,305,917.50
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 508,300.00 283,645.00 762,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 16,625.00 13,972.50 39,100.00
283,000.00
70,750.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.105 OH Tukang besi 0.063 OH Kepala Tukang 0.171 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
7,073,302.50 707,330.25 7,780,632.75
SNI.129
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 200.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.383 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.140 OH Tukang besi 0.066 OH Kepala Tukang 0.173 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 508,300.00 283,645.00 762,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 19,950.00 14,375.00 39,330.00
283,000.00
70,750.00 7,503,510.00 750,351.00 8,253,861.00
SNI.130
SNI.131 A
B
1 M3 Pekerjaan Lantai Beton Bertulang ( 120 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 120.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 2.823 OH Pekerja 0.189 OH Tukang batu
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 508,300.00 283,645.00 762,750.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 26,600.00 15,180.00 39,790.00
283,000.00
70,750.00 8,363,925.00 836,392.50 9,200,317.50
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 1,920,000.00 74,250.00 508,300.00 283,645.00 762,750.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00
423,450.00 35,910.00
0.330 0.084 0.060 0.170 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH
Tukang kayu Tukang besi Kepala Tukang Mandor
190,000.00 190,000.00 230,000.00 230,000.00
62,700.00 15,960.00 13,892.00 39,054.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,947,261.00 694,726.10 7,641,987.10
SNI.132
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 150 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 299.000 Kg Semen portland 0.799 m3 Pasir beton 1.017 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.105 OH Tukang besi 0.063 OH Kepala Tukang 0.171 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Membuat Beton Dengan Mutu K- 125 Koefisen satuan Uraian A BAHAN Kg Semen 247.000 M³ Kerikil Pecah 2/3 0.740 M³ Pasir Beton 0.621 Ltr Air kerja 215.000 B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 508,300.00 283,645.00 762,750.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 19,950.00 14,375.00 39,330.00
283,000.00
70,750.00 7,463,510.00 746,351.00 8,209,861.00
SNI.133
1 M3 Pekerjaan Pondasi Beton Bertulang ( 110 Kg Besi + Bekisting) M-K 125 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 110.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.613 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.770 OH Tukang besi 0.122 OH Kepala Tukang 0.202 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 %
Harga satuan
Jumlah harga
1,700.00 750,000.00 355,000.00 3,000.00
419,900.00 555,000.00 220,455.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,180,195.00 218,019.50 2,398,214.50
SNI.134
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 1,760,000.00 74,250.00 419,900.00 220,455.00 555,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
391,950.00 35,910.00 49,400.00 146,300.00 28,060.00 46,460.00
283,000.00
70,750.00 4,492,635.00 449,263.50
Jumlah ……………………… 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M- K 125 Koefisen satuan Uraian A BAHAN 1.500 kg Paku 5 cm - 12 cm 0.400 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
4,941,898.50
SNI.135
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 125 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 3.000 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.718 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 0.875 OH Tukang besi 0.133 OH Kepala Tukang 0.208 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
42,000.00 7,200.00 2,000,000.00 74,250.00 419,900.00 220,455.00 555,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 4,772,130.00 477,213.00 5,249,343.00
SNI.136
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K 125 Koefisen satuan Uraian A BAHAN 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 3.000 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.260 OH Tukang kayu 1.050 OH Tukang besi 0.150 OH Kepala Tukang 0.218 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,000,000.00 99,000.00 419,900.00 220,455.00 555,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00
283,000.00
70,750.00 5,516,480.00 551,648.00 6,068,128.00
SNI.137
SNI.138
1 M3 Pekerjaan Sloof Beton Bertulang ( 175 Kg Besi + Bekisting) M-K 125 Koefisen satuan Uraian
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,400,000.00 99,000.00 419,900.00 220,455.00 555,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
283,000.00
70,750.00 5,982,305.00 598,230.50 6,580,535.50
Harga satuan
Jumlah harga
A
BAHAN
0.270 2.000 0.600 175.000 3.000 247.000 0.621 0.740 215.000 B TENAGA 3.068 0.189 0.260 1.225 0.168 0.228 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 3,000.00
702,000.00 56,000.00 10,800.00 2,800,000.00 99,000.00 419,900.00 220,455.00 555,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
460,200.00 35,910.00 49,400.00 232,750.00 38,525.00 52,440.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,448,130.00 644,813.00 7,092,943.00
m3 kg Ltr Kg Kg Kg m3 m3 Ltr
Kayu Kelas III (papan) Paku 5 cm - 12 cm Minyak bekisting Besi Beton polos Kawat beton Semen portland Pasir beton Koral beton Air kerja
OH OH OH OH OH OH Hri
SNI.139
1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 419,900.00 220,455.00 555,000.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 6,988,050.00 698,805.00 7,686,855.00
SNI.140
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 419,900.00 220,455.00 555,000.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 7,453,875.00 745,387.50 8,199,262.50
SNI.141
1 M3 Pekerjaan Kolom Beton Bertulang ( 175 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 175.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.120 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.208 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.225 OH Tukang besi 0.175 OH Kepala Tukang 0.235 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.858 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.875 OH Tukang besi 0.140 OH Kepala Tukang 0.215 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,800,000.00 74,250.00 419,900.00 220,455.00 555,000.00 480,000.00 445,200.00 352,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
481,200.00 35,910.00 62,700.00 232,750.00 40,135.00 54,050.00
283,000.00
70,750.00 7,919,700.00 791,970.00 8,711,670.00
SNI.142
SNI.143 A
B
1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 419,900.00 220,455.00 555,000.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00
283,000.00
70,750.00 6,892,050.00 689,205.00 7,581,255.00
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 419,900.00 220,455.00 555,000.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00
0.225 PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… C
OH
Mandor
230,000.00
51,750.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 7,357,875.00 735,787.50 8,093,662.50
SNI.144
1 M3 Pekerjaan Balok Beton Bertulang ( 175 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 175.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kawat beton 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.208 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.225 OH Tukang besi 0.175 OH Kepala Tukang 0.235 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Lantai Beton Bertulang ( 110 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 110.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.753 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.770 OH Tukang besi 0.129 OH Kepala Tukang 0.209 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,800,000.00 74,250.00 419,900.00 220,455.00 555,000.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
481,200.00 35,910.00 62,700.00 232,750.00 40,135.00 54,050.00
283,000.00
70,750.00 7,823,700.00 782,370.00 8,606,070.00
SNI.145
SNI.146 A
1 M3 Pekerjaan Lantai Beton Bertulang ( 130 Kg Besi + Bekisting) M-K- 125 Koefisen satuan Uraian BAHAN 0.240 m3 Kayu terentang 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 130.000 Kg Besi Beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 24.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 1,760,000.00 74,250.00 419,900.00 220,455.00 555,000.00 640,000.00 445,200.00 264,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
412,950.00 35,910.00 62,700.00 146,300.00 29,670.00 48,070.00
283,000.00
70,750.00 6,572,555.00 657,255.50 7,229,810.50
Harga satuan 2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
Jumlah harga 624,000.00 89,600.00 28,800.00 2,080,000.00 74,250.00 419,900.00 220,455.00 555,000.00 640,000.00 445,200.00 264,000.00 645,000.00
B
TENAGA
2.893 0.189 0.330 0.910 0.143 0.217 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 62,700.00 172,900.00 32,890.00 49,910.00
Hri
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 6,945,215.00 694,521.50 7,639,736.50
SNI.147
1 M3 Pekerjaan Dinding Beton Bertulang ( 150 Kg Besi + Bekisting) M - K 225 Koefisen satuan Uraian A BAHAN 0.240 m3 Kayu Kelas III 3.200 Kg Paku 5 cm - 12 cm 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.160 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 14.000 Btg Dolken kayu galam f (8-10) cm, 4 m 215.000 Ltr Air kerja B TENAGA 3.033 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.050 OH Tukang besi 0.157 OH Kepala Tukang 0.225 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M3 Pekerjaan Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) M - K - 225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 175.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 3.208 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 1.225 OH Tukang besi 0.175 OH Kepala Tukang 0.235 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
624,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 630,700.00 247,790.00 785,250.00 640,000.00 445,200.00 154,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00
283,000.00
70,750.00 8,126,260.00 812,626.00 8,938,886.00
SNI.148
SNI.149 A
1 M3 Pekerjaan Tangga Beton Bertulang ( 150 Kg Besi + Bekisting) M - K - 225 Koefisen satuan Uraian BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 3,325,000.00 74,250.00 630,700.00 247,790.00 785,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
481,200.00 35,910.00 62,700.00 232,750.00 40,135.00 54,050.00
283,000.00
70,750.00 8,817,085.00 881,708.50 9,698,793.50
Harga satuan 2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00
Jumlah harga 832,000.00 89,600.00 28,800.00 2,850,000.00 74,250.00 630,700.00
0.698 1.047 0.140 2.800 16.000 215.000 B TENAGA 2.893 0.189 0.260 1.050 0.150 0.218 C PERALATAN 0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
247,790.00 785,250.00 560,000.00 445,200.00 176,000.00 645,000.00
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00
Sewa Molen Kpst 0.3 m3
283,000.00
70,750.00 8,238,740.00 823,874.00 9,062,614.00
m3 m3 m3 Lbr Btg Ltr
Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken dia 8 cm - 4 m Air kerja
OH OH OH OH OH OH Hri
SNI.150
1 M3 Pekerjaan Tangga Beton Bertulang ( 130 Kg Besi + Bekisting) M - K - 225 Koefisen satuan Uraian A BAHAN 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 130.000 Kg Besi beton ulir 2.250 Kg Kawat beton 371.000 Kg Semen portland 0.698 m3 Pasir beton 1.047 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 16.000 Btg Dolken dia 8 cm - 4 m 215.000 Ltr Air kerja B TENAGA 2.893 OH Pekerja 0.189 OH Tukang batu 0.330 OH Tukang kayu 0.910 OH Tukang besi 0.143 OH Kepala Tukang 0.217 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Tebal = 5 Cm) Koefisen satuan Uraian A BAHAN 10.000 Kg Semen 0.044 M³ Batu Kerikil 0.026 M³ Pasir Beton 215.000 Ltr Air kerja B TENAGA 0.020 OH Tukang Batu 0.002 OH Kepala Tukang 1.150 OH Pekerja 0.006 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Harga satuan
Jumlah harga
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 750,000.00 4,000,000.00 159,000.00 11,000.00 3,000.00
832,000.00 89,600.00 28,800.00 2,470,000.00 74,250.00 630,700.00 247,790.00 785,250.00 560,000.00 445,200.00 176,000.00 645,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 62,700.00 172,900.00 32,890.00 49,910.00
283,000.00
70,750.00 7,843,600.00 784,360.00 8,627,960.00
SNI.151
SNI.152 A
B
C
1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Koefisen satuan BAHAN 200.000 Kg Semen 0.862 M³ Batu Kerikil 0.522 M³ Pasir Beton 215.000 Ltr Air kerja TENAGA 0.250 OH Tukang Batu 0.220 OH Kepala Tukang 1.320 OH Pekerja 0.013 OH Mandor PERALATAN
Uraian
Harga satuan
Jumlah harga
1,700.00 575,000.00 355,000.00 3,000.00
17,000.00 25,300.00 9,230.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
3,800.00 460.00 172,500.00 1,380.00
283,000.00
70,750.00 945,420.00 94,542.00 1,039,962.00
Harga satuan
Jumlah harga
1,700.00 575,000.00 355,000.00 3,000.00
340,000.00 495,650.00 185,310.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 50,600.00 198,000.00 3,036.00
0.250 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Hri
283,000.00
Sewa Molen Kpst 0.3 m3
1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr Koefisen satuan Uraian A BAHAN 247.000 Kg Semen 0.740 M³ Batu Kerikil 0.621 M³ Pasir Beton 215.000 Ltr Air kerja B TENAGA 0.189 OH Tukang Batu 0.019 OH Kepala Tukang 1.323 OH Pekerja 0.132 OH Mandor C PERALATAN 0.250 Hri Sewa Molen Kpst 0.3 m3 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
70,750.00 2,035,846.00 203,584.60 2,239,430.60
SNI.153
SNI.156
1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 150.000 Kg Besi beton polos 3.000 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 KR/Koral beton 2.893 0.189 0.260 1.050 0.150 0.218
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.157
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 125.000 Kg Besi beton polos 3.000 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 KR/Koral beton 2.718 0.189 0.260 0.875 0.133 0.208
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.158
Harga satuan
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
1 M3 Pekerjaan Sloof Beton Bertulang ( 120 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 120.000 Kg Besi beton polos 3.000 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 KR/Koral beton 2.683 0.189 0.260 0.840 0.129
OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang
Jumlah harga
1,700.00 575,000.00 355,000.00 3,000.00
419,900.00 425,500.00 220,455.00 645,000.00
190,000.00 230,000.00 150,000.00 230,000.00
35,910.00 4,370.00 198,450.00 30,360.00
283,000.00
70,750.00 2,050,695.00 205,069.50 2,255,764.50
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
702,000.00 56,000.00 10,800.00 2,400,000.00 99,000.00 419,900.00 220,455.00 425,500.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
433,950.00 35,910.00 49,400.00 199,500.00 34,500.00 50,140.00 5,137,055.00 513,705.50 5,650,760.50
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
702,000.00 56,000.00 10,800.00 2,000,000.00 99,000.00 419,900.00 220,455.00 425,500.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
407,700.00 35,910.00 49,400.00 166,250.00 30,475.00 47,840.00 4,671,230.00 467,123.00 5,138,353.00
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
702,000.00 56,000.00 10,800.00 1,920,000.00 99,000.00 419,900.00 220,455.00 425,500.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00
402,450.00 35,910.00 49,400.00 159,600.00 29,670.00
0.206 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.159
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
47,380.00 4,578,065.00 457,806.50 5,035,871.50
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
702,000.00 56,000.00 10,800.00 1,600,000.00 99,000.00 419,900.00 220,455.00 425,500.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
381,450.00 35,910.00 49,400.00 133,000.00 26,450.00 45,540.00 4,205,405.00 420,540.50 4,625,945.50
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
1 M3 Pekerjaan Lantai Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 2,600,000.00 0.240 m3 Kayu terentang 28,000.00 3.200 Kg Paku biasa 2 " - 5 " 18,000.00 1.600 Ltr Minyak bekisting 16,000.00 175.000 Kg Besi beton polos 33,000.00 2.250 Kg Kawat beton 1,700.00 247.000 Kg Semen portland 355,000.00 0.621 m3 Pasir beton 575,000.00 0.740 m3 Koral beton 4,000,000.00 0.160 m3 Kayu balok kelas II 159,000.00 2.800 Lbr Plywood tebal 9 mm 11,000.00 24.000 Btg Dolken dia 8 cm - 4 m 3.208 0.189 0.330 1.225 0.175 0.235
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.164
OH OH OH OH OH OH
230,000.00
1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 2,600,000.00 0.320 m3 Kayu Kelas III 28,000.00 3.200 Kg Paku 5 cm - 12 cm 18,000.00 1.600 Ltr Minyak bekisting 16,000.00 125.000 Kg Besi beton polos 33,000.00 2.250 Kg Kawat beton 1,700.00 247.000 Kg Semen portland 355,000.00 0.621 m3 Pasir beton 575,000.00 0.740 m3 KR/Koral beton 4,000,000.00 0.120 m3 Kayu balok kelas II 159,000.00 2.800 Lbr Plywood tebal 9 mm 11,000.00 32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 2.858 0.189 0.330 0.875 0.140 0.215
SNI.163
Mandor
1 M3 Pekerjaan Sloof Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.270 m3 Kayu Kelas III (papan) 2.000 kg Paku 5 cm - 12 cm 0.600 Ltr Minyak bekisting 100.000 Kg Besi beton polos 3.000 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 KR/Koral beton 2.543 0.189 0.260 0.700 0.115 0.198
SNI.162
OH
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 2,600,000.00 0.240 m3 Kayu terentang 28,000.00 3.200 Kg Paku biasa 2 " - 5 " 18,000.00 1.600 Ltr Minyak bekisting 16,000.00 150.000 Kg Besi beton polos 33,000.00 2.250 Kg Kawat beton 1,700.00 247.000 Kg Semen portland
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 419,900.00 220,455.00 425,500.00 480,000.00 445,200.00 352,000.00 428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00 6,142,800.00 614,280.00 6,757,080.00
624,000.00 89,600.00 28,800.00 2,800,000.00 74,250.00 419,900.00 220,455.00 425,500.00 640,000.00 445,200.00 264,000.00 481,200.00 35,910.00 62,700.00 232,750.00 40,135.00 54,050.00 6,938,450.00 693,845.00 7,632,295.00
624,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 419,900.00
0.621 0.740 0.160 2.800 24.000
m3 m3 m3 Lbr Btg
Pasir beton Koral beton Kayu balok kelas II Plywood tebal 9 mm Dolken dia 8 cm - 4 m
3.033 0.189 0.330 1.050 0.157 0.225
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.164.a2lp
1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 100.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 2.683 0.189 0.330 0.700 0.122 0.205
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
SNI.164.b1lp 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi ) BT, 1 Pc : 2 Ps : 3 Kr 100.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.200 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.164.c1lp
OH
Tenaga
1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 75.000 Kg Besi beton polos 1.125 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton
0.200 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH
Tenaga
355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
220,455.00 425,500.00 640,000.00 445,200.00 264,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00 6,472,625.00 647,262.50 7,119,887.50
16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
1,600,000.00 74,250.00 419,900.00 220,455.00 425,500.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
402,450.00 35,910.00 62,700.00 133,000.00 28,060.00 47,150.00 3,449,375.00 344,937.50 3,794,312.50
16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
1,600,000.00 74,250.00 419,900.00 220,455.00 425,500.00
2,740,105.00
548,021.00 3,288,126.00 328,812.60 3,616,938.60
16,000.00 33,000.00 1,700.00 355,000.00 575,000.00
1,200,000.00 37,125.00 419,900.00 220,455.00 425,500.00
2,302,980.00
460,596.00 2,763,576.00 276,357.60 3,039,933.60
SNI.164.1lp.a 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 2,600,000.00 0.120 m3 Kayu terentang 28,000.00 1.600 Kg Paku biasa 2 " - 5 " 18,000.00 1.600 Ltr Minyak bekisting 16,000.00 100.000 Kg Besi beton polos 33,000.00 1.125 Kg Kawat beton 1,700.00 247.000 Kg Semen portland 355,000.00 0.621 m3 Pasir beton 575,000.00 0.740 m3 Koral beton 4,000,000.00 0.080 m3 Kayu balok kelas II 159,000.00 2.800 Lbr Plywood tebal 9 mm 11,000.00 12.000 Btg Dolken dia 8 cm - 4 m 2.683 0.189 0.330 0.700 0.122 0.205
Jumlah ( A + B + C ) Keuntungan & Overhead 10 %
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
312,000.00 44,800.00 28,800.00 1,600,000.00 37,125.00 419,900.00 220,455.00 425,500.00 320,000.00 445,200.00 132,000.00 402,450.00 35,910.00 62,700.00 133,000.00 28,060.00 47,150.00 4,695,050.00 469,505.00
Jumlah ………………………
5,164,555.00
SNI.164.1lp.b 1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.120 m3 Kayu terentang 1.600 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 75.000 Kg Besi beton polos 1.125 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.080 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 12.000 Btg Dolken dia 8 cm - 4 m 2.508 0.189 0.330 0.525 0.105 0.195
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.165
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
1 M3 Pekerjaan Balok Beton Bertulang (175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 175.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 16.000 Btg Dolken dia 8 cm - 4 m 3.208 0.189 0.330 1.225 0.175 0.235
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.167
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
312,000.00 44,800.00 28,800.00 1,200,000.00 37,125.00 419,900.00 220,455.00 425,500.00 320,000.00 445,200.00 132,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
376,200.00 35,910.00 62,700.00 99,750.00 24,035.00 44,850.00 4,229,225.00 422,922.50 4,652,147.50
1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 2,600,000.00 0.320 m3 Kayu terentang kelas III 28,000.00 3.200 Kg Paku biasa 2 " - 5 " 18,000.00 1.600 Ltr Minyak bekisting 16,000.00 200.000 Kg Besi beton polos 33,000.00 2.250 Kg Kawat beton 1,700.00 247.000 Kg Semen portland 355,000.00 0.621 m3 Pasir beton 575,000.00 0.740 m3 Koral beton 4,000,000.00 0.140 m3 Kayu balok kelas II 159,000.00 2.800 Lbr Plywood tebal 9 mm 11,000.00 16.000 Btg Dolken dia 8 cm - 4 m 3.383 0.189 0.330 1.400 0.192 0.245
SNI.166
OH OH OH OH OH OH
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
1 M3 Pekerjaan Balok Beton Bertulang (150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 150.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland
832,000.00 89,600.00 28,800.00 3,200,000.00 74,250.00 419,900.00 220,455.00 425,500.00 560,000.00 445,200.00 176,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
507,450.00 35,910.00 62,700.00 266,000.00 44,160.00 56,350.00 7,444,275.00 744,427.50 8,188,702.50
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
832,000.00 89,600.00 28,800.00 2,800,000.00 74,250.00 419,900.00 220,455.00 425,500.00 560,000.00 445,200.00 176,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
481,200.00 35,910.00 62,700.00 232,750.00 40,135.00 54,050.00 6,978,450.00 697,845.00 7,676,295.00
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00
832,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 419,900.00
0.621 0.740 0.140 2.800 16.000
m3 m3 m3 Lbr Btg
Pasir beton Koral beton Kayu balok kelas II Kayu balok kelas II Dolken dia 8 cm - 4 m
3.033 0.189 0.330 1.050 0.157 0.225
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.168
1 M3 Pekerjaan Balok Beton Bertulang (125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 125.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kayu balok kelas II 16.000 Btg Dolken dia 8 cm - 4 m 2.858 0.189 0.330 0.875 0.140 0.215
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.169
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
1 M3 Pekerjaan Balok Beton Bertulang (110 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 110.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Kayu balok kelas II 16.000 Btg Dolken dia 8 cm - 4 m 2.753 0.189 0.330 0.770 0.129 0.209
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.170
OH OH OH OH OH OH
OH OH OH OH OH OH
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
220,455.00 425,500.00 560,000.00 445,200.00 176,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
454,950.00 35,910.00 62,700.00 199,500.00 36,110.00 51,750.00 6,512,625.00 651,262.50 7,163,887.50
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
832,000.00 89,600.00 28,800.00 2,000,000.00 74,250.00 419,900.00 220,455.00 425,500.00 560,000.00 445,200.00 176,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
428,700.00 35,910.00 62,700.00 166,250.00 32,085.00 49,450.00 6,046,800.00 604,680.00 6,651,480.00
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
832,000.00 89,600.00 28,800.00 1,760,000.00 74,250.00 419,900.00 220,455.00 425,500.00 560,000.00 445,200.00 176,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
412,950.00 35,910.00 62,700.00 146,300.00 29,670.00 48,070.00 5,767,305.00 576,730.50 6,344,035.50
1 M3 Pek Dinding Plat Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 2,600,000.00 0.240 m3 Kayu Kelas III 28,000.00 3.200 Kg Paku 5 cm - 12 cm 18,000.00 1.600 Ltr Minyak bekisting 16,000.00 150.000 Kg Besi beton polos 33,000.00 2.250 Kg Kawat beton 1,700.00 247.000 Kg Semen portland 355,000.00 0.621 m3 Pasir beton 575,000.00 0.740 m3 KR/Koral beton 4,000,000.00 0.160 m3 Kayu balok kelas II 159,000.00 2.800 Lbr Plywood tebal 9 mm 11,000.00 14.000 Btg Dolken kayu galam f (8-10) cm, 4 m
624,000.00 89,600.00 28,800.00 2,400,000.00 74,250.00 419,900.00 220,455.00 425,500.00 640,000.00 445,200.00 154,000.00
150,000.00 190,000.00 190,000.00
454,950.00 35,910.00 62,700.00
3.033 0.189 0.330
OH OH OH
Pekerja Tukang batu Tukang kayu
1.050 0.157 0.225
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.171
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
1 M2 Pekerjaan Bekisting Lantai 0.040 m3 Kayu terentang 0.400 Kg Paku biasa 2 " - 5 " 0.200 Ltr Minyak bekisting 0.015 m3 Kayu balok kelas II 0.350 Lbr Plywood tebal 9 mm 6.000 Btg Dolken dia 8 cm - 4 m 0.660 0.330 0.033 0.033
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.165.a
Pekerja Tukang batu Tukang kayu Tukang besi Kepala Tukang Mandor
1 M2 Pekerjaan Bekisting Kolom 0.040 m3 Kayu Kelas III 0.400 Kg Paku 5 cm - 12 cm 0.200 Ltr Minyak bekisting 0.015 m3 Kayu balok kelas II 0.350 Lbr Plywood tebal 9 mm 2.000 Btg Dolken kayu galam f (8-10) cm, 4 m 0.660 0.330 0.033 0.033
SNI.163.a
OH OH OH OH OH OH
1 M2 Pekerjaan Bekisting Sloof 0.045 m3 Kayu Kelas III (papan) 0.300 kg Paku 5 cm - 12 cm 0.100 Ltr Minyak bekisting 0.520 0.260 0.026 0.026
SNI.160.a
Tukang besi Kepala Tukang Mandor
1 M3 Pek Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr 0.320 m3 Kayu terentang kelas III 3.200 Kg Paku biasa 2 " - 5 " 1.600 Ltr Minyak bekisting 175.000 Kg Besi beton polos 2.250 Kg Kawat beton 247.000 Kg Semen portland 0.621 m3 Pasir beton 0.740 m3 Koral beton 0.140 m3 Kayu balok kelas II 2.800 Lbr Plywood tebal 9 mm 16.000 Btg Dolken dia 8 cm - 4 m 3.208 0.189 0.330 1.225 0.175 0.235
SNI.155.a
OH OH OH
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
1 M2 Pekerjaan Bekisting Balok 0.040 m3 Kayu terentang kelas III 0.400 Kg Paku biasa 2 " - 5 "
190,000.00 230,000.00 230,000.00
199,500.00 36,110.00 51,750.00 6,362,625.00 636,262.50 6,998,887.50
2,600,000.00 28,000.00 18,000.00 16,000.00 33,000.00 1,700.00 355,000.00 575,000.00 4,000,000.00 159,000.00 11,000.00
832,000.00 89,600.00 28,800.00 2,800,000.00 74,250.00 419,900.00 220,455.00 425,500.00 560,000.00 445,200.00 176,000.00
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
481,200.00 35,910.00 62,700.00 232,750.00 40,135.00 54,050.00 6,978,450.00 697,845.00 7,676,295.00
2,600,000.00 28,000.00 18,000.00
117,000.00 8,400.00 1,800.00
150,000.00 190,000.00 230,000.00 230,000.00
78,000.00 49,400.00 5,980.00 5,980.00 266,560.00 26,656.00 293,216.00
2,600,000.00 28,000.00 18,000.00 4,000,000.00 159,000.00 11,000.00
104,000.00 11,200.00 3,600.00 60,000.00 55,650.00 22,000.00
150,000.00 190,000.00 230,000.00 230,000.00
99,000.00 62,700.00 7,590.00 7,590.00 433,330.00 43,333.00 476,663.00
2,600,000.00 28,000.00 18,000.00 4,000,000.00 159,000.00 11,000.00
104,000.00 11,200.00 3,600.00 60,000.00 55,650.00 66,000.00
150,000.00 190,000.00 230,000.00 230,000.00
99,000.00 62,700.00 7,590.00 7,590.00 477,330.00 47,733.00 525,063.00
2,600,000.00 28,000.00
104,000.00 11,200.00
18,000.00 4,000,000.00 159,000.00 11,000.00
3,600.00 72,000.00 55,650.00 22,000.00
150,000.00 190,000.00 230,000.00 230,000.00
99,000.00 62,700.00 7,590.00 7,590.00 445,330.00 44,533.00 489,863.00
2,600,000.00 28,000.00 18,000.00 4,000,000.00 159,000.00 11,000.00
78,000.00 11,200.00 3,600.00 80,000.00 55,650.00 33,000.00
150,000.00 190,000.00 230,000.00 230,000.00
99,000.00 62,700.00 7,590.00 7,590.00 438,330.00 43,833.00 482,163.00
16,000.00 33,000.00
168,000.00 4,950.00
Pekerja Tukang besi Kepala Tukang Mandor
150,000.00 190,000.00 230,000.00 230,000.00
10,500.00 13,300.00 1,610.00 920.00 199,280.00 19,928.00 219,208.00 21,920.80
10 Kg Pembesian dengan Besi Ulir 10.500 Kg Besi beton ulir 0.150 Kg Kawat beton
19,000.00 33,000.00
199,500.00 4,950.00
150,000.00 190,000.00 230,000.00 230,000.00
10,500.00 13,300.00 1,610.00 920.00 230,780.00 23,078.00 253,858.00 25,385.80
37,000.00 33,000.00
37,740.00 1,650.00
150,000.00 190,000.00 230,000.00 230,000.00
3,750.00 4,750.00 460.00 230.00 48,580.00 4,858.00 53,438.00
66,000.00 33,000.00
67,320.00 1,650.00
150,000.00 190,000.00 230,000.00 230,000.00
3,750.00 4,750.00 460.00 230.00 78,160.00 7,816.00 85,976.00
0.200 0.018 0.350 2.000
Ltr m3 Lbr Btg
Minyak bekisting Kayu balok kelas II Plywood tebal 9 mm Dolken dia 8 cm - 4 m
0.660 0.330 0.033 0.033
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.170.a
1 M2 Pek Bekisting Dinding Plat 0.030 m3 Kayu Kelas III 0.400 Kg Paku 5 cm - 12 cm 0.200 Ltr Minyak bekisting 0.020 m3 Kayu balok kelas II 0.350 Lbr Plywood tebal 9 mm 3.000 Btg Dolken kayu galam f (8-10) cm, 4 m 0.660 0.330 0.033 0.033
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.173.1
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Jumlah 1 Kg Pembesian besi polos
0.070 0.070 0.007 0.004
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Jumlah 1 Kg Pembesian besi ulir SNI.173.3a
OH OH OH OH
OH OH OH OH
Pekerja Tukang besi Kepala Tukang Mandor
Memasang 1 M2 Jaring Kawat Baja / Wiremesh 6 mm 1.020 Kg Jaring Kawat Baja/ Wiremesh 6 mm 0.050 Kg Kawat beton 0.025 0.025 0.002 0.001
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.173.3b
Pekerja Tukang kayu Kepala Tukang Mandor
10 Kg Pembesian dengan Besi Polos 10.500 Kg Besi beton polos 0.150 Kg Kawat beton 0.070 0.070 0.007 0.004
SNI.173.2
OH OH OH OH
OH OH OH OH
Pekerja Tukang besi Kepala Tukang Mandor
Memasang 1 M2 Jaring Kawat Baja / Wiremesh 8 mm 1.020 Kg Jaring Kawat Baja/ Wiremesh 8 mm 0.050 Kg Kawat beton 0.025 0.025 0.002 0.001
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH
Pekerja Tukang besi Kepala Tukang Mandor
SNI.173.3c
Memasang 1 M2 Jaring Kawat Baja / Wiremesh 10 mm 1.020 Kg Jaring Kawat Baja/ Wiremesh 10 mm 0.050 Kg Kawat beton 0.025 0.025 0.002 0.001
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.173.4a
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
Memasang 1 M Plat lantai sistem Bondex 0.75 mm 1.030 M2 Plat Bondex tebal 0.75 mm 0.040 M3 Kayu terentang kelas III 0.100 Kg Paku biasa 2 " - 5 " 0.004 M3 Kayu balok kelas II 0.090 Lbr Plywood 9 mm 1.500 Btg Dolken dia 8 cm - 4 m 0.170 0.080 0.010 0.010
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.173.4d
OH OH OH OH
Memasang 1 M Plat lantai sistem Bondex 0.70 mm 1.030 M2 Plat Bondex tebal 0.70 mm 0.040 M3 Kayu terentang kelas III 0.100 Kg Paku biasa 2 " - 5 " 0.004 M3 Kayu balok kelas II 0.090 Lbr Plywood 9 mm 1.500 Btg Dolken dia 8 cm - 4 m 0.170 0.080 0.010 0.010
SNI.173.4c
Pekerja Tukang besi Kepala Tukang Mandor
Memasang 1 M Plat lantai sistem Bondex 0.65 mm 1.030 M2 Plat Bondex tebal 0.65 mm 0.040 M3 Kayu terentang kelas III 0.100 Kg Paku biasa 2 " - 5 " 0.004 M3 Kayu balok kelas II 0.090 Lbr Plywood 9 mm 1.500 Btg Dolken dia 8 cm - 4 m 0.170 0.080 0.010 0.010
SNI.173.4b
OH OH OH OH
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
Memasang 1 M Plat lantai sistem Bondex 100 mm 1.030 M2 Plat Bondex tebal 100 mm 0.040 M3 Kayu terentang kelas III 0.100 Kg Paku biasa 2 " - 5 " 0.004 M3 Kayu balok kelas II 0.090 Lbr Plywood 9 mm 1.500 Btg Dolken dia 8 cm - 4 m 0.170 0.080 0.010 0.010
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN KAYU
OH OH OH OH
Pekerja Tukang kayu Kepala Tukang Mandor
105,000.00 33,000.00
107,100.00 1,650.00
150,000.00 190,000.00 230,000.00 230,000.00
3,750.00 4,750.00 460.00 230.00 117,940.00 11,794.00 129,734.00
110,000.00 2,600,000.00 28,000.00 4,000,000.00 159,000.00 11,000.00
113,300.00 104,000.00 2,800.00 16,000.00 14,310.00 16,500.00
150,000.00 190,000.00 230,000.00 230,000.00
25,500.00 15,200.00 2,300.00 2,300.00 312,210.00 31,221.00 343,431.00
120,000.00 2,600,000.00 28,000.00 4,000,000.00 159,000.00 11,000.00
123,600.00 104,000.00 2,800.00 16,000.00 14,310.00 16,500.00
150,000.00 190,000.00 230,000.00 230,000.00
25,500.00 15,200.00 2,300.00 2,300.00 322,510.00 32,251.00 354,761.00
130,000.00 2,600,000.00 28,000.00 4,000,000.00 159,000.00 11,000.00
133,900.00 104,000.00 2,800.00 16,000.00 14,310.00 16,500.00
150,000.00 190,000.00 230,000.00 230,000.00
25,500.00 15,200.00 2,300.00 2,300.00 332,810.00 33,281.00 366,091.00
210,000.00 2,600,000.00 28,000.00 4,000,000.00 159,000.00 11,000.00
216,300.00 104,000.00 2,800.00 16,000.00 14,310.00 16,500.00
150,000.00 190,000.00 230,000.00 230,000.00
25,500.00 15,200.00 2,300.00 2,300.00 415,210.00 41,521.00 456,731.00
SNI.174
1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 BAHAN 0.012 M³ Kayu Klas II 0.150 Kg Paku 7 - 12 cm TENAGA 0.100 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 ( Expose ) BAHAN 0.012 M³ Kayu Klas II 0.150 Kg Paku 7 - 12 cm TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
4,000,000.00 28,000.00
48,000.00 4,200.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 15,000.00 1,150.00 89,650.00 8,965.00 98,615.00
4,000,000.00 28,000.00
48,000.00 4,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 22,500.00 1,725.00 119,025.00 11,902.50 130,927.50
4,000,000.00 28,000.00
56,000.00 4,200.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 15,000.00 1,150.00 97,650.00 9,765.00 107,415.00
4,000,000.00 28,000.00
56,000.00 4,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 22,500.00 1,725.00 127,025.00 12,702.50 139,727.50
4,000,000.00 28,000.00
39,200.00 2,940.00
190,000.00 230,000.00 150,000.00 230,000.00
13,300.00 1,610.00 10,500.00 805.00 68,355.00 6,835.50 75,190.50
28,000.00
2,940.00
190,000.00 230,000.00 150,000.00 230,000.00
13,300.00 1,610.00 10,500.00 805.00 29,155.00 2,915.50 32,070.50
SNI.174.a
SNI.175
1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 BAHAN 0.014 M³ Kayu Klas II 0.150 Kg Paku 7 - 12 cm TENAGA 0.100 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.175.a
1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 ( Expose ) BAHAN 0.014 M³ Kayu Klas II 0.150 Kg Paku 7 - 12 cm TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.176.a
1 M2 Mengerjakan / Memasang Usuk 5/7 cm BAHAN 0.010 M³ Kayu Klas II 0.105 Kg Paku 7 - 12 cm TENAGA 0.070 OH Tukang Kayu 0.007 OH Kepala Tukang Kayu 0.070 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.176.b
1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm BAHAN 0.105 Kg Paku 7 - 12 cm TENAGA 0.070 OH Tukang Kayu 0.007 OH Kepala Tukang Kayu 0.070 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.176.c
1 M2 Mengerjakan / Memasang Reng 3/4 cm
0.004 0.045
M³ Kg
0.030 0.003 0.030 0.002
OH OH OH OH
BAHAN Kayu Klas II Paku 7 - 12 cm TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
4,000,000.00 28,000.00
16,800.00 1,260.00
190,000.00 230,000.00 150,000.00 230,000.00
5,700.00 690.00 4,500.00 345.00 29,295.00 2,929.50 32,224.50
28,000.00
1,260.00
190,000.00 230,000.00 150,000.00 230,000.00
5,700.00 690.00 4,500.00 345.00 12,495.00 1,249.50 13,744.50
4,250,000.00 28,000.00
61,625.00 1,680.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 5,750.00 22,500.00 17,250.00 156,305.00 15,630.50 171,935.50
4,250,000.00 28,000.00
36,550.00 1,400.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 5,750.00 15,000.00 11,500.00 108,200.00 10,820.00 119,020.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 5,750.00 15,000.00 11,500.00 70,250.00 7,025.00 77,275.00
4,250,000.00 28,000.00
18,700.00 700.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 15,000.00 11,500.00 67,200.00 6,720.00 73,920.00
4,250,000.00 28,000.00 91,000.00
80,750.00 420.00 95,550.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.176.d
1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm BAHAN 0.045 Kg Paku 7 - 12 cm TENAGA 0.030 OH Tukang Kayu 0.003 OH Kepala Tukang Kayu 0.030 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.178
1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 3/20 ) Kayu Klas II BAHAN 0.015 M³ Papan Kayu Klas II 0.060 Kg Paku 7 - 12 cm TENAGA 0.250 OH Tukang Kayu 0.025 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.075 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.179
1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II BAHAN 0.009 M³ Papan Kayu Klas II 0.050 Kg Paku 7 - 12 cm TENAGA 0.200 OH Tukang Kayu 0.025 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.050 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.179.a
1 M' Memasang Kembali Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II TENAGA 0.200 OH Tukang Kayu 0.025 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.050 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.180
1 M' Pekerjaan Papan Reuter (2/20) BAHAN 0.004 M³ Papan Kayu Klas II 0.025 Kg Paku 7 - 12 cm TENAGA 0.100 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.050 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.181
1 M' Mengerjakan Talang Karet BAHAN 0.019 M³ Papan Kayu Klas II 0.015 Kg Paku Biasa 1cm - 2,5 cm 1.050 M' Karet Talang
0.200 0.020 0.200 0.001
OH OH OH OH
TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 30,000.00 230.00 249,550.00 24,955.00 274,505.00
4,250,000.00 28,000.00 76,000.00
80,750.00 420.00 79,800.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 30,000.00 230.00 233,800.00 23,380.00 257,180.00
35,000.00 28,000.00 76,000.00
17,500.00 420.00 79,800.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 22,500.00 1,840.00 185,960.00 18,596.00 204,556.00
4,000,000.00 35,000.00 28,000.00
4,400,000.00 525,000.00 22,400.00
190,000.00 230,000.00 150,000.00 230,000.00
2,660,000.00 322,000.00 900,000.00 69,000.00 8,898,400.00 889,840.00 9,788,240.00
4,000,000.00 28,000.00
4,800,000.00 22,400.00
190,000.00 230,000.00 150,000.00 230,000.00
285,000.00 1,150,000.00 2,250,000.00 46,000.00 8,553,400.00 855,340.00 9,408,740.00
25,000.00 28,000.00
27,500.00 1,400.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 15,000.00 1,150.00 87,650.00 8,765.00 96,415.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.182.a
1 M' Mengerjakan Talang datar/ jurai Seng BjLs 20 BAHAN 0.019 M³ Papan Kayu Klas II 0.015 Kg Paku Biasa 1cm - 2,5 cm 1.050 M' Seng Plat BjLs 20 TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.182.b
1 M' Mengerjakan Talang 1/2 lingkaran Seng BjLs 20 BAHAN 0.500 Kg Besi strip 0.015 Kg Paku Biasa 1cm - 2,5 cm 1.050 M' Seng Plat BjLs 20 TENAGA 0.300 OH Tukang Kayu 0.030 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.184
1 M3 Pekerjaan Kayu Kuda - Kuda, Gording Kayu Klas II (Expose) BAHAN 1.100 M³ Kayu Klas II 15.000 Kg Besi Strip 0.800 Kg Paku 7 - 12 cm TENAGA 14.000 OH Tukang Kayu 1.400 OH Kepala Tukang Kayu 6.000 OH Pekerja 0.300 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.185
1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II BAHAN 1.200 M³ Kayu Klas II 0.800 Kg Paku 7 - 12 cm TENAGA 1.500 OH Tukang Kayu 5.000 OH Kepala Tukang Kayu 15.000 OH Pekerja 0.200 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.186
1 M' Pasang Kasiplank ukuran (0.8x20), 1 Lapis BAHAN 1.100 M' Kasi plank 0.050 Kg Paku 5 cm - 10 cm TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.187
1 M' Pasang Kasiplank ukuran (0.8x20), 2 Lapis
1.650 0.075
M' Kg
0.300 0.030 0.150 0.008
OH OH OH OH
BAHAN Kasi plank Paku 5 cm - 10 cm TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
25,000.00 28,000.00
41,250.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 22,500.00 1,725.00 131,475.00 13,147.50 144,622.50
4,000,000.00 28,000.00
4,800,000.00 22,400.00
190,000.00 230,000.00 150,000.00 230,000.00
304,000.00 1,380,000.00 2,400,000.00 69,000.00 8,975,400.00 897,540.00 9,872,940.00
4,000,000.00 55,000.00 28,000.00
4,800,000.00 55,000.00 35,000.00
190,000.00 230,000.00 150,000.00 230,000.00
3,420,000.00 460,000.00 900,000.00 69,000.00 9,739,000.00 973,900.00 10,712,900.00
4,250,000.00 28,000.00 55,000.00 115,000.00
102,000.00 840.00 16,500.00 115,000.00
190,000.00 230,000.00 150,000.00 230,000.00
380,000.00 46,000.00 120,000.00 9,200.00 789,540.00 78,954.00 868,494.00
4,250,000.00 28,000.00 55,000.00 170,000.00
102,000.00 840.00 16,500.00 170,000.00
190,000.00 230,000.00 150,000.00 230,000.00
380,000.00 46,000.00 120,000.00 9,200.00 844,540.00 84,454.00 928,994.00
28,000.00 115,000.00
560.00 126,500.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.188
1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II (Expose) BAHAN 1.200 M³ Kayu Klas II 0.800 Kg Paku 7 - 12 cm TENAGA 1.600 OH Tukang Kayu 6.000 OH Kepala Tukang Kayu 16.000 OH Pekerja 0.300 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.189
1 M3 Pekerjaan Kayu Kusen Pintu dan Jendela BAHAN 1.200 M³ Kayu Klas II 1.000 Kg Lem Kayu 1.250 Kg Paku 7 - 12 cm TENAGA 18.000 OH Tukang Kayu 2.000 OH Kepala Tukang Kayu 6.000 OH Pekerja 0.300 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.190
1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 3 mm BAHAN 0.024 M³ Papan Kayu Klas II 0.030 Kg Paku 0.300 Kg Lem Kayu 1.000 M² Kaca 3 mm TENAGA 2.000 OH Tukang Kayu 0.200 OH Kepala Tukang Kayu 0.800 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.191
1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 5 mm BAHAN 0.024 M³ Papan Kayu Klas II 0.030 Kg Paku 0.300 Kg Lem Kayu 1.000 M² Kaca 5 mm TENAGA 2.000 OH Tukang Kayu 0.200 OH Kepala Tukang Kayu 0.800 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.192
1 M2 Pekerjaan Memasang Kaca Mati 3 mm Pintu / Jendela BAHAN 0.020 Kg Paku 1.100 M² Kaca 3 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Pekerjaan Memasang Kaca Mati 5 mm Pintu / Jendela BAHAN 0.020 Kg Paku 1.100 M² Kaca 5 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
161,432.50 16,143.25 177,575.75
SNI.193
1 M2 Pekerjaan Memasang Kaca Mati 8 mm Pintu / Jendela BAHAN 0.020 Kg Paku 1.100 M² Kaca 8 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
28,000.00 170,000.00
560.00 187,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 221,932.50 22,193.25 244,125.75
28,000.00 200,000.00
560.00 220,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 254,932.50 25,493.25 280,425.75
60,000.00 275.00
750,000.00 13.75
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 784,386.25 78,438.63 862,824.88
4,250,000.00 28,000.00 55,000.00 1,000,000.00
102,000.00 840.00 16,500.00 1,000,000.00
190,000.00 230,000.00 150,000.00 230,000.00
380,000.00 46,000.00 120,000.00 9,200.00 1,674,540.00 167,454.00 1,841,994.00
169,000.00
185,900.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 220,272.50 22,027.25 242,299.75
56,000.00
1,400,000.00
190,000.00 230,000.00 150,000.00 230,000.00
31,350.00 3,795.00 2,475.00 184.00
SNI.193.8
SNI.194
1 M2 Pekerjaan Memasang Alumunium strip 8 mm BAHAN 12.500 M² Alumunium Strip 0.050 m sealent TENAGA 0.150 OH Tukang alumunium 0.015 OH Kepala Tukang alumunium 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.195
1 M2 Pekerjaan Daun Pintu dan Jendela Kaca Tempered 8 mm BAHAN 0.024 M³ Papan Kayu Klas II 0.030 Kg Paku 0.300 Kg Lem Kayu 1.000 M² Kaca Tempered 8 mm Polos TENAGA 2.000 OH Tukang Kayu 0.200 OH Kepala Tukang Kayu 0.800 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.195.a
1 M2 Pekerjaan Memasang Kaca Cermin 5 mm BAHAN 1.100 M² Kaca Cermin 5 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.196
1 M2 Pekerjaan Memasang Glass Blok BAHAN 25.000 bh Glas Blok 20 x 20 cm TENAGA 0.165 OH Tukang batu 0.017 OH Kepala Tukang batu 0.017 OH Pekerja 0.001 OH Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
1,437,804.00 143,780.40 1,581,584.40
SNI.197
1 M2 Pekerjaan Memasang Kaca Mati Riben 5 mm Pintu / Jendela BAHAN 0.020 Kg Paku 1.100 M² Kaca Ryben 5 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Pekerjaan Memasang Kaca Mati Buram 5 mm Pintu / Jendela BAHAN 0.020 Kg Paku 1.100 M² Kaca Buram 5 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
28,000.00 165,000.00
560.00 181,500.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 216,432.50 21,643.25 238,075.75
28,000.00 215,000.00
560.00 236,500.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 271,432.50 27,143.25 298,575.75
28,000.00 1,000,000.00
560.00 1,100,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 1,134,932.50 113,493.25 1,248,425.75
4,250,000.00 28,000.00 195,000.00
340,000.00 1,400.00 97,500.00
190,000.00 230,000.00 150,000.00 230,000.00
285,000.00 34,500.00 150,000.00 11,500.00 919,900.00 91,990.00 1,011,890.00
4,250,000.00
255,000.00
190,000.00 230,000.00 150,000.00 230,000.00
570,000.00 69,000.00 150,000.00 115,000.00 1,159,000.00 115,900.00 1,274,900.00
4,250,000.00 33,000.00
255,000.00 4,950.00
190,000.00 230,000.00 150,000.00 230,000.00
380,000.00 46,000.00 75,000.00 5,750.00
SNI.197.a
SNI.198
1 M2 Pekerjaan Memasang Kaca Mati Tempered 8 mm Pintu / Jendela BAHAN 0.020 Kg Paku 1.100 M² Kaca Tempered 8mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.200
1 M2 Pekerjaan Daun Pintu Panil dan Krepyak Kayu Klas II Lap. Formika BAHAN 0.080 M³ Papan Kayu Klas II 0.050 Kg Paku 1- 3 Cm 0.500 Lbr Formika TENAGA 1.500 OH Tukang Kayu 0.150 OH Kepala Tukang Kayu 1.000 OH Pekerja 0.050 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.201
1 M2 Pekerjaan Ram Jalusi 0.060
M³
3.000 0.300 1.000 0.500
OH OH OH OH
BAHAN Papan Kayu Klas II TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.202
1 M2 Pekerjaan Ram Jalusi Mati Kusen BAHAN 0.060 M³ Papan Kayu Klas II 0.150 Kg Paku 1/2" - 1" TENAGA 2.000 OH Tukang Kayu 0.200 OH Kepala Tukang Kayu 0.500 OH Pekerja 0.025 OH Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Mengerjakan Daun Pintu Double Teakwood 3 mm BAHAN 0.025 M³ Papan Kayu Klas II 1.000 Lbr Teakwood 120x240x3 mm 0.300 Kg Lem Kayu 0.030 Kg Paku 1/2" - 1" TENAGA 2.000 OH Tukang Kayu 0.200 OH Kepala Tukang Kayu 0.800 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
766,700.00 76,670.00 843,370.00
SNI.204
1 M2 Pekerjaan Pintu Double Tripleks 3 mm BAHAN 0.025 M³ Papan Kayu Klas II 2.000 Lbr Tripleks 120x240x3 mm 0.300 Kg Lem Kayu 0.030 Kg Paku 1/2" - 1" TENAGA 2.000 OH Tukang Kayu 0.040 OH Kepala Tukang Kayu 2.000 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
4,250,000.00 220,000.00 55,000.00 33,000.00
106,250.00 220,000.00 16,500.00 990.00
190,000.00 230,000.00 150,000.00 230,000.00
380,000.00 46,000.00 120,000.00 9,200.00 898,940.00 89,894.00 988,834.00
4,250,000.00 67,000.00 55,000.00 33,000.00
106,250.00 134,000.00 16,500.00 990.00
190,000.00 230,000.00 150,000.00 230,000.00
380,000.00 9,200.00 300,000.00 9,200.00 956,140.00 95,614.00 1,051,754.00
4,250,000.00 195,000.00 220,000.00 55,000.00 33,000.00
106,250.00 97,500.00 220,000.00 44,000.00 990.00
190,000.00 230,000.00 150,000.00 230,000.00
475,000.00 57,500.00 120,000.00 9,200.00 1,130,440.00 113,044.00 1,243,484.00
4,250,000.00 195,000.00 67,000.00 55,000.00 33,000.00
106,250.00 97,500.00 67,000.00 16,500.00 990.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 9,200.00 300,000.00 9,200.00 644,640.00 64,464.00 709,104.00
23,000.00 33,000.00
25,300.00 660.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 15,000.00 115.00 62,375.00 6,237.50 68,612.50
SNI.206
SNI.208
1 M2 Pekerjaan Pintu Teakwood Lapis Formika BAHAN 0.025 M³ Papan Kayu Klas II 0.500 Lbr Formika 1.000 Lbr Teakwood 120x240x3 mm 0.800 Kg Lem Kayu 0.030 Kg Paku 1/2" - 1" TENAGA 2.500 OH Tukang Kayu 0.250 OH Kepala Tukang Kayu 0.800 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.209
1 M2 Pekerjaan Pintu Triplek Lapis Formika BAHAN 0.025 M³ Papan Kayu Klas II 0.500 Lbr Formika 1.000 Lbr Tripleks 120x240x3 mm 0.300 Ltr Lem Kayu 0.030 Kg Paku 1/2" - 1" TENAGA 0.200 OH Tukang Kayu 0.040 OH Kepala Tukang Kayu 2.000 OH Pekerja 0.040 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.210
1 M2 Pekerjaan Pasang Kawat Gerawang BAHAN 1.100 Lbr Kawat Gerawang 0.020 Kg Paku 1/2" - 1" TENAGA 0.100 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.100 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.211
1 M2 Pekerjaan Pasang Jeruji Besi Pintu BAHAN 1.000 M2 Jeruji Pintu Besi TENAGA 0.500 OH Tukang Las 0.050 OH Kepala Tukang 0.500 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Pekerjaan Pasang Kawat Duri BAHAN 0.175 Rol Kawat Duri 0.150 Kg Kawat Ikat Beton TENAGA 0.650 OH Tukang Besi 0.065 OH Kepala Tukang 0.650 OH Pekerja 0.032 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
540,000.00
540,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 75,000.00 1,207.50 722,707.50 72,270.75 794,978.25
100,000.00 33,000.00
17,500.00 4,950.00
190,000.00 230,000.00 150,000.00 230,000.00
123,500.00 14,950.00 97,500.00 7,360.00 265,760.00 26,576.00 292,336.00
110,000.00 39,000.00
660,000.00 429,000.00
190,000.00 230,000.00 150,000.00 230,000.00
199,500.00 24,150.00 157,500.00 1,207.50 1,471,357.50 147,135.75 1,618,493.25
26,000.00 13,000.00
156,000.00 143,000.00
190,000.00 230,000.00 150,000.00 230,000.00
199,500.00 24,150.00 157,500.00 1,207.50 681,357.50 68,135.75 749,493.25
59,000.00
649,000.00
190,000.00 230,000.00 150,000.00 230,000.00
199,500.00 24,150.00 157,500.00 1,207.50 1,031,357.50 103,135.75 1,134,493.25
900,000.00
900,000.00
190,000.00 230,000.00 150,000.00 230,000.00
199,500.00 24,150.00 157,500.00 1,207.50 1,282,357.50 128,235.75 1,410,593.25
SNI.212
SNI.213
1 M2 Pekerjaan Pagar besi Hollow (stenlistail) BAHAN 6.000 M' Besi hollow 40 x 40 mm 11.000 M' Besi hollow 40 x 20 mm TENAGA 1.050 OH Tukang Besi 0.105 OH Kepala Tukang 1.050 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.214
1 M2 Pekerjaan Pagar besi Hollow BAHAN 6.000 M' Besi hollow 40 x 40 mm 11.000 M' Besi hollow 40 x 20 mm TENAGA 1.050 OH Tukang Besi 0.105 OH Kepala Tukang 1.050 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.214.1
1 M2 Pekerjaan Pagar/ Dinding besi Hollow 100 x 50 mm BAHAN 11.000 M' Besi hollow 100 x 50 mm TENAGA 1.050 OH Tukang Besi 0.105 OH Kepala Tukang 1.050 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.214.A
1 M2 Pekerjaan Pintu Pagar besi (dia. 16 mm) BAHAN 1.000 M2 Pintu Besi Pagar (dia. 16 mm) TENAGA 1.050 OH Tukang Besi 0.105 OH Kepala Tukang 1.050 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.214.B
1 M2 Pekerjaan Pagar besi (dia. 16 mm) BAHAN
1.000
M2
1.050 0.105 1.050 0.005
OH OH OH OH
Pagar Besi (dia. 16 mm) TENAGA Tukang Besi Kepala Tukang Pekerja Mandor
800,000.00
800,000.00
190,000.00 230,000.00 150,000.00 230,000.00
199,500.00 24,150.00 157,500.00 1,207.50 1,182,357.50 118,235.75 1,300,593.25
1,800.00
46,800.00
190,000.00 230,000.00 150,000.00 230,000.00
14,250.00 1,840.00 22,500.00 1,840.00 87,230.00 8,723.00 95,953.00
6,900.00 1,700.00 225,000.00
41,400.00 13,600.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 460.00 165,260.00 16,526.00 181,786.00
3,900.00
97,500.00
190,000.00 230,000.00 150,000.00 230,000.00
14,250.00 1,840.00 22,500.00 1,840.00 137,930.00 13,793.00 151,723.00
193,000.00 7,000.00
169,427.48 110,610.69
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 30,000.00 230.00 331,568.17 33,156.82 364,724.98
8,800.00 1,700.00 225,000.00
44,000.00 13,600.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 460.00 167,860.00 16,786.00 184,646.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN ATAP SNI.215 1 M2 Pekerjaan Atap Genteng Lokal BAHAN 26.000 Bh Genteng Lokal TENAGA 0.075 OH Tukang Kayu 0.008 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.216
1 M2 Pekerjaan Bubungan Genteng Lokal BAHAN 6.000 Bh Bubungan Genteng Lokal 8.000 Kg Pc 0.032 M³ Pasir TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.400 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.217
1 M2 Pekerjaan Atap Genteng Pejaten Bali BAHAN 25.000 Bh Genteng Pejaten TENAGA 0.075 OH Tukang Kayu 0.008 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.217,a
1m² Pasang Atap Genteng Bitumen Monoleyer model gelombang ex. Onduline BAHAN 0.878 lbr Atap bitumen gelombang H : 3,0 mm 15.802 bh Paku fiser bitumen TENAGA 0.100 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.218
1 M2 Pekerjaan Bubungan Genteng Pejaten Bali BAHAN 5.000 Bh Bubungan Genteng Pejaten 8.000 Kg Semen Portland 0.032 M³ Pasir TENAGA 0.200 OH Tukang Batu 0.020 OH Kepala Tukang Batu 0.400 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.218.a
1 m Pemasangan nok bitumen Monolayer BAHAN
72.760 1.200
Lbr bh
0.150 0.015 0.250 0.013
OH OH OH OH
Nok / Ridge Onduline Sekrup / Paku TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
90,000.00 13,000.00
6,548,400.00 15,600.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 37,500.00 2,990.00 6,636,440.00 663,644.00 7,300,084.00
65,000.00 2,000.00 1,350,000.00
71,500.00 24,000.00 1,350.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 15,000.00 2,300.00 220,650.00 22,065.00 242,715.00
75,000.00 2,000.00 1,350,000.00
82,500.00 24,000.00 1,350.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 15,000.00 2,300.00 231,650.00 23,165.00 254,815.00
94,000.00 2,000.00 1,350,000.00
103,400.00 24,000.00 1,350.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 15,000.00 2,300.00 252,550.00 25,255.00 277,805.00
60,000.00 2,000.00
66,000.00 10,920.00
190,000.00 230,000.00 150,000.00 230,000.00
10,450.00 1,265.00 30,000.00 460.00 119,095.00 11,909.50 131,004.50
5,500.00
137,500.00
190,000.00 230,000.00 150,000.00 230,000.00
14,250.00 1,840.00 22,500.00 1,840.00 177,930.00 17,793.00 195,723.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.219.0.25 1 M2 Pekerjaan Atap Trimdeck 0.25 TCT (Spandek) BAHAN 1.100 M2 Penutup Atap Trimdeck 12.000 Bh Paku Mata Bor Tahan Karat 0.001 Unit Mesin Bor Baut TENAGA 0.500 OH Tukang Besi 0.050 OH Kepala Tukang Besi 0.100 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.219.0.30 1 M2 Pekerjaan Atap Trimdeck 0.30 TCT (Spandek) BAHAN 1.100 M2 Penutup Atap Trimdeck 12.000 Bh Paku Mata Bor Tahan Karat 0.001 Unit Mesin Bor Baut TENAGA 0.500 OH Tukang Besi 0.050 OH Kepala Tukang Besi 0.100 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.219.0.35 1 M2 Pekerjaan Atap Trimdeck 0.35 TCT (Spandek) BAHAN 1.100 M2 Penutup Atap Trimdeck 12.000 Bh Paku Mata Bor Tahan Karat 0.001 Unit Mesin Bor Baut TENAGA 0.500 OH Tukang Besi 0.050 OH Kepala Tukang Besi 0.100 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.220
1 M' Pekerjaan Memasang Bubungan Trimdeck 0.35 TCT (Spandek) BAHAN 1.100 M1 Bubungan Atap Trimdeck 5.460 Bh Paku Mata Bor Tahan Karat TENAGA 0.055 OH Tukang Besi 0.006 OH Kepala Tukang Besi 0.200 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.221.a
1 M2 Pekerjaan Atap Genteng Kodok BAHAN 25.000 Bh Genteng Kodok TENAGA 0.075 OH Tukang Kayu 0.008 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.221.b
1 M2 Pekerjaan Atap Genteng kanmuri full flat BAHAN 11.500 Bh Genteng Kanmuri TENAGA 0.075 OH Tukang Kayu 0.008 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Pekerjaan Bubungan Genteng Kodok BAHAN 5.000 Bh Bubungan Genteng Kodok 8.000 Kg Semen Portland 0.032 M³ Pasir TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.400 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
21,000.00
241,500.00
190,000.00 230,000.00 150,000.00 230,000.00
14,250.00 1,840.00 22,500.00 1,840.00 281,930.00 28,193.00 310,123.00
6,600.00 1,700.00 225,000.00
33,000.00 13,600.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 460.00 156,860.00 15,686.00 172,546.00
35,000.00 1,700.00 225,000.00
175,000.00 13,600.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 460.00 298,860.00 29,886.00 328,746.00
75,000.00 45,000.00
67,500.00 3,150.00
190,000.00 230,000.00 150,000.00 230,000.00
2,850.00 34,500.00 22,500.00 11,500.00 142,000.00 14,200.00 156,200.00
50,000.00 45,000.00
45,000.00 3,150.00
190,000.00 230,000.00 150,000.00 230,000.00
2,850.00 34,500.00 22,500.00 11,500.00 119,500.00 11,950.00 131,450.00
69,000.00 45,000.00
51,750.00 5,400.00
190,000.00 230,000.00 150,000.00 230,000.00
13,300.00 16,100.00 21,000.00 1,610.00 109,160.00 10,916.00 120,076.00
SNI.222.a
SNI.222.b
1 M2 Pekerjaan Bubungan Genteng kanmuri full flat BAHAN 5.000 Bh Bubungan Genteng kanmuri 8.000 Kg Semen Portland 0.032 M³ Pasir TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.400 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.223
1 M2 Pekerjaan Atap Seng Gelombang BJLS 20 BAHAN 0.900 Lbr Seng BJLS 20 mm 0.070 Kg Paku Seng TENAGA 0.015 OH Tukang Kayu 0.150 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.050 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.224
1 M' Memasang Bubungan Seng BJLS 20 BAHAN 0.900 Lbr Seng BJLS 20 mm 0.070 Kg Paku Seng TENAGA 0.015 OH Tukang Kayu 0.150 OH Kepala Tukang Kayu 0.150 OH Pekerja 0.050 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.225
1 M2 Pekerjaan Atap Asbes Gelombang Kecil BAHAN 0.750 Lbr Asbes Gelombang Kecil 0.120 Kg Paku Asbes TENAGA 0.070 OH Tukang Kayu 0.070 OH Kepala Tukang Kayu 0.140 OH Pekerja 0.007 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.226
1 M' Memasang Bubungan Asbes Gelombang Kecil BAHAN 1.000 Lbr Bubungan Asbes Gelombang Kecil 0.120 Kg Paku Asbes TENAGA 0.067 OH Tukang Kayu 0.007 OH Kepala Tukang Kayu 0.140 OH Pekerja 0.007 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 m2 Mengerjakan atap genteng Metalroof ( Tebal 2.5 mm ) lapisan butiran BAHAN 1.500 Lbr Genteng metal roof 0.200 kg Paku biasa 1/2"=1" TENAGA 0.100 OH Tukang 0.010 OH Kepala tukang 0.140 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
55,000.00 45,000.00
55,000.00 5,400.00
190,000.00 230,000.00 150,000.00 230,000.00
12,730.00 1,610.00 21,000.00 1,610.00 97,350.00 9,735.00 107,085.00
70,000.00 33,000.00
105,000.00 6,600.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 21,000.00 230.00 154,130.00 15,413.00 169,543.00
75,000.00 33,000.00
82,500.00 1,650.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 21,000.00 230.00 126,680.00 12,668.00 139,348.00
80,000.00 33,000.00
120,000.00 6,600.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 21,000.00 230.00 169,130.00 16,913.00 186,043.00
85,000.00 33,000.00
93,500.00 1,650.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 21,000.00 230.00 137,680.00 13,768.00 151,448.00
65,000.00 33,000.00
107,900.00 6,600.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 21,000.00 230.00 157,030.00 15,703.00 172,733.00
SNI.227
SNI.228
1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 2.5 mm ) lap. Butiran BAHAN 1.100 m' Bubungan Genteng metal roof 0.050 kg Paku biasa 1/2"=1" TENAGA 0.100 OH Tukang 0.010 OH Kepala tukang 0.140 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.229.a
1 m2 Mengerjakan atap genteng Metalroof ( Tebal 3 mm ) lapisan butiran BAHAN 1.500 Lbr Genteng metal roof 0.200 kg Paku biasa 1/2"=1" TENAGA 0.100 OH Tukang 0.010 OH Kepala tukang 0.140 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.229.b
1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 3 mm ) lap. Butiran BAHAN 1.100 m' Bubungan Genteng metal roof 0.050 kg Paku biasa 1/2"=1" TENAGA 0.100 OH Tukang 0.010 OH Kepala tukang 0.140 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.230
1 m2 Mengerjakan atap genteng Metal ( Tebal 2.5 mm ) Sakura BAHAN 1.660 Lbr Genteng Metal anti karat (sakura) 0.200 kg Paku biasa 1/2"=1" TENAGA 0.100 OH Tukang 0.010 OH Kepala tukang 0.140 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.231
1 m' Mengerjakan bubungan Genteng Metal ( Tebal 2.5 mm ) BAHAN 1.100 m' Bubungan Genteng Metal anti karat 0.050 kg Paku biasa 1/2"=1" TENAGA 0.100 OH Tukang 0.010 OH Kepala tukang 0.140 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 m2 Mengerjakan Plafond Gypsum Board, tebal 9 mm + rangka kayu BAHAN 0.014 M³ Kayu Klas II 0.020 Kg Paku Panjang 4-6 Cm 0.364 Lbr Gypsum Board Tebal 9 mm 0.110 kg Paku Sekrup TENAGA 0.300 OH Tukang 0.030 OH Kepala tukang 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
70,000.00 33,000.00
77,000.00 1,650.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 21,000.00 230.00 121,180.00 12,118.00 133,298.00
4,000,000.00 28,000.00 100,000.00 35,000.00
56,000.00 560.00 36,400.00 3,850.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 193,010.00 19,301.00 212,311.00
53,000.00 30,000.00
55,650.00 1,920.00
190,000.00 230,000.00 150,000.00 230,000.00
3,990.00 483.00 3,150.00 230.00 65,423.00 6,542.30 71,965.30
40,000.00 30,000.00
42,000.00 1,920.00
190,000.00 230,000.00 150,000.00 230,000.00
3,990.00 483.00 3,150.00 230.00 51,773.00 5,177.30 56,950.30
26,000.00 100,000.00 35,000.00 30,000.00
71,500.00 110,000.00 3,850.00 1,920.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 22,500.00 1,725.00 254,095.00 25,409.50 279,504.50
35,000.00 85,000.00 3,000.00 6,000.00 6,000.00 2,000.00
8,750.00 31,450.00 5,100.00 4,860.00 4,860.00 1,620.00
SNI.232
SNI.233.a
1 m' Mengerjakan List Plafond Gypsum Board Type I BAHAN 1.050 m' List Gypsum Type I 0.064 kg Lem Gypsum TENAGA 0.021 OH Tukang 0.002 OH Kepala tukang 0.021 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.233.b
1 m' Mengerjakan List Plafond Gypsum Board Type II BAHAN 1.050 m' List Gypsum Type II 0.064 kg Lem Gypsum TENAGA 0.021 OH Tukang 0.002 OH Kepala tukang 0.021 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234
1 m2 Mengerjakan Plafond Gypsum Rangka Hollow 40x40 Zincromate BAHAN 2.750 M' Besi Holow 40x40 zincromate 1.100 M2 Gypsum Board Tebal 9 mm 0.110 kg Paku Sekrup 0.064 kg Lem Gypsum TENAGA 0.200 OH Tukang 0.020 OH Kepala tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234.a
1 m2 Memasang langit-langit WPC , rangka metal furing BAHAN 0.250 btg Top Cross Rail 250FX 0.370 btg Furring Chanel PN 205 1.700 bh Furring Chanel PN 208 0.810 bh Suspension Spring Clip 223SS 0.810 bh 4 mm Soft Galv Suspension Rod PN 225 0.810 bh Angle Bracket PN 220
0.810 0.050 0.075 0.003 1.754
bh roll roll kg lbr
0.500 0.075 0.780 0.050
OH OH OH OH
Wall Angle 252FX Paper Tape Steel Tape UB Cote Read Mix Papan WPC teval 7 mm TENAGA Tukang Kayu Kepala tukang Pekerja Mandor
15,000.00 55,000.00 132,000.00 165,000.00 330,000.00
12,150.00 2,750.00 9,900.00 495.00 578,947.37
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 17,250.00 117,000.00 11,500.00 901,632.37 90,163.24 991,795.61
140,000.00 1,500,000.00
616,000.00 1,575,000.00
190,000.00 230,000.00 150,000.00 230,000.00
152,000.00 18,400.00 12,000.00 920.00 2,374,320.00 237,432.00 2,611,752.00
1,250,000.00
1,375,000.00
190,000.00 230,000.00 150,000.00 230,000.00
152,000.00 18,400.00 12,000.00 920.00 1,558,320.00 155,832.00 1,714,152.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234.b
1 m2 Pasang Atap Kaca Laminasi / Laminated 12 mm rangka hollow BAHAN 4.400 m1 Rangka Hollow 5 x 100 mm 1.050 m2 Kaca Laminated 12 mm TENAGA 0.800 OH Tukang Besi 0.080 OH Kepala tukang Besi 0.080 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234.c
1 m2 Pasang Kaca Tempered Clear T=10 BAHAN 1.100 m2 Kaca Tempered Clear T=10 TENAGA 0.800 OH Tukang Kayu 0.080 OH Kepala tukang Kayu 0.080 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234.d
1 m2 Pasang Atap Kanopi GRC gelombang BAHAN 1.050 m2 GRC Board bergelombang TENAGA 0.800 OH Tukang Kayu 0.080 OH Kepala tukang Kayu 0.080 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234.SP.1 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Putih polos BAHAN 2.750 M' Besi Holow 40x40 zincromate 1.300 M2 PVC Plafond, 10 mm, Putih Polos 0.170 kg Paku Sekrup TENAGA 0.200 OH Tukang 0.020 OH Kepala tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.234.SP.2 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Warna BAHAN 2.750 M' Besi Holow 40x40 zincromate 1.300 M2 PVC Plafond, 10 mm, Warna 0.170 kg Paku Sekrup TENAGA 0.200 OH Tukang 0.020 OH Kepala tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
90,000.00
94,500.00
190,000.00 230,000.00 150,000.00 230,000.00
152,000.00 18,400.00 12,000.00 920.00 277,820.00 27,782.00 305,602.00
26,000.00 250,000.00 35,000.00
71,500.00 325,000.00 5,950.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 22,500.00 1,725.00 469,275.00 46,927.50 516,202.50
26,000.00 280,000.00 35,000.00
71,500.00 364,000.00 5,950.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 22,500.00 1,725.00 508,275.00 50,827.50 559,102.50
SNI.234.AQ
1 m2 Mengerjakan Plafond Akustik Rangka Alumunium BAHAN 3.600 M' Rangka Alumunium "T" 1.300 Lbr Plafond Akustik 600 x 600 0.150 kg Kawat f 4 mm 1.050 kg Ramset/ Dinabolt TENAGA 0.200 OH Tukang 0.020 OH Kepala tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Pekerjaan Plafond Tripleks 3 mm + Rangka kayu BAHAN 0.014 M³ Kayu Klas II 0.020 Kg Paku Panjang 4-6 Cm 0.015 Kg Paku Panjang 1-3 Cm 0.375 Lbr Tripleks 3 mm TENAGA 0.300 OH Tukang Kayu 0.030 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
15,000.00 155,000.00 85,000.00 75,000.00
54,000.00 201,500.00 12,750.00 78,750.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 22,500.00 1,725.00 413,825.00 41,382.50 455,207.50
4,000,000.00 28,000.00 33,000.00 67,000.00
56,000.00 560.00 495.00 25,125.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 178,380.00 17,838.00 196,218.00
4,000,000.00 28,000.00 33,000.00 106,000.00
56,000.00 560.00 495.00 39,750.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 193,005.00 19,300.50 212,305.50
4,000,000.00 28,000.00
56,000.00 560.00
190,000.00 230,000.00 150,000.00 230,000.00
43,700.00 5,290.00 25,500.00 1,763.33 132,813.33 13,281.33 146,094.67
33,000.00 106,000.00
495.00 39,750.00
190,000.00 230,000.00 150,000.00 230,000.00
13,300.00 1,610.00 4,500.00 536.67 60,191.67 6,019.17 66,210.83
33,000.00 4,000,000.00 67,000.00
495.00 28,000.00 25,125.00
SNI.235.a
SNI.235.b
1 M2 Pekerjaan Plafond Tripleks 5 mm + Rangka kayu BAHAN 0.014 M³ Kayu Klas II 0.020 Kg Paku Panjang 4-6 Cm 0.015 Kg Paku Panjang 1-3 Cm 0.375 Lbr Tripleks 5 mm TENAGA 0.300 OH Tukang Kayu 0.030 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.235.c
1 M2 Pekerjaan Rangka Langit-langit BAHAN 0.014 M³ Kayu Klas II 0.020 Kg Paku Panjang 7-10 Cm TENAGA 0.230 OH Tukang Kayu 0.023 OH Kepala Tukang Kayu 0.170 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.235.d
1 M2 Pekerjaan Plafond Tripleks 5 mm BAHAN 0.015 Kg Paku Panjang 1-5 Cm 0.375 Lbr Tripleks 5 mm TENAGA 0.070 OH Tukang Kayu 0.007 OH Kepala Tukang Kayu 0.030 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.236.a
1 M2 Pekerjaan Plafond Miring Tripleks 3 mm + Rangka kayu BAHAN 0.015 Kg Paku Panjang 1-3 Cm 0.007 M³ Kayu Klas II 0.375 Lbr Tripleks 3 mm TENAGA
0.300 0.030 0.200 0.010
OH OH OH OH
Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 149,820.00 14,982.00 164,802.00
33,000.00 4,000,000.00 106,000.00
495.00 28,000.00 39,750.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 164,445.00 16,444.50 180,889.50
4,000,000.00 33,000.00 33,000.00 67,000.00
56,000.00 660.00 990.00 50,250.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 204,100.00 20,410.00 224,510.00
4,000,000.00 33,000.00 33,000.00 106,000.00
56,000.00 660.00 990.00 79,500.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 233,350.00 23,335.00 256,685.00
14,000.00 33,000.00
14,700.00 330.00
190,000.00 230,000.00 150,000.00 230,000.00
9,500.00 1,150.00 7,500.00 690.00 33,870.00 3,387.00 37,257.00
9,000.00 33,000.00
9,450.00 330.00
190,000.00 230,000.00 150,000.00 230,000.00
9,500.00 1,150.00 7,500.00 690.00 28,620.00 2,862.00 31,482.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.236.b
1 M2 Pekerjaan Plafond Miring Tripleks 5 mm + Rangka kayu BAHAN 0.015 Kg Paku Panjang 1-3 Cm 0.007 M³ Kayu Klas II 0.375 Lbr Tripleks 5 mm TENAGA 0.300 OH Tukang Kayu 0.030 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.237.a
1 M2 Pekerjaan Dinding Double Tripleks 3 mm + Rangka kayu BAHAN 0.014 M³ Kayu Klas II 0.020 Kg Paku Panjang 4-6 Cm 0.030 Kg Paku Panjang 1-3 Cm 0.750 Lbr Tripleks 3 mm TENAGA 0.300 OH Tukang Kayu 0.030 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.237.b
1 M2 Pekerjaan Dinding Double Tripleks 5 mm + Rangka kayu BAHAN 0.014 M³ Kayu Klas II 0.020 Kg Paku Panjang 4-6 Cm 0.030 Kg Paku Panjang 1-3 Cm 0.750 Lbr Tripleks 5 mm TENAGA 0.300 OH Tukang Kayu 0.030 OH Kepala Tukang Kayu 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.238
1 M' Pekerjaan List Plafond Kayu Profil 4/4 cm BAHAN 1.050 M³ List Profil 4/4 cm 0.010 Kg Paku Panjang 1-3 Cm TENAGA 0.050 OH Tukang Kayu 0.005 OH Kepala Tukang Kayu 0.050 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.239
1 M' Pekerjaan List Plafond Kayu Profil 2/4 cm BAHAN 1.050 M³ List Profil 2/4 cm 0.010 Kg Paku Panjang 1-3 Cm TENAGA 0.050 OH Tukang Kayu 0.005 OH Kepala Tukang Kayu 0.050 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
PEKERJAAN ALUMUNIUM dan BESI SNI.241.a Memasang 1 Kg Rangka Kanal - C BAHAN 1.150 M³ Besi Kanal C TENAGA 0.060 OH Tukang Las Konstruksi 0.006 OH Kepala Tukang 0.060 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Pasang 1 m Handrail dan Railing BAHAN 2.650 m1 Pipa 2" black steel di cat duco 4.400 m1 Pipa 1"black steel dicat duco 10% Harga (Perlengkapan) TENAGA 0.250 OH Tukang Las Konstruksi 0.115 OH Kepala Tukang 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
38,000.00
43,700.00
190,000.00 230,000.00 150,000.00 230,000.00
11,400.00 1,380.00 9,000.00 690.00 66,170.00 6,617.00 72,787.00
69,000.00 44,000.00 56,500.00
182,850.00 193,600.00 5,650.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 26,450.00 2,250.00 207.00 458,507.00 45,850.70 504,357.70
43,000.00 43,000.00
47,300.00 6,450.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 22,500.00 207.00 108,407.00 10,840.70 119,247.70
94,000.00
759,050.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 26,450.00 2,250.00 207.00 835,457.00 83,545.70 919,002.70
32,000.00
258,400.00
190,000.00 230,000.00 150,000.00 230,000.00
47,500.00 26,450.00 2,250.00 207.00 334,807.00 33,480.70 368,287.70
32,000.00
32,000.00
3,200.00
3,200.00 35,200.00 3,520.00 38,720.00
132,000.00
132,000.00
13,200.00
13,200.00
SNI.241.b
SNI.241.c
Pasang 1 m Galvanis Steel 3/4" BAHAN 1.100 m1 Galvanis Steel 3/4" 15% Harga (Perlengkapan) TENAGA 0.150 OH Tukang Las Konstruksi 0.015 OH Kepala Tukang 0.150 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.d
Pasang 1 m Railing Stainless BAHAN 8.075 m1 Besi Stainless Ø 3/4' TENAGA 0.250 OH Tukang Las Konstruksi 0.115 OH Kepala Tukang 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.e
Pasang 1 m Tangga Hollow 5x5 cm BAHAN 8.075 m1 Hollow 5x5 cm TENAGA 0.250 OH Tukang Las Konstruksi 0.115 OH Kepala Tukang 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.1
1 m2 Pasang Syntetic Grass 1.000
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.2
m2 ls
BAHAN Syntetic Grass TENAGA Biaya pasang / Alat bantu
1 m Pasang WPC 5x5 cm 1.000
m1
1.000
ls
BAHAN WPC 5x5 cm TENAGA Biaya pasang / Alat bantu
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.3
1 m Pasang WPC 10x5 cm 1.000
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.4
m1 ls
BAHAN WPC 10x5 cm TENAGA Biaya pasang / Alat bantu
230,000.00
230,000.00
23,000.00
23,000.00 253,000.00 25,300.00 278,300.00
350,000.00
350,000.00
35,000.00
35,000.00 385,000.00 38,500.00 423,500.00
485,000.00
485,000.00
48,500.00
48,500.00 533,500.00 53,350.00 586,850.00
574,000.00
574,000.00
57,400.00
57,400.00 631,400.00 63,140.00 694,540.00
44,000.00
44,000.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 4,600.00 151,200.00 15,120.00 166,320.00
170,000.00
170,000.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 4,600.00 277,200.00 27,720.00 304,920.00
44,000.00 160,000.00
44,000.00 400,000.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 4,600.00 551,200.00 55,120.00 606,320.00
1 m Pasang WPC 15x5 cm 1.000
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.5
145,200.00 14,520.00 159,720.00
m1 ls
BAHAN WPC 15x5 cm TENAGA Biaya pasang / Alat bantu
1 m Pasang WPC 20x5 cm 1.000
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
m1 ls
BAHAN WPC 20x5 cm TENAGA Biaya pasang / Alat bantu
SNI.241.6
1 m Pasang WPC Panel W15 x H2,5 cm BAHAN 1.000 m1 WPC Panel W15 x H2,5 cm TENAGA 1.000 ls Biaya pasang / Alat bantu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.7
1 m2 Pasang Floor hardener 3 Kg/m2 BAHAN 1.000 m2 Floor hardener 3 Kg/m2 TENAGA 0.200 OH Tukang 0.020 OH Kepala Tukang 0.400 OH Pekerja 0.020 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.8
1 m2 Pasang Efoxy waterbased flooring non slip anti abrasion BAHAN 1.000 m2 Cat Epoxy TENAGA 0.200 OH Tukang 0.020 OH Kepala Tukang 0.400 OH Pekerja 0.020 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.9
1 m2 Pasang Floor hardener 3 Kg/m2 + ceramic stepnoosing 100 x 200 mm BAHAN 1.000 m2 Floor hardener 3 Kg/m2 2.500 m1 ceramic stepnoosing 100 x 200 mm TENAGA 0.200 OH Tukang 0.020 OH Kepala Tukang 0.400 OH Pekerja 0.020 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.10
1 m2 Pasang Floor hardener 7 Kg/m2 + grove line 2 cm
1.000 4.000
m2 m2
0.200 0.020 0.400 0.020
OH OH OH OH
BAHAN Floor hardener 7 Kg/m2 Grooe line 2 cm TENAGA Tukang Kepala Tukang Pekerja Mandor
57,000.00 26,000.00
57,000.00 104,000.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 60,000.00 4,600.00 268,200.00 26,820.00 295,020.00
220,000.00 220,000.00 1,700.00
220,000.00 8,800.00 76.50
75,000.00
75,000.00 303,876.50 30,387.65 334,264.15
132,000.00 132,000.00
1,320,000.00 5,280.00
55,000.00
55,000.00 1,380,280.00 138,028.00 1,518,308.00
6,500.00 47,000.00 410,000.00
6,500.00 4,700.00 328,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 230.00 15,000.00 1,150.00 374,580.00 37,458.00 412,038.00
38,000.00 23,000.00 160,000.00
570,000.00 754,400.00 8,000.00
190,000.00 230,000.00 150,000.00 230,000.00
199,500.00 24,150.00 157,500.00 11,960.00 1,725,510.00 172,551.00 1,898,061.00
6,500.00 47,000.00 160,000.00 410,000.00
1,950.00 1,880.00 64,000.00 69,700.00
190,000.00 230,000.00 150,000.00 230,000.00
3,800.00 460.00 6,000.00 460.00 148,250.00 14,825.00 163,075.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.11
Pasang GRC Rosters 300x300x150 BAHAN 1.000 m2 Roster 30 x 30 4% Biaya Perlengkapan 0.045 kg PC TENAGA 1.000 ls Upah Pasang Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.241.12
Pasang Kisi-kisi 50x100 mm UPVC Motif Kayu BAHAN 10.000 m1 Kisi-kisi 50x100 mm UPVC Motif Kayu 4% Biaya Perlengkapan TENAGA 1.000 ls Upah Pasang Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.242
Mengerjakan 100 kg pekerjaan perakitan BAHAN 1.000 Ltr Solar 0.100 Ltr Minyak pelumas 0.800 jam Sewa Alat TENAGA 0.100 OH Tukang Besi konstruksi 0.001 OH Kepala Tukang 0.100 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.243
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku BAHAN 15.000 Kg Besi siku 32.800 Kg Besi plat baja 2 mm 0.050 Kg kawat las TENAGA 1.050 OH Tukang Las Konstruksi 0.105 OH Kepala Tukang 1.050 OH Pekerja 0.052 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.244
Mengerjakan 10 cm pengelasan dengan las listrik BAHAN 0.300 Ltr Solar 0.040 Ltr Minyak pelumas 0.400 kg Kawat las listrik 0.170 jam Sewa Alat TENAGA 0.020 OH Tukang Besi konstruksi 0.002 OH Kepala Tukang 0.040 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.245
Memasang 1 m2 rolling door alluminium BAHAN
1.000
M2
1.000 0.100 1.000 0.050
OH OH OH OH
Rolling door alluminium TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
600,000.00
600,000.00
190,000.00 230,000.00 150,000.00 230,000.00
190,000.00 23,000.00 150,000.00 11,500.00 974,500.00 97,450.00 1,071,950.00
500,000.00
500,000.00
190,000.00 230,000.00 150,000.00 230,000.00
152,000.00 18,400.00 12,000.00 920.00 683,320.00 68,332.00 751,652.00
95,000.00 22,000.00 35,000.00
104,500.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
8,170.00 989.00 6,450.00 494.50 166,703.50 16,670.35 183,373.85
95,000.00 200,000.00 22,000.00 35,000.00
418,000.00 220,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 715,932.50 71,593.25 787,525.75
95,000.00 1,000,000.00 22,000.00 35,000.00
418,000.00 1,100,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,595,932.50 159,593.25 1,755,525.75
95,000.00 1,100,000.00 22,000.00 35,000.00
418,000.00 1,210,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,705,932.50
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.246
Memasang 1 m2 sunscreen alluminium BAHAN 1.000 M2 Sunscreen alluminium TENAGA 0.800 OH Tukang Alumunium 0.080 OH Kepala Tukang 0.080 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.247
Memasang 1 m kusen pintu alluminium Natural BAHAN 1.100 m Kusen Alumunium Natural 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.043 OH Tukang Alumunium 0.004 OH Kepala Tukang 0.043 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.247.a
Memasang 1 m2 Dinding kusen alluminium Natural + Kaca polos 8 mm BAHAN 4.400 m Kusen Alumunium Natural 1.100 m2 Kaca Polos 8 mm 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.247.b
Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, polos BAHAN 4.400 m Kusen Alumunium Natural 1.100 m2 Kaca Tempreat 8 mm, Polos 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.247.c
Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, warna BAHAN 4.400 m Kusen Alumunium Natural 1.100 m2 Kaca Tempreat 8 mm, Warna 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C )
Keuntungan & Overhead 10 % Jumlah ……………………… Memasang 1 m kusen pintu alluminium Warna BAHAN 1.100 m Kusen Alumunium Warna 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.043 OH Tukang Alumunium 0.004 OH Kepala Tukang 0.043 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
170,593.25 1,876,525.75
SNI.248
Memasang 1 m2 Dinding kusen alluminium Warna + Kaca polos 8 mm BAHAN 4.400 m Kusen Alumunium Warna 1.100 m2 Kaca Polos 8 mm 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.043 OH Tukang Alumunium 0.004 OH Kepala Tukang 0.043 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
110,000.00 22,000.00 35,000.00
121,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
8,170.00 989.00 6,450.00 494.50 183,203.50 18,320.35 201,523.85
110,000.00 200,000.00 22,000.00 35,000.00
484,000.00 220,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
8,170.00 989.00 6,450.00 494.50 766,203.50 76,620.35 842,823.85
110,000.00 1,000,000.00 22,000.00 35,000.00
484,000.00 1,100,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
8,170.00 989.00 6,450.00 494.50 1,646,203.50 164,620.35 1,810,823.85
110,000.00 1,100,000.00 22,000.00 35,000.00
484,000.00 1,210,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,771,932.50 177,193.25 1,949,125.75
26,000.00 1,800,000.00 22,000.00 35,000.00
114,400.00 1,980,000.00 44,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 2,172,332.50 217,233.25 2,389,565.75
SNI.248.a
SNI.248.b
Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, polos BAHAN 4.400 m Kusen Alumunium Warna 1.100 m2 Kaca Tempreat 8 mm, Polos 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.043 OH Tukang Alumunium 0.004 OH Kepala Tukang 0.043 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.c
Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, warna BAHAN 4.400 m Kusen Alumunium Warna 1.100 m2 Kaca Tempreat 8 mm, Warna 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.12
Memasang 1 m2 Besi Hollow + Kaca tempreat 12 mm, warna BAHAN 4.400 m Besi Hollow 1.100 m2 Kaca Tempreat 12 mm, Warna 2.000 bh Skrup fixer 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.T8p
Memasang 1 m2 Kaca temreat 8 mm, polos
1.100 0.060
m2 tube
0.085 0.009 0.085 0.004
OH OH OH OH
BAHAN Kaca Tempreat 8 mm, Polos Sealant TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
1,000,000.00 35,000.00
1,100,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,133,932.50 113,393.25 1,247,325.75
1,100,000.00 35,000.00
1,210,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,243,932.50 124,393.25 1,368,325.75
170,000.00 35,000.00
187,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 220,932.50 22,093.25 243,025.75
200,000.00 35,000.00
220,000.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 253,932.50 25,393.25 279,325.75
165,000.00 35,000.00
181,500.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 215,432.50 21,543.25 236,975.75
215,000.00 35,000.00
236,500.00 2,100.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 270,432.50 27,043.25 297,475.75
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.T8w
Memasang 1 m2 Kaca temreat 8 mm, Warna BAHAN 1.100 m2 Kaca Tempreat 8 mm, Warna 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.5p
Memasang 1 m2 Kaca mati 5 mm, polos BAHAN 1.100 m2 Kaca 5 mm, Polos 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.8p
Memasang 1 m2 Kaca mati 8 mm, polos BAHAN 1.100 m2 Kaca 8 mm, Polos 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.R
Memasang 1 m2 Kaca mati Riben 5 mm BAHAN 1.100 m2 Kaca Riben 5 mm 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.248.B/E
Memasang 1 m2 Kaca mati Buram/Es 5 mm BAHAN 1.100 m2 Kaca Buram/Es 5 mm 0.060 tube Sealant TENAGA 0.085 OH Tukang Alumunium 0.009 OH Kepala Tukang 0.085 OH Pekerja 0.004 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249
Memasang 1 m2 pintu alluminium strip
4.400 8.750
m m'
0.085 0.009 0.085 0.004
OH OH OH OH
BAHAN Kusen Alumunium Natural alluminium strip TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
95,000.00 60,000.00
418,000.00 525,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 974,832.50 97,483.25 1,072,315.75
169,000.00
185,900.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 220,272.50 22,027.25 242,299.75
1,500,000.00
1,650,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 1,684,372.50 168,437.25 1,852,809.75
1,800,000.00
1,980,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 1,840.00 2,016,040.00 201,604.00 2,217,644.00
1,100,000.00
1,210,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 1,840.00 1,246,040.00 124,604.00 1,370,644.00
190,000.00 230,000.00 150,000.00 230,000.00
285,000.00 17,250.00 112,500.00 575.00 415,325.00 41,532.50 456,857.50
190,000.00 230,000.00 150,000.00 230,000.00
475,000.00 17,250.00 11,250.00 575.00 504,075.00 50,407.50
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.a
Pasang 1 Buah Cermin ex. TOTO TS 119 AS5 BAHAN 1.100 m2 Kaca Cermin 5 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.b
Pasang 1 Buah Kaca Laminasi tebal 12 mm BAHAN 1.100 m2 Laminasi tebal 12 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.c
Pasang 1 m2 kaca green glass 12 mm BAHAN 1.100 m2 Kaca green glass 12 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.d
Pasang 1 m2 kaca green glass tebal 8 mm BAHAN 1.100 m2 Kaca temperet 8 mm TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.e
Pasang 1 bh Pintu Engineering door / WPC TENAGA 1.500 OH Tukang 0.075 OH Kepala Tukang 0.750 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.f
Pasang 1 bh Pintu Green glass TENAGA 2.500 OH Tukang 0.075 OH Kepala Tukang 0.075 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 %
Jumlah ……………………… Pasang 1 bh Pintu siku alumunium powder coating BAHAN 1.000 m1 Siku alumunium TENAGA 0.500 OH Tukang 0.010 OH Kepala Tukang 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
554,482.50
SNI.249.g
Pemasangan 1 m1 Kusen plat baja uk. 15x9x0,2 cm BAHAN 1.000 m1 plat baja 15x9x9,2 cm 15.000 cm1 pengelasan TENAGA 0.800 OH Tukang 0.045 OH Kepala Tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
82,000.00
82,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 2,300.00 1,500.00 1,150.00 99,950.00 9,995.00 109,945.00
315,000.00 1,300.00
315,000.00 19,500.00
190,000.00 230,000.00 150,000.00 230,000.00
152,000.00 10,350.00 22,500.00 1,840.00 521,190.00 52,119.00 573,309.00
32,000.00 12,000.00
33,600.00 12,000.00
190,000.00 230,000.00 150,000.00 230,000.00
15,200.00 10,350.00 22,500.00 1,840.00 95,490.00 9,549.00 105,039.00
210,000.00 2,000.00
210,000.00 4,000.00
190,000.00 230,000.00 150,000.00 230,000.00
15,200.00 10,350.00 22,500.00 1,840.00 263,890.00 26,389.00 290,279.00
1,500,000.00 700,000.00 1,300,000.00 185,000.00 1,650,000.00 1,000,000.00
7,380,000.00 700,000.00 2,600,000.00 185,000.00 3,300,000.00 1,050,000.00
290,279.00 554,482.50
2,960,845.80 1,108,965.00 19,284,810.80 1,928,481.08 21,213,291.88
0.00 700,000.00 185,000.00 185,000.00 130,000.00 350,000.00
0.00 504,000.00 185,000.00 370,000.00 780,000.00 700,000.00
290,279.00
1,799,729.80
SNI.249.1
SNI.249.2
Pemasangan 1 m1 Kusen Steel Frame Hollow Galvanis 150x40x3 mm BAHAN 1.050 m1 Steel Frame Hollow Galvanis 150x40x3 mm 1.000 ls Alat bantu TENAGA 0.080 OH Tukang 0.045 OH Kepala Tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.3
Pemasangan 1 m1 Kusen alumunium 4" YKK finishing powder coating BAHAN 1.000 m1 Alumunium 4" Dark Gray ex. YKK 2.000 bh Sekrup TENAGA 0.080 OH Tukang 0.045 OH Kepala Tukang 0.150 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4a
Mengerjakan 1 Unit pintu double UGD type P-01 BAHAN 4.920 m2 Kaca green glass 12 mm 1.000 m2 Plat stainless steel 2.000 bh Pull Handle ex. Dekson type 01 1.000 bh Lock Case ex. Dekson 2.000 bh Engsel Floor hange Dexson 1.050 m2 Kaca green glass 8 mm TENAGA 10.200 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 2.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4b
Mengerjakan 1 Unit pintu type P-02 BAHAN 2.000 bh WPC door type 02 include kaca 5 mm 0.720 m2 Plate stainless steel 1.000 bh Lock Case ex. Dekson 2.000 bh Lever Handle ex. Dekson 6.000 bh Engsel kupu ex. Dekson 2.000 bh Door Closer ex dekson TENAGA 6.200 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin
2.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
bh
Pasang Daun Pintu
Mengerjakan 1 Unit pintu type P-03 BAHAN 1.000 bh WPC door type 03 include kaca 5 mm 0.520 m2 Plate stainless steel 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 6.000 bh Engsel kupu ex. Dekson 1.000 bh Door Closer ex dekson TENAGA 5.700 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.500 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
456,857.50
913,715.00 5,252,444.80 525,244.48 5,777,689.28
0.00 700,000.00 185,000.00 185,000.00 130,000.00 350,000.00
0.00 364,000.00 185,000.00 185,000.00 780,000.00 350,000.00
290,279.00 456,857.50
1,654,590.30 685,286.25 4,203,876.55 420,387.66 4,624,264.21
0.00 700,000.00 185,000.00 185,000.00 130,000.00 350,000.00
0.00 252,000.00 185,000.00 185,000.00 390,000.00 350,000.00
290,279.00 456,857.50
1,538,478.70 456,857.50 3,357,336.20 335,733.62 3,693,069.82
0.00 700,000.00 185,000.00 185,000.00 130,000.00 350,000.00
0.00 252,000.00 185,000.00 185,000.00 390,000.00 350,000.00
290,279.00 456,857.50
1,538,478.70 456,857.50 3,357,336.20 335,733.62 3,693,069.82
0.00 700,000.00 185,000.00 185,000.00 130,000.00 350,000.00
0.00 196,000.00 185,000.00 185,000.00 390,000.00 350,000.00
290,279.00 456,857.50
1,480,422.90 456,857.50 3,243,280.40 324,328.04 3,567,608.44
0.00 185,000.00 185,000.00 130,000.00
0.00 185,000.00 185,000.00 390,000.00
290,279.00 456,857.50
1,509,450.80 456,857.50 2,726,308.30 272,630.83 2,998,939.13
SNI.249.4c
SNI.249.4d
Mengerjakan 1 Unit pintu type P-04A BAHAN 1.000 bh WPC door type 02 include kaca 5 mm 0.360 m2 Plate stainless steel 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 3.000 bh Engsel kupu ex. Dekson 1.000 bh Door Closer ex dekson TENAGA 5.300 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4e
Mengerjakan 1 Unit pintu type P-04B BAHAN 1.000 bh WPC door type 04b include kaca 5 mm 0.360 m2 Plate stainless steel 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 3.000 bh Engsel kupu ex. Dekson 1.000 bh Door Closer ex dekson TENAGA 5.300 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4f
Mengerjakan 1 Unit pintu type P-04C BAHAN 1.000 bh WPC door type 04c include kaca 5 mm 0.280 m2 Plate stainless steel 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 3.000 bh Engsel kupu ex. Dekson 1.000 bh Door Closer ex dekson TENAGA 5.100 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4g
Mengerjakan 1 Unit pintu type P-05 BAHAN 1.000 bh WPC door type 06 uk. 2,2 x 0,8 m 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 3.000 bh Engsel kupu ex. Dekson TENAGA 5.200 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.249.4h
Mengerjakan 1 Unit pintu type P-06 BAHAN 1.000 bh WPC door type 06 uk. 2,2 x 0,8 m 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 3.000 bh Engsel kupu ex. Dekson 0.400 m2 Kaca es TENAGA 7.100 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Mengerjakan 1 Unit pintu type P-07 BAHAN 1.000 bh WPC door type 06 uk. 2,2 x 0,8 m 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 3.000 bh Engsel kupu ex. Dekson 0.450 m2 Kaca es TENAGA 7.100 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
0.00 185,000.00 185,000.00 130,000.00 215,000.00
0.00 185,000.00 185,000.00 390,000.00 86,000.00
290,279.00 456,857.50
2,060,980.90 456,857.50 3,363,838.40 336,383.84 3,700,222.24
0.00 185,000.00 185,000.00 130,000.00 215,000.00
0.00 185,000.00 185,000.00 390,000.00 96,750.00
290,279.00 456,857.50
2,060,980.90 456,857.50 3,374,588.40 337,458.84 3,712,047.24
0.00 130,000.00
0.00 260,000.00
290,279.00 456,857.50
986,948.60 456,857.50 1,703,806.10 170,380.61 1,874,186.71
0.00 185,000.00 1,500,000.00 200,000.00
0.00 185,000.00 1,500,000.00 200,000.00
290,279.00 456,857.50
1,712,646.10 662,443.38 4,260,089.48 426,008.95 4,686,098.42
0.00 185,000.00 1,500,000.00 200,000.00
0.00 185,000.00 1,500,000.00 200,000.00
290,279.00 456,857.50
1,538,478.70 662,443.38 4,085,922.08 408,592.21 4,494,514.28
18,800,000.00 185,000.00 185,000.00 110,000.00 130,000.00
18,800,000.00 185,000.00 185,000.00 550,000.00 1,950,000.00
573,309.00 456,857.50
4,987,788.30 662,443.38 27,320,231.68 2,732,023.17 30,052,254.84
SNI.249.4i
SNI.249.4j
Mengerjakan 1 Unit pintu type P-08 BAHAN 1.000 bh WPC door type 08 uk. 1.1 x 0,6 m 2.000 bh Engsel kupu ex. Dekson TENAGA 3.400 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.000 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4k
Mengerjakan 1 Unit pintu type P-09 BAHAN 1.000 bh WPC door type 09 uk. 2,2 x 1,5 m 1.000 bh Lock Case ex. Dekson 1.000 bh Slide Handle ex. Dekson 1.000 bh Engsel sliding TENAGA 5.900 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.450 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4l
Mengerjakan 1 Unit pintu type P-10 BAHAN 1.000 bh WPC door type 10 uk. 2,2 x 0,9 m 1.000 bh Lock Case ex. Dekson 1.000 bh Slide Handle ex. Dekson 1.000 bh Engsel sliding TENAGA 5.300 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.450 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.249.4m
Mengerjakan 1 Unit pintu type P-11 BAHAN 1.000 bh Pintu plat baja tebal 5,5 mm lapis timah hitam ex. Bostinc 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 5.000 bh Flush bolt ex. Dekson 15.000 bh Engsel kupu ex. Dekson TENAGA 8.700 m1 Pasang kusen pintu plat baja uk. 15x9x0,2 cm lapis timah 1.450 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.249.4n
Mengerjakan 1 Unit pintu type P-12 BAHAN 1.000 bh WPC door type 11 uk. 2,2 x 1,3 m 0.520 m2 Plate stainless steel 1.000 bh Lock Case ex. Dekson 1.000 bh Lever Handle ex. Dekson 6.000 bh Engsel kupu ex. Dekson 1.000 bh Door Closer ex dekson TENAGA 5.700 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 1.500 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Mengerjakan 1 Unit pintu type P-S BAHAN 1.000 set Kalsiboard rangka alumunium 2.000 bh Engsel kupu ex. Dekson TENAGA 3.800 m1 Pasang kusen pintu siku alumunium finishing Powder 1.500 bh Pasang Daun Pintu Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
0.00 700,000.00 185,000.00 185,000.00 130,000.00 350,000.00
0.00 364,000.00 185,000.00 185,000.00 780,000.00 350,000.00
290,279.00 456,857.50
1,654,590.30 685,286.25 4,203,876.55 420,387.66 4,624,264.21
0.00 130,000.00
0.00 260,000.00
82,000.00 228,428.75
311,600.00 342,643.13 914,243.13 91,424.31 1,005,667.44
1,100,000.00
1,100,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,131,832.50 113,183.25 1,245,015.75
1,100,000.00
1,100,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,131,832.50 113,183.25 1,245,015.75
1,150,000.00
1,150,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,181,832.50 118,183.25 1,300,015.75
1,200,000.00
1,200,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,231,832.50 123,183.25 1,355,015.75
SNI.249.4o
SNI.250.N5
Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (natural) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 5 mm, (natural) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.250.N8
Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (natural) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 8 mm, (natural) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.250.W5
Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (warna) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 5 mm, (warna) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.250.W8
Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (warna) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 8 mm, (warna) 0.085 0.009 0.085 0.004
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
SNI.251.N
Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (natural) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 5 mm, (natural) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
1,100,000.00
1,100,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,131,832.50 113,183.25 1,245,015.75
1,100,000.00
1,100,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,131,832.50 113,183.25 1,245,015.75
1,150,000.00
1,150,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,181,832.50 118,183.25 1,300,015.75
1,200,000.00
1,200,000.00
190,000.00 230,000.00 150,000.00 230,000.00
16,150.00 1,955.00 12,750.00 977.50 1,231,832.50 123,183.25 1,355,015.75
30,000.00 7,500.00 7,000.00 500.00
127,800.00 36,975.00 98,000.00 5,500.00
190,000.00 230,000.00 150,000.00 230,000.00
76,000.00 9,200.00 21,000.00 16,100.00 390,575.00 39,057.50 429,632.50
19,000.00 7,500.00 7,000.00 500.00
80,940.00 36,975.00 98,000.00 5,500.00
190,000.00 230,000.00 150,000.00
76,000.00 9,200.00 21,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.N8
Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (natural) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 8 mm, (natural) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.W
Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (warna) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 5 mm, (warna) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.W8
Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (warna) BAHAN 1.000 M2 Daun pintu/jendela alumunium + kaca 8 mm, (warna) 0.085 0.009 0.085 0.004
OH OH OH OH
TENAGA Tukang Alumunium Kepala Tukang Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.75.a
1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.100 BAHAN 4.260 M1 Profil C 75.100 4.930 M1 Reng U 0.45 14.000 Bh Baut Truss 11.000 Bh Baut Reng TENAGA 0.400 OH Tukang Alumunium 0.040 OH Kepala Tukang 0.140 OH Pekerja 0.070 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.75.b 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75 BAHAN 4.260 M1 Profil C 75.75 4.930 M1 Reng U 0.45 14.000 Bh Baut Truss 11.000 Bh Baut Reng TENAGA 0.400 OH Tukang Alumunium 0.040 OH Kepala Tukang 0.140 OH Pekerja
0.070 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH
Mandor
SNI.251.75.b 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75 BAHAN 4.260 M1 Profil C 75.75 4.930 M1 Reng U 0.45 14.000 Bh Baut Truss 11.000 Bh Baut Reng TENAGA 0.400 OH Tukang Alumunium 0.040 OH Kepala Tukang 0.140 OH Pekerja 0.070 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) Usuk C 75 BAHAN 4.260 M1 Profil C 75.75 14.000 Bh Baut Truss TENAGA 0.280 OH Tukang Alumunium 0.028 OH Kepala Tukang 0.098 OH Pekerja 0.049 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
230,000.00
16,100.00 343,715.00 34,371.50 378,086.50
19,000.00 7,500.00 7,000.00 500.00
80,940.00 36,975.00 98,000.00 5,500.00
190,000.00 230,000.00 150,000.00 230,000.00
76,000.00 9,200.00 21,000.00 16,100.00 343,715.00 34,371.50 378,086.50
19,000.00 7,000.00
80,940.00 98,000.00
190,000.00 230,000.00 150,000.00 230,000.00
53,200.00 6,440.00 14,700.00 11,270.00 264,550.00 26,455.00 291,005.00
7,500.00 500.00
36,975.00 5,500.00
190,000.00 230,000.00 150,000.00 230,000.00
22,800.00 2,760.00 6,300.00 4,830.00 79,165.00 7,916.50 87,081.50
35,000.00 7,500.00 7,000.00 500.00
149,100.00 36,975.00 98,000.00 5,500.00
190,000.00 230,000.00 150,000.00 230,000.00
76,000.00 9,200.00 21,000.00 16,100.00 411,875.00 41,187.50 453,062.50
25,000.00 7,500.00 7,000.00 500.00
106,500.00 36,975.00 98,000.00 5,500.00
190,000.00 230,000.00 150,000.00 230,000.00
76,000.00 9,200.00 21,000.00 16,100.00 369,275.00 36,927.50 406,202.50
SNI.251.75.c
SNI.251.75.d 1 M2 Rangka Reng Aluzing Aluminium (Baja ringan) Reng U 0.45 BAHAN 4.930 M1 Reng U 0.45 11.000 Bh Baut Reng TENAGA 0.120 OH Tukang Alumunium 0.012 OH Kepala Tukang 0.042 OH Pekerja 0.021 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.80.a
1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.100 BAHAN 4.260 M1 Profil C 80.100 4.930 M1 Reng U 0.45 14.000 Bh Baut Truss 11.000 Bh Baut Reng TENAGA 0.400 OH Tukang Alumunium 0.040 OH Kepala Tukang 0.140 OH Pekerja 0.070 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.80.b 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.75 BAHAN 4.260 M1 Profil C 80.75 4.930 M1 Reng U 0.45 14.000 Bh Baut Truss 11.000 Bh Baut Reng TENAGA 0.400 OH Tukang Alumunium 0.040 OH Kepala Tukang 0.140 OH Pekerja 0.070 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.ACP.a 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Interior BAHAN
6.000 1.100 0.200 0.250
M' M2 kg tube
0.150 0.015 0.015 0.008
OH OH OH OH
Besi Holow 40x40 zincromate Alluminium Composit Panel (ACP) 0,30 mm, (Interior) Paku Sekrup Sealant TENAGA Tukang Kepala tukang Pekerja Mandor
26,000.00 550,000.00 35,000.00 35,000.00
156,000.00 605,000.00 7,000.00 8,750.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 1,725.00 812,675.00 81,267.50 893,942.50
26,000.00 800,000.00 35,000.00 35,000.00
156,000.00 880,000.00 7,000.00 8,750.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 1,725.00 1,087,675.00 108,767.50 1,196,442.50
13,000.00 550,000.00 35,000.00 35,000.00
78,000.00 605,000.00 7,000.00 8,750.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 1,725.00 734,675.00 73,467.50 808,142.50
19,000.00 35,000.00 100,000.00
83,600.00 3,500.00 220,000.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 403,300.00 40,330.00 443,630.00
19,000.00 35,000.00 222,000.00
83,600.00 3,500.00 333,000.00
190,000.00 230,000.00 150,000.00 230,000.00
57,000.00 6,900.00 30,000.00 2,300.00 516,300.00 51,630.00 567,930.00
127,000.00 50,000.00 127,000.00
33,020.00 5,000.00 12,700.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.ACP.b 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Exterior BAHAN 6.000 M' Besi Holow 40x40 zincromate 1.100 M2 Alluminium Composit Panel (ACP) 0,30 mm, (Exterior) 0.200 kg Paku Sekrup 0.250 tube Sealant TENAGA 0.150 OH Tukang 0.015 OH Kepala tukang 0.015 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.ACP.c 1 M2 Rangka dan Penutup Wood Panel Composit (WPC), Exterior BAHAN 6.000 M' Besi Holow 40x40 zincromate 1.100 M2 Wood Panel Composit 0.200 kg Paku Sekrup 0.250 tube Sealant TENAGA 0.150 OH Tukang 0.015 OH Kepala tukang 0.015 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.DG
1 M2 Pekerjaan Dinding Double Gypsum 9 mm + Rangka profil C BAHAN 4.400 m Profil C 0.100 Kg Paku Sekrup 2.200 M2 Gypsum board 1200 x 2400 x 9 mm TENAGA 0.300 OH Tukang 0.030 OH Kepala Tukang 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.251.DC
1 M2 Pekerjaan Dinding Double Calsiboart 6 mm + Rangka profil C BAHAN 4.400 m Profil C 0.100 Kg Paku Sekrup 1.500 Lbr Calsiboard 1200 x 240 x 6 mm TENAGA 0.300 OH Tukang 0.030 OH Kepala Tukang 0.200 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN PENGECATAN/FINISING SNI.252 1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Eksterior) BAHAN 0.260 Kg Cat Tembok Mutu Tinggi, (Exterior) 0.100 Kg Plamir Tembok 0.100 Kg Cat Dasar TENAGA
0.063 0.006 0.020 0.003
OH OH OH OH
Tukang Cat Kepala Tukang Cat Pekerja Mandor
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 67,714.00 6,771.40 74,485.40
60,000.00 50,000.00 60,000.00
15,600.00 5,000.00 6,000.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 43,594.00 4,359.40 47,953.40
60,000.00 50,000.00 60,000.00
15,600.00 5,000.00 6,000.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 1,950.00 2,300.00 73,450.00 7,345.00 80,795.00
65,000.00
16,900.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 33,894.00 3,389.40 37,283.40
110,000.00 29,000.00 65,000.00
115,500.00 29,000.00 68,250.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 229,744.00 22,974.40 252,718.40
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.a
1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Interior) BAHAN 0.260 Kg Cat Tembok Mutu Tinggi, (Interior) 0.100 Kg Plamir Tembok 0.100 Kg Cat Dasar TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.020 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.b
1 M2 Pekerjaan Cat Plafond Baru 1 x Dasar, 2 x Cat BAHAN 0.260 Kg Cat Plafond 0.100 Kg Plamir Plafond 0.100 Kg Cat Dasar TENAGA 0.200 OH Tukang Cat 0.020 OH Kepala Tukang Cat 0.013 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.c
1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) BAHAN 0.260 Kg Cat Dak, (Water Proofing) TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.020 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.d
1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) BAHAN 1.050 m2 Fiber Bakar 1.000 bh Kuas 1.050 m2 Waterproofing TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.020 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.e
1 m² Pengecatan Tembok Baru anti bakteri ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup anti bakteri) BAHAN 0.100 Kg Plamir 50,000.00 0.100 Kg Cat Dasar 127,000.00 0.100 Lbr Ampelas 9,000.00 0.360 Kg Cat Tembok berbahan anti bakteri 127,000.00 TENAGA 0.063 OH Tukang Cat 190,000.00 0.006 OH Kepala Tukang Cat 230,000.00 0.020 OH Pekerja 150,000.00 0.003 OH Mandor 230,000.00 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.f
1 m² Memasang pelapis tembok dengan plat timbal hitam tebal 3 mm rangka hollow
5,000.00 12,700.00 900.00 45,720.00 11,970.00 1,449.00 3,000.00 575.00 81,314.00 8,131.40 89,445.40
1.100 1.100 6.400 4.400 10.000
m2 m2 m1 m1 cm
0.063 0.006 0.020 0.003
OH OH OH OH
BAHAN Plat timbah hitam 3 m Triplek rebal 6 mm Hollow 40 x 40 tebal 1 mm Hollow 20 x 40 tebal 1 mm Pengelasan TENAGA Tukang Besi Kepala Tukang Besi Pekerja Mandor
750,000.00 106,000.00 26,000.00 13,000.00 1,300.00
825,000.00 116,600.00 166,400.00 57,200.00 13,000.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 1,195,194.00 119,519.40 1,314,713.40
86,700.00 25,000.00
104,040.00 5,000.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 126,034.00 12,603.40 138,637.40
100,000.00 25,000.00
150,000.00 4,000.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 170,994.00 17,099.40 188,093.40
120,000.00 1,700.00 225,000.00
150,000.00 150,000.00 150,000.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 3,000.00 575.00 466,994.00 46,699.40 513,693.40
1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Eksterior 0.180 Kg Cat Tembok 0.120 Kg Cat Dasar 0.042 OH Tukang Cat 0.004 OH Kepala Tukang Cat 0.028 OH Pekerja 0.003 OH Mandor
127,000.00 127,000.00 190,000.00 230,000.00 150,000.00 230,000.00
22,860.00 15,240.00 7,980.00 966.00 4,200.00 575.00 51,821.00
1 M2 Pekerjaan Mengikis/ Mengerok Permukaan Cat Tembok Lama 0.050 Kg Soda api 0.150 OH Pekerja 0.003 OH Mandor
66,000.00 150,000.00 230,000.00
3,300.00 22,500.00 575.00 26,375.00
1 M2 Pekerjaan Mencuci Bidang Permukaan Tembok yang pernah di cat 0.050 Kg Sabun 0.150 OH Pekerja 0.003 OH Mandor
20,000.00 150,000.00 230,000.00
1,000.00 22,500.00 575.00 24,075.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.g
1 m² Measang pelapis tembak dengan HPL BAHAN 1.200 m3 HPL 0.200 Kg Kapur Sirih TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.020 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.h
1 m² Pemasangan Wall Paper BAHAN 1.200 m3 Wall Paper 0.200 Kg Perekat TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.020 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.252.i
1 m2 Pengecatan Cat Tekstur Fin. Kamprot Halus BAHAN 0.260 kg Cat tembok dulux Watersilt Pro 4.320 kg PC 0.006 m3 Pasir pasang TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.020 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.253
Jumlah 1 M2 Cat Tembok 1 x Cat ( I + II + III ) Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
102,271.00 102,271.00 10,227.10 112,498.10
SNI.253.a
1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Interior 0.180 Kg Cat Tembok 0.120 Kg Cat Dasar 0.042 OH Tukang Cat 0.004 OH Kepala Tukang Cat 0.028 OH Pekerja 0.003 OH Mandor
60,000.00 60,000.00 190,000.00 230,000.00 150,000.00 230,000.00
10,800.00 7,200.00 7,980.00 966.00 4,200.00 575.00 31,721.00
1 M2 Pekerjaan Mengikis/ Mengerok Permukaan Cat Tembok Lama 0.050 Kg Soda api 0.150 OH Pekerja 0.003 OH Mandor
66,000.00 150,000.00 230,000.00
3,300.00 22,500.00 575.00 26,375.00
1 M2 Pekerjaan Mencuci Bidang Permukaan Tembok yang pernah di cat 0.050 Kg Sabun 0.150 OH Pekerja 0.003 OH Mandor
20,000.00 150,000.00 230,000.00
1,000.00 22,500.00 575.00 24,075.00
Jumlah 1 M2 Cat Tembok 1 x Cat ( I + II + III ) Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Eksterior BAHAN 0.200 Kg Cat Tembok 0.120 Kg Cat Dasar TENAGA 0.042 OH Tukang Cat 0.004 OH Kepala Tukang Cat 0.028 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
82,171.00 82,171.00 8,217.10 90,388.10
SNI.254
1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Interior BAHAN 0.200 Kg Cat Tembok 0.120 Kg Cat Dasar TENAGA 0.042 OH Tukang Cat 0.004 OH Kepala Tukang Cat 0.028 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
127,000.00 127,000.00
25,400.00 15,240.00
190,000.00 230,000.00 150,000.00 230,000.00
7,980.00 966.00 4,200.00 575.00 54,361.00 5,436.10 59,797.10
60,000.00 60,000.00
12,000.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
7,980.00 966.00 4,200.00 575.00 32,921.00 3,292.10 36,213.10
60,000.00 60,000.00
12,000.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 1,950.00 2,300.00 66,050.00 6,605.00 72,655.00
42,000.00 60,000.00
7,560.00 7,200.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 25,050.00 1,932.00 84,342.00 8,434.20 92,776.20
SNI.254.a
SNI.254.b
1 M2 Pekerjaan Cat Plafond Lama 1 x Dasar, 2 x Cat BAHAN 0.200 Kg Cat Tembok 0.120 Kg Cat Dasar TENAGA 0.200 OH Tukang Cat 0.020 OH Kepala Tukang Cat 0.013 OH Pekerja 0.010 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.255
1 M2 Pekerjaan cat Genteng BAHAN 0.180 Kg Cat Genteng 0.120 Kg Cat Dasar TENAGA 0.200 OH Tukang Cat 0.020 OH Kepala Tukang Cat 0.167 OH Pekerja 0.008 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.256
1 M2 Pekerjaan Cat Kayu 1 x Meni, 2 x Cat
0.200 0.260 0.170 0.150 0.020
Kg Kg Kg Kg Kg
0.009 0.006 0.070 0.003
OH OH OH OH
BAHAN Cat Meni Cat Kayu Cat Dasar Plamir Kayu Minyak Cat TENAGA Tukang Cat Kepala Tukang Cat Pekerja Mandor
35,000.00 90,000.00 72,000.00 29,000.00 20,000.00
7,000.00 23,400.00 12,240.00 4,350.00 400.00
190,000.00 230,000.00 150,000.00 230,000.00
1,710.00 1,380.00 10,500.00 575.00 61,555.00 6,155.50 67,710.50
90,000.00 29,000.00 72,000.00
15,300.00 4,350.00 12,240.00
190,000.00 230,000.00 150,000.00 230,000.00
14,250.00 1,725.00 10,500.00 575.00 58,940.00 5,894.00 64,834.00
42,000.00
10,920.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 13,050.00 736.00 46,006.00 4,600.60 50,606.60
35,000.00 20,000.00 250,000.00
2,800.00 400.00 2,500.00
190,000.00 230,000.00 150,000.00 230,000.00
7,600.00 920.00 6,000.00 575.00 20,795.00 2,079.50 22,874.50
36,000.00 37,000.00 9,000.00
5,400.00 13,764.00 18,000.00
190,000.00 230,000.00 230,000.00
11,400.00 3,680.00 575.00 52,819.00 5,281.90 58,100.90
35,000.00 70,000.00 20,000.00 20,000.00 20,000.00
3,500.00 11,200.00 5,400.00 20,000.00 1,000.00
190,000.00 230,000.00
19,000.00 2,300.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.257
1 M2 Pekerjaan Cat Kayu, 1 x Cat BAHAN 0.170 Kg Cat Kayu 0.150 Kg Plamir 0.170 Kg Cat Dasar TENAGA 0.075 OH Tukang Cat 0.008 OH Kepala Tukang Cat 0.070 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.258
1 M2 Pekerjaan Cat paving Blok BAHAN 0.260 Kg Cat Penutup 2 x TENAGA 0.100 OH Tukang Cat 0.010 OH Kepala Tukang Cat 0.087 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.259
1 M2 Mendempul dan Menggosok Kayu BAHAN 0.080 Kg Dempul Jadi 0.020 Kg Minyak Cat 0.010 Kg Batu Apung TENAGA 0.040 OH Tukang Cat 0.004 OH Kepala Tukang Cat 0.040 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.260
1 M2 Pekerjaan Politur 2 Kali BAHAN 0.150 Ltr Politur 0.372 Ltr Politur Jadi 2.000 Lbr Amplas TENAGA 0.060 OH Tukang Cat 0.016 OH Kepala Tukang Cat 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.261
1 M2 Mengecat Besi 1 x Meni, 2 x Cat BAHAN 0.100 Kg Cat Meni Besi 0.160 Kg Cat Besi 0.270 Ltr Minyak Cat 1.000 Lbr Amplas 0.050 Bh Kuas TENAGA 0.100 OH Tukang Cat 0.010 OH Kepala Tukang Cat
0.020 0.010
OH OH
Pekerja Mandor
150,000.00 230,000.00
3,000.00 2,300.00 67,700.00 6,770.00 74,470.00
35,000.00 70,000.00 20,000.00
49,700.00 70,000.00 5,000.00
190,000.00 230,000.00 150,000.00 230,000.00
228,000.00 27,600.00 180,000.00 13,800.00 574,100.00 57,410.00 631,510.00 63,151.00
18,000.00
6,480.00
190,000.00 230,000.00 150,000.00 230,000.00
11,970.00 1,449.00 6,000.00 575.00 26,474.00 2,647.40 29,121.40
37,000.00
12,950.00
190,000.00 230,000.00 150,000.00 230,000.00
11,400.00 3,680.00 15,000.00 1,380.00 44,410.00 4,441.00 48,851.00
164,000.00
164,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 2,300.00 1,500.00 1,150.00 263,950.00 26,395.00 290,345.00
555,000.00
555,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 2,300.00 1,500.00 1,150.00 654,950.00 65,495.00 720,445.00
24,000.00
24,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 115.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.262
10 M2 Mengecat Atap Seng Gelombang BAHAN 1.420 Kg Cat Meni Besi 1.000 Kg Cat Besi 0.250 Ltr Minyak Cat TENAGA 1.200 OH Tukang Cat 0.120 OH Kepala Tukang Cat 1.200 OH Pekerja 0.060 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… M2 Mengecat Besi 1 x Meni SNI.263
1 M2 Pekerjaan Pelaburan Bidang Kayu dengan Teak Oil BAHAN 0.360 Ltr Teak Oil TENAGA 0.063 OH Tukang Cat 0.006 OH Kepala Tukang Cat 0.040 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.264
1 M2 Mengeter Kayu 2x 0.350
Ltr
0.060 0.016 0.100 0.006
OH OH OH OH
BAHAN Teer Arang TENAGA Tukang Cat Kepala Tukang Cat Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN PAS.KUNCI SNI.265.b 1 Bh. Pasang Kunci Tanam Mutu Menengah BAHAN 1.000 bh Kunci tanam mutu menengah TENAGA 0.500 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.265.c
1 Bh. Pasang Kunci Tanam Mutu Tinggi BAHAN 1.000 bh Kunci tanam mutu tinggi TENAGA 0.500 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.268.1
1 Bh. Pasang Grendel Besar 1.000
bh
0.100 0.010 0.010 0.001
OH OH OH OH
BAHAN Grendel Besar TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.268.2
46,915.00 4,691.50 51,606.50
1 Bh. Pasang Grendel Kecil 1.000
bh
0.100 0.010 0.010 0.001
OH OH OH OH
BAHAN Grendel Kecil TENAGA Tukang Kayu Kepala Tukang Kayu Pekerja Mandor
14,000.00
14,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 115.00 36,915.00 3,691.50 40,606.50
14,000.00
14,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,500.00 3,450.00 2,250.00 172.50 48,372.50 4,837.25 53,209.75
10,000.00
10,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 7,500.00 575.00 124,575.00 12,457.50 137,032.50
90,000.00
90,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 115.00 112,915.00 11,291.50 124,206.50
70,000.00
70,000.00
190,000.00 230,000.00 150,000.00 230,000.00
38,000.00 4,600.00 3,000.00 230.00 115,830.00 11,583.00 127,413.00
39,000.00
39,000.00
150,000.00 230,000.00
2,250.00 172.50 41,422.50 4,142.25 45,564.75
39,000.00
39,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.269
1 Bh. Pasang Kait Angin Besar BAHAN 1.000 set Kait Angin Besar TENAGA 0.150 OH Tukang Kayu 0.015 OH Kepala Tukang Kayu 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.270
1 Bh. Pasang Kait Angin Kecil BAHAN 1.000 set Kait Angin Kecil TENAGA 0.500 OH Tukang Kayu 0.050 OH Kepala Tukang Kayu 0.050 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.271
1 Bh. Pasang Kunci Selot Besar BAHAN 1.000 bh Kunci Selot Besar TENAGA 0.100 OH Tukang Kayu 0.010 OH Kepala Tukang Kayu 0.010 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.272
1 Bh. Pasang Kunci Selot Kecil BAHAN 1.000 bh Kunci Selot Kecil TENAGA 0.200 OH Tukang Kayu 0.020 OH Kepala Tukang Kayu 0.020 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.273
1 Bh. Pasang Beugel U 1.000
bh
0.015 0.001
OH OH
BAHAN Beugel U TENAGA Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.274
1 Bh. Pasang Beugel Plat 1.000
bh
BAHAN Beugel U TENAGA
0.015 0.001
OH OH
Pekerja Mandor
150,000.00 230,000.00
2,250.00 172.50 41,422.50 4,142.25 45,564.75
6,000.00
6,000.00
150,000.00 230,000.00
2,250.00 172.50 8,422.50 842.25 9,264.75
5,000.00
5,000.00
150,000.00 230,000.00
2,250.00 172.50 7,422.50 742.25 8,164.75
6,000.00
6,000.00
150,000.00 230,000.00
2,250.00 172.50 8,422.50 842.25 9,264.75
7,000.00
7,000.00
150,000.00 230,000.00
2,250.00 172.50 9,422.50 942.25 10,364.75
8,000.00
8,000.00
150,000.00 230,000.00
2,250.00 172.50 10,422.50 1,042.25 11,464.75
10,000.00
10,000.00
150,000.00 230,000.00
2,250.00 172.50 12,422.50 1,242.25 13,664.75
850,000.00
850,000.00
190,000.00 230,000.00 150,000.00 230,000.00
95,000.00 11,500.00 7,500.00 57.50 964,057.50 96,405.75 1,060,463.25
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.275
1 Bh. Pasang Angker Dia 12 MM BAHAN 1.000 bh Angkur Dia 12 mm TENAGA 0.015 OH Pekerja 0.001 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.276.a
1 Bh. Pas. Baut Mur 1.000
bh
0.015 0.001
OH OH
BAHAN Baut Mur TENAGA Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.276.b
1 Bh. Pas. Baut Mur 12 mm 1.000
bh
0.015 0.001
OH OH
BAHAN Paku Sekrup 10 cm TENAGA Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.276.c
1 Bh. Pas. Baut Mur 16 mm 1.000
bh
0.015 0.001
OH OH
BAHAN Paku Sekrup 1- 2,5 cm TENAGA Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.276.d
1 Bh. Pas. Baut Mur 18 mm 1.000
bh
0.015 0.001
OH OH
BAHAN Skrup Fixer TENAGA Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.276.e
1 Bh. Pas. Baut Mur 22 mm 1.000
bh
0.015 0.001
OH OH
BAHAN Baut Mur 22 mm TENAGA Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.282
1 Bh. Pasang Pintu Feber glass (Wc) BAHAN 1.000 bh Pintu Fiber Glass (Wc) TENAGA 0.500 OH Tukang Kayu 0.050 OH Kepala Tukang Kayu 0.050 OH Pekerja 0.000 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
PEKERJAAN SANITAIR SNI.283.B Memasang 1 Bh Kloset Duduk Biasa BAHAN 1.000 Bh Kloset Duduk biasa 6% Harga Kloset Perlengkapan TENAGA 1.100 OH Tukang Batu 0.001 OH Kepala Tukang Batu 3.300 OH Pekerja 0.160 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Memasang 1 Bh Kloset Duduk (KW 1 Super) BAHAN 1.000 Bh Kloset Duduk (Kw 1 super) 6% Harga Kloset Perlengkapan TENAGA 1.100 OH Tukang Batu 0.001 OH Kepala Tukang Batu 3.300 OH Pekerja 0.160 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
830,000.00
830,000.00 49,800.00
190,000.00 230,000.00 150,000.00 230,000.00
209,000.00 230.00 495,000.00 36,800.00 1,620,830.00 162,083.00 1,782,913.00
3,660,000.00
3,660,000.00 219,600.00
190,000.00 230,000.00 150,000.00 230,000.00
209,000.00 230.00 495,000.00 36,800.00 4,620,630.00 462,063.00 5,082,693.00
2,730,000.00
2,730,000.00 163,800.00
190,000.00 230,000.00 150,000.00 230,000.00
209,000.00 230.00 495,000.00 36,800.00 3,634,830.00 363,483.00 3,998,313.00
485,000.00
485,000.00 58,200.00 10,200.00 2,250.00
SNI.283.K
SNI.283.U
Memasang 1 Bh Urinoir Porselin (KW 1 Super) BAHAN 1.000 Bh Kloset Duduk 6% Harga Kloset Perlengkapan TENAGA 1.100 OH Tukang Batu 0.001 OH Kepala Tukang Batu 3.300 OH Pekerja 0.160 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.284
Memasang 1 Bh Wastafel Biasa BAHAN 1.000 Bh Wastafel biasa 12% Harga Wastafel Perlengkapan 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang TENAGA 1.450 OH Tukang Batu 0.150 OH Kepala Tukang Batu 1.200 OH Pekerja 0.100 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Memasang 1 buah Urinoir ex. TOTO U 57 M BAHAN 1.000 bh Urinoir 6% Harga Wastafel Perlengkapan 6.000 Kg Semen Portland 0.010 m3 Pasir Pasang TENAGA 1.000 OH Tukang Batu 0.100 OH Kepala Tukang Batu 1.000 OH Pekerja 0.100 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
1,700.00 225,000.00 190,000.00 230,000.00 150,000.00 230,000.00
275,500.00 34,500.00 180,000.00 23,000.00 1,068,650.00 106,865.00 1,175,515.00
2,730,000.00
2,730,000.00 163,800.00 10,200.00 2,250.00
SNI.286
SNI.286.a
Memasang 1 bh Pembatas Urinoir ex. TOTO A 100 BAHAN 1.000 bh Pembatas urinoir ex. TOTO A 100 TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor
1,700.00 225,000.00 190,000.00 230,000.00 150,000.00 230,000.00
190,000.00 23,000.00 150,000.00 23,000.00 3,292,250.00 329,225.00 3,621,475.00
1,400,000.00
1,400,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… Memasang 1 buah Kitchen Sink Stainless Steel ex. TOTO BAHAN 1.000 bh Kitchen Sink Stainless Steel ex. TOTO 6% Harga Wastafel Perlengkapan TENAGA 0.700 OH Tukang Batu 0.054 OH Kepala Tukang Batu 0.100 OH Pekerja 0.110 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
1,423,950.00 142,395.00 1,566,345.00
SNI.286.b
Memasang 1 Bh Bak Cuci Piring Logam, 1 lubang 1.000 Bh Bak Cuci Piring Logam, 1 lubang 1.000 Set Water Drain + Acesories 0.300 OH Tukang Batu 0.030 OH Kepala Tukang Batu 0.030 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
2,200,000.00
2,200,000.00 132,000.00
190,000.00 230,000.00 150,000.00 230,000.00
133,000.00 12,420.00 15,000.00 25,300.00 2,517,720.00 251,772.00 2,769,492.00
530,000.00 69,000.00 190,000.00 230,000.00 150,000.00 230,000.00
530,000.00 69,000.00 57,000.00 6,900.00 4,500.00 345.00 667,745.00 66,774.50 734,519.50
650,000.00 69,000.00 190,000.00 230,000.00 150,000.00 230,000.00
650,000.00 69,000.00 57,000.00 6,900.00 4,500.00 345.00 787,745.00 78,774.50 866,519.50
485,000.00 1,700.00 225,000.00
485,000.00 10,200.00 2,250.00
190,000.00 230,000.00 150,000.00 230,000.00
142,500.00 16,100.00 315,000.00 25,300.00 996,350.00 99,635.00 1,095,985.00
525,000.00
525,000.00 94,500.00
190,000.00 230,000.00 150,000.00 230,000.00
513,000.00 124,200.00 270,000.00 25,300.00 1,552,000.00 155,200.00 1,707,200.00
530,000.00
530,000.00 95,400.00
190,000.00 230,000.00 150,000.00 230,000.00
513,000.00 124,200.00 270,000.00 25,300.00 1,557,900.00 155,790.00 1,713,690.00
SNI.286.1
SNI.286.2
Memasang 1 Bh Bak Cuci Piring Logam, 2 lubang 1.000 Bh Bak Cuci Piring Logam, 2 lubang 1.000 Set Water Drain + Acesories 0.300 OH Tukang Batu 0.030 OH Kepala Tukang Batu 0.030 OH Pekerja 0.002 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.287
Memasang 1 Bh Bak Mandi Teraso BAHAN 1.000 Bh Bak Teraso 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang TENAGA 0.750 OH Tukang Batu 0.070 OH Kepala Tukang Batu 2.100 OH Pekerja 0.110 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.288
Memasang 1 Bh Bak Mandi Fiberglass BAHAN 1.000 Bh Bak Fiberglass 18% Harga Bak Perlengkapan TENAGA 2.700 OH Tukang Batu 0.540 OH Kepala Tukang Batu 1.800 OH Pekerja 0.110 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.289
Memasang 1 Bh Bak Mandi Plastik BAHAN 1.000 Bh Bak Plastik 18% Harga Bak Perlengkapan TENAGA 2.700 OH Tukang Batu 0.540 OH Kepala Tukang Batu 1.800 OH Pekerja 0.110 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.290.a
Memasang 1 bh Kran ex. TOTO T2613 BAHAN 1.000 bh Kran Shower 0.025 bh Seal tape TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.291
363,000.00 6,000.00
363,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 387,100.00 38,710.00 425,810.00
27,000.00
27,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 50,950.00 5,095.00 56,045.00
40,000.00
40,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 63,950.00 6,395.00 70,345.00
120,000.00
120,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 143,950.00 14,395.00 158,345.00
813,000.00 6,000.00
813,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 837,100.00 83,710.00 920,810.00
11,000,000.00 6,000.00
11,000,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
123,500.00 2,300.00 15,000.00 1,150.00 11,142,100.00 1,114,210.00 12,256,310.00
Memasang 1 Bh Floor Drain 1.000
Bh
0.100 0.010 0.010 0.005
OH OH OH OH
BAHAN Floor Drain TENAGA Tukang Batu Kepala Tukang Batu Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.291.a
Memasang 1 bh Floor Drain ex. TOTO TX 1 BV 3 BAHAN 1.000 bh Floor Drain ex. TOTO TX 1 BV 3 TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292
Memasang 1 Bh Saringan Air Besi BAHAN 1.000 Bh Saringan Air Besi TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292.1
Memasang 1 bh Shower spray ex. TOTO TX 403 SBPIV BAHAN 1.000 bh Shower spray ex. TOTO TX 403 SBPIV 0.025 bh Seal tape TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292.2
Memasang 1 bh Spoel hoek 1.000 0.025
bh bh
0.650 0.010 0.100 0.005
OH OH OH OH
BAHAN Spoel hoek Seal tape TENAGA Tukang Batu Kepala Tukang Batu Pekerja Mandor
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292.3
Memasang 1 bh shower ex. TOTO TR 309 SZ BAHAN
1.000 0.025
bh bh
0.100 0.010 0.010 0.005
OH OH OH OH
Shower ex. TOTO TR 309 SZ Seal tape TENAGA Tukang Batu Kepala Tukang Batu Pekerja Mandor
565,000.00 6,000.00
565,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 589,100.00 58,910.00 648,010.00
594,000.00
594,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 617,950.00 61,795.00 679,745.00
160,000.00
160,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 183,950.00 18,395.00 202,345.00
940,000.00
940,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 963,950.00 96,395.00 1,060,345.00
1,430,000.00
1,430,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 1,453,950.00 145,395.00 1,599,345.00
2,100,000.00
2,100,000.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 2,300.00 1,500.00 1,150.00 2,123,950.00 212,395.00 2,336,345.00
24,500.00 6,000.00
24,500.00 1,000.00
190,000.00 230,000.00
28,857.83 3,496.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292.4
Memasang 1 bh Paper Holder ex. TOTO TIPE TS116R BAHAN 1.000 bh Paper Holder ex. TOTO TIPE TS116R TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292.5
Memasang 1 bh soap holder ex. TOTO S 156N BAHAN 1.000 bh soap holder ex. TOTO S 156N TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.292.6
Memasang 1 bh hand railing stainless steel ex. TOTO TX 3A2 BAHAN 1.000 bh hand railing stainless steel ex. TOTO TX 3A2 TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.293.a
Memasang 1 Bh Tandon Air kap. 500 Liter BAHAN 1.000 Bh Tandon Air Kap. 500 Liter TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.293.b
Memasang 1 Bh Tandon Air kap. 1000 Liter BAHAN 1.000 Bh Tandon Air Kap. 1000 Liter TENAGA 0.100 OH Tukang Batu 0.010 OH Kepala Tukang Batu 0.010 OH Pekerja 0.005 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.294.G
Memasang 1 m' Pipa GI dia 1/2" BAHAN 1.000 m' Pipa GI dia 1/2" 0.167 Bh Seel tipe TENAGA 0.152 OH Tukang Pipa 0.015 OH Kepala Tukang Pipa
0.091 0.012
OH OH
Pekerja Mandor
150,000.00 230,000.00
13,670.00 2,683.33 74,207.17 7,420.72 81,627.88
100,000.00 6,000.00
100,000.00 1,000.00
190,000.00 230,000.00 150,000.00 230,000.00
28,857.83 3,496.00 13,670.00 2,683.33 149,707.17 14,970.72 164,677.88
120,000.00 190,000.00 230,000.00 150,000.00 230,000.00
120,000.00 380,000.00 46,000.00 10,005.00 759.00 556,764.00 55,676.40 612,440.40
38,000.00 1,132,000.00 17,000,000.00 1,132,000.00 57,000.00 1,600.00 190,000.00 230,000.00 150,000.00
76,000.00 3,169.60 28,339.00 2,603.60 4,560.00 24,000.00 285,000.00 34,500.00 300,000.00 758,172.20 75,817.22 833,989.42
40,000.00 11,000.00 190,000.00 150,000.00 230,000.00 230,000.00 150,000.00 230,000.00
1,000,000.00 66,000.00 380,000.00 390,000.00 18,400.00 690,000.00 675,000.00 17,250.00 3,236,650.00 323,665.00 3,560,315.00
40,000.00 11,000.00 190,000.00 150,000.00 230,000.00 230,000.00 150,000.00 230,000.00
1,800,000.00 66,000.00 418,000.00 300,000.00 18,400.00 690,000.00 675,000.00 17,250.00 3,984,650.00 398,465.00 4,383,115.00
40,000.00 11,000.00 190,000.00 150,000.00 230,000.00 230,000.00 150,000.00
2,800,000.00 66,000.00 475,000.00 300,000.00 18,400.00 690,000.00 675,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.298.Ga
Memasang 1 m' Pipa GI dia 2" BAHAN 1.000 m' Pipa GI dia 2" 0.167 Bh Seel tipe TENAGA 0.152 OH Tukang Pipa 0.015 OH Kepala Tukang Pipa 0.091 OH Pekerja 0.012 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… PEKERJAAN LAIN - LAIN SNI.299 1 M' Pagar BRC tinggi 1,20 m 1.000 M' Pagar BRC 2.000 OH Tukang Besi 0.200 OH Kepala Tukang Besi 0.067 OH Pekerja 0.003 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.300
1 M2 Fabrikasi Besi 2.000 Kg 0.003 Unit 0.002 Buah 0.002 Unit 0.080 Buah 15.000 KWh 1.500 OH 0.150 OH 2.000 OH Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
Besi Siku Mesin Pemotong Besi Las Listrik Mesin Bor Mata Bor Listrik Tukang Las Kepala Tukang Las Pekerja Terlatih
SNI.301.3
3 M3 Kawat Bronjong 3 mm 25.000 Kg Kawat Galvanis Tebal 3 mm 6.000 Bh Dolken/ Perancah 2.000 OH Penganyam 2.600 OH Pekerja Pengayam 0.080 OH Mandor Pengayam 3.000 M3 Batu Kali 4.500 OH Pekerja Pengisi 0.075 OH Mandor Pengisi Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.301.4
3 M3 Kawat Bronjong 4 mm 45.000 Kg Kawat Galvanis Tebal 4 mm 6.000 Bh Dolken/ Perancah 2.200 OH Penganyam 2.000 OH Pekerja Pengayam 0.080 OH Mandor Pengayam 3.000 M3 Batu Kali 4.500 OH Pekerja Pengisi 0.075 OH Mandor Pengisi Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.301.5
3 M3 Kawat Bronjong 5 mm 70.000 Kg Kawat Galvanis Tebal 5 mm 6.000 Bh Dolken/ Perancah 2.500 OH Penganyam 2.000 OH Pekerja Pengayam 0.080 OH Mandor Pengayam 3.000 M3 Batu Kali 4.500 OH Pekerja Pengisi
0.075 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
OH
Mandor Pengisi
PEKERJAAN VEGETASI TANAMAN SNI.302 1 bh Tanam Pohon Kamboja tinggi 5 meter BAHAN 1.000 bh Tanam Pohon Kamboja tinggi 5 meter 0.500 kg Pupuk kandang 0.005 kg Insektisida / Furadan TENAGA 0.100 OH Tukang 0.075 OH Kepala Tukang 0.100 OH Pekerja 0.025 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 bh Tanam Pohon Tabebuya tinggi 4 meter BAHAN 1.000 bh Tanam Pohon Tabebuya tinggi 4 meter 0.500 kg Pupuk kandang 0.005 kg Insektisida / Furadan TENAGA 0.100 OH Tukang 0.075 OH Kepala Tukang 0.100 OH Pekerja 0.025 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
230,000.00
17,250.00 5,041,650.00 504,165.00 5,545,815.00
1,880,000.00 32,000.00 30,000.00
1,880,000.00 16,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 17,250.00 15,000.00 5,750.00 1,953,150.00 195,315.00 2,148,465.00
1,500,000.00 32,000.00 30,000.00
1,500,000.00 16,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 17,250.00 15,000.00 5,750.00 1,573,150.00 157,315.00 1,730,465.00
1,250,000.00 32,000.00 30,000.00
1,250,000.00 16,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 17,250.00 15,000.00 5,750.00 1,323,150.00 132,315.00 1,455,465.00
130,000.00 32,000.00 30,000.00
130,000.00 16,000.00 150.00
190,000.00 230,000.00 150,000.00 230,000.00
19,000.00 17,250.00 15,000.00 5,750.00 203,150.00 20,315.00 223,465.00
19,000.00 32,000.00
19,000.00 16,000.00
190,000.00 230,000.00 150,000.00 230,000.00
9,500.00 3,450.00 7,500.00 5,750.00 61,200.00 6,120.00 67,320.00
22,000.00
22,000.00
SNI.302.1
SNI.302.2
1 bh Tanam Pohon Palem raja tinggi 3 meter BAHAN 1.000 bh Tanam Pohon Palem raja tinggi 3 meter 0.500 kg Pupuk kandang 0.005 kg Insektisida / Furadan TENAGA 0.100 OH Tukang 0.075 OH Kepala Tukang 0.100 OH Pekerja 0.025 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.3
1 bh Tanam Pohon Pisang Kipas tinggi 1,5 meter BAHAN 1.000 bh Tanam Pohon Pisang Kipas tinggi 1,5 meter 0.500 kg Pupuk kandang 0.005 kg Insektisida / Furadan TENAGA 0.100 OH Tukang 0.075 OH Kepala Tukang 0.100 OH Pekerja 0.025 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.4
1 bh Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter BAHAN 1.000 bh Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter 0.500 kg Pupuk kandang TENAGA 0.050 OH Tukang 0.015 OH Kepala Tukang 0.050 OH Pekerja 0.025 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.5
1 bh Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter BAHAN 1.000 bh Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter
0.500
kg
0.050 0.015 0.050 0.025
OH OH OH OH
Pupuk kandang TENAGA Tukang Kepala Tukang Pekerja Mandor
32,000.00
16,000.00
190,000.00 230,000.00 150,000.00 230,000.00
9,500.00 3,450.00 7,500.00 5,750.00 64,200.00 6,420.00 70,620.00
16,000.00 32,000.00
16,000.00 16,000.00
190,000.00 230,000.00 150,000.00 230,000.00
9,500.00 3,450.00 7,500.00 5,750.00 58,200.00 5,820.00 64,020.00
832,000.00 32,000.00 30,000.00
832,000.00 2,560.00 30.00
10,000.00
10,000.00 844,590.00 84,459.00 929,049.00
1,900,000.00 32,000.00 30,000.00
1,900,000.00 2,560.00 30.00
10,000.00
10,000.00 1,912,590.00 191,259.00 2,103,849.00
565,000.00 32,000.00 30,000.00
565,000.00 2,560.00 30.00
10,000.00
10,000.00 577,590.00 57,759.00 635,349.00
876,000.00 32,000.00 30,000.00
876,000.00 2,560.00 30.00
10,000.00
10,000.00 888,590.00 88,859.00 977,449.00
1,188,000.00 32,000.00 30,000.00
1,188,000.00 2,560.00 30.00
10,000.00
10,000.00 1,200,590.00 120,059.00 1,320,649.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.6
1 bh Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter BAHAN 1.000 bh Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter 0.500 kg Pupuk kandang TENAGA 0.050 OH Tukang 0.015 OH Kepala Tukang 0.050 OH Pekerja 0.025 OH Mandor Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.a
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Damar (Agathis dammara) Tinggi 4m 0.080 kg Pupuk kandang 0.001 kg Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.b
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Pulai (alstonia scholaris) Tinggi 6m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.c
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Kasia Jawa (Cassia javanica) Tinggi 4m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.d
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.e
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Flamboyan (Delonix regia) Tinggi 7m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
SNI.302.f
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Biola Cantik (Ficus lyrata) Tinggi 6m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
813,000.00 32,000.00 30,000.00
813,000.00 2,560.00 30.00
10,000.00
10,000.00 825,590.00 82,559.00 908,149.00
1,065,000.00 32,000.00 30,000.00
1,065,000.00 2,560.00 30.00
10,000.00
10,000.00 1,077,590.00 107,759.00 1,185,349.00
1,065,000.00 32,000.00 30,000.00
1,065,000.00 2,560.00 30.00
10,000.00
10,000.00 1,077,590.00 107,759.00 1,185,349.00
880,000.00 32,000.00 30,000.00
880,000.00 2,560.00 30.00
10,000.00
10,000.00 892,590.00 89,259.00 981,849.00
545,000.00 32,000.00 30,000.00
545,000.00 2,560.00 30.00
10,000.00
10,000.00 557,590.00 55,759.00 613,349.00
1,465,000.00 32,000.00 30,000.00
1,465,000.00 2,560.00 30.00
10,000.00
10,000.00 1,477,590.00 147,759.00 1,625,349.00
940,000.00 32,000.00 30,000.00
940,000.00 2,560.00 30.00
10,000.00
10,000.00 952,590.00 95,259.00 1,047,849.00
SNI.302.g
SNI.302.h
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Sosis (Kigelia pinnata) Tinggi 7m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.i
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.j
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tin 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.k
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.l
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Parahiba (Schizolobium parahyba) Tinggi 7m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.m
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm
1.000 0.080 0.001
bh kg ls
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
ls
BAHAN Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m Pupuk kandang Insektisida / Furadan TENAGA Upah tanam vegetasi pohon
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
680,000.00 32,000.00 30,000.00
680,000.00 2,560.00 30.00
10,000.00
10,000.00 692,590.00 69,259.00 761,849.00
188,000.00 32,000.00 30,000.00
188,000.00 2,560.00 30.00
10,000.00
10,000.00 200,590.00 20,059.00 220,649.00
750,000.00 32,000.00 30,000.00
750,000.00 2,560.00 30.00
10,000.00
10,000.00 762,590.00 76,259.00 838,849.00
107,000.00 32,000.00 30,000.00
107,000.00 2,560.00 30.00
10,000.00
10,000.00 119,590.00 11,959.00 131,549.00
157,000.00 32,000.00 30,000.00
157,000.00 2,560.00 30.00
10,000.00
10,000.00 169,590.00 16,959.00 186,549.00
1,888,000.00 32,000.00 30,000.00
1,888,000.00 2,560.00 30.00
10,000.00
10,000.00 1,900,590.00 190,059.00 2,090,649.00
1,750,000.00 32,000.00 30,000.00
1,750,000.00 2,560.00 30.00
10,000.00
10,000.00 1,762,590.00 176,259.00 1,938,849.00
SNI.302.n
SNI.302.o
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Palem Kuning (Chrysalidacarpus lutescens) Tinggi 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.p
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.q
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Palem Kol (Licualis grandis) Tinggi 1,5m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.r
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.s
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.t
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN
1.000 0.080 0.001
bh kg ls
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
ls
Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1 Pupuk kandang Insektisida / Furadan TENAGA Upah tanam vegetasi pohon
1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm BAHAN 1.000 bh Pohon Pisang Hias (Strelitzia nicolai) Tinggi 1,5m 0.080 kg Pupuk kandang 0.001 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
565,000.00 32,000.00 30,000.00
565,000.00 2,560.00 30.00
10,000.00
10,000.00 577,590.00 57,759.00 635,349.00
565,000.00 32,000.00 30,000.00
565,000.00 2,560.00 30.00
10,000.00
10,000.00 577,590.00 57,759.00 635,349.00
100,000.00 32,000.00 30,000.00
1,000,000.00 16,000.00 150.00
15,000.00
15,000.00 1,031,150.00 103,115.00 1,134,265.00
63,000.00 32,000.00 30,000.00
630,000.00 16,000.00 150.00
15,000.00
15,000.00 661,150.00 66,115.00 727,265.00
53,000.00 32,000.00 30,000.00
530,000.00 16,000.00 150.00
15,000.00
15,000.00 561,150.00 56,115.00 617,265.00
313,000.00 32,000.00 30,000.00
3,130,000.00 16,000.00 150.00
15,000.00
15,000.00 3,161,150.00 316,115.00 3,477,265.00
169,000.00 32,000.00 30,000.00
1,690,000.00 16,000.00 150.00
15,000.00
15,000.00 1,721,150.00 172,115.00 1,893,265.00
94,000.00
940,000.00
SNI.302.u
SNI.302.1a
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Agave (Agave angustifolia) Tinggi 300-400 mm 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1b
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Paku Sarang Burung (Asplenium nidus) Tinggi 25 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1c
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1d
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1e
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Spineless (Spineless Yucca) Tinggi 800 mm 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1f
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm
0.500 0.005
kg ls
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
ls
Pupuk kandang Insektisida / Furadan TENAGA Upah tanam vegetasi pohon
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Honje Merah (Alpinia purpurata) Tinggi 700-800m 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
32,000.00 30,000.00
16,000.00 150.00
15,000.00
15,000.00 971,150.00 97,115.00 1,068,265.00
19,000.00 32,000.00 30,000.00
190,000.00 16,000.00 150.00
15,000.00
15,000.00 221,150.00 22,115.00 243,265.00
22,000.00 32,000.00 30,000.00
220,000.00 16,000.00 150.00
15,000.00
15,000.00 251,150.00 25,115.00 276,265.00
44,000.00 32,000.00 30,000.00
440,000.00 16,000.00 150.00
15,000.00
15,000.00 471,150.00 47,115.00 518,265.00
44,000.00 32,000.00 30,000.00
440,000.00 16,000.00 150.00
15,000.00
15,000.00 471,150.00 47,115.00 518,265.00
19,000.00 32,000.00 30,000.00
190,000.00 16,000.00 150.00
15,000.00
15,000.00 221,150.00 22,115.00 243,265.00
88,000.00 32,000.00 30,000.00
880,000.00 16,000.00 150.00
15,000.00
15,000.00 911,150.00 91,115.00 1,002,265.00
19,000.00 32,000.00
190,000.00 16,000.00
SNI.302.1g
SNI.302.1h
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1i
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1j
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1k
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1l
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Bunga Pagoda (Cleorodendrum paniculatum) Ting 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1m
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700 0.500 kg Pupuk kandang
0.005
ls
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
ls
Insektisida / Furadan TENAGA Upah tanam vegetasi pohon
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Pacing Merah (Costus woodsonii) Tinggi 400-500 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
30,000.00
150.00
15,000.00
15,000.00 221,150.00 22,115.00 243,265.00
13,000.00 32,000.00 30,000.00
130,000.00 16,000.00 150.00
15,000.00
15,000.00 161,150.00 16,115.00 177,265.00
73,000.00 32,000.00 30,000.00
730,000.00 16,000.00 150.00
15,000.00
15,000.00 761,150.00 76,115.00 837,265.00
9,400.00 32,000.00 30,000.00
94,000.00 16,000.00 150.00
15,000.00
15,000.00 125,150.00 12,515.00 137,665.00
13,000.00 32,000.00 30,000.00
130,000.00 16,000.00 150.00
15,000.00
15,000.00 161,150.00 16,115.00 177,265.00
25,000.00 32,000.00 30,000.00
250,000.00 16,000.00 150.00
15,000.00
15,000.00 281,150.00 28,115.00 309,265.00
19,000.00 32,000.00 30,000.00
190,000.00 16,000.00 150.00
15,000.00
15,000.00 221,150.00 22,115.00 243,265.00
95,000.00 32,000.00 30,000.00
950,000.00 16,000.00 150.00
SNI.302.1n
SNI.302.1o
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Sirih Gading (Epipremnum aureum) Tinggi 300-5 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1p
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Heliconia Bunga Pink (Heliconia chartacea) Tingg 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1q
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Bakung Lele (Hymenocallis littoralis) Tinggi 2500.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1r
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1s
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Alang Mini (Ophiopogon japonicus "dwarf") Tingg 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1t
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan
1.000
ls
TENAGA Upah tanam vegetasi pohon
15,000.00
15,000.00 981,150.00 98,115.00 1,079,265.00
25,000.00 32,000.00 30,000.00
250,000.00 16,000.00 150.00
15,000.00
15,000.00 281,150.00 28,115.00 309,265.00
32,000.00 32,000.00 30,000.00
320,000.00 16,000.00 150.00
15,000.00
15,000.00 351,150.00 35,115.00 386,265.00
38,000.00 32,000.00 30,000.00
380,000.00 16,000.00 150.00
15,000.00
15,000.00 411,150.00 41,115.00 452,265.00
47,000.00 32,000.00 30,000.00
470,000.00 16,000.00 150.00
15,000.00
15,000.00 501,150.00 50,115.00 551,265.00
11,500.00 32,000.00 30,000.00
115,000.00 16,000.00 150.00
15,000.00
15,000.00 146,150.00 14,615.00 160,765.00
11,000.00 32,000.00 30,000.00
110,000.00 16,000.00 150.00
15,000.00
15,000.00 141,150.00 14,115.00 155,265.00
28,000.00 32,000.00 30,000.00
280,000.00 16,000.00 150.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1v
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 2500.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1x
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Daun Philo "Burle Marx" (Philadendron "Burle Mar 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1y
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Daun Philo Besar (Philadendron sellaum) Tinggi 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.1z
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.2a
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.2b
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Melati Jepang (Pseuderanthemum reticulatum) Ti 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.2c
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak kembang Air Mancur Merah (Russelia equisetiform 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
ls
Upah tanam vegetasi pohon
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 40 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
15,000.00
15,000.00 311,150.00 31,115.00 342,265.00
44,000.00 32,000.00 30,000.00
440,000.00 16,000.00 150.00
15,000.00
15,000.00 471,150.00 47,115.00 518,265.00
8,500.00 32,000.00 30,000.00
85,000.00 16,000.00 150.00
15,000.00
15,000.00 116,150.00 11,615.00 127,765.00
13,000.00 32,000.00 30,000.00
130,000.00 16,000.00 150.00
15,000.00
15,000.00 161,150.00 16,115.00 177,265.00
19,000.00 32,000.00 30,000.00
190,000.00 16,000.00 150.00
15,000.00
15,000.00 221,150.00 22,115.00 243,265.00
25,000.00 32,000.00 30,000.00
250,000.00 16,000.00 150.00
15,000.00
15,000.00 281,150.00 28,115.00 309,265.00
63,000.00 32,000.00
63,000.00 24,000.00
5,000.00
5,000.00 92,000.00 9,200.00 101,200.00
1,120,000.00 197,900.00
1,120,000.00 197,900.00 69,265.00 29,685.00
SNI.302.2d
SNI.302.2e
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.2f
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.2g
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 30 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.2h
1 bh Tanam semak , lubang polibag 15 x 15 cm BAHAN 10.000 bh Semak Kembang Coklat (Zephyranthes candida) Tinggi 10 0.500 kg Pupuk kandang 0.005 ls Insektisida / Furadan TENAGA 1.000 ls Upah tanam vegetasi pohon Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.302.3a
1 m2 Tanam rumput 1.000 0.750
1.000 Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
m2 kg ls
BAHAN Semak Rumput Manila (Zoysia matrella) Pupuk kandang TENAGA Upah tanam vegetasi pohon
PEKERJAAN TAMBAHAN SNI.Ls.1 1 M' Biaya Pengeboran air + Pipa Casing Ø 6'' 1.000 m' Biaya Pengeboran air 1.000 m' Pipa PVC dia 6" Perlengkapan (35 % x harga pipa) 1.000 Ls Biaya pemasangan sebesar 15% dari harga material
29,685.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.2
1,416,850.00 141,685.00 1,558,535.00
1 M' Biaya Pengeboran air + Pipa Casing Ø 4'' 1.000 m Biaya Pengeboran air 1.000 m' Pipa PVC dia 4" Perlengkapan (35 % x harga pipa) 1.000 Ls Biaya pemasangan sebesar 15% dari harga material
850,000.00 94,900.00 14,235.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.3
992,350.00 99,235.00 1,091,585.00
1 M' Biaya Pengeboran air + Pipa Casing Ø 3'' 1.000 m Biaya Pengeboran air 1.000 m' Pipa PVC dia 3" Perlengkapan (35 % x harga pipa) 1.000 Ls Biaya pemasangan sebesar 15% dari harga material
400,000.00 65,100.00 9,765.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.4
1 M' Biaya Pengeboran air + Pipa Casing Ø 2.5'' 1.000 m Biaya Pengeboran air 1.000 m' Pipa PVC dia 2.5" Perlengkapan (35 % x harga pipa) 1.000 Ls Biaya pemasangan sebesar 15% dari harga material
200,000.00 45,600.00 6,840.00
Ls
Biaya Asisories dan Perakitan 20% dari harga bahan
28,800,000.00
28,800,000.00
5,760,000.00
5,760,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.6
1 Bh' Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Phase 1.000 zet Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Phase
34,560,000.00 3,456,000.00 38,016,000.00
49,124,000.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.7
1 Bh' Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 Complit pemasangan 1.000 zet 25,905,000.00 Mesin disel+Pompa Outo matis Jet pam ØINT OUT1.5'' 30 Complit
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.8
1 Bh' Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1''- 25 Complit pemasangan 1.000 zet 23,350,000.00 Mesin disel+Pompa Outo matis ( setara sanyo ) ØINT 1''20 Complit
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ………………………
200,000.00 45,600.00 15,960.00 6,840.00
268,400.00 26,840.00 295,240.00
1 Bh' Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar ) 1.000 zet Mesin tenaga disel 6.5 Pk YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar ) 1.000
400,000.00 65,100.00 22,785.00 9,765.00
497,650.00 49,765.00 547,415.00
Jumlah ( A + B + C ) Keuntungan & Overhead 10 % Jumlah ……………………… SNI.Ls.5
850,000.00 94,900.00 33,215.00 14,235.00
49,124,000.00
49,124,000.00 4,912,400.00 54,036,400.00
25,905,000.00
25,905,000.00 2,590,500.00 28,495,500.00
23,350,000.00
23,350,000.00 2,335,000.00 25,685,000.00
1. 1.1.1. HARGA SATUAN PEKERJAAN PERSIAPAN 1. 1.1.1.1.
A
No
B
Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
0.4
150,000.00
60,000.00
Tukang Kayu Kepala Tukang
L.02 L.03
OH OH
0.2 0.02
190,000.00 230,000.00
38,000.00 4,600.00
Mandor
L.04
OH
0.02 230,000.00 JUMLAH TENAGA KERJA
4,600.00 107,200.00
BAHAN Dolken kayu f 8-10/400 cm Semen portland Pasir beton
Batang
1.25
11,000.00
13,750.00
Kg
5 0.005
1,700.00 355,000.00
8,500.00 1,775.00
0.009 0.072
345,000.00 2,600,000.00
3,105.00 187,200.00
0.06 0.4
28,000.00 25,000.00
1,680.00 10,000.00
m m3 3
Koral beton Kayu 5/7
m3 Kg Liter
Paku biasa 2” – 5” Residu
JUMLAH HARGA BAHAN C
226,010.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
333,210.00 33,321.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.2.
Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
366,531.00
Harga Satuan (Rp) A
No
Jumlah Harga
Uraian TENAGA
Kode
Satuan
Koefisien
(Rp)
Pekerja Tukang Kayu
L.01 L.02
OH OH
0.2 0.4
150,000.00 190,000.00
30,000.00 76,000.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.02 0.02
230,000.00 230,000.00
4,600.00 4,600.00
JUMLAH TENAGA KERJA B
-
115,200.00
BAHAN Dolken kayu f 8-10/400 cm Semen portland Seng gelombang Pasir beton
Batang
1.25
11,000.00
13,750.00
Kg
2.5
1,700.00
4,250.00
Lbr
1.2 0.005
120,000.00 355,000.00
144,000.00 1,775.00
0.009 0.072
345,000.00 2,600,000.00
3,105.00 187,200.00
0.06
28,000.00
1,680.00
Koral beton Kayu 5/7
m3 m3 m3
Paku biasa 2” – 5”
Kg
m²
Meni besi C
Liter
0.45 35,000.00 JUMLAH HARGA BAHAN
15,750.00 371,510.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
486,710.00 48,671.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.3.
Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No A
B
Uraian
Kode
-
535,381.00
Satuan
Harga Satuan Koefisien (Rp)
Jumlah Harga (Rp)
TENAGA Pekerja
L.01
OH
0.2
150,000.00
30,000.00
Tukang Kayu Kepala Tukang
L.02 L.03
OH OH
0.3 0.02
190,000.00 230,000.00
57,000.00 4,600.00
Mandor
L.04
OH
0.02 230,000.00 JUMLAH TENAGA KERJA
4,600.00 96,200.00
BAHAN Dolken kayu f 8-10/400 cm Semen portland Kawat duri Pasir beton
Batang
1
11,000.00
11,000.00
Kg
2
1,700.00
3,400.00
M’
25 0.005
2,500.00 355,000.00
62,500.00 1,775.00
0.009 0.06
345,000.00 28,000.00
3,105.00 1,680.00
m m3 Kg 3
Koral beton Paku biasa 2” – 5”
JUMLAH HARGA BAHAN C
83,460.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F 1. 1.1.1.4.
Pengukuran dan pemasangan 1 m’ Bouwplank
8,806.00 96,866.00
Harga Satuan (Rp)
B
No
88,060.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
A
m²
Uraian TENAGA
Kode
Satuan
Koefisien
Pekerja Tukang Kayu
L.01 L.02
OH OH
0.1 0.1
Kepala Tukang Mandor
L.03 L.04
OH OH
Jumlah Harga (Rp)
150,000.00 190,000.00
15,000.00 19,000.00
0.01 230,000.00 0.005 230,000.00 JUMLAH TENAGA KERJA
2,300.00 1,150.00 37,450.00
BAHAN Kayu balok 5/7 Paku 2”-3”
m3 Kg
0.012 0.02
2,600,000.00 33,000.00
31,200.00 660.00
m²
Kayu papan 3/20 C
m3
0.007 2,600,000.00 JUMLAH HARGA BAHAN
18,200.00 50,060.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.5.
Pembuatan 1 m2 kantor sementara lantai plesteran
A
No
B
87,510.00 8,751.00
0.10 x D
F
-
96,261.00
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
2
150,000.00
300,000.00
Tukang Kayu Tukang batu
L.02 L.02
OH OH
2 1
190,000.00 190,000.00
380,000.00 190,000.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.3 230,000.00 0.05 230,000.00 JUMLAH TENAGA KERJA
69,000.00 11,500.00 950,500.00
BAHAN Dolken kayu diameter 810/400 cm
Batang
1.25
11,000.00
13,750.00
Kayu Paku biasa
m3 Kg
0.18 0.08
2,600,000.00 28,000.00
468,000.00 2,240.00
Besi strip Semen Portland
Kg Kg
1.1 35
33,000.00 1,700.00
36,300.00 59,500.00
Pasir pasang Pasir beton
m3 m3
0.15 0.1
225,000.00 355,000.00
33,750.00 35,500.00
Koral beton Bata merah
m3 Bh
0.15 30
345,000.00 850.00
51,750.00 25,500.00
Seng plat Jendela naco Kaca polos
Lbr Bh
0.25 0.2 0.08
135,000.00 141,000.00 115,000.00
33,750.00 28,200.00 9,200.00
0.15 0.06
137,000.00 130,000.00
20,550.00 7,800.00
m2 Bh Lbr
Kunci tanam Plywood 4mm
JUMLAH HARGA BAHAN C
825,790.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
F 1. 1.1.1.6.
Pembuatan 1 m2 rumah jaga (konstruksi kayu )
No
Uraian TENAGA
Kode
1,776,290.00 177,629.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
A
m'
1,953,919.00
Satuan
Koefisien
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
m²
Pekerja Tukang Kayu
L.01 L.02
OH OH
1 1.5
150,000.00 190,000.00
150,000.00 285,000.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.15 0.05
230,000.00 230,000.00
34,500.00 11,500.00
JUMLAH TENAGA KERJA B
481,000.00
BAHAN Batang
3
Kayu Paku biasa
m3 Kg
0.276 0.7
Seng gelombang
Lbr
Dolken kayu f 8-10/400 cm
C
11,000.00
33,000.00
2,600,000.00 28,000.00
717,600.00 19,600.00
1.5 120,000.00 JUMLAH HARGA BAHAN
180,000.00 950,200.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
1,431,200.00 143,120.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.7.
Pembuatan 1 m2 gudang semen dan peralatan
1,574,320.00
Harga Satuan (Rp) A
No
B
Kode
Satuan
Koefisien
(Rp)
L.01
OH
1
150,000.00
150,000.00
Tukang Kayu Kepala Tukang
L.02 L.03
OH OH
2 0.2
190,000.00 230,000.00
380,000.00 46,000.00
Mandor
L.04
OH
0.05 230,000.00 JUMLAH TENAGA KERJA
11,500.00 587,500.00
BAHAN Batang
1.7
11,000.00
18,700.00
Kayu Paku biasa
m3 Kg
0.21 0.3
2,600,000.00 28,000.00
546,000.00 8,400.00
Semen Portland Pasir beton
Kg m3
10.5 0.03
1,700.00 355,000.00
17,850.00 10,650.00
Koral beton Seng gelombang Seng plat
m3 Lbr Lbr
0.05 1.5 0.25
345,000.00 120,000.00 135,000.00
17,250.00 180,000.00 33,750.00
JUMLAH HARGA BAHAN
832,600.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah Harga
Uraian TENAGA Pekerja
Dolken kayu diameter 810/400 cm
C
-
Jumlah (A+B+C)
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.8.
Pembuatan 1 m2 bedeng pekerja
0.10 x D
1,420,100.00 142,010.00 1,562,110.00
m²
Harga Satuan (Rp) A
No
Uraian TENAGA
Kode
Satuan
Koefisien
(Rp)
Pekerja Tukang Kayu
L.01 L.02
OH OH
1 2
150,000.00 190,000.00
150,000.00 380,000.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.2 0.05
230,000.00 230,000.00
46,000.00 11,500.00
JUMLAH TENAGA KERJA B
Jumlah Harga
587,500.00
BAHAN Dolken kayu diameter 810/400 cm
C
Batang
1.25
11,000.00
13,750.00
Kayu Paku biasa
m3 Kg
0.186 0.3
2,600,000.00 28,000.00
483,600.00 8,400.00
Semen Portland Pasir beton
Kg
18 0.03
1,700.00 355,000.00
30,600.00 10,650.00
0.05 1.5
345,000.00 120,000.00
17,250.00 180,000.00
1.35 130,000.00 JUMLAH HARGA BAHAN
175,500.00 919,750.00
Koral beton Seng gelombang
m m3 Lbr
Plywood 4mm
Lbr
3
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.9.
Pembersihan 1 m2 lapangan dan perataan
1,507,250.00 0.10 x D
150,725.00 1,657,975.00
Harga Satuan (Rp) A
No
B
-
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
1
Mandor
L.04
OH
m²
Jumlah Harga (Rp)
150,000.00
150,000.00
0.05 230,000.00 JUMLAH TENAGA KERJA
11,500.00 161,500.00
BAHAN
C
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.10.
Pembuatan 1 m2 steger/perancah dari bambu
No
Uraian
161,500.00
Kode
0.10 x D
16,150.00 177,650.00
Satuan
Koefisien
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
m²
A
B
TENAGA Pekerja
L.01
OH
0.25
150,000.00
37,500.00
Tukang Kayu Kepala Tukang
L.02 L.03
OH OH
0.017 0.002
190,000.00 230,000.00
3,230.00 460.00
Mandor
L.04
OH
0.013 230,000.00 JUMLAH TENAGA KERJA
2,990.00 44,180.00
BAHAN Bambu diameter 8/600 cm
Batang
6-
Tali ijuk C
m3
1
27,500.00
0.25 JUMLAH HARGA BAHAN
27,500.00 27,500.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
71,680.00 7,168.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.11.
Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm
A
No
B
-
Uraian TENAGA Tukang Kayu
Kode
Satuan
Koefisien
L.02
OH
0.3
Kepala Tukang
L.03
OH
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
190,000.00
57,000.00
0.03 230,000.00 JUMLAH TENAGA KERJA
6,900.00 63,900.00
BAHAN Kayu papan kelas III
m3
0.036
2,600,000.00
93,600.00
Kayu balok 5/7 kelas III Paku biasa
m kg
0.0105 0.08
2,600,000.00 28,000.00
27,300.00 2,240.00
3
JUMLAH HARGA BAHAN C
-
123,140.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F 1. 1.1.1.12.
Pembuatan 1 m2 jalan sementara
No
TENAGA
Uraian
Pekerja Mandor
Kode
0.10 x D
18,704.00 205,744.00
Satuan
L.01 L.04
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 1 0.005
150,000.00 230,000.00
JUMLAH TENAGA KERJA B
187,040.00
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
A
m²
150,000.00 1,150.00 151,150.00
BAHAN Batu belah
m3
0.15
245,000.00
36,750.00
bh
Batu pecah Pasir pasang
m3 m
3
0.09 0.01
230,000.00 225,000.00
JUMLAH HARGA BAHAN C
20,700.00 2,250.00 59,700.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
F 1. 1.1.1.13.
Pembongkaran 1 m3 beton bertulang
A
No
TENAGA Pekerja
Uraian
231,935.00
Satuan
L.01
Mandor B
Kode
L.04
(Rp)
Harga (Rp)
Koefisien 150,000.00
1,000,050.00
230,000.00 0.333 JUMLAH TENAGA KERJA
76,590.00 1,076,640.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.14.
Pembongkaran 1 m3 dinding tembok bata
No
TENAGA
Uraian
Pekerja Mandor
C
Jumlah
6.667
D
B
Harga Satuan
1,076,640.00
Kode L.01 L.04
0.10 x D
107,664.00 1,184,304.00
Satuan
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 0.667 0.033
150,000.00 230,000.00
100,005.00 7,659.00
JUMLAH TENAGA KERJA
107,664.00
JUMLAH HARGA BAHAN
-
BAHAN
PERALATAN JUMLAH HARGA ALAT
D
m²
BAHAN
C
A
210,850.00 21,085.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
Jumlah (A+B+C)
107,664.00
m³
E
0.10 x D
10,766.40
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.1.1.15.
Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm
A
No
TENAGA
Uraian
Kode
118,430.40
Satuan
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien
Pekerja Tukang
L.01 L.02
0.042 0.004
150,000.00 190,000.00
6,300.00 760.00
Kepala Tukang Mandor
L.03 L.04
0.002 0.042
230,000.00 230,000.00
460.00 9,660.00
JUMLAH TENAGA KERJA B
17,180.00
BAHAN Kawat jaring
C
Lbr
0.1434 23,000.00 JUMLAH HARGA BAHAN
3,298.20 3,298.20
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1.1.1.1.16.
Pemasangan 1 m2 panel beton pracetak 5x50x213 cm
B
No
TENAGA
Uraian
Kode
Pekerja Tukang
L.01 L.02
Kepala Tukang Mandor
L.03 L.04
0.10 x D
2,047.82 22,526.02
Satuan
Koefisien 0.375 0.125
Semen PC Pasir beton Koral
150,000.00 190,000.00
56,250.00 23,750.00
0.012 230,000.00 0.019 230,000.00 JUMLAH TENAGA KERJA
2,760.00 4,370.00 87,130.00
Lbr Batang
0.986 0.525
Kg m3
45 0.074 0.146
m3
1,700.00 355,000.00 345,000.00
76,500.00 26,270.00 50,370.00 153,140.00
PERALATAN JUMLAH HARGA ALAT
F
Jumlah Harga (Rp)
JUMLAH HARGA BAHAN
D E
m²
BAHAN Panel beton pracetak Kolom beton pracetak
C
20,478.20
Harga Satuan (Rp) A
m³
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
240,270.00 24,027.00 -
m²
1. 1.5.1. HARGA SATUAN PEKERJAAN TANAH 1. 1.5.1.1.
Penggalian 1 m3 tanah biasa sedalam 1 m Harga Satuan (Rp)
A
No
TENAGA Pekerja Mandor
Uraian
B
BAHAN
C
PERALATAN
Kode
Satuan
L.01 L.04
OH OH
D E F
Jumlah (A+B+C)
1. 1.5.1.2.
Penggalian 1 m3 tanah biasa sedalam 2 m
Koefisien 0.75 150,000.00 0.025 230,000.00 JUMLAH TENAGA KERJA
-
JUMLAH HARGA ALAT
118,250.00 11,825.00 130,075.00
Harga Satuan (Rp) A
No
TENAGA Pekerja
Uraian
Mandor B
BAHAN
C
PERALATAN
Kode
Satuan
Koefisien
L.01
OH
0.9
L.04
OH
D E F
Jumlah (A+B+C)
1. 1.5.1.3.
Menggali 1 m3 tanah biasa sedalam 3 m
135,000.00
0.045 230,000.00 JUMLAH TENAGA KERJA
10,350.00 145,350.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
145,350.00 14,535.00 159,885.00
Harga Satuan (Rp) A
No
TENAGA Pekerja Mandor
Uraian
Kode
Satuan
Koefisien
L.01
OH
1.05
L.04
OH
m³
Jumlah Harga (Rp)
150,000.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
112,500.00 5,750.00 118,250.00
JUMLAH HARGA BAHAN
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
Jumlah Harga (Rp)
150,000.00
157,500.00
0.067 230,000.00 JUMLAH TENAGA KERJA
15,410.00 172,910.00
m³
B
BAHAN
C
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C)
1. 1.5.1.4.
Menggali 1 m3 tanah keras sedalam 1 m
A
JUMLAH HARGA BAHAN
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
TENAGA Pekerja Mandor
Uraian
B
BAHAN
C
PERALATAN
172,910.00 17,291.00 190,201.00
Kode
Satuan
Koefisien
L.01 L.04
OH OH
1 0.032
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.5.1.5.
Menggali 1 m3 tanah cadas sedalam 1 m
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 230,000.00
No
TENAGA Pekerja Mandor
Uraian
B
BAHAN
C
PERALATAN
150,000.00 7,360.00
JUMLAH TENAGA KERJA
157,360.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
157,360.00
0.10 x D
Harga Satuan (Rp) A
m³
Kode
Satuan
L.01 L.04
OH OH
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.5.1.6.
Menggali 1 m3 tanah lumpur sedalam 1 m
Koefisien 1.5 150,000.00 0.06 230,000.00 JUMLAH TENAGA KERJA
15,736.00 173,096.00
m³
Jumlah Harga (Rp) 225,000.00 13,800.00 238,800.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
238,800.00
0.10 x D
23,880.00 262,680.00
m³
Harga Satuan (Rp) A
No
TENAGA
Uraian
Pekerja Mandor B
Kode
Satuan
L.01 L.04
OH OH
Koefisien 1.2 150,000.00 0.045 230,000.00 JUMLAH TENAGA KERJA
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C)
1. 1.5.1.7.
Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) No
TENAGA Pekerja Mandor
Uraian
B
BAHAN
C
PERALATAN
Kode
Satuan
L.01 L.04
OH OH
D E F
Jumlah (A+B+C)
1. 1.5.1.8.
Pembuangan 1 m3 tanah sejauh 30 meter
Koefisien 0.05 150,000.00 0.005 230,000.00 JUMLAH TENAGA KERJA
No
TENAGA Pekerja Mandor
Uraian
B
BAHAN
C
PERALATAN
Kode
Satuan
L.01 L.04
OH OH
m³
Jumlah Harga
7,500.00 1,150.00 8,650.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
190,350.00 19,035.00 209,385.00
(Rp)
Harga Satuan (Rp) A
180,000.00 10,350.00 190,350.00
BAHAN
C
A
Jumlah Harga (Rp)
8,650.00 865.00 9,515.00
Jumlah Harga
Koefisien
(Rp)
0.33 150,000.00 0.01 230,000.00 JUMLAH TENAGA KERJA
49,500.00 2,300.00 51,800.00
JUMLAH HARGA BAHAN
-
m²
JUMLAH HARGA ALAT D E
Jumlah (A+B+C)
51,800.00 5,180.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1. 1.5.1.9.
Pengurugan kembali 1 m3 galian tanah
-
56,980.00
m³
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian Harga Satuan (Rp) A
No
TENAGA
Uraian
Pekerja Mandor B
Kode
Satuan
L.01 L.04
OH OH
Koefisien 0.25 150,000.00 0.008 230,000.00 JUMLAH TENAGA KERJA
Jumlah Harga (Rp) 37,500.00 1,916.67 39,416.67
BAHAN JUMLAH HARGA BAHAN
C
PERALATAN
D E F
Jumlah (A+B+C)
JUMLAH HARGA ALAT 0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
39,416.67 3,941.67 43,358.33
m³
1. 1.5.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm) Harga Satuan (Rp) A
No
TENAGA Pekerja
Uraian
Mandor B
BAHAN
C
PERALATAN
Kode
Satuan
Koefisien
L.01
OH
0.5
L.04
OH
Jumlah Harga (Rp)
150,000.00
75,000.00
0.05 230,000.00 JUMLAH TENAGA KERJA
11,500.00 86,500.00
JUMLAH HARGA BAHAN
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
JUMLAH HARGA ALAT
86,500.00
0.10 x D
8,650.00 95,150.00
1. 1.5.1.11. Pengurugan 1 m3 dengan pasir urug Harga Satuan (Rp) No
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m³
A
TENAGA Pekerja Mandor
B
L.01 L.04
OH OH
0.3 150,000.00 0.01 230,000.00 JUMLAH TENAGA KERJA
45,000.00 2,300.00 47,300.00
1.2 195,000.00 JUMLAH HARGA BAHAN
234,000.00 234,000.00
JUMLAH HARGA ALAT
281,300.00
0.10 x D
28,130.00 309,430.00
BAHAN Pasir urug
C
PERALATAN
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
m³
1. 1.5.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL Harga Satuan (Rp) A
No
TENAGA Pekerja Tukang
Uraian
Kepala Tukang Mandor B
C
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.8 0.4
L.03 L.04
OH OH
BAHAN Kapur Padam Pasir Pasang
m3 m3
Tanah Liat
m3
Jumlah Harga (Rp)
150,000.00 190,000.00
120,000.00 76,000.00
0.04 230,000.00 0.08 230,000.00 JUMLAH TENAGA KERJA
9,200.00 18,400.00 223,600.00
0.135 0.4
6,000.00 225,000.00
810.00 90,000.00
0.948 58,000.00 JUMLAH HARGA BAHAN
54,984.00 145,794.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C) 0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
369,394.00 36,939.40 406,333.40
1. 1.5.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan Harga Satuan (Rp) A
B
No
TENAGA Pekerja Mandor
Uraian
Kode
Satuan
L.01 L.04
OH OH
0.15 150,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
22,500.00 3,450.00 25,950.00
m3
6 29,000.00 JUMLAH HARGA BAHAN
174,000.00 174,000.00
BAHAN Ijuk
C
Koefisien
Jumlah Harga (Rp)
PERALATAN
m³
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) 0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
199,950.00 19,995.00 219,945.00
m²
1. 1.5.1.14. Pengurugan 1 m3 sirtu padat
A
No
B
TENAGA Pekerja Mandor
Uraian
Kode
Satuan
Koefisien
L.01 L.04
OH OH
0.25 0.025
BAHAN Sirtu
C
m3
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 230,000.00
37,500.00 5,750.00
JUMLAH TENAGA KERJA
43,250.00
1.2 240,000.00 JUMLAH HARGA BAHAN
288,000.00 288,000.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
331,250.00
0.10 x D
33,125.00 364,375.00
m³
1. 1.5.1.15. Pengurugan 1 m3 tanah padat
A
B
No
TENAGA Pekerja Mandor
Uraian
Kode
Satuan
L.01 L.04
OH OH
BAHAN Tanah cadas
m3
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 0.25 150,000.00 0.025 230,000.00 JUMLAH TENAGA KERJA 1.2
192,000.00
JUMLAH HARGA BAHAN C
37,500.00 5,750.00 43,250.00 230,400.00 230,400.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
273,650.00
0.10 x D
27,365.00 301,015.00
m³
3. 3.1.1. HARGA SATUAN PEKERJAAN PONDASI 3. 3.1.1.1.
A
No
B
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang Batu
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
TENAGA
Uraian
Harga Satuan
JUMLAH TENAGA KERJA
402,000.00
1.2 202 0.485
294,000.00 343,400.00 109,125.00
BAHAN Batu belah Semen Portlan Pasir Pasang
m3 Kg m3
245,000.00 1,700.00 225,000.00
JUMLAH HARGA BAHAN C
746,525.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
1,148,525.00
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.2.
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
A
No
0.10 x D
114,852.50 1,263,377.50
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang Batu
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
TENAGA
Uraian
JUMLAH TENAGA KERJA B
C
-
m³
402,000.00
BAHAN Batu belah Semen Portlan
m3 Kg
Pasir Pasang
m3
1.2 163
245,000.00 1,700.00
294,000.00 277,100.00
0.52 225,000.00 JUMLAH HARGA BAHAN
117,000.00 688,100.00
PERALATAN
JUMLAH HARGA ALAT
1,090,100.00
0.10 x D
109,010.00 1,199,110.00
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.3.
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP Harga Satuan
Jumlah
m³
(Rp) A
No
Satuan
Koefisien
Pekerja Tukang Batu
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
JUMLAH TENAGA KERJA B
402,000.00
BAHAN
C
Batu belah Semen Portlan
m3 Kg
Pasir Pasang
m3
1.2 136
245,000.00 1,700.00
294,000.00 231,200.00
0.544 225,000.00 JUMLAH HARGA BAHAN
122,400.00 647,600.00
PERALATAN
JUMLAH HARGA ALAT
1,049,600.00
0.10 x D
104,960.00 1,154,560.00
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.4.
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
A
Harga (Rp)
Kode
TENAGA
Uraian
No
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang Batu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
JUMLAH TENAGA KERJA B
402,000.00
BAHAN Batu belah Semen Portlan
m3 Kg
Pasir Pasang
m3
C
PERALATAN
D E
Jumlah (A+B+C)
1.2 117
245,000.00 1,700.00
294,000.00 198,900.00
0.561 225,000.00 JUMLAH HARGA BAHAN
126,225.00 619,125.00
JUMLAH HARGA ALAT
F 3. 3.1.1.5.
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP
1,123,237.50
Harga Satuan (Rp) No
Jumlah Harga
Kode
Satuan
Koefisien
Pekerja Tukang Batu
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
TENAGA
Uraian
1,021,125.00 102,112.50
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
A
m³
(Rp)
m³
JUMLAH TENAGA KERJA B
BAHAN Batu belah
m3 Kg
Semen Portlan Pasir Pasang
m3
1.2
245,000.00
294,000.00
91 0.584
1,700.00 225,000.00
154,700.00 131,400.00
JUMLAH HARGA BAHAN C
402,000.00
580,100.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.6.
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP
A
No
982,100.00 0.10 x D
98,210.00 1,080,310.00
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang Batu
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
TENAGA
Uraian
JUMLAH TENAGA KERJA B
-
402,000.00
BAHAN
C
Batu belah Kapur Semen Portlan
m3
Pasir Pasang
m3
m3 Kg
1.2 0.17 0.17
245,000.00 6,000.00 1,700.00
294,000.00 1,020.00 289.00
0.34 225,000.00 JUMLAH HARGA BAHAN
76,500.00 371,809.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) 0.10 x D
F 3. 3.1.1.7.
Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP
851,189.90
Harga Satuan (Rp)
B
No
TENAGA Pekerja
Uraian
773,809.00 77,380.90
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
A
m³
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
L.01
OH
1.5
150,000.00
225,000.00
Tukang Batu Kepala Tukang
L.02 L.03
OH OH
0.75 0.075
190,000.00 230,000.00
142,500.00 17,250.00
Mandor
L.04
OH
0.075 230,000.00 JUMLAH TENAGA KERJA
17,250.00 402,000.00
BAHAN Batu belah Semen Portlan Kapur
m3 Kg m
3
1.2 61 0.147
245,000.00
294,000.00
1,700.00 6,000.00
103,700.00 882.00
m³
Pasir Pasang C
m3
0.492 225,000.00 JUMLAH HARGA BAHAN
110,700.00 509,282.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
911,282.00
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.8.
Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP
A
No
0.10 x D
91,128.20 1,002,410.20
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang Batu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
1.5 0.75
150,000.00 190,000.00
225,000.00 142,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.075 0.075
230,000.00 230,000.00
17,250.00 17,250.00
JUMLAH TENAGA KERJA B
-
402,000.00
BAHAN Batu belah Semen Portlan
m3 Kg
1.2 41
245,000.00 1,700.00
294,000.00 69,700.00
Kapur Pasir Pasang
m3
0.131 0.523
6,000.00 225,000.00
786.00 117,675.00
m
3
JUMLAH HARGA BAHAN C
482,161.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.9.
Pemasangan 1 m3 batu kosong (anstamping)
972,577.10
Harga Satuan (Rp)
B
No
Satuan
Koefisien
Pekerja Tukang Batu Kepala Tukang
L.01 L.02 L.03
OH OH OH
0.78 0.39 0.039
150,000.00 190,000.00 230,000.00
117,000.00 74,100.00 8,970.00
Mandor
L.04
OH
0.039 230,000.00 JUMLAH TENAGA KERJA
8,970.00 209,040.00
BAHAN Batu belah Pasir urug
C
Jumlah Harga
Kode
TENAGA
Uraian
884,161.00 88,416.10
0.10 x D
F
A
m³
m3 m3
1.2
(Rp)
245,000.00
294,000.00
0.432 195,000.00 JUMLAH HARGA BAHAN
84,240.00 378,240.00
PERALATAN JUMLAH HARGA ALAT
-
m³
D E F
Jumlah (A+B+C)
3. 3.1.1.10.
Pemasangan 1 m3 pondasi sumuran, diameter 100 cm
587,280.00 58,728.00 646,008.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
B
Uraian
Satuan
Koefisien
L.01
OH
3.4
150,000.00
510,000.00
Tukang Batu Kepala Tukang
L.02 L.03
OH OH
0.85 0.085
190,000.00 230,000.00
161,500.00 19,550.00
Mandor
L.04
OH
0.17 230,000.00 JUMLAH TENAGA KERJA
39,100.00 730,150.00
BAHAN Batu belah Semen Portlan Pasir Beton Kerikil
(Rp)
m3 Kg
0.48 194
245,000.00 1,700.00
117,600.00 329,800.00
m3
0.312 0.468
355,000.00 570,000.00
110,760.00 266,760.00
16,000.00 33,000.00
2,016,000.00 59,400.00
m Kg Kg
3
Besi beton Kawat beton
126 1.8
JUMLAH HARGA BAHAN C
Jumlah Harga
Kode
TENAGA Pekerja
2,900,320.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
3,630,470.00 363,047.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3. 3.1.1.11.
Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
3,993,517.00
Harga Satuan (Rp) A
No
Uraian
Satuan
Koefisien
Pekerja Tukang Batu
L.01 L.02
OH OH
2.4 0.8
150,000.00 190,000.00
360,000.00 152,000.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.08 0.119
230,000.00 230,000.00
18,400.00 27,370.00
BAHAN Batu belah Semen Portlan Pasir Beton Kerikil
C
(Rp)
m3 Kg m m3 3
557,770.00
0.45
245,000.00
110,250.00
194 0.312
1,700.00 355,000.00
329,800.00 110,760.00
0.468 570,000.00 JUMLAH HARGA BAHAN
266,760.00 817,570.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga
Kode
TENAGA
JUMLAH TENAGA KERJA B
m³
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
1,375,340.00 137,534.00
m³
F
Harga Satuan Pekerjaan (D+E)
1,512,874.00
m³
4. 4.1.1. HARGA SATUAN PEKERJAAN BETON 4. 4.1.1.1.
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.65 0.275 0.028 0.083
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
247,500.00 52,250.00 6,440.00 19,090.00
JUMLAH TENAGA KERJA B
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
kg kg kg Liter
247 869 999 215
1,700.00 253.57 450.00 3,000.00
JUMLAH HARGA BAHAN C
325,280.00 419,900.00 220,353.57 449,550.00 645,000.00 1,734,803.57
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
2,060,083.57 206,008.36 2,266,091.93
4. 4.1.1.2.
Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
TENAGA Pekerja
Uraian
Tukang Batu Kepala Tukang Mandor B
Kode
Satuan
Koefisien
L.01
OH
1.65
L.02 L.03 L.04
OH OH OH
BAHAN 1. Semen Portland 2. Pasir Beton 3. Kerikil(Maks 30mm) 4. Air
C
kg kg kg Liter
150,000.00
247,500.00
0.275 190,000.00 0.028 230,000.00 0.083 230,000.00 JUMLAH TENAGA KERJA
52,250.00 6,440.00 19,090.00 325,280.00
276
1,700.00
469,200.00
828 253.57 1012 450.00 215 3,000.00 JUMLAH HARGA BAHAN
209,957.14 455,400.00 645,000.00 1,779,557.14
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga (Rp)
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
2,104,837.14
0.10 x D
210,483.71
m³
F
Harga Satuan Pekerjaan (D+E)
2,315,320.86
4. 4.1.1.3.
Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87 Harga Satuan (Rp)
A
No
B
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
BAHAN Semen Portland Pasir Beton Kerikil(Maks 30mm) Air
C
kg kg kg Liter
Koefisien
Jumlah Harga (Rp)
1.65 150,000.00 0.275 190,000.00 0.028 230,000.00 0.083 230,000.00 JUMLAH TENAGA KERJA
247,500.00 52,250.00 6,440.00 19,090.00 325,280.00
299 1,700.00 799 253.57 1017 450.00 215 3,000.00 JUMLAH HARGA BAHAN
508,300.00 202,603.57 457,650.00 645,000.00 1,813,553.57
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C) 0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
2,138,833.57 213,883.36 2,352,716.93
CATATAN Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
4. 4.1.1.4.
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Harga Satuan (Rp)
A
B
m³
No
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
C
PERALATAN
D
Jumlah (A+B+C)
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
kg kg kg Liter
Koefisien
Jumlah Harga (Rp)
1.2 150,000.00 0.2 190,000.00 0.02 230,000.00 0.06 230,000.00 JUMLAH TENAGA KERJA
180,000.00 38,000.00 4,600.00 13,800.00 236,400.00
230 1,700.00 893 253.57 1027 450.00 200 3,000.00 JUMLAH HARGA BAHAN
391,000.00 226,439.29 462,150.00 600,000.00 1,679,589.29
JUMLAH HARGA ALAT
1,915,989.29
m³
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
191,598.93 2,107,588.21
4. 4.1.1.5.
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87 Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.65 0.275 0.028 0.083
B
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
kg kg kg Liter
326 760 1029 215
247,500.00 52,250.00 6,440.00 19,090.00 325,280.00
1,700.00 253.57 450.00 3,000.00
JUMLAH HARGA BAHAN C
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
554,200.00 192,714.29 463,050.00 645,000.00 1,854,964.29
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.1.1.6.
Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87
A
B
No
2,180,244.29 218,024.43 2,398,268.71
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang Batu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
1.65 0.275
150,000.00 190,000.00
247,500.00 52,250.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.028 230,000.00 0.083 230,000.00 JUMLAH TENAGA KERJA
6,440.00 19,090.00 325,280.00
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
C
kg kg kg Liter
352 731
1,700.00 253.57
598,400.00 185,360.71
1031 450.00 215 3,000.00 JUMLAH HARGA BAHAN
463,950.00 645,000.00 1,892,710.71
F
m³
PERALATAN JUMLAH HARGA ALAT
D E
m³
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
2,217,990.71 221,799.07 2,439,789.79
m³
4. 4.1.1.7.
Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87 Harga Satuan (Rp)
A
No
TENAGA
Uraian
Pekerja Tukang Batu Kepala Tukang Mandor B
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Koefisien
Jumlah Harga (Rp)
1.65 150,000.00 0.275 190,000.00 0.028 230,000.00 0.083 230,000.00 JUMLAH TENAGA KERJA
247,500.00 52,250.00 6,440.00 19,090.00 325,280.00
371 1,700.00 698 253.57 1047 450.00 215 3,000.00 JUMLAH HARGA BAHAN
630,700.00 176,992.86 471,150.00 645,000.00 1,923,842.86
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
C
kg kg kg Liter
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
2,249,122.86 224,912.29 2,474,035.14
4. 4.1.1.8.
Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.65 0.275 0.028 0.083
B
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
kg kg kg Liter
384 692 1039 215
247,500.00 52,250.00 6,440.00 19,090.00 325,280.00
1,700.00 253.57 450.00 3,000.00
JUMLAH HARGA BAHAN C
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
m³
652,800.00 175,471.43 467,550.00 645,000.00 1,940,821.43
PERALATAN JUMLAH HARGA ALAT
-
D
Jumlah (A+B+C)
2,266,101.43
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.9.
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87
0.10 x D
226,610.14 2,492,711.57
m³
Harga Satuan (Rp) A
No
TENAGA
Uraian
Pekerja Tukang Batu Kepala Tukang Mandor B
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
1.65 0.275 0.028 0.083
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
C
Koefisien
kg kg kg Liter
406 684 1026 215
247,500.00 52,250.00 6,440.00 19,090.00 325,280.00
1,700.00 253.57 450.00 3,000.00
JUMLAH HARGA BAHAN
PERALATAN
Jumlah Harga (Rp)
690,200.00 173,442.86 461,700.00 645,000.00 1,970,342.86
-
JUMLAH HARGA ALAT D
Jumlah (A+B+C)
2,295,622.86
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.10.
Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87
0.10 x D
229,562.29 2,525,185.14
Harga Satuan (Rp) A
No
B
C
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.65 0.275 0.028 0.083
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air PERALATAN
kg m3 m3 Liter
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA 413 681 1021 215
247,500.00 52,250.00 6,440.00 19,090.00 325,280.00
1,700.00 253.57 450.00 3,000.00
JUMLAH HARGA BAHAN
702,100.00 172,682.14 459,450.00 645,000.00 1,979,232.14
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4. 4.1.1.11.
Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
Harga Satuan
m³
2,304,512.14 230,451.21 2,534,963.36
Jumlah
m³
(Rp) A
No
Uraian
TENAGA Pekerja Tukang Batu
Kepala Tukang Mandor B
Kode
Satuan
Koefisien
L.01 L.02
OH OH
2.1 0.35
L.03 L.04
OH OH
BAHAN Semen Portland Pasir Beton
kg kg
Kerikil (Maks 30mm) Air C
kg Liter
Harga (Rp)
150,000.00 190,000.00
315,000.00 66,500.00
0.035 230,000.00 0.105 230,000.00 JUMLAH TENAGA KERJA
8,050.00 24,150.00 413,700.00
439 670
1,700.00 253.57
746,300.00 169,892.86
1006 450.00 215 3,000.00 JUMLAH HARGA BAHAN
452,700.00 645,000.00 2,013,892.86
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.1.1.12.
Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
TENAGA
Uraian
Pekerja Tukang Batu Kepala Tukang Mandor B
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Koefisien
2,427,592.86 242,759.29 2,670,352.14
m³
Jumlah Harga (Rp)
2.1 150,000.00 0.35 190,000.00 0.035 230,000.00 0.105 230,000.00 JUMLAH TENAGA KERJA
315,000.00 66,500.00 8,050.00 24,150.00 413,700.00
448 1,700.00 667 253.57 1000 450.00 215 3,000.00 JUMLAH HARGA BAHAN
761,600.00 169,132.14 450,000.00 645,000.00 2,025,732.14
BAHAN Semen Portland Pasir Beton Kerikil (Maks 30mm) Air
C
kg kg kg Liter
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.13.
Membuat 1 m3 beton kedap air dengan strorox – 100
2,439,432.14 0.10 x D
Harga Satuan (Rp) No
Uraian
-
Kode
Satuan
Koefisien
243,943.21 2,683,375.36
Jumlah Harga (Rp)
m³
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
L.01 L.02 L.03 L.04
BAHAN Semen Portland Pasir Beton Kerikil (2cm/3cm) Strorox – 100
OH OH OH OH
150,000.00 2.1 190,000.00 0.35 230,000.00 0.035 230,000.00 0.105 JUMLAH TENAGA KERJA
413,700.00
1,700.00 355,000.00 570,000.00 40,000.00
680,000.00 170,400.00 456,000.00 48,000.00
kg m3 m3 kg
400 0.48 0.8 1.2
JUMLAH HARGA BAHAN C
315,000.00 66,500.00 8,050.00 24,150.00
1,354,400.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.14.
Pemasangan 1 m’ PVC Waterstop lebar 150 mm
A
No
B
Uraian TENAGA Pekerja Tukang Batu/Pipa
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.06 0.03
Kepala Tukang Mandor
L.03 L.04
BAHAN Waterstop lebar 150 mm
C
1,768,100.00 176,810.00 1,944,910.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 190,000.00
9,000.00 5,700.00
OH OH
0.003 230,000.00 0.003 230,000.00 JUMLAH TENAGA KERJA
690.00 690.00 16,080.00
m
1.05 JUMLAH HARGA BAHAN
-
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.15.
Pemasangan 1 m’ PVC Waterstop lebar 200 mm
-
Harga Satuan (Rp) No
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang Batu/Pipa Kepala Tukang
L.01 L.02 L.03
OH OH OH
0.07 0.035 0.004
150,000.00 190,000.00 230,000.00
10,500.00 6,650.00 920.00
Mandor
L.04
OH
0.007
230,000.00
1,610.00
TENAGA
Uraian
16,080.00 1,608.00
0.10 x D
F
A
m³
m'
B
BAHAN Waterstop lebar 200 mm
C
m
JUMLAH TENAGA KERJA
19,680.00
1.05 JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C)
4. 4.1.1.16.
Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm
19,680.00 1,968.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
TENAGA Pekerja
Uraian
Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
L.01
OH
0.08
150,000.00
12,000.00
L.02 L.03 L.04
OH OH OH
0.04 0.004 0.004
190,000.00 230,000.00 230,000.00
7,600.00 920.00 920.00
BAHAN Waterstop lebar 230 mm - 320 mm
C
m
1.05
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
Jumlah (A+B+C)
21,440.00 2,144.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.17.
Pembesian 10 kg dengan besi polos atau besi ulir
-
Harga Satuan (Rp) No
TENAGA Pekerja
Uraian
Tukang Besi Kepala Tukang Mandor B
C
21,440.00
PERALATAN
D E
A
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA B
m'
Kode
Satuan
Koefisien
L.01
OH
0.07
L.02 L.03 L.04
OH OH OH
BAHAN Besi beton (polos/ulir)
kg
Kawat beton
kg
PERALATAN
Jumlah Harga (Rp)
150,000.00
10,500.00
0.07 190,000.00 0.007 230,000.00 0.004 230,000.00 JUMLAH TENAGA KERJA
13,300.00 1,610.00 920.00 26,330.00
10.5
19,000.00
199,500.00
0.15 33,000.00 JUMLAH HARGA BAHAN
4,950.00 204,450.00
m'
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4. 4.1.1.18.
Pemasangan 10 kg kabel presstressed polos/strands
230,780.00 23,078.00 253,858.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
B
Kode
Satuan
Koefisien
L.01 L.02 L.03
OH OH OH
0.05 0.05 0.005
150,000.00 190,000.00 230,000.00
7,500.00 9,500.00 1,150.00
Mandor
L.04
OH
0.003 230,000.00 JUMLAH TENAGA KERJA
690.00 18,840.00
kg kg
10.5 19,000.00 0.1 33,000.00 JUMLAH HARGA BAHAN
199,500.00 3,300.00 202,800.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.19.
Pemasangan 10 kg jaring kawat baja (wiremesh), 6 mm
243,804.00
Harga Satuan (Rp) No
TENAGA Pekerja
Uraian
Tukang Besi Kepala Tukang Mandor B
C
Satuan
Koefisien
L.01
OH
0.025
150,000.00
3,750.00
L.02 L.03 L.04
OH OH OH
0.025 190,000.00 0.002 230,000.00 0.001 230,000.00 JUMLAH TENAGA KERJA
4,750.00 460.00 230.00 9,190.00
BAHAN 1. Jaring kawat baja dilas
kg
2. Kawat beton
kg
1.02
kg
Jumlah Harga (Rp)
Kode
37,000.00
37,740.00
0.05 33,000.00 JUMLAH HARGA BAHAN
1,650.00 39,390.00
PERALATAN JUMLAH HARGA ALAT
D E F
221,640.00 22,164.00
0.10 x D
F
A
kg
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang Besi Kepala Tukang
BAHAN Besi beton (polos/ulir) Kawat beton
C
-
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
48,580.00 4,858.00 53,438.00
kg
4. 4.1.1.20.
Pemasangan 1 m2 bekisting untuk pondasi Harga Satuan (Rp)
A
No
TENAGA
Uraian
Pekerja Tukang Kayu Kepala Tukang Mandor B
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Koefisien
Jumlah Harga (Rp)
0.52 150,000.00 0.26 190,000.00 0.026 230,000.00 0.026 230,000.00 JUMLAH TENAGA KERJA
78,000.00 49,400.00 5,980.00 5,980.00 139,360.00
0.04 2,600,000.00 0.3 28,000.00 0.1 18,000.00 JUMLAH HARGA BAHAN
104,000.00 8,400.00 1,800.00 114,200.00
BAHAN Kayu kelas III Paku 5 – 10 cm Minyak bekisting
C
m3 kg Liter
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.21.
Pemasangan 1 m2 bekisting untuk sloof (3 x Pakai)
A
No
B
C
Uraian TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor
253,560.00
0.10 x D
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
BAHAN Kayu kelas III Paku 5 cm – 10 cm Minyak bekisting
m3 kg Liter
25,356.00 278,916.00
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 0.52 150,000.00 0.26 190,000.00 0.026 230,000.00 0.026 230,000.00 JUMLAH TENAGA KERJA
78,000.00 49,400.00 5,980.00 5,980.00 139,360.00
0.045 2,600,000.00 0.3 28,000.00 0.1 18,000.00 JUMLAH HARGA BAHAN
117,000.00 8,400.00 1,800.00 127,200.00
m²
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.22.
Pemasangan 1 m2 bekisting untuk kolom (3 x Pakai)
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
Harga Satuan
266,560.00 26,656.00 97,738.67
Jumlah
m²
(Rp) A
No
Uraian
TENAGA Pekerja Tukang Kayu
Kepala Tukang Mandor B
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.66 0.33
L.03 L.04
OH OH
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu
150,000.00 190,000.00
99,000.00 62,700.00
0.033 230,000.00 0.033 230,000.00 JUMLAH TENAGA KERJA
7,590.00 7,590.00 176,880.00
m3 kg
0.04 0.4
2,600,000.00 28,000.00
104,000.00 11,200.00
Liter m3 Lbr Batang
0.2 0.015 0.35 2
18,000.00 2,600,000.00 159,000.00 11,000.00
3,600.00 39,000.00 55,650.00 22,000.00
8-10cm –panj 4 m C
Harga (Rp)
JUMLAH HARGA BAHAN
235,450.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.23.
Pemasangan 1 m2 bekisting untuk balok (3 x Pakai)
412,330.00 41,233.00 151,187.67
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
B
No
Kode
Satuan
Koefisien
L.01 L.02 L.03
OH OH OH
0.66 0.33 0.033
150,000.00 190,000.00 230,000.00
99,000.00 62,700.00 7,590.00
Mandor
L.04
OH
0.033 230,000.00 JUMLAH TENAGA KERJA
7,590.00 176,880.00
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting
D E F
m²
Jumlah Harga
Uraian TENAGA Pekerja Tukang Kayu Kepala Tukang
Balok kayu kelas II Plywood tebal 9 mm Dolken kayu g 8–10)cm panj4 m C
-
(Rp)
m3 kg Liter
0.04 0.4 0.2
2,600,000.00 28,000.00 18,000.00
104,000.00 11,200.00 3,600.00
m3 Lbr Batang
0.018 0.35 2
2,600,000.00 159,000.00 11,000.00
46,800.00 55,650.00 22,000.00
JUMLAH HARGA BAHAN
243,250.00
JUMLAH HARGA ALAT
420,130.00 42,013.00
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
154,047.67
m²
4. 4.1.1.24.
Pemasangan 1 m2 bekisting untuk lantai (3 x Pakai) Harga Satuan (Rp)
A
No
TENAGA Pekerja
Uraian
Tukang Kayu Kepala Tukang Mandor B
Kode
Satuan
Koefisien
L.01
OH
0.66
L.02 L.03 L.04
OH OH OH
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu galam, 8–10 cm panj4 m
C
104,000.00
kg Liter m3 Lbr Batang
0.4 0.2 0.015 0.35 6
28,000.00 18,000.00 2,600,000.00 159,000.00 11,000.00
11,200.00 3,600.00 39,000.00 55,650.00 66,000.00
JUMLAH HARGA BAHAN
279,450.00
JUMLAH HARGA ALAT
456,330.00 45,633.00 167,321.00
PERALATAN
Pemasangan 1 m2 bekisting untuk dinding
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian TENAGA Pekerja Tukang Kayu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.66 0.33
Kepala Tukang Mandor
L.03 L.04
OH OH
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu , 8–10 cm, panj4 m Penjaga jarak bekisting/spacer
D
62,700.00 7,590.00 7,590.00 176,880.00
2,600,000.00
4. 4.1.1.25.
C
99,000.00
0.04
Jumlah (A+B+C)
B
150,000.00
0.33 190,000.00 0.033 230,000.00 0.033 230,000.00 JUMLAH TENAGA KERJA
m3
D E F
A
Jumlah Harga (Rp)
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 190,000.00
99,000.00 62,700.00
0.033 230,000.00 0.033 230,000.00 JUMLAH TENAGA KERJA
7,590.00 7,590.00 176,880.00
m3 kg
0.03 0.4
2,600,000.00 28,000.00
78,000.00 11,200.00
Liter m3 Lbr
0.2 0.02 0.35 3
18,000.00 2,600,000.00 159,000.00 11,000.00
3,600.00 52,000.00 55,650.00 33,000.00
Batang Buah
4
-
-
JUMLAH HARGA BAHAN
233,450.00
JUMLAH HARGA ALAT
410,330.00
PERALATAN
Jumlah (A+B+C)
m²
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
4. 4.1.1.26.
Pemasangan 1 m2 bekisting untuk tangga
41,033.00 -
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.66 0.33 0.033 0.033
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu, 8–10 cm,panj4 m
C
2,600,000.00 28,000.00 18,000.00 2,600,000.00
78,000.00 11,200.00 2,700.00 39,000.00
Lbr Batang
0.35 2
159,000.00 11,000.00
55,650.00 22,000.00
JUMLAH HARGA BAHAN
208,550.00
JUMLAH HARGA ALAT
385,430.00 38,543.00
Jumlah (A+B+C) 0.10 x D
4. 4.1.1.27.
Pemasangan 1 m2 jembatan untuk pengecoran beton
423,973.00
Harga Satuan (Rp) No
TENAGA
Uraian
Pekerja Tukang Kayu Kepala Tukang Mandor
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Koefisien 0.15 150,000.00 0.05 190,000.00 0.005 230,000.00 0.008 230,000.00 JUMLAH TENAGA KERJA
Jumlah Harga (Rp) 22,500.00 9,500.00 1,150.00 1,840.00 34,990.00
BAHAN Kayu kelas III (papan) Paku 5 cm – 12 cm Dolken kayu , 8–10 panj 4m
m3 kg Batang
0.0264 0.6 0.5
2,600,000.00 28,000.00 11,000.00
JUMLAH HARGA BAHAN
68,640.00 16,800.00 5,500.00 90,940.00
PERALATAN JUMLAH HARGA ALAT
D
176,880.00
0.03 0.4 0.15 0.015
F
C
99,000.00 62,700.00 7,590.00 7,590.00
m3 kg Liter m3
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
B
Jumlah Harga (Rp)
PERALATAN
D E
A
m²
Jumlah (A+B+C)
125,930.00
m²
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
12,593.00 138,523.00
4. 4.1.1.28.
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Harga Satuan (Rp)
A
No
B
C
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang batu Tukang kayu Tukang besi
Kode
Satuan
Koefisien
L.01 L.02 L.02 L.02
OH OH OH OH
5.3 0.275 1.3 1.05
150,000.00 190,000.00 190,000.00 190,000.00
795,000.00 52,250.00 247,000.00 199,500.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.262 230,000.00 0.265 230,000.00 JUMLAH TENAGA KERJA
60,260.00 60,950.00 1,414,960.00
BAHAN Kayu kelas III Paku 5 cm – 12 cm
m3 kg
0.2 1.5
Minyak bekisting Besi beton polos Kawat beton
Liter kg kg
0.4 157.5 2.25
Semen Portland Pasir Beton Kerikil
kg m3 m3
2,600,000.00 28,000.00
520,000.00 42,000.00
18,000.00 19,000.00 33,000.00
7,200.00 2,992,500.00 74,250.00
336 1,700.00 0.54 355,000.00 0.81 570,000.00 JUMLAH HARGA BAHAN
571,200.00 191,700.00 461,700.00 4,860,550.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.29.
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
A
No
Uraian
TENAGA Pekerja Tukang batu
6,275,510.00 627,551.00 6,903,061.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Tukang kayu Tukang besi Kepala tukang Mandor B
m²
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01 L.02
OH OH
5.65 0.275
150,000.00 190,000.00
847,500.00 52,250.00
L.02 L.02 L.03 L.04
OH OH OH OH
1.56 190,000.00 1.4 190,000.00 0.323 230,000.00 0.283 230,000.00 JUMLAH TENAGA KERJA
296,400.00 266,000.00 74,290.00 65,090.00 1,601,530.00
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos
m3 kg Liter
0.27 2 0.6
2,600,000.00 28,000.00 18,000.00
702,000.00 56,000.00 10,800.00
kg
210
19,000.00
3,990,000.00
m³
Kawat beton Semen Portland Pasir Beton Kerikil C
kg kg m3 m3
3 33,000.00 336 1,700.00 0.54 355,000.00 0.81 570,000.00 JUMLAH HARGA BAHAN
99,000.00 571,200.00 191,700.00 461,700.00 6,082,400.00
JUMLAH HARGA ALAT
7,683,930.00 768,393.00 8,452,323.00
PERALATAN
D E F
Jumlah (A+B+C)
4. 4.1.1.30.
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
B
TENAGA Pekerja
Uraian
Kode
Satuan
Koefisien
L.01
OH
7.05
150,000.00
1,057,500.00
L.02 L.02 L.02
OH OH OH
0.275 1.65 2.1
190,000.00 190,000.00 190,000.00
52,250.00 313,500.00 399,000.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.403 230,000.00 0.353 230,000.00 JUMLAH TENAGA KERJA
92,690.00 81,190.00 1,996,130.00
BAHAN Kayu kelas III Paku 5 cm – 12cm
m3 kg
0.4 4
2,600,000.00 28,000.00
1,040,000.00 112,000.00
Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil
Liter kg kg kg m3 m3
2 315 4.5 336 0.54 0.81
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 570,000.00
36,000.00 5,985,000.00 148,500.00 571,200.00 191,700.00 461,700.00
M3 Lbr Batang
0.15 3.5 20
2,600,000.00 159,000.00 11,000.00
390,000.00 556,500.00 220,000.00
JUMLAH HARGA BAHAN C
9,712,600.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.31.
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
Jumlah Harga (Rp)
Tukang batu Tukang kayu Tukang besi
Kayu kelas II balok Plywood 9 mm Dolken kayu (8-10) cm, panj4 m
m³
No
TENAGA Pekerja
Uraian
Kode
Satuan
Koefisien
L.01
OH
6.35
11,708,730.00 1,170,873.00 12,879,603.00
Jumlah Harga (Rp)
150,000.00
952,500.00
m³
Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor B
L.02 L.02 L.02 L.03 L.04
0.275 1.65 1.4 0.333 0.318
190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu (8-10) cm, panj 4 m
C
OH OH OH OH OH
52,250.00 313,500.00 266,000.00 76,590.00 73,140.00 1,733,980.00
m3 kg Liter kg
0.32 3.2 1.6 210
2,600,000.00 28,000.00 18,000.00 19,000.00
832,000.00 89,600.00 28,800.00 3,990,000.00
kg kg m3 m3
3 336 0.54 0.81
33,000.00 1,700.00 355,000.00 570,000.00
99,000.00 571,200.00 191,700.00 461,700.00
m3 Lembar Batang
0.14 2.8 16
2,600,000.00 159,000.00 11,000.00
364,000.00 445,200.00 176,000.00
JUMLAH HARGA BAHAN
PERALATAN
7,249,200.00
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
8,983,180.00 898,318.00 9,881,498.00
4. 4.1.1.32.
Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
TENAGA
Uraian
Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.02 L.02 L.03 L.04
OH OH OH OH OH OH
5.3 0.275 1.3 1.05 0.265 0.265
150,000.00 190,000.00 190,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
Jumlah Harga (Rp) 795,000.00 52,250.00 247,000.00 199,500.00 60,950.00 60,950.00 1,415,650.00
BAHAN Kayu kelas III Paku 5 cm – 12 cm
m3 kg
0.32 3.2
2,600,000.00 28,000.00
832,000.00 89,600.00
Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil
Liter kg kg kg m3 m3
1.6 157.5 2.25 336 0.54 0.81
18,000.00 19,000.00 33,000.00 1,700.00 355,000.00 570,000.00
28,800.00 2,992,500.00 74,250.00 571,200.00 191,700.00 461,700.00
m3 Lembar
0.12 2.8
2,600,000.00 159,000.00
312,000.00 445,200.00
Kayu kelas II balok Plywood 9 mm
m³
Dolken kayu (8-10) cm, panjang 4 m
Batang
32
11,000.00
JUMLAH HARGA BAHAN C
352,000.00
6,350,950.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
7,766,600.00 776,660.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.33.
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
8,543,260.00
Harga Satuan (Rp) No A
B
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
5.3
Tukang batu Tukang kayu Tukang besi
L.02 L.02 L.02
OH OH OH
0.275 1.3 1.05
Kepala tukang Mandor
L.03 L.04
OH OH
BAHAN Kayu kelas III
m3
Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton
kg Liter kg kg kg m3
Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu (8-10) cm, panjang 4 m
m3 m3 Lembar Batang
795,000.00 52,250.00 247,000.00
190,000.00 230,000.00 0.262 230,000.00 0.265 JUMLAH TENAGA KERJA
199,500.00 60,260.00 60,950.00 1,414,960.00
2,600,000.00
624,000.00
28,000.00 18,000.00 19,000.00 33,000.00 1,700.00 355,000.00
89,600.00 28,800.00 2,992,500.00 74,250.00 571,200.00 191,700.00
570,000.00 2,600,000.00 159,000.00 11,000.00
461,700.00 416,000.00 445,200.00 264,000.00
0.24 3.2 1.6 157.5 2.25 336 0.54 0.81 0.16 2.8 24
m³
Jumlah Harga (Rp)
150,000.00 190,000.00 190,000.00
JUMLAH HARGA BAHAN C
-
6,158,950.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.34.
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) No
Uraian
Kode
Satuan
Koefisien
7,573,910.00 757,391.00 8,331,301.00
Jumlah Harga (Rp)
m³
A
B
TENAGA Pekerja Tukang batu Tukang kayu Tukang besi
L.01 L.02 L.02 L.02
OH OH OH OH
5.65 0.275 1.56 1.4
150,000.00 190,000.00 190,000.00 190,000.00
847,500.00 52,250.00 296,400.00 266,000.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.323 230,000.00 0.283 230,000.00 JUMLAH TENAGA KERJA
74,290.00 65,090.00 1,601,530.00
2,600,000.00 28,000.00
650,000.00 84,000.00
18,000.00 19,000.00 33,000.00 1,700.00
21,600.00 3,990,000.00 99,000.00 571,200.00
355,000.00 570,000.00 2,600,000.00 159,000.00 11,000.00
191,700.00 461,700.00 273,000.00 397,500.00 154,000.00
BAHAN Kayu kelas III Paku 5 cm – 12 cm
m3 kg
Minyak bekisting Besi beton polos Kawat beton Semen Portland
Liter kg kg kg
Pasir Beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu (8-10) cm, panj 4 m
m3 m3 m3 Lembar Batang
0.25 3 1.2 210 3 336 0.54 0.81 0.105 2.5 14
JUMLAH HARGA BAHAN C
6,893,700.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.1.1.35.
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
8,495,230.00 0.10 x D
849,523.00 9,344,753.00
Harga Satuan (Rp) A
B
No
-
Uraian TENAGA Pekerja Tukang batu Tukang kayu Tukang besi
Kode
Satuan
Koefisien
L.01 L.02 L.02 L.02
OH OH OH OH
0.18 0.02 0.02 0.02
Kepala tukang Mandor
L.03 L.04
OH OH
Jumlah Harga (Rp)
150,000.00 190,000.00 190,000.00 190,000.00
27,000.00 3,800.00 3,800.00 3,800.00
0.006 230,000.00 0.009 230,000.00 JUMLAH TENAGA KERJA
1,380.00 2,070.00 41,850.00
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil
m3 kg Liter kg kg kg
0.002 0.01 3 0.045 4
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00 1,700.00
5,200.00 280.00 57,000.00 1,485.00 6,800.00
m3 m3
0.006 0.009
355,000.00 570,000.00
2,130.00 5,130.00
m³
JUMLAH HARGA BAHAN C
78,025.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.1.1.36.
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
119,875.00 11,987.50 131,862.50
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
B
Kode
Satuan
Koefisien
L.01 L.02 L.02 L.02
OH OH OH OH
0.297 0.033 0.033 0.033
150,000.00 190,000.00 190,000.00 190,000.00
44,550.00 6,270.00 6,270.00 6,270.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
2,300.00 3,450.00 69,110.00
m3 kg Liter kg kg
Semen Portland Pasir Beton Kerikil
kg m3 m3
0.003 0.02
2,600,000.00 28,000.00 18,000.00 19,000.00 33,000.00
7,800.00 560.00 68,400.00 1,650.00
5.5 1,700.00 0.009 355,000.00 0.015 570,000.00 JUMLAH HARGA BAHAN
9,350.00 3,195.00 8,550.00 99,505.00
3.6 0.05
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
168,615.00 16,861.50 185,476.50
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
4.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK 4.4.1.2.1.
Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm Harga Satuan (Rp)
A
m'
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang batu Tukang kayu Tukang besi
BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton
C
-
No
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH OH OH
0.132 0.022 0.002
150,000.00 190,000.00 230,000.00
19,800.00 4,180.00 460.00
Mandor
L.04
OH
0.007
230,000.00
1,610.00
TENAGA
Uraian
Jumlah Harga (Rp)
m'
JUMLAH TENAGA KERJA B
C
BAHAN Semen PC Pasir beton Kerikil (maks 30mm)
Kg Kg Kg
Air
L
26.08 60.8 82.32
26,050.00
1,700.00 260.00 450.00
44,336.00 15,808.00 37,044.00
17.2 3,000.00 JUMLAH HARGA BAHAN
51,600.00 148,788.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
174,838.00 17,483.80 192,321.80
4.4.1.2.2.
Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
TENAGA Pekerja
Uraian
Tukang batu Kepala tukang Mandor B
C
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
0.165
150,000.00
24,750.00
L.02 L.03 L.04
OH OH OH
0.028 190,000.00 0.003 230,000.00 0.008 230,000.00 JUMLAH TENAGA KERJA
5,320.00 690.00 1,840.00 32,600.00
BAHAN Semen PC
Kg
Pasir beton Kerikil (maks 30mm) Air
Kg Kg L
32.6
1,700.00
55,420.00
76 260.00 102.9 450.00 21.5 3,000.00 JUMLAH HARGA BAHAN
19,760.00 46,305.00 64,500.00 185,985.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4.4.1.2.3.
Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
A
B
m²
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
218,585.00 21,858.50 240,443.50
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang batu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.198 0.033
150,000.00 190,000.00
29,700.00 6,270.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.003 230,000.00 0.01 230,000.00 JUMLAH TENAGA KERJA
690.00 2,300.00 38,960.00
BAHAN
m²
Semen PC Pasir beton Kerikil (maks 30mm) Air C
Kg Kg Kg L
32.12 1,700.00 91.2 260.00 123.48 450.00 25.8 3,000.00 JUMLAH HARGA BAHAN
54,604.00 23,712.00 55,566.00 77,400.00 211,282.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
250,242.00 25,024.20
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.4.
Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
275,266.20
Harga Satuan (Rp) A
No
B
C
Uraian
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH OH OH
0.248 0.041 0.004
150,000.00 190,000.00 230,000.00
37,200.00 7,790.00 920.00
Mandor
L.04
OH
0.013 230,000.00 JUMLAH TENAGA KERJA
2,990.00 48,900.00
BAHAN Semen PC Pasir beton Kerikil (maks 30mm)
Kg Kg Kg
48.9 114 154.35
Air
L
TENAGA
1,700.00 260.00 450.00
83,130.00 29,640.00 69,457.50
32.25 3,000.00 JUMLAH HARGA BAHAN
96,750.00 278,977.50
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.1.2.5.
Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian TENAGA Pekerja Tukang batu Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.007 0.076 0.008 0.001
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
327,877.50 32,787.75 360,665.25
0.10 x D
Harga Satuan (Rp) A
m²
Jumlah Harga (Rp) 1,050.00 14,440.00 1,840.00 230.00 17,560.00
BAHAN Lantai kerja tebal 10cm
m3
0.08
-
Besi hollow 50.50.3
Kg
9.394
-
m²
Kayu kaso 5/7 Phenol film 12mm Minyak bekisting Dinabolt dia 12mm (10-15cm)
m3 Lbr L Bh
0.005 0.08 0.2 3.882
2,600,000.00 18,000.00
JUMLAH HARGA BAHAN C
13,000.00 3,600.00 16,600.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.6.
Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
34,160.00 0.10 x D
3,416.00 -
Harga Satuan (Rp) A
No
B
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.004 0.038
150,000.00 190,000.00
600.00 7,220.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.004 230,000.00 0.001 230,000.00 JUMLAH TENAGA KERJA
920.00 230.00 8,970.00
m3 Lbr
0.005 0.043
2,600,000.00
13,000.00 -
L Bh
0.2 0.693
18,000.00
3,600.00 -
Minyak bekisting Dinabolt dia 12mm (10-15cm)
JUMLAH HARGA BAHAN
16,600.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.1.2.7.
Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
A
B
m²
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang batu
BAHAN Kayu kaso 5/7 Phenol film 12mm
C
-
No
25,570.00 2,557.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang batu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.004 0.038
150,000.00 190,000.00
600.00 7,220.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.004 230,000.00 0.001 230,000.00 JUMLAH TENAGA KERJA
920.00 230.00 8,970.00
BAHAN
m²
Kayu kaso 5/7 Phenol film 12mm Minyak bekisting Paku 5-7cm Dinabolt dia 12mm
m3 Lbr L Kg Bh
0.004 0.048 0.2 0.046 0.693
2,600,000.00 18,000.00 28,000.00
10,400.00 3,600.00 1,288.00 -
(10-15cm) JUMLAH HARGA BAHAN C
15,288.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
24,258.00 2,425.80 -
4.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
TENAGA
Uraian
Pekerja Tukang kayu Mandor B
Kode
Satuan
L.01
OH OH OH
L.04
-
Koefisien 0.053 150,000.00 0.018 190,000.00 0.005 230,000.00 JUMLAH TENAGA KERJA
Jumlah Harga (Rp) 7,950.00 3,420.00 1,150.00 12,520.00
BAHAN JUMLAH HARGA BAHAN
C
PERALATAN
D E F
Jumlah (A+B+C)
4.4.1.2.9.
Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
JUMLAH HARGA ALAT
A
B
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
12,520.00 1,252.00 13,772.00
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang kayu
Kode
Satuan
Koefisien
L.01
OH OH
0.089 0.03
150,000.00 190,000.00
13,350.00 5,700.00
Mandor
L.04
OH
0.005 230,000.00 JUMLAH TENAGA KERJA
1,150.00 20,200.00
bh
BAHAN -
PERALATAN JUMLAH HARGA ALAT
D E F
-
Harga Satuan
JUMLAH HARGA BAHAN C
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
20,200.00 2,020.00 22,220.00
bh
4.4.1.2.10.
Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak Harga Satuan (Rp)
A
No
B
Uraian TENAGA Pekerja Tukang kayu Mandor
Kode
Satuan
L.01
OH OH OH
L.04
Koefisien 0.071 150,000.00 0.024 190,000.00 0.005 230,000.00 JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C)
4.4.1.2.11.
Penuangan/menebar beton untuk 1 buah komponen plat pracetak
16,360.00 1,636.00 17,996.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) No
B
Uraian
Kode
Satuan
Pekerja Tukang batu Tukang vibrator Kepala Tukang Mandor
L.01 L.02 L.02 L.03 L.04
OH OH OH OH OH
TENAGA
Koefisien 0.064 150,000.00 0.244 190,000.00 0.128 0.034 230,000.00 0.073 230,000.00 JUMLAH TENAGA KERJA
bh
Jumlah Harga (Rp) 9,600.00 46,360.00 7,820.00 16,790.00 80,570.00
BAHAN
C
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C)
4.4.1.2.12.
Penuangan/menebar beton untuk 1 buah komponen balok pracetak
80,570.00 8,057.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
10,650.00 4,560.00 1,150.00 16,360.00
BAHAN
C
A
Jumlah Harga (Rp)
No
Uraian TENAGA Pekerja Tukang batu Tukang vibrator
Kode
Satuan
Koefisien
L.01 L.02 L.02
OH OH OH
0.069 0.242 0.138
150,000.00 190,000.00
Jumlah Harga (Rp) 10,350.00 45,980.00 -
bh
Kepala Tukang Mandor B
L.03 L.04
OH OH
0.037 230,000.00 0.073 230,000.00 JUMLAH TENAGA KERJA
BAHAN
C
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E
Jumlah (A+B+C)
81,630.00 8,163.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.13.
Penuangan/menebar beton untuk 1 buah komponen kolom pracetak
A
No
Uraian
TENAGA Pekerja Tukang batu
Tukang vibrator Kepala Tukang Mandor B
-
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.061 0.213
150,000.00 190,000.00
9,150.00 40,470.00
L.02 L.03 L.04
OH OH OH
0.122 0.033 230,000.00 0.073 230,000.00 JUMLAH TENAGA KERJA
7,590.00 16,790.00 74,000.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E
Jumlah (A+B+C)
74,000.00 7,400.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.14.
Mendirikan 1 buah komponen plat pracetak
-
Harga Satuan (Rp) No
TENAGA Pekerja
Uraian
Tukang batu Tukang erection Kepala Tukang Mandor B
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
0.067
150,000.00
10,050.00
L.02 L.02 L.03 L.04
OH OH OH OH
0.067 190,000.00 0.134 0.067 230,000.00 0.067 230,000.00 JUMLAH TENAGA KERJA
12,730.00 15,410.00 15,410.00 53,600.00
L
6.676 JUMLAH HARGA BAHAN
-
0.067
-
BAHAN Solar
C
bh
BAHAN
C
A
8,510.00 16,790.00 81,630.00
PERALATAN Sewa crane
UH
bh
Sewa pipe support
D E
UH
1.1 JUMLAH HARGA ALAT
-
Jumlah (A+B+C)
53,600.00 5,360.00
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.15.
Mendirikan 1 buah komponen balok pracetak
-
Harga Satuan (Rp) A
No
B
Uraian TENAGA Pekerja Tukang batu
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.061 0.061
Tukang erection Operator crane Pembantu operator crane
L.02
OH OH OH
0.122 0.061 0.061
Kepala Tukang Mandor
L.03 L.04
OH OH
0.061 230,000.00 0.061 230,000.00 JUMLAH TENAGA KERJA
BAHAN Solar
C
L
PERALATAN Sewa crane Sewa chaffolding
UH UH
150,000.00 190,000.00
-
-
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.16.
Mendirikan 1 buah komponen kolom pracetak
-
48,800.00 0.10 x D
4,880.00 -
Harga Satuan (Rp)
B
C
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang batu Tukang erection Operator crane Pembantu operator crane
L.01 L.02 L.02
OH OH OH OH OH
0.083 0.083 0.166 0.083 0.083
150,000.00 190,000.00
12,450.00 15,770.00 -
Kepala Tukang Mandor
L.03 L.04
OH OH
0.083 230,000.00 0.083 230,000.00 JUMLAH TENAGA KERJA
19,090.00 19,090.00 66,400.00
TENAGA
Uraian
14,030.00 14,030.00 48,800.00
0.061 1.1 JUMLAH HARGA ALAT
E F
No
9,150.00 11,590.00
-
Jumlah (A+B+C)
A
Jumlah Harga (Rp)
6.11 JUMLAH HARGA BAHAN
D
BAHAN Solar PERALATAN
bh
L
8.277
-
-
JUMLAH HARGA BAHAN
-
bh
Sewa crane Sewa pipe support
UH UH
0.083 2.2 JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.17.
Melangsir 1 buah komponen plat pracetak ( ± 20 m)
-
66,400.00 0.10 x D
6,640.00 -
Harga Satuan (Rp) A
No
B
Kode
Satuan
Koefisien
L.01
OH
0.019
150,000.00
2,850.00
Tukang batu Operator crane Pembantu operator crane
L.02
OH OH OH
0.038 0.019 0.019
190,000.00
7,220.00 -
L
PERALATAN Sewa crane
UH
(Rp)
JUMLAH TENAGA KERJA
10,070.00
1.897 JUMLAH HARGA BAHAN
-
0.019
-
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.1.2.18.
Melangsir 1 buah komponen balok pracetak ( ± 20 m)
10,070.00 1,007.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang batu Operator crane
Kode
Satuan
Koefisien
L.01 L.02
OH OH OH
0.019 0.038 0.019
OH
0.019
Pembantu operator crane
C
BAHAN Solar PERALATAN Sewa crane
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
L
UH
bh
Jumlah Harga (Rp)
150,000.00 190,000.00
1.897
2,850.00 7,220.00 -
JUMLAH TENAGA KERJA B
bh
Jumlah Harga
Uraian TENAGA Pekerja
BAHAN Solar
C
-
10,070.00
-
-
JUMLAH HARGA BAHAN
-
0.019 JUMLAH HARGA ALAT
-
10,070.00
0.10 x D
1,007.00 -
bh
4.4.1.2.19.
Melangsir 1 buah komponen kolom pracetak ( ± 20 m) Harga Satuan (Rp)
A
No
B
Uraian TENAGA Pekerja Tukang batu Operator crane Pembantu operator crane
Kode
Satuan
Koefisien
L.01 L.02
OH OH OH OH
0.019 0.038 0.019 0.019
BAHAN Solar
C
L
PERALATAN Sewa crane
UH
D E F
Jumlah (A+B+C)
4.4.1.2.20.
Bahan 1 m3 grouting campuran
150,000.00 190,000.00
10,070.00
1.897 JUMLAH HARGA BAHAN
-
0.019 JUMLAH HARGA ALAT
-
Harga Satuan (Rp) A
No
TENAGA
Uraian
Kode
Satuan
2,850.00 7,220.00 -
JUMLAH TENAGA KERJA
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
Koefisien
10,070.00 1,007.00 -
Jumlah Harga (Rp)
JUMLAH TENAGA KERJA B
C
BAHAN Semen grout
Kg
Screening Air
Kg L
-
1,200.00
-
650 350 3,000.00 JUMLAH HARGA BAHAN
1,050,000.00 1,050,000.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) 0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.21.
Bahan 1 m3 grouting tidak campuran
No
TENAGA
Uraian
Kode
Satuan
Koefisien JUMLAH TENAGA KERJA
B
BAHAN
1,050,000.00 105,000.00 -
Harga Satuan (Rp) A
bh
Jumlah Harga (Rp) -
m³
Semen grout Air
Kg L
1,850.00 400 3,000.00 JUMLAH HARGA BAHAN
1,200,000.00 1,200,000.00
JUMLAH HARGA ALAT
1,200,000.00 120,000.00 -
C
PERALATAN
D E F
Jumlah (A+B+C)
4.4.1.2.22.
Upah melakukan 1 titik grouting pada join pracetak
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
B
Uraian TENAGA Tukang batu Kepal tukang Mandor
Kode
Satuan
L.02 L.03 L.04
OH OH OH
Koefisien 0.367 190,000.00 0.074 230,000.00 0.037 230,000.00 JUMLAH TENAGA KERJA
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.1.2.23.
Pemasangan 1 titik Bekisting join pracetak
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
95,260.00
0.10 x D
Harga Satuan (Rp) No
TENAGA
Uraian
Pekerja Tukang kayu Kepala tukang Mandor
Kode
L.02 L.03 L.04
Satuan
OH OH OH
Koefisien
ttk
Jumlah Harga (Rp)
0.147 150,000.00 0.147 190,000.00 0.015 230,000.00 0.005 230,000.00 JUMLAH TENAGA KERJA
22,050.00 27,930.00 3,450.00 1,150.00 54,580.00
m3 m3 Kg
0.012 2,600,000.00 0.004 2,600,000.00 0.264 28,000.00 JUMLAH HARGA BAHAN
31,200.00 10,400.00 7,392.00 48,992.00
PERALATAN JUMLAH HARGA ALAT
D E F
9,526.00 104,786.00
BAHAN Kayu kaso 5/7 Papan cor Paku 5-7cm
C
69,730.00 17,020.00 8,510.00 95,260.00
PERALATAN
D
B
Jumlah Harga (Rp)
BAHAN
C
A
m³
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
103,572.00 10,357.20 113,929.20
ttk
4.4.1.2.24.
Upah 1 titik Join dengan Sling Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Tukang besi Mandor
Kode
L.02 L.02 L.04
Satuan
OH OH OH
Koefisien 0.22 0.22 0.22 0.011
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B C
D E F
Jumlah Harga (Rp) 33,000.00 41,800.00 50,600.00 2,530.00 127,930.00
BAHAN JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
127,930.00 12,793.00 140,723.00
ttk
4.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM 4.4.2.1.1.
Pemasangan 1 kg besi profil Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Las Konstruksi Kepala tukang Mandor
B
C
Kode
Jumlah Harga
Satuan
Koefisien
(Rp)
L.01 L.03
OH OH
0.06 0.06
150,000.00 190,000.00
9,000.00 11,400.00
L.03 L.04
OH OH
0.006 0.003
230,000.00 230,000.00
1,380.00 690.00 22,470.000
JUMLAH TENAGA KERJA BAHAN Besi Profil
38,000.00 1.15 JUMLAH HARGA BAHAN
Kg
43,700.00 43,700.00
PERALATAN JUMLAH HARGA ALAT
D E F 4.4.2.1.2.
66,170.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
6,617.00 72,787.00
Pemasangan 1 kg rangka kuda-kuda baja IWF Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Las Kepala tukang Mandor
B
C
Kode
Jumlah Harga
Satuan
Koefisien
(Rp)
L.01 L.03
OH OH
0.06 0.06
150,000.00 190,000.00
9,000.00 11,400.00
L.03 L.04
OH OH
0.006 0.003
230,000.00 230,000.00
1,380.00 690.00 22,470.00
JUMLAH TENAGA KERJA BAHAN Besi Baja IWF
Kg
1.15
38,000.00
JUMLAH HARGA BAHAN PERALATAN
43,700.00 43,700.00 -
JUMLAH HARGA ALAT D E F 4.4.2.1.3.
66,170.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
6,617.00 72,787.00
Pengerjaan 100 kg pekerjaan perakitan Harga Satuan (Rp)
No A
kg
Uraian TENAGA Pekerja
Kode L.01
Satuan
Koefisien
OH
0.1
Jumlah Harga (Rp)
150,000.00
15,000.00
kg
Tukang Las Kepala tukang Mandor B
C
L.03 L.03
OH OH
L.04
OH
F
4.4.2.1.4.
190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Solar Minyak pelumas
Liter Liter
1 0.1
6,500.00 47,000.00
JUMLAH HARGA BAHAN Jam
0.8 51,300.00 JUMLAH HARGA ALAT
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Uraian TENAGA Pekerja
Mandor
C
6,500.00 4,700.00 11,200.00 41,040.00 41,040.00
96,382.00
kg
Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Tukang Las Kepala tukang
B
35,380.000
87,620.00 8,762.00
Harga Satuan (Rp) No A
19,000.00 230.00 1,150.00
PERALATAN 1. Sewa alat
D E
0.1 0.001 0.005
Kode
Jumlah Harga (Rp)
Satuan
Koefisien
L.01
OH
1.05
150,000.00
157,500.00
L.03 L.03
OH OH
1.05 0.105
190,000.00 230,000.00
199,500.00 24,150.00
L.04
OH
0.052
230,000.00
11,960.00 393,110.00
JUMLAH TENAGA KERJA BAHAN Besi siku L 30.30.3 Besi plat baja
Kg Kg
15 32.8
38,000.00 33,000.00
570,000.00 1,082,400.00
Kawat las
Kg
0.05
160,000.00
8,000.00 1,660,400.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E F
4.4.2.1.5.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
2,053,510.00 205,351.00 2,258,861.00
0.10 x D
Harga Satuan Pekerjaan (D+E)
Pengerjaan 10 cm pengelasan dengan las listrik Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Las Kepala tukang Mandor
B
BAHAN
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.04 0.02
L.03 L.04
OH OH
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00
0.002 230,000.00 0.002 JUMLAH TENAGA KERJA
6,000.00 3,800.00 460.00 460.00 10,720.00
m²
Kg Liter Liter
Kawat las listrik Solar Minyak pelumas C
D E F
4.4.2.1.6.
PERALATAN Sewa alat
Jam
160,000.00 6,500.00 47,000.00
0.4 0.3
0.04 JUMLAH HARGA BAHAN 0.17
51,300.00 JUMLAH HARGA ALAT
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Uraian TENAGA Pekerja
Mandor
Kode
8,727.10 95,998.10 cm
Jumlah Harga
Satuan
Koefisien
L.01 L.03 L.03
OH OH OH
0.65
150,000.00
97,500.00
0.65 0.065
190,000.00 230,000.00
123,500.00 14,950.00
L.04
OH
0.032
230,000.00
7,360.00 243,310.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Besi scuare tube Besi lis kaca (1 x 1) cm Pengelasan
C
8,721.00 8,721.00
Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm
Tukang Las Kepala tukang
B
67,830.00
87,271.00
Jumlah (A+B+C)
Harga Satuan (Rp) No A
64,000.00 1,950.00 1,880.00
m
4.76
-
-
m
4.522
-
-
cm
20
9,599.81
JUMLAH HARGA BAHAN
191,996.20 191,996.20
PERALATAN -
JUMLAH HARGA ALAT D E F 4.4.2.1.7.
No A
43,530.62 -
Pemasangan 1 m2 pintu rolling door besi
Uraian TENAGA Pekerja
Mandor
C
0.10 x D
Harga Satuan Pekerjaan (D+E)
Tukang Las Kepala tukang
B
435,306.20
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
1.2
150,000.00
180,000.00
L.03 L.03
OH OH
1.2 0.12
190,000.00 230,000.00
228,000.00 27,600.00
L.04
OH
0.006
230,000.00
1,380.00 436,980.00
JUMLAH TENAGA KERJA BAHAN Pintu gulung besi
m2
1
1,750,000.00
JUMLAH HARGA BAHAN PERALATAN
1,750,000.00 1,750,000.00
m²
-
JUMLAH HARGA ALAT D E F
4.4.2.1.8.
2,186,980.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
218,698.00 2,405,678.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Kepala tukang Mandor
B
C
D E F 4.4.2.1.9.
No A
C
Kode
Koefisien
(Rp)
L.01 L.03
OH OH
0.44 0.44
150,000.00 190,000.00
66,000.00 83,600.00
L.03 L.04
OH OH
0.044 0.022
230,000.00 230,000.00
10,120.00 5,060.00 164,780.00
JUMLAH TENAGA KERJA m2
1
-
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
164,780.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
16,478.00 -
F
4.4.2.1.10.
m²
Pemasangan 1 m2 sunscreen alluminium
Uraian TENAGA Pekerja Tukang
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01 L.03
OH OH
0.08 0.8
150,000.00 190,000.00
12,000.00 152,000.00
L.03 L.04
OH OH
0.08 0.004
230,000.00 230,000.00
18,400.00 920.00
JUMLAH TENAGA KERJA BAHAN Sunscreen alluminium
m2
1
500,000.00
JUMLAH HARGA BAHAN
183,320.00 500,000.00 500,000.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga
Satuan
BAHAN Pintu lipat
Kepala tukang Mandor B
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 rolling door alluminium
0.10 x D
683,320.00 68,332.00 751,652.00
m²
No A
Uraian TENAGA Pekerja Tukang Khusus Alumunium Kepala tukang Mandor
B
C
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
1 1
150,000.00 190,000.00
150,000.00 190,000.00
L.03
OH
L.03 L.04
OH OH
0.1
230,000.00
23,000.00
0.05
230,000.00
11,500.00 374,500.00
JUMLAH TENAGA KERJA BAHAN Rolling dor alluminium
m2
1
600,000.00
JUMLAH HARGA BAHAN
600,000.00 600,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F 4.4.2.1.11.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
974,500.00 97,450.00
0.10 x D
1,071,950.00
Harga Satuan Pekerjaan (D+E) Pemasangan 1 m kusen pintu alluminium Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Khusus Alumunium Kepala tukang Mandor
B
Kode
Jumlah Harga
Satuan
Koefisien
L.01
OH
0.043
150,000.00
6,450.00
0.043
190,000.00
8,170.00
L.03 L.03
OH OH
0.0043
230,000.00
989.00
L.04
OH
0.0021
230,000.00
483.00 16,092.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Profil alluminium Skrup fixer Sealant
C
m buah
1.1 2
110,000.00 22,000.00
121,000.00 44,000.00
Tube
0.06
35,000.00
2,100.00 167,100.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.2.1.12.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
Harga Satuan Pekerjaan (D+E)
183,192.00 18,319.20 201,511.20
Pemasangan 1 m2 pintu alluminium strip lebar 8 cm Harga Satuan (Rp)
No
m²
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m'
A
TENAGA Pekerja Tukang Khusus Allumunium Kepala tukang Mandor
B
C
L.01
OH
L.03
OH
L.03 L.04
OH OH
0.085 0.085
150,000.00 190,000.00
12,750.00 16,150.00
0.0085 0.0042
230,000.00 230,000.00
1,955.00 966.00
JUMLAH TENAGA KERJA BAHAN Profil alluminium
m
Alluminium strip
m
31,821.00
4.4
110,000.00
484,000.00
14.6
60,000.00
876,000.00 1,360,000.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F 4.4.2.1.13.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
1,391,821.00 139,182.10
0.10 x D
1,531,003.10
Harga Satuan Pekerjaan (D+E) Pemasangan 1 m2 pintu kaca rangka alluminium Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Allumunium/Kaca Kepala tukang Mandor
B
Kode
Jumlah Harga
Satuan
Koefisien
L.01
OH
0.085
150,000.00
12,750.00
0.085
190,000.00
16,150.00
L.03 L.03
OH OH
L.04
OH
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Pintu alluminium Profil kaca Sealant
C
32,120.00
m m
4.4 4.5
110,000.00 95,000.00
484,000.00 427,500.00
Tube
0.27
35,000.00
9,450.00 920,950.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.2.1.14.
953,070.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
95,307.00 -
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 venetions blinds dan Vertical blinds Harga Satuan (Rp)
No A
m²
Uraian TENAGA Pekerja Tukang Kepala tukang
Kode
Jumlah Harga
Satuan
Koefisien
(Rp)
L.01 L.03
OH OH
0.35 0.35
150,000.00 190,000.00
52,500.00 66,500.00
L.03
OH
0.035
230,000.00
8,050.00
m²
Mandor B
C
D E F 4.4.2.1.15.
No A
C
OH
0.018
230,000.00
JUMLAH TENAGA KERJA BAHAN 1. Venetions blinds dan vertical blinds (tirai)
m2
1
4,140.00 131,190.00
-
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
131,190.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
13,119.00 -
Uraian TENAGA Pekerja Tukang Las
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01 L.03
OH OH
1.67 1.67
150,000.00 190,000.00
250,500.00 317,300.00
L.03 L.04
OH OH
0.167 0.083
230,000.00 230,000.00
38,410.00 19,090.00
BAHAN Besi strip Pengelasan
kg cm
JUMLAH TENAGA KERJA
625,300.00
6.177 27.08
160,602.00 259,962.85 420,564.85
26,000.00 9,599.81
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F 4.4.2.1.16.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
1,045,864.85 104,586.49
0.10 x D
1,150,451.34
Harga Satuan Pekerjaan (D+E) Pemasangan 1 m2 kawat nyamuk Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Kepala tukang Mandor
B
m²
Pemasangan 1 m2 terali besi strip (2 x 3) mm
Kepala tukang Mandor B
L.04
Kode
Satuan
Koefisien
(Rp)
L.01 L.03 L.03
OH OH OH
0.1
150,000.00
15,000.00
0.1 0.01
190,000.00 230,000.00
19,000.00 2,300.00
L.04
OH
0.005
230,000.00
1,150.00 37,450.00
JUMLAH TENAGA KERJA BAHAN Kawat nyamuk Pengelasan Baja strip (0,2 x 2) cm
Jumlah Harga
m2 cm kg
1.1
29,000.00
31,900.00
11.11 1.716
9,599.81 26,000.00
106,653.89 44,616.00
m²
C
JUMLAH HARGA BAHAN
183,169.89
PERALATAN -
JUMLAH HARGA ALAT D E F 4.4.2.1.17.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
220,619.89 22,061.99
0.10 x D
242,681.88
Harga Satuan Pekerjaan (D+E) Pemasangan 1 m2 jendela nako & tralis Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang Kepala tukang Mandor
B
Kode
Jumlah Harga
Satuan
Koefisien
L.01 L.03
OH OH
L.03 L.04
OH OH
0.2 0.2 0.02
150,000.00 190,000.00 230,000.00
30,000.00 38,000.00 4,600.00
0.001
230,000.00
230.00 72,830.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Jendela nako (rangka + kaca 5 mm) Paku skrup 1 cm – 2,5 cm Besi strip
C
m2 buah
1.1 10
m
7
141,000.00
155,100.00
400.00
4,000.00
26,000.00
182,000.00
JUMLAH HARGA BAHAN
341,100.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.2.1.18.
No A
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
C
413,930.00 41,393.00
0.10 x D
455,323.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
Uraian TENAGA Pekerja Tukang Kepala tukang Mandor
B
m²
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01 L.03
OH OH
0.2 0.2
150,000.00 190,000.00
30,000.00 38,000.00
L.03 L.04
OH OH
0.02 0.001
230,000.00 230,000.00
4,600.00 230.00
JUMLAH TENAGA KERJA BAHAN Seng plat Paku 1 cm - 2,5 cm Papan kayu kelas II
m kg m3
1.05 0.015 0.019
76,000.00 33,000.00 4,250,000.00
JUMLAH HARGA BAHAN PERALATAN
72,830.00 79,800.00 495.00 80,750.00 161,045.00
m²
-
JUMLAH HARGA ALAT D E F 4.4.2.1.19.
No A
23,387.50 257,262.50
Uraian TENAGA Pekerja Tukang
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
L.03 L.03
OH OH
0.15 0.3
150,000.00 190,000.00
22,500.00 57,000.00
L.04
OH
0.03 0.008
230,000.00 230,000.00
6,900.00 1,840.00
JUMLAH TENAGA KERJA BAHAN Seng plat Paku 1 cm – 2,5 cm
88,240.00
m kg
1.05 0.01
67,500.00 33,000.00
70,875.00 330.00
kg
0.5
26,000.00
13,000.00 84,205.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F 4.4.2.1.20.
172,445.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
17,244.50 189,689.50
Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
Harga (Rp)
L.01
OH
0.25
150,000.00
37,500.00
Tukang Besi Kepala Tukang Mandor
L.02 L.03 L.04
OH OH OH
0.25 0.025 0.013
190,000.00 230,000.00 230,000.00
47,500.00 5,750.00 2,990.00 93,740.00
BAHAN Rangka metal hollow 40.40.2 mm
M1
3.5
Assesoris (perkuatan, las dll)
Ls
100%xran gka
62,616.67
219,158.33
219,158.33
219,158.33
JUMLAH HARGA BAHAN C
Jumlah
TENAGA Pekerja
JUMLAH TENAGA KERJA B
m'
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No
A
m'
Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Besi strip C
0.10 x D
Harga Satuan Pekerjaan (D+E)
Kepala tukang Mandor B
233,875.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
438,316.67
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
532,056.67
0.10 x D
53,205.67 585,262.33
m²
4.4.2.1.21.
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
No
Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
A
Pekerja Tukang Besi
L.01 L.02
OH OH
0.35 0.35
150,000.00 190,000.00
52,500.00 66,500.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.035 0.018
230,000.00 230,000.00
8,050.00 4,140.00 131,190.00
BAHAN Rangka metal hollow 40.40.2 mm
M1
4
Assesoris (perkuatan, las dll)
Ls
100%xran gka
62,616.67
250,466.67
250,466.67
250,466.67
JUMLAH HARGA BAHAN C
Harga (Rp)
TENAGA
JUMLAH TENAGA KERJA B
Jumlah
500,933.33
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
632,123.33 63,212.33 695,335.67
m²
4.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING 4. 4.4.1.1. No
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
L.01 L.02 L.03 L.04
BAHAN Bata merah Semen Portlan Pasir Pasang
C
OH OH OH OH
bh Kg m3
0.6 0.2 0.02 0.03
150,000.00 190,000.00 230,000.00 230,000.00
90,000.00 38,000.00 4,600.00 6,900.00
JUMLAH TENAGA KERJA
139,500.00
850.00 140 43.5 1,700.00 0.08 225,000.00 JUMLAH HARGA BAHAN
119,000.00 73,950.00 18,000.00 210,950.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.2.
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
B
C
0.10 x D
Uraian
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.6 150,000.00 0.2 190,000.00 0.02 230,000.00 0.03 230,000.00 JUMLAH TENAGA KERJA
90,000.00 38,000.00 4,600.00 6,900.00 139,500.00
bh Kg m3
850.00 140 32.95 1,700.00 0.091 225,000.00 JUMLAH HARGA BAHAN
119,000.00 56,015.00 20,475.00 195,490.00
BAHAN Bata merah Semen Portlan Pasir Pasang
Koefisien Harga Satuan (Rp)
E F
Jumlah Harga (Rp)
PERALATAN JUMLAH HARGA ALAT
D
350,450.00 35,045.00 385,495.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
334,990.00
0.10 x D
33,499.00 368,489.00
4. 4.4.1.3. No
A
B
C
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP Uraian
Kode
Satuan
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala Tukang Mandor
L.03 L.04
Koefisien Harga Satuan (Rp)
0.6 0.2
Jumlah Harga (Rp)
150,000.00 190,000.00
90,000.00 38,000.00
OH OH
0.02 230,000.00 0.03 230,000.00 JUMLAH TENAGA KERJA
4,600.00 6,900.00 139,500.00
BAHAN Bata merah Semen Portlan
bh Kg
140 26.55
850.00 1,700.00
119,000.00 45,135.00
Pasir Pasang
m3
0.093 225,000.00 JUMLAH HARGA BAHAN
20,925.00 185,060.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.4.
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
324,560.00 32,456.00 357,016.00
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.6 0.2 0.02 0.03
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
C
BAHAN Bata merah Semen Portlan
bh Kg
Pasir Pasang
m3
90,000.00 38,000.00 4,600.00 6,900.00 139,500.00
850.00 1,700.00
119,000.00 37,740.00
0.102 225,000.00 JUMLAH HARGA BAHAN
22,950.00 179,690.00
140 22.2
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.5.
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
Satuan
Koefisien Harga Satuan
319,190.00 31,919.00 351,109.00
Jumlah
No
Uraian
Kode
Satuan
Koefisien (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
L.01 L.02 L.03 L.04
BAHAN Bata merah Semen Portlan Pasir Pasang
C
Harga (Rp)
OH OH OH OH
0.6 150,000.00 0.2 190,000.00 0.02 230,000.00 0.03 230,000.00 JUMLAH TENAGA KERJA
90,000.00 38,000.00 4,600.00 6,900.00 139,500.00
bh Kg m3
850.00 140 18.5 1,700.00 0.122 225,000.00 JUMLAH HARGA BAHAN
119,000.00 31,450.00 27,450.00 177,900.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.6.
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
B
C
Uraian
317,400.00 31,740.00 349,140.00
Kode
Satuan
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala Tukang Mandor
L.03 L.04
Koefisien Harga Satuan (Rp)
0.6 0.2
Jumlah Harga (Rp)
150,000.00 190,000.00
90,000.00 38,000.00
OH OH
0.02 230,000.00 0.03 230,000.00 JUMLAH TENAGA KERJA
4,600.00 6,900.00 139,500.00
BAHAN Bata merah Semen Portlan
bh Kg
140 10.08
850.00 1,700.00
119,000.00 17,136.00
Kapur Padam Pasir Pasang
m3 m3
0.0275 6,000.00 0.0925 225,000.00 JUMLAH HARGA BAHAN
165.00 20,812.50 157,113.50
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.7.
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
296,613.50 29,661.35 326,274.85
Jumlah Harga (Rp)
A
TENAGA
B
C
Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala Tukang Mandor
L.03 L.04
OH OH
BAHAN Bata merah Semen Portlan
bh Kg
Pasir Pasang
m3
0.3 0.1
150,000.00 190,000.00
45,000.00 19,000.00
0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
2,300.00 3,450.00 69,750.00
850.00 1,700.00
59,500.00 32,215.00
0.038 225,000.00 JUMLAH HARGA BAHAN
8,550.00 100,265.00
70 18.95
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.8.
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
170,015.00 17,001.50 187,016.50
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
L.01 L.02 L.03 L.04
BAHAN Bata merah Semen Portlan Pasir Pasang
C
OH OH OH OH
bh Kg m3
0.3 0.1 0.01 0.015
150,000.00 190,000.00 230,000.00 230,000.00
45,000.00 19,000.00 2,300.00 3,450.00
JUMLAH TENAGA KERJA
69,750.00
850.00 70 14.37 1,700.00 0.04 225,000.00 JUMLAH HARGA BAHAN
59,500.00 24,429.00 9,000.00 92,929.00
PERALATAN JUMLAH HARGA ALAT
D E F 4.4.4.1.9.
Jumlah (A+B+C)
162,679.00 16,267.90 178,946.90
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No
Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
A
-
TENAGA Pekerja Tukang Batu Kepala Tukang
L.01 L.02 L.03
OH OH OH
Mandor
L.04
OH
0.3 0.1 0.01
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00
45,000.00 19,000.00 2,300.00
0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 69,750.00
B
C
BAHAN Bata merah
bh
Semen Portlan Pasir Pasang
Kg m3
850.00 70 11.5 1,700.00 0.043 225,000.00 JUMLAH HARGA BAHAN
59,500.00 19,550.00 9,675.00 88,725.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.10.
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
158,475.00 15,847.50 174,322.50
Satuan
Koefisien Harga Satuan (Rp)
A
B
TENAGA Pekerja Tukang Batu Kepala Tukang
L.01 L.02 L.03
OH OH OH
Mandor
L.04
BAHAN Bata merah Semen Portlan Pasir Pasang
0.3 0.1 0.01
Harga (Rp)
150,000.00 190,000.00 230,000.00
45,000.00 19,000.00 2,300.00
OH
0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 69,750.00
bh Kg m3
70 9.68 0.045
850.00 1,700.00 225,000.00
59,500.00 16,456.00 10,125.00
JUMLAH HARGA BAHAN C
Jumlah
86,081.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
155,831.00
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.11.
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
No
A
Uraian
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
15,583.10 171,414.10
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
0.10 x D
0.3 150,000.00 0.1 190,000.00 0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
45,000.00 19,000.00 2,300.00 3,450.00 69,750.00
850.00 1,700.00
59,500.00 14,144.00
BAHAN Bata merah Semen Portland
bh Kg
70 8.32
Pasir Pasang C
m3
0.049 225,000.00 JUMLAH HARGA BAHAN
11,025.00 84,669.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
154,419.00 15,441.90
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.12.
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
No
Uraian
Kode
169,860.90
Satuan
Koefisien Harga Satuan (Rp)
A
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
L.01 L.02 L.03 L.04
OH OH OH OH
0.3 150,000.00 0.1 190,000.00 0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
45,000.00 19,000.00 2,300.00 3,450.00 69,750.00
bh Kg m3
850.00 70 6.5 1,700.00 0.05 225,000.00 JUMLAH HARGA BAHAN
59,500.00 11,050.00 11,250.00 81,800.00
BAHAN Bata merah Semen Portland Pasir Pasang
C
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.13.
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
151,550.00 15,155.00 166,705.00
0.10 x D
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.3 0.1 0.01 0.015
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
BAHAN Bata merah Semen Portlan Kapur Padam Pasir Pasang
bh Kg m3 m3
70 4.5 0.015 0.05
850.00 1,700.00 6,000.00 225,000.00
JUMLAH HARGA BAHAN C
PERALATAN
45,000.00 19,000.00 2,300.00 3,450.00 69,750.00 59,500.00 7,650.00 90.00 11,250.00 78,490.00
JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.14.
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
Uraian
148,240.00 14,824.00 163,064.00
Kode
Satuan
Pekerja Tukang Batu Kepala Tukang
L.01 L.02 L.03
OH OH OH
Mandor
L.04
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
TENAGA
B
C
0.3 0.1 0.01
150,000.00 190,000.00 230,000.00
45,000.00 19,000.00 2,300.00
OH
0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 69,750.00
BAHAN Bata merah Semen Merah Kapur Padam
bh Kg m3
70 0.018 0.018
850.00 15,000.00 6,000.00
59,500.00 270.00 108.00
Pasir Pasang
m3
0.018 225,000.00 JUMLAH HARGA BAHAN
4,050.00 63,928.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.15.
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No
A
B
C
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Uraian
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Bata merah Semen Merah Kapur Padam Pasir Pasang PERALATAN
Koefisien Harga Satuan (Rp)
133,678.00 13,367.80 147,045.80
Kode
Satuan
Jumlah Harga (Rp)
L.01 L.02 L.03 L.04
OH OH OH OH
0.3 150,000.00 0.1 190,000.00 0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
45,000.00 19,000.00 2,300.00 3,450.00 69,750.00
bh Kg m3 m3
850.00 70 0.014 15,000.00 0.014 6,000.00 0.028 225,000.00 JUMLAH HARGA BAHAN
59,500.00 210.00 84.00 6,300.00 66,094.00
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4. 4.4.1.16.
Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
No
A
Uraian
135,844.00 13,584.40 149,428.40
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Kode
Satuan
Koefisien Harga Satuan (Rp)
TENAGA Pekerja
L.01
OH
0.35
150,000.00
52,500.00
Tukang Batu Kepala Tukang Mandor
L.02 L.03 L.04
OH OH OH
0.15 0.015 0.018
190,000.00 230,000.00 230,000.00
28,500.00 3,450.00 4,140.00
JUMLAH TENAGA KERJA B
BAHAN HB-20 Semen Portland Pasir Pasang Besi angker diameter 8
bh Kg m3 Kg
12.5 30.32 0.728 0.28
8,000.00 1,700.00 225,000.00 16,000.00
JUMLAH HARGA BAHAN C
-
Jumlah Harga (Rp)
88,590.00 100,000.00 51,544.00 163,800.00 4,480.00 319,824.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
408,414.00
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.17.
Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP
No
A
Uraian
Koefisien Harga Satuan (Rp)
40,841.40 449,255.40
Kode
Satuan
Jumlah Harga (Rp)
L.01 L.02 L.03 L.04
OH OH OH OH
0.35 150,000.00 0.15 190,000.00 0.015 230,000.00 0.018 230,000.00 JUMLAH TENAGA KERJA
52,500.00 28,500.00 3,450.00 4,140.00 88,590.00
m3 Kg m3 Kg
12.5 8,000.00 24.26 1,700.00 0.772 225,000.00 0.28 16,000.00 JUMLAH HARGA BAHAN
100,000.00 41,242.00 173,700.00 4,480.00 319,422.00
BAHAN HB-20 Semen Portland Pasir Pasang Besi angker dia 8
C
0.10 x D
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
-
PERALATAN JUMLAH HARGA ALAT
-
D
Jumlah (A+B+C)
408,012.00
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.18.
Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP
No
A
B
Uraian
Kode
Satuan
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala Tukang Mandor
L.03 L.04
BAHAN HB-15 Semen Portland Pasir Pasang Besi angker dia 8
C
0.10 x D
40,801.20 448,813.20
Koefisien Harga Satuan (Rp)
150,000.00 190,000.00
48,000.00 22,800.00
OH OH
0.012 230,000.00 0.016 230,000.00 JUMLAH TENAGA KERJA
2,760.00 3,680.00 77,240.00
m3 Kg
16.667 7,000.00 22.74 1,700.00 0.55 225,000.00 0.28 16,000.00 JUMLAH HARGA BAHAN
116,669.00 38,658.00 123,750.00 4,480.00 283,557.00
m3 Kg
0.32 0.12
Jumlah Harga (Rp)
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C)
360,797.00 36,079.70
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.19.
Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP
No
Uraian
Kode
396,876.70
Satuan
Koefisien Harga Satuan (Rp)
A
B
C
-
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.02 L.03 L.04
0.32
Jumlah Harga (Rp)
150,000.00
48,000.00
OH OH OH
0.12 190,000.00 0.012 230,000.00 0.016 230,000.00 JUMLAH TENAGA KERJA
22,800.00 2,760.00 3,680.00 77,240.00
BAHAN HB-15
m3
16.667
7,000.00
116,669.00
Semen Portland Pasir Pasang Besi angker dia 8
Kg m3 Kg
18.2 1,700.00 0.582 225,000.00 0.28 16,000.00 JUMLAH HARGA BAHAN
30,940.00 130,950.00 4,480.00 283,039.00
PERALATAN JUMLAH HARGA ALAT
-
D E
Jumlah (A+B+C)
360,279.00 36,027.90
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.20.
Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP
No
Uraian
Kode
396,306.90
Satuan
Koefisien Harga Satuan (Rp)
A
B
TENAGA Pekerja Tukang Batu Kepala Tukang
L.01 L.02 L.03
OH OH OH
Mandor
L.04
0.3 0.1 0.01
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00
45,000.00 19,000.00 2,300.00
OH
0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 69,750.00
m3 Kg
25 6,000.00 15.16 1,700.00 0.364 225,000.00 0.28 16,000.00 JUMLAH HARGA BAHAN
150,000.00 25,772.00 81,900.00 4,480.00 262,152.00
BAHAN HB-10 Semen Portland Pasir Pasang Besi angker dia 8
C
m3 Kg
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4. 4.4.1.21.
Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP
No
Uraian
Kode
331,902.00 33,190.20 365,092.20
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Satuan
-
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
B
C
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala Tukang Mandor
L.03 L.04
0.3 0.1
150,000.00 190,000.00
45,000.00 19,000.00
OH OH
0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
2,300.00 3,450.00 69,750.00
BAHAN HB-10 Semen Portland
m3 Kg
25 12.13
6,000.00 1,700.00
150,000.00 20,621.00
Pasir Pasang Besi angker dia 8
m3 Kg
0.388 225,000.00 0.28 16,000.00 JUMLAH HARGA BAHAN
87,300.00 4,480.00 262,401.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
332,151.00
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4. 4.4.1.22.
Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No
Uraian
Kode
0.10 x D
Satuan
33,215.10 365,366.10
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.3 0.1 0.01 0.015
150,000.00 190,000.00 230,000.00 230,000.00
45,000.00 19,000.00 2,300.00 3,450.00
JUMLAH TENAGA KERJA B
BAHAN Bata rooster
m3 Kg
Semen Portland Pasir Pasang C
m
3
30
69,750.00
18,000.00
540,000.00
11 1,700.00 0.035 225,000.00 JUMLAH HARGA BAHAN
18,700.00 7,875.00 566,575.00
PERALATAN JUMLAH HARGA ALAT
-
D E F
Jumlah (A+B+C)
4. 4.4.1.23.
Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
A
Uraian
C
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Koefisien Harga Satuan (Rp)
BAHAN Bata berongga Semen Portland Pasir Pasang
m3 Kg m3
0.3 0.1 0.01 0.015
150,000.00 190,000.00 230,000.00 230,000.00
F
45,000.00 19,000.00 2,300.00 3,450.00
JUMLAH TENAGA KERJA
69,750.00
30 18,000.00 11 1,700.00 0.035 225,000.00 JUMLAH HARGA BAHAN
540,000.00 18,700.00 7,875.00 566,575.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
636,325.00 63,632.50 699,957.50
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
636,325.00 63,632.50 699,957.50
4. 4.4.1.24.
Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
No
A
B
C
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.02 L.03 L.04
OH OH OH
BAHAN Bata rooster
m3
Semen Portland Pasir Pasang
Kg m3
Koefisien Harga Satuan (Rp)
0.3
150,000.00
45,000.00
0.15 190,000.00 0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
28,500.00 3,450.00 3,450.00 80,400.00
70
18,000.00
1,260,000.00
14 1,700.00 0.032 225,000.00 JUMLAH HARGA BAHAN
23,800.00 7,200.00 1,291,000.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah Harga (Rp)
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
1,371,400.00 137,140.00 1,508,540.00
m²
m²
m²
m²
m²
ran 1SP : 3KP : 10PP
m²
m²
m²
m²
m²
ran 1SP : 3KP :10PP
m²
m²
m²
ran 1SM : 1KP :1PP
uran 1SM : 1KP :2PP
m²
m²
m²
m²
m²
cm²
cm²
cm²
cm²
cm²
cm²
4.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN 4.4.4.2.1.
Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
No
.Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
L.01 L.03 L.03 L.04
BAHAN 1. PC 2. PP
C
OH OH OH OH
Kg m3
0.3 0.15 0.015 0.015
150,000.00 190,000.00 230,000.00 230,000.00
45,000.00 28,500.00 3,450.00 3,450.00
JUMLAH TENAGA KERJA
80,400.00
15.504 1,700.00 0.016 225,000.00 JUMLAH HARGA BAHAN
26,356.80 3,600.00 29,956.80
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.2.
Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.
No
Uraian
Kode
110,356.80 11,035.68 121,392.48
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Satuan
Koefisien Harga Satuan (Rp)
A
B
C
Harga (Rp)
L.01 L.03 L.03
OH OH OH
0.3 0.15 0.015
150,000.00 190,000.00 230,000.00
45,000.00 28,500.00 3,450.00
Mandor
L.04
OH
0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 80,400.00
Kg m3
10.224 1,700.00 0.02 225,000.00 JUMLAH HARGA BAHAN
17,380.80 4,500.00 21,880.80
BAHAN 1. PC 2. PP
m²
Jumlah
TENAGA Pekerja Tukang Batu Kepala Tukang
PERALATAN JUMLAH HARGA ALAT
D E
-
Jumlah (A+B+C)
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.3.
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
0.10 x D
102,280.80 10,228.08 112,508.88
m²
No
A
Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
L.01 L.03 L.03 L.04
OH OH OH OH
0.3 150,000.00 0.15 190,000.00 0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
45,000.00 28,500.00 3,450.00 3,450.00 80,400.00
Kg m3
7.776 1,700.00 0.023 225,000.00 JUMLAH HARGA BAHAN
13,219.20 5,175.00 18,394.20
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
BAHAN 1. PC 2. PP
C
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.4.
Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
Uraian
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
C
98,794.20 9,879.42 108,673.62
Kode
Satuan
L.01 L.03 L.03 L.04
OH OH OH OH
0.3 150,000.00 0.15 190,000.00 0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
45,000.00 28,500.00 3,450.00 3,450.00 80,400.00
Kg m3
6.24 1,700.00 0.024 225,000.00 JUMLAH HARGA BAHAN
10,608.00 5,400.00 16,008.00
BAHAN 1. PC 2. PP
Koefisien Harga Satuan (Rp)
-
m²
Jumlah Harga (Rp)
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) 0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
F
96,408.00 9,640.80 106,048.80
4.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN 4.4.4.2.5. No
Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm Uraian
Kode
Satuan
Koefisien Harga Satuan
Jumlah
m²
No
Uraian
Kode
Satuan
Koefisien (Rp)
A
B
TENAGA Pekerja Tukang Batu
L.01 L.03
OH OH
Kepala Tukang Mandor
L.03 L.04
BAHAN 1. PC 2. PP
0.3 0.15
150,000.00 190,000.00
45,000.00 28,500.00
OH OH
0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 3,450.00 80,400.00
Kg m3
5.184 0.026
1,700.00 225,000.00
JUMLAH HARGA BAHAN C
Harga (Rp)
8,812.80 5,850.00 14,662.80
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.6.
Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
No
A
B
C
Uraian
95,062.80 9,506.28 104,569.08
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.03 L.03 L.04
Koefisien Harga Satuan (Rp)
45,000.00
OH OH OH
0.15 190,000.00 0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
28,500.00 3,450.00 3,450.00 80,400.00
BAHAN 1. PC
Kg
4.416
2. PP
m
1,700.00
7,507.20
0.027 225,000.00 JUMLAH HARGA BAHAN
6,075.00 13,582.20
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.7.
Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm Uraian
Kode
Satuan
93,982.20 9,398.22 103,380.42
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
m²
Jumlah Harga (Rp)
150,000.00
3
0.3
-
TENAGA Pekerja
L.01
OH
0.3
150,000.00
45,000.00
Tukang Batu
L.03
OH
0.15
190,000.00
28,500.00
m²
Kepala Tukang Mandor B
C
L.03 L.04
OH OH
0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
BAHAN 1. PC
Kg
3.936
2. PP
m
3
3,450.00 3,450.00 80,400.00
1,700.00
6,691.20
0.028 225,000.00 JUMLAH HARGA BAHAN
6,300.00 12,991.20
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.8.
Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm
No
Uraian
Kode
93,391.20 9,339.12 102,730.32
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Satuan
-
Koefisien Harga Satuan (Rp)
m²
Jumlah Harga (Rp)
A
B
C
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.03 L.03 L.04
150,000.00
45,000.00
OH OH OH
0.15 190,000.00 0.015 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
28,500.00 3,450.00 3,450.00 80,400.00
BAHAN 1. PC
Kg
3.456
2. PP
m
3
0.3
1,700.00
5,875.20
0.029 225,000.00 JUMLAH HARGA BAHAN
6,525.00 12,400.20
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.9.
Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm
No
Uraian
Kode
92,800.20 9,280.02 102,080.22
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Satuan
-
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.03 L.03 L.04
OH OH OH OH
0.36 0.12 0.012 0.018
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
54,000.00 22,800.00 2,760.00 4,140.00 83,700.00
BAHAN 1. PC
Kg
5.76
1,700.00
9,792.00
2. KP
m3
0.003
6,000.00
18.00
m²
3. PP C
m3
0.013 225,000.00 JUMLAH HARGA BAHAN
2,925.00 12,735.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.10.
Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm
No
A
B
Uraian
Kode
Satuan
TENAGA Pekerja Tukang Batu
L.01 L.03
OH OH
Kepala Tukang Mandor
L.03 L.04
BAHAN 1. PC 2. KP 3. PP
C
96,435.00 9,643.50 106,078.50
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Koefisien Harga Satuan (Rp)
0.36 0.12
-
Jumlah Harga (Rp)
150,000.00 190,000.00
54,000.00 22,800.00
OH OH
0.012 230,000.00 0.018 230,000.00 JUMLAH TENAGA KERJA
2,760.00 4,140.00 83,700.00
Kg m3 m3
3 1,700.00 0.005 6,000.00 0.02 225,000.00 JUMLAH HARGA BAHAN
5,100.00 30.00 4,500.00 9,630.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.11.
Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
L.01 L.03 L.03 L.04
OH OH OH OH
0.36 150,000.00 0.12 190,000.00 0.012 230,000.00 0.018 230,000.00 JUMLAH TENAGA KERJA
m3 m3 m3
0.009 0.009 0.009
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
93,330.00 9,333.00 102,663.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
m²
54,000.00 22,800.00 2,760.00 4,140.00 83,700.00
BAHAN 1. SM 2. KP 3. PP
1,700.00 6,000.00 225,000.00
JUMLAH HARGA BAHAN
15.30 54.00 2,025.00 2,094.30
m²
C
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.12.
Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm
No
Uraian
85,794.30
Kode
0.10 x D
Satuan
8,579.43 94,373.73
Koefisien Harga Satuan (Rp)
m²
Jumlah Harga (Rp)
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.03 L.03 L.04
OH OH OH OH
0.36 0.12 0.012 0.018
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
C
BAHAN 1. SM
m3
2. KP 3. PP
m m3 3
0.007
54,000.00 22,800.00 2,760.00 4,140.00 83,700.00
1,700.00
11.90
0.007 6,000.00 0.015 225,000.00 JUMLAH HARGA BAHAN
42.00 3,375.00 3,428.90
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.13.
Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
No
A
B
Uraian
Kode
Satuan
TENAGA Pekerja Tukang Batu
L.01 L.03
OH OH
Kepala Tukang Mandor
L.03 L.04
BAHAN 1. PC 2. PP
87,128.90 8,712.89 95,841.79
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Koefisien Harga Satuan (Rp)
0.4 0.2
Jumlah Harga (Rp)
150,000.00 190,000.00
60,000.00 38,000.00
OH OH
0.02 230,000.00 0.022 230,000.00 JUMLAH TENAGA KERJA
4,600.00 5,060.00 107,660.00
Kg m3
13.632 0.027
1,700.00 225,000.00
JUMLAH HARGA BAHAN C
-
23,174.40 6,075.00 29,249.40
PERALATAN JUMLAH HARGA ALAT
-
m²
D E F
Jumlah (A+B+C)
4.4.4.2.14.
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
B
C
Uraian
136,909.40 13,690.94 150,600.34
0.10 x D
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.03 L.03 L.04
Koefisien Harga Satuan (Rp)
0.26
Jumlah Harga (Rp)
150,000.00
39,000.00
OH OH OH
0.2 190,000.00 0.02 230,000.00 0.013 230,000.00 JUMLAH TENAGA KERJA
38,000.00 4,600.00 2,990.00 84,590.00
BAHAN 1. PC
Kg
10.368
2. PP
m3
1,700.00
17,625.60
0.031 225,000.00 JUMLAH HARGA BAHAN
6,975.00 24,600.60
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.15.
Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. Uraian
Satuan
L.01 L.03 L.03 L.04
OH OH OH OH
0.4 150,000.00 0.2 190,000.00 0.02 230,000.00 0.022 230,000.00 JUMLAH TENAGA KERJA
60,000.00 38,000.00 4,600.00 5,060.00 107,660.00
Kg m3
8.32 1,700.00 0.032 225,000.00 JUMLAH HARGA BAHAN
14,144.00 7,200.00 21,344.00
F
m²
Jumlah Harga (Rp)
BAHAN
PERALATAN JUMLAH HARGA ALAT
D E
109,190.60 10,919.06 120,109.66
Kode
1. PC 2. PP C
Koefisien Harga Satuan (Rp)
-
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
129,004.00 12,900.40 141,904.40
m²
4.4.4.2.16.
Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm
No
A
Uraian
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
Kode
Satuan
L.01 L.03 L.03 L.04
OH OH OH OH
0.4 150,000.00 0.2 190,000.00 0.02 230,000.00 0.022 230,000.00 JUMLAH TENAGA KERJA
60,000.00 38,000.00 4,600.00 5,060.00 107,660.00
Kg m3
6.912 1,700.00 0.035 225,000.00 JUMLAH HARGA BAHAN
11,750.40 7,875.00 19,625.40
BAHAN 1. PC 2. PP
C
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.17.
Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm
No
Uraian
127,285.40
Kode
0.10 x D
Satuan
12,728.54 140,013.94
Koefisien Harga Satuan (Rp)
m²
Jumlah Harga (Rp)
A
B
C
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.03 L.03 L.04
BAHAN 1. PC 2. PP
OH OH OH OH
Kg m3
0.4 0.2 0.02 0.022
150,000.00 190,000.00 230,000.00 230,000.00
60,000.00 38,000.00 4,600.00 5,060.00
JUMLAH TENAGA KERJA
107,660.00
5.888 1,700.00 0.036 225,000.00 JUMLAH HARGA BAHAN
10,009.60 8,100.00 18,109.60
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.18.
Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
125,769.60 12,576.96 138,346.56
m²
No
A
B
C
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.03 L.03 L.04
Koefisien Harga Satuan (Rp)
150,000.00
66,000.00
OH OH OH
0.22 190,000.00 0.022 230,000.00 0.022 230,000.00 JUMLAH TENAGA KERJA
41,800.00 5,060.00 5,060.00 117,920.00
BAHAN 1. SM
m3
0.009
2. KP 3. PP
m m3 3
0.44
Jumlah Harga (Rp)
1,700.00
15.30
0.009 6,000.00 0.018 225,000.00 JUMLAH HARGA BAHAN
54.00 4,050.00 4,119.30
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.19.
Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
No
A
Uraian
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
B
Kode
Satuan
L.01 L.03 L.03 L.04
OH OH OH OH
0.15 150,000.00 0.075 190,000.00 0.008 230,000.00 0.008 230,000.00 JUMLAH TENAGA KERJA
22,500.00 14,250.00 1,840.00 1,840.00 40,430.00
Kg m3
5.184 1,700.00 0.026 225,000.00 JUMLAH HARGA BAHAN
8,812.80 5,850.00 14,662.80
BAHAN PC PP
C
122,039.30 12,203.93 134,243.23
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
Koefisien Harga Satuan (Rp)
m²
Jumlah Harga (Rp)
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.20.
Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm
No
Uraian
Kode
55,092.80 5,509.28
0.10 x D
F
-
60,602.08
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
m²
A
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.03 L.03 L.04
OH OH OH OH
0.08 0.4 0.04 0.004
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA B
BAHAN Semen PC Pasir pasang
C
Kg m3
0.5 1,700.00 0.013 225,000.00 JUMLAH HARGA BAHAN
12,000.00 76,000.00 9,200.00 920.00 98,120.00 850.00 2,925.00 3,775.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.21.
Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm
No
Uraian
101,895.00
Kode
0.10 x D
Satuan
10,189.50 112,084.50
Koefisien Harga Satuan (Rp)
A
B
Harga (Rp)
L.01 L.03 L.03
OH OH OH
0.45 0.225 0.023
150,000.00 190,000.00 230,000.00
67,500.00 42,750.00 5,290.00
Mandor
L.04
OH
0.023 230,000.00 JUMLAH TENAGA KERJA
5,290.00 120,830.00
Kg Kg
10 1,700.00 15 JUMLAH HARGA BAHAN
17,000.00 17,000.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.22.
Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm
No
Uraian
137,830.00 13,783.00
0.10 x D
F
A
m²
Jumlah
TENAGA Pekerja Tukang Batu Kepala Tukang
BAHAN Semen PC Batu granit
C
-
-
Kode
Satuan
Koefisien Harga Satuan (Rp)
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu
L.01 L.03
OH OH
0.45 0.225
150,000.00 190,000.00
67,500.00 42,750.00
Kepala Tukang
L.03
OH
0.023
230,000.00
5,290.00
m²
Mandor B
L.04
BAHAN Semen PC Batu traso
OH
Kg Kg
0.023 230,000.00 JUMLAH TENAGA KERJA 10 15
1,700.00
JUMLAH HARGA BAHAN C
5,290.00 120,830.00 17,000.00 17,000.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.4.2.23.
Pemasangan 1 m2 plesteran ciprat 1SP : 2PP
No
Uraian
137,830.00
Kode
0.10 x D
Satuan
13,783.00 -
Koefisien Harga Satuan (Rp)
m²
Jumlah Harga (Rp)
A
B
C
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala Tukang Mandor
L.03 L.03 L.04
OH OH OH
BAHAN Semen PC
Kg
Pasir pasang
Kg
0.3
150,000.00
45,000.00
0.1 190,000.00 0.01 230,000.00 0.015 230,000.00 JUMLAH TENAGA KERJA
19,000.00 2,300.00 3,450.00 69,750.00
4.32
1,700.00
7,344.00
0.006 225,000.00 JUMLAH HARGA BAHAN
1,350.00 8,694.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.24.
Pemasangan 1 m2 finishing siar pasangan bata merah
No
Uraian
Kode
78,444.00 7,844.40 86,288.40
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Satuan
Koefisien Harga Satuan (Rp)
A
B
-
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang
L.01 L.03 L.03
OH OH OH
0.15 0.075 0.008
150,000.00 190,000.00 230,000.00
22,500.00 14,250.00 1,840.00
Mandor
L.04
OH
0.008 230,000.00 JUMLAH TENAGA KERJA
1,840.00 40,430.00
Kg
3.108
BAHAN Semen PC
1,700.00
5,283.60
m²
JUMLAH HARGA BAHAN C
5,283.60
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.25.
Pemasangan 1 m2 finishing siar pasangan conblock ekspose
No
Uraian
Kode
45,713.60 4,571.36 50,284.96
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Satuan
Koefisien Harga Satuan (Rp)
A
B
-
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang
L.01 L.03 L.03
OH OH OH
0.07 0.035 0.004
150,000.00 190,000.00 230,000.00
10,500.00 6,650.00 920.00
Mandor
L.04
OH
0.004 230,000.00 JUMLAH TENAGA KERJA
920.00 18,990.00
Kg
1.6 1,700.00 JUMLAH HARGA BAHAN
2,720.00 2,720.00
BAHAN Semen PC
C
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah (A+B+C)
4.4.4.2.26.
Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. Uraian
Kode
Satuan
Koefisien Harga Satuan (Rp)
B
C
21,710.00 2,171.00 23,881.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
A
m²
Jumlah Harga (Rp)
TENAGA Pekerja Tukang Batu Kepala Tukang
L.01 L.03 L.03
OH OH OH
0.3 0.15 0.015
150,000.00 190,000.00 230,000.00
45,000.00 28,500.00 3,450.00
Mandor
L.04
OH
0.015 230,000.00 JUMLAH TENAGA KERJA
3,450.00 80,400.00
Kg m3
6.34 1,700.00 0.012 225,000.00 JUMLAH HARGA BAHAN
10,778.00 2,700.00 13,478.00
BAHAN Semen PC Pasir pasang PERALATAN
JUMLAH HARGA ALAT
-
m²
D E F
Jumlah (A+B+C)
4.4.4.2.27.
Pemasangan 1 m2 acian.
A
B
C
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
No
Uraian
Kode
Satuan
TENAGA Pekerja Tukang Batu
L.01 L.03
OH OH
Kepala Tukang Mandor
L.03 L.04
BAHAN Semen PC
93,878.00 9,387.80 103,265.80
Koefisien Harga Satuan (Rp)
0.2 0.1
Jumlah Harga (Rp)
150,000.00 190,000.00
30,000.00 19,000.00
OH OH
0.01 230,000.00 0.01 230,000.00 JUMLAH TENAGA KERJA
2,300.00 2,300.00 53,600.00
Kg
3.25 1,700.00 JUMLAH HARGA BAHAN
5,525.00 5,525.00
PERALATAN JUMLAH HARGA ALAT
D E F
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
59,125.00 5,912.50 65,037.50
m²
4.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING 4.4.4.3.1.
No A
B
C
Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25
150,000.00
37,500.00
0.125 0.013
190,000.00 230,000.00
23,750.00 2,990.00
0.013
230,000.00
2,990.00 67,230.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Ubin abu-abu Semen Portlan
Bh kg
6.63 9.8
10,100.00 1,700.00
66,963.00 16,660.00
Pasir pasang
M3
0.045
225,000.00
10,125.00 93,748.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.2.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
160,978.00 16,097.80
0.10 x D
177,075.80
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25 0.125
150,000.00 190,000.00
37,500.00 23,750.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
E F
67,230.00
BAHAN Ubin abu-abu Semen Portlan
Bh kg
11.87 10
5,700.00 1,700.00
67,659.00 17,000.00
Pasir pasang
M3
0.045
225,000.00
10,125.00 94,784.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
162,014.00
0.10 x D
16,201.40 178,215.40
m²
4.4.4.3.3.
Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 0.27
150,000.00
40,500.00
0.135 0.014
190,000.00 230,000.00
25,650.00 3,220.00
0.014
230,000.00
3,220.00 72,590.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Ubin abu-abu
Bh
26.5
2,600.00
68,900.00
Semen Portlan Pasir pasang
kg M3
10.4 0.045
1,700.00 225,000.00
17,680.00 10,125.00 96,705.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.4.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
169,295.00 16,929.50
0.10 x D
186,224.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25 0.125
150,000.00 190,000.00
37,500.00 23,750.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
F
67,230.00
BAHAN Ubin warna Semen Portlan
Bh kg
6.63 9.8
12,800.00 1,700.00
84,864.00 16,660.00
Semen warna Pasir pasang
Kg M3
1.3 0.045
15,000.00 225,000.00
19,500.00 10,125.00
JUMLAH HARGA BAHAN
131,149.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
198,379.00 19,837.90 218,216.90
m²
4.4.4.3.5.
No A
B
C
Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.26 0.13
150,000.00 190,000.00
39,000.00 24,700.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
69,680.00
BAHAN Ubin warna Semen Portlan
Bh kg
11.87 10
12,800.00 1,700.00
151,936.00 17,000.00
Semen warna Pasir pasang
Kg M3
1.5 0.045
15,000.00 225,000.00
22,500.00 10,125.00 201,561.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.6.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
271,241.00 27,124.10
0.10 x D
298,365.10
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.27 0.135
150,000.00 190,000.00
40,500.00 25,650.00
0.014 0.014
230,000.00 230,000.00
3,220.00 3,220.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
F
72,590.00
BAHAN Ubin warna Semen Portlan
Bh kg
26.5 10.4
12,800.00 1,700.00
339,200.00 17,680.00
Semen warna Pasir pasang
Kg M3
1.62 0.045
15,000.00 225,000.00
24,300.00 10,125.00
JUMLAH HARGA BAHAN
391,305.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
463,895.00 46,389.50 510,284.50
m²
4.4.4.3.7.
No A
B
C
Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25 0.125
150,000.00 190,000.00
37,500.00 23,750.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
67,230.00
BAHAN Ubin teraso Semen Portlan
Bh kg
6.63 9.8
13,600.00 1,700.00
90,168.00 16,660.00
Semen warna Pasir pasang
Kg M3
1.3 0.045
15,000.00 225,000.00
19,500.00 10,125.00 136,453.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.8.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
203,683.00 20,368.30
0.10 x D
224,051.30
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.26 0.13
150,000.00 190,000.00
39,000.00 24,700.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
F
69,680.00
BAHAN Ubin teraso Semen Portlan
Bh kg
11.87 10
7,700.00 1,700.00
91,399.00 17,000.00
Semen warna Pasir pasang
Kg M3
1.5 0.045
15,000.00 225,000.00
22,500.00 10,125.00
JUMLAH HARGA BAHAN
141,024.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
210,704.00 21,070.40 231,774.40
m²
4.4.4.3.9.
No A
B
C
Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25 0.125
150,000.00 190,000.00
37,500.00 23,750.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
67,230.00
BAHAN Ubin granit Semen Portlan
Bh kg
6.63 9.8
72,000.00 1,700.00
477,360.00 16,660.00
Semen warna Pasir pasang
Kg M3
1.3 0.045
15,000.00 225,000.00
19,500.00 10,125.00 523,645.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.10.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
590,875.00 59,087.50
0.10 x D
649,962.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.26 0.13
150,000.00 190,000.00
39,000.00 24,700.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
69,680.00
BAHAN Ubin granit Semen Portlan
Bh kg
11.87 10
40,500.00 1,700.00
480,735.00 17,000.00
Semen warna Pasir pasang
Kg M3
1.5 0.045
15,000.00 225,000.00
22,500.00 10,125.00
JUMLAH HARGA BAHAN
F
530,360.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
600,040.00 60,004.00 660,044.00
m²
4.4.4.3.11.
No A
B
C
Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25 0.125
150,000.00 190,000.00
37,500.00 23,750.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
67,230.00
BAHAN Ubin teralux Semen Portlan
Bh kg
6.63 9.8
96,000.00 1,700.00
636,480.00 16,660.00
Semen warna Pasir pasang
Kg M3
1.3 0.045
15,000.00 225,000.00
19,500.00 10,125.00 682,765.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.12.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
749,995.00 74,999.50
0.10 x D
824,994.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.26 0.13
150,000.00 190,000.00
39,000.00 24,700.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
69,680.00
BAHAN Ubin teralux Semen Portlan
Bh kg
11.87 10
54,000.00 1,700.00
640,980.00 17,000.00
Semen warna Pasir pasang
Kg M3
1.5 0.045
15,000.00 225,000.00
22,500.00 10,125.00
JUMLAH HARGA BAHAN
F
690,605.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
760,285.00 76,028.50 836,313.50
m²
4.4.4.3.13.
No A
B
C
Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.24 0.12
150,000.00 190,000.00
36,000.00 22,800.00
0.012 0.012
230,000.00 230,000.00
2,760.00 2,760.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
64,320.00
BAHAN Ubin teralux marmer Semen Portlan
Bh kg
3.1 9.6
216,000.00 1,700.00
669,600.00 16,320.00
Semen warna Pasir pasang
Kg M3
1.5 0.045
15,000.00 225,000.00
22,500.00 10,125.00 718,545.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.14.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
782,865.00 78,286.50
0.10 x D
861,151.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.25 0.125
150,000.00 190,000.00
37,500.00 23,750.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
F
67,230.00
BAHAN Ubin teralux marmer Semen Portlan
Bh kg
6.63 9.8
96,000.00 1,700.00
636,480.00 16,660.00
Semen warna Pasir pasang
Kg M3
1.3 0.045
15,000.00 225,000.00
19,500.00 10,125.00
JUMLAH HARGA BAHAN
682,765.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
749,995.00 74,999.50 824,994.50
m²
4.4.4.3.15.
No A
B
C
Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.26 0.13
150,000.00 190,000.00
39,000.00 24,700.00
0.013 0.013
230,000.00 230,000.00
2,990.00 2,990.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
69,680.00
BAHAN Ubin teralux marmer Semen Portlan
Bh kg
11.87 10
54,000.00 1,700.00
640,980.00 17,000.00
Semen warna Pasir pasang
Kg M3
1.5 0.045
15,000.00 225,000.00
22,500.00 10,125.00 690,605.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.16.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
760,285.00 76,028.50
0.10 x D
836,313.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
F
4.4.4.3.17.
Jumlah Harga
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Plint ubin PC
Bh
5.3
Semen Portland Pasir pasang
kg M3
1.65 0.004
33,820.00
1,900.00
10,070.00
1,700.00 225,000.00
2,805.00 900.00
JUMLAH HARGA BAHAN
13,775.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm
47,595.00 4,759.50 52,354.50
m²
Harga Satuan (Rp) No A
B
C
Uraian
Kode
Jumlah Harga
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint ubin PC
Bh
3.53
1,900.00
6,707.00
Semen Portland Pasir pasang
kg M3
1.24 0.003
1,700.00 225,000.00
2,108.00 675.00
JUMLAH HARGA BAHAN
9,490.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.18.
No A
B
C
43,310.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4,331.00 47,641.00
Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint ubin PC Semen Portlan
Bh kg
2.65 1.24
2,600.00 1,700.00
6,890.00 2,108.00
Pasir pasang
M3
0.003
225,000.00
675.00 9,673.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.19.
43,493.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4,349.30 47,842.30
Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm Harga Satuan (Rp)
No
m²
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m²
A
B
C
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
0.09
150,000.00
13,500.00
0.09 0.009
190,000.00 230,000.00
17,100.00 2,070.00
0.005
230,000.00
1,150.00 33,820.00
JUMLAH TENAGA KERJA BAHAN Plint ubin warna
Bh
2.65
1,600.00
4,240.00
Semen Portlan Semen warna Pasir pasang
kg Kg M3
1.14 0.1 0.003
1,700.00 15,000.00 225,000.00
1,938.00 1,500.00 675.00
JUMLAH HARGA BAHAN
8,353.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.20.
No A
B
C
42,173.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4,217.30 46,390.30
Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.09
150,000.00
13,500.00
0.09 0.009 0.005
190,000.00 230,000.00 230,000.00
17,100.00 2,070.00 1,150.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint ubin warna Semen Portlan
Bh kg
3.53 1.14
2,400.00 1,700.00
8,472.00 1,938.00
Semen warna Pasir pasang
Kg M3
0.1 0.003
15,000.00 225,000.00
1,500.00 675.00
JUMLAH HARGA BAHAN
12,585.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.21.
No A
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
46,405.00 4,640.50
0.10 x D
51,045.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm
Uraian TENAGA
Kode
Satuan
Koefisien
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
m²
B
C
Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint ubin warna Semen Portlan
Bh kg
2.65 1.14
3,200.00 1,700.00
8,480.00 1,938.00
Semen warna Pasir pasang
Kg M3
0.1 0.003
15,000.00 225,000.00
1,500.00 675.00 12,593.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.22.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
46,413.00 4,641.30
0.10 x D
51,054.30
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00 33,820.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Plint ubin teraso
Bh
3.53
2,550.00
9,001.50
Semen Portlan Semen warna
kg Kg
1.14 0.1
1,700.00 15,000.00
1,938.00 1,500.00
Pasir pasang
M3
0.003
225,000.00
675.00 13,114.50
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.23.
46,934.50
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
4,693.45 51,627.95
Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm Harga Satuan (Rp)
No A
m²
Uraian TENAGA Pekerja
Kode L.01
Satuan
Koefisien
OH
0.09
Jumlah Harga (Rp)
150,000.00
13,500.00
m²
B
C
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
0.09 0.009
190,000.00 230,000.00
17,100.00 2,070.00
0.005
230,000.00
1,150.00 33,820.00
JUMLAH TENAGA KERJA BAHAN Plint ubin teraso
Bh
2.65
3,400.00
9,010.00
Semen Portlan Semen warna
kg Kg
1.14 0.1
1,700.00 15,000.00
1,938.00 1,500.00
Pasir pasang
M3
0.003
225,000.00
675.00 13,123.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.24.
No A
B
C
46,943.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4,694.30 51,637.30
Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.09
150,000.00
13,500.00
0.09 0.009
190,000.00 230,000.00
17,100.00 2,070.00
0.005
230,000.00
1,150.00 33,820.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Plint ubin granit Semen Portlan
Bh kg
2.65 1.14
18,000.00 1,700.00
47,700.00 1,938.00
Semen warna Pasir pasang
Kg M3
0.1 0.003
15,000.00 225,000.00
1,500.00 675.00
JUMLAH HARGA BAHAN
51,813.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.25.
No A
m²
Jumlah (A+B+C)
85,633.00 8,563.30
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
94,196.30
Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm
Uraian TENAGA Pekerja Tukang Batu
Kode L.01 L.02
Satuan
Koefisien
OH OH
0.09 0.09
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 190,000.00
13,500.00 17,100.00
m²
Kepala tukang Mandor B
C
L.03 L.04
OH OH
0.009 0.005
230,000.00 230,000.00
JUMLAH TENAGA KERJA
2,070.00 1,150.00 33,820.00
BAHAN Plint ubin granit Semen Portlan
Bh kg
3.53 1.14
13,500.00 1,700.00
47,655.00 1,938.00
Semen warna Pasir pasang
Kg M3
0.1 0.003
15,000.00 225,000.00
1,500.00 675.00
JUMLAH HARGA BAHAN
51,768.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.26.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
85,588.00 8,558.80
0.10 x D
94,146.80
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint teralux kerang
Bh
2.63
24,000.00
63,120.00
Semen Portlan Semen warna
kg Kg
1.14 0.1
1,700.00 15,000.00
1,938.00 1,500.00
Pasir pasang
M3
0.003
225,000.00
675.00 67,233.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.27.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
101,053.00 10,105.30 111,158.30
0.10 x D
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm Harga Satuan (Rp)
No A
m²
Uraian
Kode
Satuan
Koefisien
OH OH OH
0.09 0.09 0.009
TENAGA Pekerja Tukang Batu Kepala tukang
L.01 L.02 L.03
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00
13,500.00 17,100.00 2,070.00
m²
Mandor B
C
L.04
OH
0.005
230,000.00
JUMLAH TENAGA KERJA
1,150.00 33,820.00
BAHAN Plint teralux kerang
Bh
3.53
18,000.00
63,540.00
Semen Portlan Semen warna
kg Kg
1.14 0.1
1,700.00 15,000.00
1,938.00 1,500.00
Pasir pasang
M3
0.003
225,000.00
675.00 67,653.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.28.
101,473.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
10,147.30 111,620.30
Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm Harga Satuan (Rp)
No A
B
C
Uraian
Satuan
Koefisien
L.01
OH
0.09
150,000.00
13,500.00
Tukang Batu Kepala tukang
L.02 L.03
OH OH
0.09 0.009
190,000.00 230,000.00
17,100.00 2,070.00
Mandor
L.04
OH
0.005
230,000.00
1,150.00 33,820.00
TENAGA Pekerja
Kode
Jumlah Harga (Rp)
JUMLAH TENAGA KERJA BAHAN Plint teralux marmer Semen Portlan
Bh kg
1.7 1.14
36,000.00 1,700.00
61,200.00 1,938.00
Semen warna Pasir pasang
Kg M3
0.1 0.003
15,000.00 225,000.00
1,500.00 675.00
JUMLAH HARGA BAHAN
65,313.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.29.
No A
m²
99,133.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
9,913.30 109,046.30
Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.09
150,000.00
13,500.00
0.09 0.009 0.005
190,000.00 230,000.00 230,000.00
17,100.00 2,070.00 1,150.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
m²
B
C
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint teralux marmer Semen Portland
Bh kg
2.65 1.14
24,000.00 1,700.00
63,600.00 1,938.00
Semen warna Pasir pasang
Kg M3
0.1 0.003
15,000.00 225,000.00
1,500.00 675.00
JUMLAH HARGA BAHAN
67,713.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.30.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
101,533.00 10,153.30
0.10 x D
111,686.30
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.009 0.005
230,000.00 230,000.00
2,070.00 1,150.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
33,820.00
BAHAN Plint teralux marmer Semen Portlan Semen warna
Bh kg Kg
3.53 1.14 0.1
18,000.00 1,700.00 15,000.00
63,540.00 1,938.00 1,500.00
Pasir pasang
M3
0.003
225,000.00
675.00 67,653.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.31.
No A
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
101,473.00 10,147.30
0.10 x D
111,620.30
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm
Uraian TENAGA Pekerja Tukang Batu Kepala tukang Mandor
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01 L.02
OH OH
0.36 0.18
150,000.00 190,000.00
54,000.00 34,200.00
L.03 L.04
OH OH
0.018 0.018
230,000.00 230,000.00
4,140.00 4,140.00
JUMLAH TENAGA KERJA
96,480.00
m²
B
C
BAHAN Teraso cor
M3
0.036
Semen warna
Kg
0.1
15,000.00
JUMLAH HARGA BAHAN
1,500.00 1,500.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.32.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
97,980.00 9,798.00 -
0.10 x D
Pemasangan 1m2 lantai keramik artistik 10cm x 20cm Harga Satuan (Rp)
No A
B
Uraian
Kode
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Ubin keramik Semen Portlan Pasir pasang
Jumlah Harga
Satuan
TENAGA
Bh Kg M3 Kg
Semen warna C
187,600.00
53 8.19 0.045
13,000.00 1,700.00 225,000.00
689,000.00 13,923.00 10,125.00
2.75
15,000.00
41,250.00 754,298.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.33.
No A
B
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
941,898.00 94,189.80
0.10 x D
1,036,087.80
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA BAHAN Ubin keramik
Bh
106
13,000.00
187,600.00 1,378,000.00
m²
Semen Portlan Pasir pasang
Kg M Kg
3
Semen warna C
8.19 0.045 3.2
1,700.00 225,000.00
13,923.00 10,125.00
15,000.00
48,000.00 1,450,048.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1,637,648.00 163,764.80 1,801,412.80
0.10 x D
m²
4.4.4.3.35.a Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 0.7
150,000.00
105,000.00
0.35 0.035
190,000.00 230,000.00
66,500.00 8,050.00
0.035
230,000.00
8,050.00 187,600.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Ubin keramik
Bh
6.625
22,400.00
148,400.00
Semen Portland Pasir pasang Semen warna
Kg M3 Kg
10 0.045 1.5
1,700.00 225,000.00 15,000.00
17,000.00 10,125.00 22,500.00
JUMLAH HARGA BAHAN
198,025.00
PERALATAN -
JUMLAH HARGA ALAT D E F 4.4.4.3.34.
No A
B
385,625.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
38,562.50 424,187.50
Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
187,600.00
BAHAN Ubin keramik Semen Portland
Bh Kg
10 8.19
15,246.00 1,700.00
152,460.00 13,923.00
Pasir pasang
M3
0.045
225,000.00
10,125.00
m²
Semen warna C
Kg
1.62
15,000.00
JUMLAH HARGA BAHAN
24,300.00 200,808.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.35.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
388,408.00 38,840.80
0.10 x D
427,248.80
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
187,600.00
BAHAN Ubin keramik Semen Portland
Bh Kg
11.87 10
12,600.00 1,700.00
149,562.00 17,000.00
Pasir pasang Semen warna
M3 Kg
0.045 1.5
225,000.00 15,000.00
10,125.00 22,500.00 199,187.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.36.
No A
B
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
386,787.00 38,678.70
0.10 x D
425,465.70
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
187,600.00
BAHAN Ubin keramik Semen Portlan
Bh Kg
26.5 10.4
5,600.00 1,700.00
148,400.00 17,680.00
Pasir pasang
M3
0.045
225,000.00
10,125.00
m²
Semen warna C
Kg
1.62
15,000.00
JUMLAH HARGA BAHAN
24,300.00 200,505.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.37.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
388,105.00 38,810.50
0.10 x D
426,915.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 1.05 0.525
150,000.00 190,000.00
157,500.00 99,750.00
0.053 0.053
230,000.00 230,000.00
12,190.00 12,190.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA BAHAN Ubin keramik Semen Portlan
Bh Kg
33 9.8
Pasir pasang Semen warna
M3 Kg
0.045 4.37
281,630.00
4,620.00 1,700.00
152,460.00 16,660.00
225,000.00 15,000.00
10,125.00 65,550.00 244,795.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.38.
No A
B
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
526,425.00 52,642.50
0.10 x D
579,067.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
187,600.00
BAHAN Ubin keramik Semen Portlan
Bh Kg
11.87 14.15
78,750.00 1,700.00
934,762.50 24,055.00
Pasir pasang
M3
0.039
225,000.00
8,775.00
m²
Semen warna C
Kg
2
15,000.00
JUMLAH HARGA BAHAN
30,000.00 997,592.50
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.39.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
1,185,192.50 118,519.25
0.10 x D
1,303,711.75
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga
Satuan
Koefisien 0.09 0.09
150,000.00 190,000.00
13,500.00 17,100.00
0.035 0.005
230,000.00 230,000.00
8,050.00 1,150.00 39,800.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Plint keramik
Bh
5.3
Semen Portlan Pasir pasang
Kg M3
Semen warna
Kg
13,000.00
68,900.00
1.14 0.003
1,700.00 225,000.00
1,938.00 675.00
0.025
15,000.00
375.00 71,888.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.40.
111,688.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
11,168.80 122,856.80
Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm Harga Satuan (Rp)
No A
B
m²
Uraian
Kode
Jumlah Harga
Satuan
Koefisien 0.09
150,000.00
13,500.00
0.09 0.035
190,000.00 230,000.00
17,100.00 8,050.00
0.005
230,000.00
1,150.00 39,800.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Plint keramik
Bh
10.6
1,400.00
14,840.00
Semen Portland Pasir pasang Semen warna
Kg M3 Kg
1.14 0.003 0.05
1,700.00 225,000.00 15,000.00
1,938.00 675.00 750.00
m'
C
JUMLAH HARGA BAHAN
18,203.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.41.
No A
B
C
58,003.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
5,800.30 63,803.30
Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm
Uraian
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
0.09
150,000.00
13,500.00
Tukang Batu Kepala tukang
L.02 L.03
OH OH
0.09 0.035
190,000.00 230,000.00
17,100.00 8,050.00
Mandor
L.04
OH
0.005
230,000.00
1,150.00 39,800.00
TENAGA Pekerja
Kode
Harga Satuan
JUMLAH TENAGA KERJA BAHAN Plint keramik Semen Portland
Bh Kg
5.3 0.57
Pasir pasang Semen warna
M3 Kg
0.0015 0.013
1,400.00 1,700.00
7,420.00 969.00
225,000.00 15,000.00
337.50 195.00
JUMLAH HARGA BAHAN
8,921.50
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.42.
No A
B
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
48,721.50 4,872.15
0.10 x D
53,593.65
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.75 0.75
150,000.00 190,000.00
112,500.00 142,500.00
0.075 0.038
230,000.00 230,000.00
17,250.00 8,740.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
280,990.00
BAHAN Internal cove Semen Portlan
Bh Kg
5.3 1.14
1,700.00
1,938.00
Pasir pasang Semen warna
M3 Kg
0.003 0.1
225,000.00 15,000.00
675.00 1,500.00 4,113.00
JUMLAH HARGA BAHAN
m'
C
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.43.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
285,103.00 28,510.30
0.10 x D
-
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
187,600.00
BAHAN Marmer Semen Portlan
Bh Kg
1.06 8.19
600,000.00 1,700.00
636,000.00 13,923.00
Pasir pasang Semen warna
M3 Kg
0.045 0.65
225,000.00 15,000.00
10,125.00 9,750.00
JUMLAH HARGA BAHAN
669,798.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.44.
No A
B
C
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
857,398.00 85,739.80
0.10 x D
943,137.80
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 lantai karpet
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
0.17
150,000.00
25,500.00
L.02 L.03 L.04
OH OH OH
0.17 0.017 0.009
190,000.00 230,000.00 230,000.00
32,300.00 3,910.00 2,070.00
JUMLAH TENAGA KERJA BAHAN Karpet Lem
m2 Kg
1.05 0.35
25,000.00 55,000.00
JUMLAH HARGA BAHAN PERALATAN
63,780.00 26,250.00 19,250.00 45,500.00
m²
-
JUMLAH HARGA ALAT D E F
4.4.4.3.45.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
109,280.00 10,928.00
0.10 x D
120,208.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 underlayer (pelapis bawah karpet)
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
0.12
150,000.00
18,000.00
L.02 L.03 L.04
OH OH OH
0.12 0.012 0.006
190,000.00 230,000.00 230,000.00
22,800.00 2,760.00 1,380.00
JUMLAH TENAGA KERJA BAHAN Underlayer Lem
m2 Kg
1.05 0.35
55,000.00
JUMLAH HARGA BAHAN
44,940.00 19,250.00 19,250.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.46.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
64,190.00 6,419.00
0.10 x D
-
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 lantai parquet kayu
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Kayu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 0.7
150,000.00
105,000.00
0.35 0.035
190,000.00 230,000.00
66,500.00 8,050.00
0.035
230,000.00
8,050.00 187,600.00
JUMLAH TENAGA KERJA BAHAN Parquet Lem
m2 Kg
1.05 0.6
1,000,000.00 55,000.00
JUMLAH HARGA BAHAN
E
1,050,000.00 33,000.00 1,083,000.00
PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
1,270,600.00
0.10 x D
127,060.00
m²
F
4.4.4.3.47.
No A
B
C
1,397,660.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 lantai kayu gymfloor
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7
150,000.00
105,000.00
0.35 0.035
190,000.00 230,000.00
66,500.00 8,050.00
0.035
230,000.00
8,050.00 187,600.00
TENAGA Pekerja
L.01
OH
Tukang Kayu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Parquet Lem
m2 Kg
1.05 0.6
1,000,000.00 55,000.00
JUMLAH HARGA BAHAN
1,050,000.00 33,000.00 1,083,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.48.
1,270,600.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
127,060.00 1,397,660.00
B
C
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
Koefisien
E F
Jumlah Harga (Rp)
1
150,000.00
150,000.00
0.5 0.05
190,000.00 230,000.00
95,000.00 11,500.00
0.05
230,000.00
11,500.00 268,000.00
JUMLAH TENAGA KERJA BAHAN Porslen
Bh
86
Semen Portlan Pasir pasang
Kg M3
9.3 0.018
Semen warna
Kg
1.5
1,452.00
124,872.00
1,700.00 225,000.00
15,810.00 4,050.00
15,000.00
22,500.00 167,232.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m²
Pemasangan 1 m2 dinding porslen 11cm x 11cm Harga Satuan (Rp)
No A
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
435,232.00
0.10 x D
43,523.20 478,755.20
m²
4.4.4.3.49.
Pemasangan 1 m2 dinding porslen 10cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Porslen
Bh
53
Semen Portlan Pasir Pasang Semen warna
Kg M3 Kg
9.3 0.018 2.75
2,400.00
127,200.00
1,700.00 225,000.00 15,000.00
15,810.00 4,050.00 41,250.00
JUMLAH HARGA BAHAN
188,310.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.50.
429,510.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
42,951.00 472,461.00
Pemasangan 1 m2 dinding porslen 20cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
Koefisien
E F
Jumlah Harga (Rp)
0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
JUMLAH TENAGA KERJA BAHAN Porslen
Bh
26
Semen Portland Pasir Pasang
Kg M3
Semen warna
Kg
4,800.00
124,800.00
9.3 0.018
1,700.00 225,000.00
15,810.00 4,050.00
1.94
15,000.00
29,100.00 173,760.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
414,960.00
0.10 x D
41,496.00 456,456.00
m²
4.4.4.3.51.
Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Keramik artistik
Bh
53
Semen Portlan Pasir Pasang Semen warna
Kg M3 Kg
9.3 0.018 2.75
2,800.00
148,400.00
1,700.00 225,000.00 15,000.00
15,810.00 4,050.00 41,250.00
JUMLAH HARGA BAHAN
209,510.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.52.
450,710.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
45,071.00 495,781.00
Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
Koefisien
E F
Jumlah Harga (Rp)
0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
JUMLAH TENAGA KERJA BAHAN Keramik artistik
Bh
106
Semen Portlan Pasir Pasang
Kg M3
9.3 0.018
Semen warna
Kg
2.9
1,400.00
148,400.00
1,700.00 225,000.00
15,810.00 4,050.00
15,000.00
43,500.00 211,760.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
452,960.00
0.10 x D
45,296.00 498,256.00
m²
4.4.4.3.53.
Pemasangan 1 m2 dinding keramik 10cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Keramik artistik
Bh
53
Semen Portlan Pasir Pasang Semen warna
Kg M3 Kg
9.3 0.018 2.75
2,800.00
148,400.00
1,700.00 225,000.00 15,000.00
15,810.00 4,050.00 41,250.00
JUMLAH HARGA BAHAN
209,510.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.54.
450,710.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
45,071.00 495,781.00
Pemasangan 1 m2 dinding keramik 20cm x 20cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
Koefisien
E F
Jumlah Harga (Rp)
0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
JUMLAH TENAGA KERJA BAHAN Keramik artistik
Bh
26.5
5,600.00
148,400.00
Semen Portlan Pasir Pasang
Kg M3
9.3 0.018
1,700.00 225,000.00
15,810.00 4,050.00
Semen warna
Kg
1.94
15,000.00
29,100.00 197,360.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
438,560.00
0.10 x D
43,856.00 482,416.00
m²
4.4.4.3.55.
Pemasangan 1 m2 dinding marmer 100cm x 100cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 1.3
150,000.00
195,000.00
0.65 0.065
190,000.00 230,000.00
123,500.00 14,950.00
0.065
230,000.00
14,950.00 348,400.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Marmer
Bh
1.06
600,000.00
636,000.00
Semen Portlan Pasir Pasang Semen warna
Kg M3 Kg
12.44 0.025 0.65
1,700.00 225,000.00 15,000.00
21,148.00 5,625.00 9,750.00
Paku 12cm
Bh
3.03
28,000.00
84,840.00 757,363.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.56.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
1,105,763.00 110,576.30
0.10 x D
1,216,339.30
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 1 0.5
150,000.00 190,000.00
150,000.00 95,000.00
0.05 0.05
230,000.00 230,000.00
11,500.00 11,500.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
F
268,000.00
BAHAN Bata pelapis Semen Portlan
Bh Kg
63 12.44
950.00 1,700.00
59,850.00 21,148.00
Pasir Pasang Semen warna
M3 Kg
0.025 2.75
225,000.00 15,000.00
5,625.00 41,250.00 127,873.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
395,873.00 39,587.30 435,460.30
m²
4.4.4.3.54a. Pemasangan 1 m2 dinding keramik 30cm x 30cm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Jumlah Harga (Rp)
Satuan
Koefisien 0.9
150,000.00
135,000.00
0.45 0.045
190,000.00 230,000.00
85,500.00 10,350.00
0.045
230,000.00
10,350.00 241,200.00
TENAGA Pekerja
L.01
OH
Tukang Batu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
JUMLAH TENAGA KERJA BAHAN Keramik artistik
Bh
12.11
12,600.00
152,600.00
Semen Portlan Pasir Pasang Semen warna
Kg M3 Kg
9.3 0.018 1.94
1,700.00 225,000.00 15,000.00
15,810.00 4,050.00 29,100.00
JUMLAH HARGA BAHAN
201,560.00
PERALATAN -
JUMLAH HARGA ALAT D E F
442,760.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
44,276.00 487,036.00
m²
4.4.4.3.54b. Pemasangan 1 m2 dinding keramik 40cm x 40cm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien 0.9 0.45
150,000.00 190,000.00
135,000.00 85,500.00
0.045 0.045
230,000.00 230,000.00
10,350.00 10,350.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA
E F
241,200.00
BAHAN Keramik artistik
Bh
12.11
22,400.00
271,288.89
Semen Portlan Pasir Pasang
Kg M3
9.3 0.018
1,700.00 225,000.00
15,810.00 4,050.00
Semen warna
Kg
1.94
15,000.00
29,100.00 320,248.89
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
Jumlah Harga
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
561,448.89
0.10 x D
56,144.89 617,593.78
m²
4.4.4.3.57.
No A
B
C
Pemasangan 1 m2 dinding batu paras
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.7 0.35
150,000.00 190,000.00
105,000.00 66,500.00
0.035 0.035
230,000.00 230,000.00
8,050.00 8,050.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA
187,600.00
BAHAN Batu paras Semen Portlan
Bh Kg
1.1 11.75
221,818.18 1,700.00
244,000.00 19,975.00
Pasir Pasang
M3
0.035
225,000.00
7,875.00 271,850.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.58.
459,450.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
45,945.00 505,395.00
Pemasangan 1 m2 dinding batu tempel hitam Harga Satuan (Rp)
No A
B
C
Uraian
Kode
F
4.4.4.3.59.
Jumlah Harga
Satuan
Koefisien 0.7 0.35 0.035
150,000.00 190,000.00 230,000.00
105,000.00 66,500.00 8,050.00
0.035
230,000.00
8,050.00 187,600.00
TENAGA Pekerja Tukang Batu Kepala tukang
L.01 L.02 L.03
OH OH OH
Mandor
L.04
OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Batu temple hitam
Bh
1.1
240,909.09
265,000.00
Semen Portlan Pasir Pasang
Kg M3
11.75 0.035
1,700.00 225,000.00
19,975.00 7,875.00
JUMLAH HARGA BAHAN
292,850.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm
0.10 x D
480,450.00 48,045.00 528,495.00
m²
Harga Satuan (Rp) No A
B
C
Uraian
Kode
Jumlah Harga
Satuan
Koefisien 0.15 0.15
150,000.00 190,000.00
22,500.00 28,500.00
0.015 0.008
230,000.00 230,000.00
3,450.00 1,840.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA
56,290.00
BAHAN Vynil
Bh
11.87
58,500.00
694,395.00
Lem
Kg
0.35
55,000.00
19,250.00 713,645.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.4.3.60.
No A
B
C
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
769,935.00 76,993.50
0.10 x D
846,928.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 wallpaper lebar 50 cm
Uraian
Kode
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien 0.35 0.175
150,000.00 190,000.00
52,500.00 33,250.00
0.017 0.002
230,000.00 230,000.00
3,910.00 460.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
JUMLAH TENAGA KERJA BAHAN Wallpaper Lem
m Kg
2.2 0.25
3,333.33 55,000.00
JUMLAH HARGA BAHAN
90,120.00 7,333.33 13,750.00 21,083.33
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.61.
No A
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
111,203.33 11,120.33
0.10 x D
122,323.67
Harga Satuan Pekerjaan (D+E)
Pemasangan 1m2 floor harderner
Uraian TENAGA
Kode
Satuan
Koefisien
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
m²
B
C
Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala tukang Mandor
L.03 L.04
OH OH
0.12 0.12
150,000.00 190,000.00
18,000.00 22,800.00
0.012 0.006
230,000.00 230,000.00
2,760.00 1,380.00
JUMLAH TENAGA KERJA BAHAN Floor harderner
Kg
5
40,000.00
JUMLAH HARGA BAHAN
44,940.00 200,000.00 200,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.62.
244,940.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
24,494.00 269,434.00
Pemasangan 1 m’ plint vynil 15cm x 30cm Harga Satuan (Rp)
No A
B
C
Uraian
Satuan
Koefisien
L.01
OH
0.08
150,000.00
12,000.00
Tukang Batu Kepala tukang
L.02 L.03
OH OH
0.08 0.008
190,000.00 230,000.00
15,200.00 1,840.00
Mandor
L.04
OH
0.004
230,000.00
920.00 29,960.00
TENAGA Pekerja
Kode
Jumlah Harga (Rp)
JUMLAH TENAGA KERJA BAHAN Vynil Lem
Bh Kg
1.76 0.08
400,000.00 55,000.00
JUMLAH HARGA BAHAN
704,000.00 4,400.00 708,400.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.4.3.63.
No A
B
m²
738,360.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
73,836.00 812,196.00
Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm
Uraian
Jumlah
(Rp)
Harga (Rp)
Satuan
Koefisien
L.01
OH
0.12
150,000.00
18,000.00
Tukang Batu Kepala tukang
L.02 L.03
OH OH
0.12 0.012
190,000.00 230,000.00
22,800.00 2,760.00
Mandor
L.04
OH
0.006
230,000.00
1,380.00 44,940.00
TENAGA Pekerja
Kode
Harga Satuan
JUMLAH TENAGA KERJA BAHAN
m²
Papan kayu kelas 1 Paku/skrup 5cm C
M3 Kg
0.003 0.05
5,480,000.00 35,000.00
JUMLAH HARGA BAHAN
16,440.00 1,750.00 18,190.00
PERALATAN -
JUMLAH HARGA ALAT D E F 4.4.4.3.64.
63,130.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
6,313.00 69,443.00
Memasang 1 m2 Paving blok tebal 8 cm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
E F
Jumlah Harga
Satuan
Koefisien 0.25 0.2
150,000.00 190,000.00
37,500.00 38,000.00
0.02 0.02
230,000.00 230,000.00
4,600.00 4,600.00 84,700.00
TENAGA Pekerja Tukang Batu
L.01 L.02
OH OH
Kepala Tukang Batu Mandor
L.03 L.04
OH OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Paving Block Warna
m2
1
Pasir Isian/Urugan
m3
0.1
75,000.00
75,000.00
195,000.00
19,500.00 94,500.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
179,200.00
0.10 x D
17,920.00 197,120.00
m²
A.4.5.1. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) 4.4.5.1.1.
No A
B
C
Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.03
150,000.00
4,500.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.07 0.007
190,000.00 230,000.00
13,300.00 1,610.00
Mandor
L.04
OH
0.004
230,000.00
920.00 20,330.00
JUMLAH TENAGA KERJA BAHAN Asbes semen Paku tripleks
m2 kg
1.1 0.01
47,300.00 33,000.00
JUMLAH HARGA BAHAN
52,030.00 330.00 52,360.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.5.1.2.
72,690.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
7,269.00 79,959.00
Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.12
150,000.00
18,000.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.12 0.012
190,000.00 230,000.00
22,800.00 2,760.00
Mandor
L.04
OH
0.006
230,000.00
1,380.00 44,940.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Akustik Paku tripleks
C
Lembar
12
38,750.00
465,000.00
kg
0.05
33,000.00
1,650.00 466,650.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E F
4.4.5.1.3.
Jumlah Harga
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
511,590.00
0.10 x D
Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm
51,159.00 562,749.00
No A
B
C
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.12
150,000.00
18,000.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.12 0.012
190,000.00 230,000.00
22,800.00 2,760.00
Mandor
L.04
OH
0.006
230,000.00
1,380.00 44,940.00
JUMLAH TENAGA KERJA BAHAN Akustik Paku tripleks
Lembar kg
5.8 0.05
77,500.00 33,000.00
JUMLAH HARGA BAHAN
449,500.00 1,650.00 451,150.00
PERALATAN -
JUMLAH HARGA ALAT D E F
4.4.5.1.4.
496,090.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
49,609.00 545,699.00
Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.1
150,000.00
15,000.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.1 0.01
190,000.00 230,000.00
19,000.00 2,300.00
Mandor
L.04
OH
0.005
230,000.00
1,150.00 37,450.00
JUMLAH TENAGA KERJA BAHAN Akustik Paku tripleks
C
Jumlah Harga (Rp)
Lembar
1.5
310,000.00
465,000.00
kg
0.05
33,000.00
1,650.00 466,650.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.1.5.
504,100.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm Harga Satuan (Rp)
No
50,410.00 554,510.00
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
A
B
TENAGA Pekerja
L.01
OH
Tukang kayu Kepala tukang
L.02 L.03
OH OH
Mandor
L.04
OH
150,000.00
15,000.00
0.1 0.01
190,000.00 230,000.00
19,000.00 2,300.00
0.005
230,000.00
1,150.00 37,450.00
JUMLAH TENAGA KERJA BAHAN Tripleks Paku tripleks
C
0.1
Lembar
0.375
67,000.00
25,125.00
kg
0.03
33,000.00
990.00 26,115.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.1.6.
63,565.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
6,356.50 69,921.50
Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm Harga Satuan (Rp)
No A
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
Kode
Satuan
Koefisien
L.01 L.02 L.03
OH OH OH
0.8 0.8 0.08
150,000.00 190,000.00 230,000.00
120,000.00 152,000.00 18,400.00
L.04
OH
0.04
230,000.00
9,200.00 299,600.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Kayu papan
m3 kg
Paku tripleks C
Jumlah Harga
0.015
3,715,000.00
55,725.00
0.01
33,000.00
330.00 56,055.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.1.7.
355,655.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
35,565.50 391,220.50
Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Harga Satuan (Rp)
No A
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
(Rp)
TENAGA Pekerja Tukang kayu
L.01 L.02
OH OH
0.1 0.05
150,000.00 190,000.00
15,000.00 9,500.00
Kepala tukang
L.03
OH
0.005
230,000.00
1,150.00
Mandor B
L.04
0.005
230,000.00
JUMLAH TENAGA KERJA BAHAN Gypsum board Paku skrup
C
OH
1,150.00 26,800.00
Lembar
0.364
100,000.00
36,400.00
kg
0.11
35,000.00
3,850.00 40,250.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.1.8.
67,050.00
Jumlah (A+B+C)
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
6,705.00 73,755.00
Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium Harga Satuan (Rp)
No A
B
C
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
Pekerja Tukang Besi
L.01 L.02
OH OH
0.5 0.5
150,000.00 190,000.00
75,000.00 95,000.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.05 0.025
230,000.00 230,000.00
11,500.00 5,750.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA
187,250.00
BAHAN Profil Allum"T"
m
3.6
15,000.00
54,000.00
Kawat dia 4 mm Ramset
kg Buah
0.15 1.05
85,000.00 750.00
12,750.00 787.50
Akustik60 x 120
Lembar
1.5
310,000.00
465,000.00 532,537.50
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.1.9.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
719,787.50 71,978.75 791,766.25
0.10 x D
Pemasangan 1 m’ list langit-langit kayu profil Harga Satuan (Rp)
No A
B
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
Pekerja Tukang Kayu Kepala tukang
L.01 L.02 L.03
OH OH OH
0.05
150,000.00
7,500.00
0.05 0.005
190,000.00 230,000.00
9,500.00 1,150.00
Mandor
L.04
OH
0.003
230,000.00
690.00 18,840.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN
List kayu profil Paku C
m kg
1.05 0.01
14,000.00 28,000.00
JUMLAH HARGA BAHAN
E F
4.4.5.1.10.
14,980.00
PERALATAN JUMLAH HARGA ALAT
D
14,700.00 280.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
33,820.00 0.10 x D
Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40
Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21)
-
3,382.00 37,202.00
m²
m²
m²
m²
m²
m²
m²
m²
m'
4.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP 4.4.5.2.1.
Pemasangan 1 m2 atap genteng palentong kecil Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.15 0.075 0.0075 0.008
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
22,500.00 14,250.00 1,725.00 1,840.00 40,315.00
JUMLAH TENAGA KERJA BAHAN Genteng palentong
Bh
25
1,800.00
45,000.00 45,000.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.2.2.
85,315.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
8,531.50 93,846.50
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 atap genteng kodok Harga Satuan (Rp)
No A
B
C
m²
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.15 0.075 0.008 0.008
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
22,500.00 14,250.00 1,840.00 1,840.00 40,430.00
JUMLAH TENAGA KERJA BAHAN Genteng kodok
Bh
25
5,500.00
JUMLAH HARGA BAHAN
137,500.00 137,500.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.3.
Pemasangan 1 m2 atap genteng palentong besar/super
0.10 x D
Harga Satuan
177,930.00 17,793.00 195,723.00
Jumlah
m²
(Rp) No A
B
C
Harga (Rp)
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang
Kode
Satuan
Koefisien
L.01 L.03 L.11
OH OH OH
0.15 0.075
150,000.00 190,000.00
22,500.00 14,250.00
Mandor
L.15
OH
0.008 0.008
230,000.00 230,000.00
1,840.00 1,840.00 40,430.00
JUMLAH TENAGA KERJA BAHAN Genteng super
Bh
18
3,900.00
70,200.00 70,200.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.4.
Pemasangan 1 m’ bubung genteng palentong
110,630.00 11,063.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) No A
B
C
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang Kayu
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.4
150,000.00
60,000.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.2 0.02 0.002
190,000.00 230,000.00 230,000.00
38,000.00 4,600.00 460.00 103,060.00
JUMLAH TENAGA KERJA BAHAN Genteng bubung
Bh
5
Semen Portlan Pasir pasang
Kg M3
8 0.032
6,900.00
34,500.00
1,700.00 225,000.00
13,600.00 7,200.00 55,300.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.5.
Pemasangan 1 m’ bubung genteng kodok glazuur
158,360.00 15,836.00
0.10 x D
174,196.00
Harga Satuan (Rp) No A
m²
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
0.4
Jumlah Harga (Rp)
150,000.00
60,000.00
m'
Tukang Kayu Kepala tukang Mandor B
C
L.03 L.11 L.15
0.2 0.02 0.002
OH OH OH
190,000.00 230,000.00 230,000.00
38,000.00 4,600.00 460.00 103,060.00
JUMLAH TENAGA KERJA BAHAN Genteng bubung Semen Portlan Pasir pasang
Bh Kg M3
5 8 0.032
6,600.00 1,700.00 225,000.00
33,000.00 13,600.00 7,200.00 53,800.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.6.
Pemasangan 1 m’ bubung genteng palentong besar
156,860.00 15,686.00
0.10 x D
172,546.00
Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Jumlah Harga
Kode
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.4 0.2 0.02
150,000.00 190,000.00 230,000.00
60,000.00 38,000.00 4,600.00
0.002
230,000.00
460.00 103,060.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Genteng bubung Semen Portlan Pasir pasang
Bh Kg M3
4 8 0.032
8,800.00 1,700.00 225,000.00
35,200.00 13,600.00 7,200.00 56,000.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.7.
Pemasangan 1 m2 roof light fibreglass 90x180
159,060.00 15,906.00 174,966.00
0.10 x D
Harga Satuan (Rp) No A
m'
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang Kayu
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.14
150,000.00
21,000.00
Kepala tukang
L.11
OH
0.067 0.007
190,000.00 230,000.00
12,730.00 1,610.00
m'
Mandor B
C
L.15
OH
0.007
230,000.00
1,610.00 36,950.00
JUMLAH TENAGA KERJA BAHAN Rooflight 90x180 Paku biasa ½”-1”
Lbr Kg
0.6 0.05
125,000.00 33,000.00
75,000.00 1,650.00 76,650.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
4.4.5.2.8.
113,600.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
11,360.00 124,960.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm Harga Satuan (Rp)
No A
B
C
Jumlah Harga (Rp)
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu
L.01 L.03
OH OH
0.14
150,000.00
21,000.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.075 0.008 0.008
190,000.00 230,000.00 230,000.00
14,250.00 1,840.00 1,840.00 38,930.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 92x250
Lbr
0.5
96,600.00
48,300.00
Paku pancing 6x23
Kg
0.12
45,000.00
5,400.00 53,700.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.9.
Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm
92,630.00 9,263.00 101,893.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) No A
B
m²
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Satuan
Koefisien
(Rp)
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.075 0.008
150,000.00 190,000.00 230,000.00
21,000.00 14,250.00 1,840.00
0.008
230,000.00
1,840.00 38,930.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 92x225
Jumlah Harga
Lbr
0.6
77,280.00
46,368.00
m²
Paku pancing 6x23 C
Kg
0.12
45,000.00
5,400.00 51,768.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.10.
Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm
No A
B
C
90,698.00 9,069.80 99,767.80
0.10 x D
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang
Kode
Satuan
Koefisien
L.01 L.03 L.11
OH OH OH
0.14 0.07
150,000.00 190,000.00
21,000.00 13,300.00
Mandor
L.15
OH
0.007 0.007
230,000.00 230,000.00
1,610.00 1,610.00 37,520.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 92x200 Paku pancing 6x23
Lbr Kg
0.6 0.12
68,693.33 45,000.00
41,216.00 5,400.00 46,616.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.11.
Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm
84,136.00 8,413.60 92,549.60
0.10 x D
Harga Satuan (Rp) No A
B
C
m²
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang Kayu
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.14
150,000.00
21,000.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.07 0.007 0.007
190,000.00 230,000.00 230,000.00
13,300.00 1,610.00 1,610.00 37,520.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 92x180
Lbr
0.75
69,000.00
51,750.00
Paku pancing 6x23
Kg
0.12
45,000.00
5,400.00 57,150.00
JUMLAH HARGA BAHAN PERALATAN
m²
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
94,670.00 9,467.00 104,137.00
4.4.5.2.12.
Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm
0.10 x D
Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.14 0.07 0.007 0.007
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
21,000.00 13,300.00 1,610.00 1,610.00 37,520.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 105x300 Paku pancing 6x23
Lbr Kg
0.35 0.12
248,750.00 45,000.00
87,062.50 5,400.00 92,462.50
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E
129,982.50 12,998.25
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.13.
Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm
0.10 x D
142,980.75
Harga Satuan (Rp) No A
B
C
Uraian TENAGA
Kode
Satuan
Koefisien
Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.07 0.007 0.007
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 105x270 Paku pancing 6x23
Lbr Kg
0.42 0.12
165,833.33 45,000.00
JUMLAH HARGA BAHAN
E
Jumlah Harga (Rp) 21,000.00 13,300.00 1,610.00 1,610.00 37,520.00 69,650.00 5,400.00 75,050.00
PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
112,570.00
0.10 x D
11,257.00
m²
F
Harga Satuan Pekerjaan (D+E)
123,827.00
4.4.5.2.14.
Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.07 0.007 0.007
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
21,000.00 13,300.00 1,610.00 1,610.00 37,520.00
JUMLAH TENAGA KERJA BAHAN Asbes gel 105x240 Paku pancing 6x23
Lbr Kg
0.44 0.12
122,839.51 45,000.00
54,049.38 5,400.00 59,449.38
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.15.
Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm
96,969.38 9,696.94 106,666.32
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.07 0.007
150,000.00 190,000.00 230,000.00
21,000.00 13,300.00 1,610.00
0.007
230,000.00
1,610.00 37,520.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Asbes gel 105x210 Paku pancing 6x23
Lbr Kg
0.51 0.12
m²
Jumlah Harga
Kode
102,366.26 45,000.00
JUMLAH HARGA BAHAN
52,206.79 5,400.00 57,606.79
PERALATAN JUMLAH HARGA ALAT
D E
m²
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.16.
Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm
0.10 x D
95,126.79 9,512.68 104,639.47
m²
Harga Satuan (Rp) No A
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.14 0.07 0.007 0.007
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
21,000.00 13,300.00 1,610.00 1,610.00 37,520.00
JUMLAH TENAGA KERJA
B
BAHAN Asbes gel 105x150 Paku pancing 6x23
Lbr Kg
0.8 0.12
97,491.67 45,000.00
77,993.34 5,400.00 83,393.34
JUMLAH HARGA BAHAN
C
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
120,913.34 12,091.33 133,004.67
4.4.5.2.17.
Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm
0.10 x D
Harga Satuan (Rp) No A
Uraian TENAGA
Kode
Satuan
Koefisien
Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.07 0.007 0.007
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Asbes gel 108x300 Paku pancing 6x23
Lbr Kg
0.37 0.12
45,000.00
JUMLAH HARGA BAHAN
C
m²
Jumlah Harga (Rp) 21,000.00 13,300.00 1,610.00 1,610.00 37,520.00 5,400.00 5,400.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.18.
Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm
0.10 x D
-
Harga Satuan (Rp) No
Uraian
Kode
42,920.00 4,292.00
Satuan
Koefisien
Jumlah Harga (Rp)
m²
A
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.07 0.007 0.007
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Asbes gel 108x300 Paku pancing 6x23
Lbr Kg
0.38 0.12
45,000.00
JUMLAH HARGA BAHAN
C
21,000.00 13,300.00 1,610.00 1,610.00 37,520.00 5,400.00 5,400.00
PERALATAN -
JUMLAH HARGA ALAT D
42,920.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
0.10 x D
4,292.00 -
Harga Satuan Pekerjaan (D+E)
4.4.5.2.19.
Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.14 0.07 0.007
150,000.00 190,000.00 230,000.00
21,000.00 13,300.00 1,610.00
0.007
230,000.00
1,610.00 37,520.00
BAHAN Asbes gel 108x240 Paku pancing 6x23
(Rp)
Lbr Kg
0.46 0.12
45,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
5,400.00 5,400.00
PERALATAN -
JUMLAH HARGA ALAT D E
42,920.00 4,292.00
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.20.
Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm
0.10 x D
-
Harga Satuan (Rp) A
m²
No
Uraian
Kode
Satuan
Koefisien
L.01 L.03 L.11
OH OH OH
0.14 0.07
150,000.00 190,000.00
21,000.00 13,300.00
0.007
230,000.00
1,610.00
TENAGA Pekerja Tukang Kayu Kepala tukang
Jumlah Harga (Rp)
m²
Mandor
L.15
OH
0.007
230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Asbes gel 108x210 Paku pancing 6x23
Lbr Kg
0.49 0.12
45,000.00
JUMLAH HARGA BAHAN
C
1,610.00 37,520.00 5,400.00 5,400.00
PERALATAN -
JUMLAH HARGA ALAT D
42,920.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
0.10 x D
4,292.00 -
Harga Satuan Pekerjaan (D+E)
4.4.5.2.21.
Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm Harga Satuan (Rp)
A
No
Uraian
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu
L.01 L.03
OH OH
0.14
150,000.00
21,000.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.07 0.007 0.007
190,000.00 230,000.00 230,000.00
13,300.00 1,610.00 1,610.00 37,520.00
BAHAN Asbes gel 108x180
Lbr
0.57
Paku pancing 6x23
Kg
0.12
45,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
B
5,400.00 5,400.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.22.
Pemasangan 1 m’ bubung stel gelombang 0,92m
42,920.00 4,292.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
Uraian
Kode
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.084 0.125 0.013 0.004
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
B
m²
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Bubung stel gel.
Lbr
2.4
Jumlah Harga (Rp) 12,600.00 23,750.00 2,990.00 920.00 40,260.00 -
m²
Paku skrup 3,5” C
Bh
6 JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.23.
Pemasangan 1 m’ bubung stel gelombang 1,05m
40,260.00 4,026.00 -
0.10 x D
Harga Satuan (Rp) No A
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.084 0.125 0.013 0.004
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Bubung stel gel. Paku skrup 3,5”
C
Lbr Bh
40,260.00
JUMLAH HARGA BAHAN
JUMLAH HARGA ALAT
-
PERALATAN
4.4.5.2.24.
Pemasangan 1 m’ bubung stel gelombang 1,08m
40,260.00 4,026.00 -
0.10 x D
Harga Satuan (Rp)
C
12,600.00 23,750.00 2,990.00 920.00
-
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
B
Jumlah Harga (Rp)
2.1 6
D E F
A
m'
No
Uraian
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu
L.01 L.03
OH OH
0.084
150,000.00
12,600.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.125 0.013 0.004
190,000.00 230,000.00 230,000.00
23,750.00 2,990.00 920.00 40,260.00
JUMLAH TENAGA KERJA BAHAN Bubung stel gel.
Lbr
2.05
-
Paku skrup 3,5”
Bh
6
-
JUMLAH HARGA BAHAN PERALATAN
m'
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.25.
Pemasangan 1 m’ nok paten 0,92m
40,260.00 4,026.00 -
0.10 x D
Harga Satuan (Rp) A
No
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu Kepala tukang
L.01 L.03 L.11
OH OH OH
0.084 0.125
150,000.00 190,000.00
12,600.00 23,750.00
Mandor
L.15
OH
0.013 0.004
230,000.00 230,000.00
2,990.00 920.00 40,260.00
BAHAN Nok paten 92cm Paku skrup 3,5”
C
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
0.10 x D
4,026.00 -
Harga Satuan Pekerjaan (D+E)
4.4.5.2.26.
Pemasangan 1 m’ nok paten 1,05m
No
Uraian
Kode
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.084 0.125 0.013 0.004
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
D E
1.2 6
40,260.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
C
Lbr Bh
PERALATAN
D
B
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
B
A
Uraian
m'
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Nok paten 105cm Paku skrup 3,5”
Lbr Bh
1.2 6
12,600.00 23,750.00 2,990.00 920.00 40,260.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
40,260.00 4,026.00
m'
F
Harga Satuan Pekerjaan (D+E)
4.4.5.2.27.
Pemasangan 1 m’ nok paten 1,08m
A
No
Uraian
-
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu Kepala tukang
L.01 L.03 L.11
OH OH OH
0.084 0.125
150,000.00 190,000.00
12,600.00 23,750.00
Mandor
L.15
OH
0.013 0.004
230,000.00 230,000.00
2,990.00 920.00 40,260.00
JUMLAH TENAGA KERJA
B
BAHAN Nok paten 108cm Paku skrup 3,5”
C
Lbr Bh
1.2 6 JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.28.
Pemasangan 1 m’ nok stel rata 0,92m
40,260.00 4,026.00 -
0.10 x D
Harga Satuan (Rp) A
m'
No
B
C
Uraian
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.1 0.15 0.013
150,000.00 190,000.00 230,000.00
15,000.00 28,500.00 2,990.00
0.004
230,000.00
920.00 47,410.00
BAHAN Nok paten 92cm Paku skrup 3,5”
Lbr Bh
1.1 6
135,000.00 4,000.00
JUMLAH HARGA BAHAN
148,500.00 24,000.00 172,500.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
m'
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.29.
Pemasangan 1 m’ nok stel rata 1,05m
0.10 x D
219,910.00 21,991.00 241,901.00
m'
Harga Satuan (Rp) A
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.084 0.125 0.013 0.004
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Nok paten 92cm Paku skrup 3,5”
Lbr Bh
1.1 6
154,076.09 4,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp) 12,600.00 23,750.00 2,990.00 920.00 40,260.00 169,483.70 24,000.00 193,483.70
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.30.
Pemasangan 1 m2 genteng beton
233,743.70 23,374.37 257,118.07
0.10 x D
Harga Satuan (Rp) A
No
Uraian
Kode
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.2 0.1 0.01 0.01
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Genteng beton Paku biasa 2”-5”
Bh Kg
11 0.03
28,000.00
JUMLAH HARGA BAHAN
C
m'
Jumlah Harga (Rp) 30,000.00 19,000.00 2,300.00 2,300.00 53,600.00 840.00 840.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.31.
Pemasangan 1 m2 genteng aspal
0.10 x D
-
Harga Satuan (Rp) No
Uraian
Kode
54,440.00 5,444.00
Satuan
Koefisien
Jumlah Harga (Rp)
m²
A
TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
L.01 L.03 L.11 L.15
OH OH OH OH
0.2 0.3 0.003 0.01
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Genteng aspal Plywood 6mm Paku biasa ½”-1” Plastic aerator
Bh Lbr Kg Bh
6.9 0.35 0.03 0.5
33,000.00
JUMLAH HARGA BAHAN
C
30,000.00 57,000.00 690.00 2,300.00 89,990.00 990.00 990.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.32.
Pemasangan 1 m2 genteng metal
90,980.00 9,098.00 -
0.10 x D
Harga Satuan (Rp) A
No
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.2
150,000.00
30,000.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.1 0.01 0.001
190,000.00 230,000.00 230,000.00
19,000.00 2,300.00 230.00 51,530.00
BAHAN Genteng metal
Bh
1.02
Paku biasa ½”-1”
Kg
0.2
33,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang Kayu
JUMLAH TENAGA KERJA
B
6,600.00 6,600.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.33.
Pemasangan 1 m2 atap sirap kayu
58,130.00 5,813.00 -
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
m²
No
Uraian TENAGA Pekerja
Kode
Satuan
Koefisien
L.01
OH
0.166
Jumlah Harga (Rp)
150,000.00
24,900.00
m²
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.25 0.025 0.008
190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Sirap kayu Paku biasa ½”-1”
Bh Kg
30 0.2
33,000.00
JUMLAH HARGA BAHAN
C
47,500.00 5,750.00 1,840.00 79,990.00 6,600.00 6,600.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.34.
Pemasangan 1 m’ nok genteng beton
86,590.00 8,659.00 -
0.10 x D
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.4 0.2 0.02 0.02
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Nok genteng beton Paku biasa ½”-1” Semen PC Pasir pasang
Bh Kg Kg M3
3.5 0.05 10.8 0.032
Semen warna
Kg
1
33,000.00 1,700.00 225,000.00 15,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp) 60,000.00 38,000.00 4,600.00 4,600.00 107,200.00 1,650.00 18,360.00 7,200.00 15,000.00 42,210.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.35.
Pemasangan 1 m’ nok genteng aspal
149,410.00 14,941.00 -
0.10 x D
Harga Satuan (Rp) A
m²
No
Uraian TENAGA Pekerja Tukang Kayu
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.125 0.25
150,000.00 190,000.00
Jumlah Harga (Rp) 18,750.00 47,500.00
m'
Kepala tukang Mandor
L.11 L.15
OH OH
0.025 0.006
230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Nok genteng aspal
Bh
2
Paku biasa ½”-1” Kayu balok borneo
Kg M3
0.05 0.0035
33,000.00
JUMLAH HARGA BAHAN
C
5,750.00 1,380.00 73,380.00 1,650.00 1,650.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.36.
Pemasangan 1 m’ nok genteng metal
75,030.00 7,503.00 -
0.10 x D
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.25 0.15 0.015 0.013
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Nok genteng metal Paku biasa ½”-1”
Bh Kg
1.1 0.05
70,000.00 33,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp) 37,500.00 28,500.00 3,450.00 2,990.00 72,440.00 77,000.00 1,650.00 78,650.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.37.
Pemasangan 1 m’ nok sirap
151,090.00 15,109.00 166,199.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
m'
No
Uraian
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu
L.01 L.03
OH OH
0.125
150,000.00
18,750.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.25 0.025 0.006
190,000.00 230,000.00 230,000.00
47,500.00 5,750.00 1,380.00 73,380.00
JUMLAH TENAGA KERJA
m'
B
BAHAN Seng plat 3 x 6” Paku biasa ½”-1” Paku biasa 2”-5”
Lbr Kg Kg
0.4 0.05 0.05
182,880.00 33,000.00 28,000.00
JUMLAH HARGA BAHAN
C
73,152.00 1,650.00 1,400.00 76,202.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.38.
Pemasangan 1 m2 atap seng gelombang
149,582.00 14,958.20
0.10 x D
164,540.20
Harga Satuan (Rp) A
No
Uraian
Satuan
Koefisien
Pekerja Tukang Kayu Kepala tukang
L.01 L.03 L.11
OH OH OH
0.12 0.06
150,000.00 190,000.00
18,000.00 11,400.00
Mandor
L.15
OH
0.006 0.006
230,000.00 230,000.00
1,380.00 1,380.00 32,160.00
JUMLAH TENAGA KERJA
B
BAHAN Seng gel 3”x6” Paku biasa ½”-1”
Lbr Kg
0.7 0.02
182,880.00 33,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Kode
TENAGA
128,016.00 660.00 128,676.00
PERALATAN -
JUMLAH HARGA ALAT D
0.10 x D
16,083.60 176,919.60
Harga Satuan Pekerjaan (D+E)
4.4.5.2.39.
B
160,836.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
A
m'
Pemasangan 1 m’nok atap seng
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.15 0.07 0.007 0.006
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Seng plat 3”x6”bjls28 Paku biasa ½”-1”
Lbr Kg
0.3 0.04
182,880.00 33,000.00
22,500.00 13,300.00 1,610.00 1,380.00 38,790.00 54,864.00 1,320.00
m²
JUMLAH HARGA BAHAN
C
56,184.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.5.2.40.
Pemasangan 1 m2 atap alumunium
94,974.00 9,497.40 104,471.40
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang Kayu Kepala tukang Mandor
Satuan
Koefisien
L.01 L.03 L.11 L.15
OH OH OH OH
0.15 0.75 0.08
150,000.00 190,000.00 230,000.00
22,500.00 142,500.00 18,400.00
0.006
230,000.00
1,380.00 184,780.00
BAHAN Almn gel tbl0,55 Paku hak panj 15cm
C
Lbr Kg
(Rp)
1.05 0.02 JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.41.
Pemasangan 1 m’ nok alumunium
184,780.00 18,478.00 -
0.10 x D
Harga Satuan (Rp) A
B
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
m'
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang Kayu Kepala tukang Mandor
L.03 L.11 L.15
OH OH OH
0.1 1 0.1 0.05
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Nok standar 40x18 Paku hak panj 15cm
Bh Kg
1.2 0.04
Jumlah Harga (Rp) 15,000.00 190,000.00 23,000.00 11,500.00 239,500.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
m²
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.5.2.42.
Pemasangan 1 m2 alumunium foil/sisalation
239,500.00 23,950.00 -
0.10 x D
Harga Satuan (Rp) A
B
C
No
Uraian
Satuan
Koefisien
TENAGA Pekerja Tukang Kayu
L.01 L.03
OH OH
0.15
150,000.00
22,500.00
Kepala tukang Mandor
L.11 L.15
OH OH
0.05 0.005 0.008
190,000.00 230,000.00 230,000.00
9,500.00 1,150.00 1,840.00 34,990.00
BAHAN Alumunium foil
M2
1.05
13,000.00
JUMLAH HARGA BAHAN
13,650.00 13,650.00
PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
48,640.00 4,864.00 53,504.00
m²
4.4.6.1. HARGA SATUAN PEKERJAAN KAYU 4.4.6.1.1.
A
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
7
150,000.00
1,050,000.00
OH OH
21 2.1
190,000.00 230,000.00
3,990,000.00 483,000.00
OH
0.35
230,000.00
80,500.00 5,603,500.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA
B
BAHAN
Balok kayu Paku 10 cm
m3 Kg
1.1 1.25
Lem kayu
Kg
1
5,350,000.00 28,000.00
5,885,000.00 35,000.00
55,000.00
55,000.00 5,975,000.00
JUMLAH HARGA BAHAN
C
PERALATAN
-
JUMLAH HARGA ALAT D
11,578,500.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.2.
1,157,850.00 12,736,350.00
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
C
Satuan
L.01
OH
6
150,000.00
900,000.00
OH OH
18 1.8
190,000.00 230,000.00
3,420,000.00 414,000.00
OH
0.3
230,000.00
69,000.00 4,803,000.00
L.03 L.03 L.04
Koefisien
(Rp)
JUMLAH TENAGA KERJA BAHAN
E F
4.4.6.1.3.
Jumlah Harga
Kode
Balok kayu II
m3
1.2
4,250,000.00
5,100,000.00
Paku 10 cm Lem kayu
Kg Kg
1.25 1
28,000.00 55,000.00
35,000.00 55,000.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D
m³
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
5,190,000.00 9,993,000.00
0.10 x D
Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II
999,300.00 10,992,300.00
m³
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
0.35
150,000.00
52,500.00
OH OH
1.05 0.105
190,000.00 230,000.00
199,500.00 24,150.00
OH
0.018
230,000.00
4,140.00 280,290.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA
B
BAHAN Papan kayu Paku 5 – 7 cm
m3 Kg
0.04 0.05
4,250,000.00 28,000.00
JUMLAH HARGA BAHAN
C
170,000.00 1,400.00 171,400.00
PERALATAN -
JUMLAH HARGA ALAT D
451,690.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.4.
45,169.00 496,859.00
Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN
Satuan
Koefisien
L.01
OH
0.35
150,000.00
52,500.00
OH OH
1.05 0.105
190,000.00 230,000.00
199,500.00 24,150.00
OH
0.018
230,000.00
4,140.00 280,290.00
L.03 L.03 L.04
Papan kayu
m3
0.04
2,600,000.00
104,000.00
Paku 5 – 7 cm
Kg
0.05
28,000.00
1,400.00 105,400.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
B
m²
PERALATAN -
JUMLAH HARGA ALAT D
385,690.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.5.
Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II Harga Satuan (Rp)
No
38,569.00 424,259.00
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m²
A
TENAGA Pekerja Tukang kayu Kepala tukang Mandor
L.01 L.03 L.03 L.04
OH
1
150,000.00
150,000.00
OH OH
3 0.3
190,000.00 230,000.00
570,000.00 69,000.00
OH
0.05
230,000.00
11,500.00 800,500.00
JUMLAH TENAGA KERJA
B
BAHAN
Papan kayu II
m3
0.04
4,250,000.00
170,000.00
Lem kayu
Kg
0.5
55,000.00
27,500.00 197,500.00
JUMLAH HARGA BAHAN
C
PERALATAN -
JUMLAH HARGA ALAT D
998,000.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.6.
99,800.00 1,097,800.00
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Satuan
Koefisien
L.01 L.03 L.03
OH OH OH
0.8 2.4 0.24
150,000.00 190,000.00 230,000.00
120,000.00 456,000.00 55,200.00
OH
0.04
230,000.00
9,200.00 640,400.00
L.04
BAHAN Papan kayu II
m3 Kg
Lem kayu
(Rp)
0.024
4,250,000.00
102,000.00
55,000.00
16,500.00 118,500.00
0.3
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
PERALATAN -
JUMLAH HARGA ALAT D
758,900.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.7.
75,890.00 834,790.00
Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II Harga Satuan (Rp)
A
m²
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang
Jumlah Harga
Kode
Satuan
Koefisien
L.01 L.03
OH OH
1 3
150,000.00 190,000.00
150,000.00 570,000.00
OH
0.3
230,000.00
69,000.00
L.03
(Rp)
m²
Mandor
L.04
0.05
230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Papan kayu II
m3 Kg
Lem kayu
0.064
11,500.00 800,500.00
4,250,000.00
272,000.00
55,000.00
27,500.00 299,500.00
0.5
JUMLAH HARGA BAHAN
C
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10 x D
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
0.7
150,000.00
105,000.00
OH OH
2.1 0.21
190,000.00 230,000.00
399,000.00 48,300.00
OH
0.035
230,000.00
8,050.00 560,350.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA BAHAN Papan kayu Paku 1 cm – 2,5 cm Lem kayu Plywood tebal 4 mm Ukuran (90 x 220) cm
m3 kg
0.025 0.03
kg Lembar
0.5 1
4,250,000.00 33,000.00
106,250.00 990.00
55,000.00 130,000.00
27,500.00 130,000.00
JUMLAH HARGA BAHAN
C
264,740.00
PERALATAN
-
JUMLAH HARGA ALAT D
825,090.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.9.
82,509.00 907,599.00
Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
m²
Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
No
B
1,100,000.00 110,000.00 1,210,000.00
Harga Satuan Pekerjaan (D+E)
4.4.6.1.8.
A
OH
Kode
Satuan
Koefisien
L.01
OH
0.8
150,000.00
120,000.00
OH OH
2.4 0.24
190,000.00 230,000.00
456,000.00 55,200.00
OH
0.04
230,000.00
9,200.00 640,400.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA BAHAN
Jumlah Harga (Rp)
m²
Papan kayu II Paku 1 cm – 2,5 cm Lem kayu Plywood 4 mm (90 x 220) cm
m3 kg
0.0256 0.03
kg Lembar
0.5 1
4,250,000.00 33,000.00
108,800.00 990.00
55,000.00 130,000.00
27,500.00 130,000.00
JUMLAH HARGA BAHAN
C
267,290.00
PERALATAN -
JUMLAH HARGA ALAT D
907,690.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.10.
907,690.00
Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Satuan
Koefisien
L.01 L.03
OH OH
0.67 2
150,000.00 190,000.00
100,500.00 380,000.00
OH OH
0.2 0.335
230,000.00 230,000.00
46,000.00 77,050.00
L.03 L.04
BAHAN Papan kayu II
m3 kg
Paku 1 – 2,5 cm
(Rp)
603,550.00
0.06
4,250,000.00
255,000.00
0.15
33,000.00
4,950.00 259,950.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
B
863,500.00 86,350.00
0.10 x D
949,850.00
Harga Satuan Pekerjaan (D+E)
4.4.6.1.11.
A
m²
No
Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian TENAGA Pekerja Tukang kayu
Kode
Satuan
Koefisien
OH OH
0.8 2.4
150,000.00 190,000.00
120,000.00 456,000.00
Kepala tukang Mandor
L.01 L.03 L.03 L.04
OH OH
0.24 0.04
230,000.00 230,000.00
55,200.00 9,200.00
JUMLAH TENAGA KERJA BAHAN Papan kayu
m3
0.025
5,350,000.00
640,400.00 133,750.00
m²
Paku 1 – 2,5 cm Lem kayu
kg kg
Teakwood 4 mm 90 x 220 cm
Lembar
0.03 0.3
33,000.00 55,000.00
990.00 16,500.00
130,000.00
130,000.00
1 JUMLAH HARGA BAHAN
C
281,240.00
PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
921,640.00 92,164.00 1,013,804.00
4.4.6.1.12.
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
0.10 x D
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Satuan
Koefisien
(Rp)
L.01 L.03
OH OH
0.85 2.55
150,000.00 190,000.00
127,500.00 484,500.00
OH OH
0.255 0.043
230,000.00 230,000.00
58,650.00 9,890.00
JUMLAH TENAGA KERJA
B
BAHAN Papan kayu Paku 1 – 2,5 cm Lem kayu
m3 kg kg
Teakwood 4 mm 90 x 220 cm
Lembar
Formika
Lembar
0.025 0.03 0.8
680,540.00
4,250,000.00 33,000.00 55,000.00
106,250.00 990.00 44,000.00
130,000.00
130,000.00
195,000.00
97,500.00 97,500.00
1 0.5
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
L.03 L.04
PERALATAN
-
JUMLAH HARGA ALAT D
778,040.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.13.
77,804.00 855,844.00
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
m²
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Harga Satuan (Rp)
A
m²
Kode
Satuan
Koefisien
L.01
OH
4
150,000.00
600,000.00
OH OH
12 1.2
190,000.00 230,000.00
2,280,000.00 276,000.00
OH
0.2
230,000.00
46,000.00 3,202,000.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA BAHAN
Jumlah Harga (Rp)
Balok kayu II Besi strip tebal 5mm Paku 12 cm
m3 kg
1.1 15
4,250,000.00 33,000.00
4,675,000.00 495,000.00
kg
5.6
28,000.00
156,800.00 5,326,800.00
JUMLAH HARGA BAHAN
C
PERALATAN -
JUMLAH HARGA ALAT D
8,528,800.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.14.
852,880.00 9,381,680.00
Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Harga Satuan (Rp)
A
No
Kode
Satuan
Koefisien
OH OH
6.7 20.1
150,000.00 190,000.00
1,005,000.00 3,819,000.00
Kepala tukang Mandor
L.01 L.03 L.03 L.04
OH OH
2.01 0.335
230,000.00 230,000.00
462,300.00 77,050.00 5,363,350.00
BAHAN Balok kayu Besi strip tebal 5mm Paku 12 cm
(Rp)
m3 kg
1.2
5,350,000.00
6,420,000.00
15
33,000.00
495,000.00
kg
5.6
28,000.00
156,800.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Uraian TENAGA Pekerja Tukang kayu
JUMLAH TENAGA KERJA
B
7,071,800.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
13,678,665.00
Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
12,435,150.00 1,243,515.00
0.10 x D
Harga Satuan Pekerjaan (D+E)
4.4.6.1.15.
A
m³
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
L.01
OH
6.7
150,000.00
1,005,000.00
OH OH OH
20.1 2.01 0.335
190,000.00 230,000.00 230,000.00
3,819,000.00 462,300.00 77,050.00
L.03 L.03 L.04
Koefisien
JUMLAH TENAGA KERJA BAHAN Balok kayu
m3
1.1
4,250,000.00
5,363,350.00 4,675,000.00
m³
Besi strip tebal 5 mm
kg
15
33,000.00
495,000.00
Paku 12 cm
kg
3
28,000.00
84,000.00
JUMLAH HARGA BAHAN
C
5,254,000.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10 x D
11,679,085.00
Harga Satuan Pekerjaan (D+E)
4.4.6.1.16.
A
10,617,350.00 1,061,735.00
Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
0.1
150,000.00
15,000.00
OH OH
0.1 0.01
190,000.00 230,000.00
19,000.00 2,300.00
OH
0.005
230,000.00
1,150.00 37,450.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA
B
BAHAN 1. Kaso-kaso 5 x 7cm
m3
2. Reng 2 x 3 cm 3. Paku 5 dan 10 cm
m3 kg
0.014 0.0036
4,250,000.00 3,750,000.00
59,500.00 13,500.00
28,000.00
7,000.00 80,000.00
0.25
JUMLAH HARGA BAHAN
C
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.17.
Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II
117,450.00 11,745.00 129,195.00
0.10 x D
Harga Satuan (Rp) A
B
m³
No
Jumlah Harga
Uraian TENAGA Pekerja Tukang kayu
Kode
Satuan
Koefisien
(Rp)
OH OH
0.1 0.1
150,000.00 190,000.00
15,000.00 19,000.00
Kepala tukang Mandor
L.01 L.03 L.03 L.04
OH OH
0.01 0.005
230,000.00 230,000.00
2,300.00 1,150.00
JUMLAH TENAGA KERJA BAHAN Kaso-kaso 5 x 7cm Reng (3 x 4) cm Paku 5 dan 10 cm
m3 m3 kg
0.014 0.0057 0.25
4,250,000.00 3,750,000.00 28,000.00
37,450.00 59,500.00 21,375.00 7,000.00
m²
JUMLAH HARGA BAHAN
C
87,875.00
PERALATAN -
JUMLAH HARGA ALAT D
125,325.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.18.
12,532.50 137,857.50
Pemasangan 1 m2 rangka atap sirap, kayu kelas II Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Satuan
Koefisien
L.01
OH
0.12
150,000.00
18,000.00
OH OH
0.12 0.012
190,000.00 230,000.00
22,800.00 2,760.00
OH
0.006
230,000.00
1,380.00 44,940.00
L.03 L.03 L.04
BAHAN Kayu kelas II Paku 5 - 10 cm
(Rp)
m3
0.014
4,250,000.00
59,500.00
m3
0.057
28,000.00
1,596.00 61,096.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
PERALATAN -
JUMLAH HARGA ALAT D
62,476.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.19.
6,247.60 68,723.60
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
BAHAN Kaso-kaso 5 x 7cm
Jumlah Harga
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.15 0.3
150,000.00 190,000.00
22,500.00 57,000.00
OH OH
0.03 0.075
230,000.00 230,000.00
6,900.00 17,250.00 103,650.00
L.03 L.04
(Rp)
JUMLAH TENAGA KERJA
Paku 7 cm – 10 cm C
m²
m3 kg
0.0154 0.2
2,600,000.00
40,040.00
28,000.00
5,600.00
JUMLAH HARGA BAHAN
45,640.00
PERALATAN JUMLAH HARGA ALAT
-
m²
D
62,890.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.20.
6,289.00 69,179.00
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Satuan
Koefisien
L.01 L.03
OH OH
0.2 0.3
150,000.00 190,000.00
30,000.00 57,000.00
OH OH
0.03 0.01
230,000.00 230,000.00
6,900.00 2,300.00 96,200.00
L.03 L.04
(Rp)
BAHAN Kaso-kaso
m3
0.0163
5 x 7 cm Paku 7 – 10 cm
kg
0.25
2,600,000.00
42,380.00
28,000.00
7,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
49,380.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
No
Uraian TENAGA Pekerja Tukang kayu
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.1 0.2
150,000.00 190,000.00
15,000.00 38,000.00
OH OH
0.02 0.005
230,000.00 230,000.00
4,600.00 1,150.00
L.03 L.04
JUMLAH TENAGA KERJA BAHAN Papan kayu II Paku 5 dan 7 cm
C
160,138.00
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Kepala tukang Mandor B
145,580.00 14,558.00
0.10 x D
Harga Satuan Pekerjaan (D+E)
4.4.6.1.21.
A
m3 kg
0.0108
58,750.00
4,250,000.00
45,900.00
28,000.00
2,800.00
0.1
JUMLAH HARGA BAHAN
48,700.00
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
107,450.00 10,745.00
m²
F
Harga Satuan Pekerjaan (D+E)
4.4.6.1.22.
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
118,195.00
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01
OH
0.1
150,000.00
15,000.00
OH OH
0.2 0.02
190,000.00 230,000.00
38,000.00 4,600.00
OH
0.005
230,000.00
1,150.00 58,750.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA
B
BAHAN Papan kayu II
m3 kg
Paku 5 dan 7 cm
0.011
4,250,000.00
46,750.00
0.05
28,000.00
1,400.00 48,150.00
JUMLAH HARGA BAHAN
C
PERALATAN -
JUMLAH HARGA ALAT D
106,900.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.23.
10,690.00 117,590.00
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
D
Jumlah Harga
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.15 0.45
150,000.00 190,000.00
22,500.00 85,500.00
OH OH
0.045 0.008
230,000.00 230,000.00
10,350.00 1,840.00
L.03 L.04
(Rp)
JUMLAH TENAGA KERJA BAHAN Balok kayu III Paku 5 dan 7 cm
C
m'
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Harga Satuan (Rp)
A
m'
m3 kg
0.028 0.15
120,190.00
2,600,000.00
72,800.00
28,000.00
4,200.00
JUMLAH HARGA BAHAN
77,000.00
PERALATAN JUMLAH HARGA ALAT
197,190.00
0.10 x D
197,190.00
E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.24.
Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
m²
Harga Satuan (Rp) A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.15 0.45
150,000.00 190,000.00
22,500.00 85,500.00
OH OH
0.045 0.008
230,000.00 230,000.00
10,350.00 1,840.00
L.03 L.04
(Rp)
JUMLAH TENAGA KERJA
B
BAHAN Balok kayu, 6 x 12 Paku 5 dan 10 Teakwood 4 mm, 120 x 240 Lem kayu
120,190.00
m3 kg Lembar
0.028 0.15 0.86
4,250,000.00
119,000.00
28,000.00
4,200.00
220,000.00
189,200.00
kg
0.56
55,000.00
30,800.00 343,200.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
PERALATAN -
JUMLAH HARGA ALAT D
463,390.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.25.
46,339.00 509,729.00
Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Harga Satuan (Rp)
A
B
No
Kode
Satuan
Koefisien
OH OH OH
0.2 0.6 0.06
150,000.00 190,000.00 230,000.00
30,000.00 114,000.00 13,800.00
Mandor
L.01 L.03 L.03 L.04
OH
0.01
230,000.00
2,300.00 160,100.00
(Rp)
JUMLAH TENAGA KERJA BAHAN Balok kayu,
5 dan 10 Plywood 4 mm, 120 x 240 Lem kayu
m3
0.028
4,250,000.00
119,000.00
kg
0.15
28,000.00
4,200.00
Lembar
0.86
220,000.00
189,200.00
kg
0.56
55,000.00
30,800.00 343,200.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah Harga
Uraian TENAGA Pekerja Tukang kayu Kepala tukang
6 x 12 Paku
C
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
503,300.00
0.10 x D
50,330.00 553,630.00
m²
4.4.6.1.26.
Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01
OH
0.6
150,000.00
90,000.00
OH OH
1.8 0.18
190,000.00 230,000.00
342,000.00 41,400.00
OH
0.03
230,000.00
6,900.00 480,300.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA
B
BAHAN Papan kayu
m3
Paku 5 dan 10 Paku skrup 10 cm
kg kg
0.007
5,350,000.00
37,450.00
0.1 0.15
28,000.00 35,000.00
2,800.00 5,250.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
45,500.00
PERALATAN
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.27.
Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm
A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
525,800.00 52,580.00 578,380.00
0.10 x D
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01 L.03
OH OH
0.025 0.075
150,000.00 190,000.00
3,750.00 14,250.00
OH OH
0.008 0.001
230,000.00 230,000.00
1,840.00 230.00
L.03 L.04
JUMLAH TENAGA KERJA
B
BAHAN Plywood 4 mm
m3 kg
Paku 1 dan 2,5
0.4
220,000.00
0.05
33,000.00
JUMLAH HARGA BAHAN
C
m²
20,070.00 88,000.00 1,650.00 89,650.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C)
0.10 x D
F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.1.28.
Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV
120,692.00
Harga Satuan No
Uraian
Kode
109,720.00 10,972.00
Satuan
Koefisien
Jumlah
m²
(Rp) A
No
Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor
B
Satuan
Koefisien
L.01
OH
0.1
150,000.00
15,000.00
OH OH
0.05 0.005
190,000.00 230,000.00
9,500.00 1,150.00
OH
0.005
230,000.00
1,150.00 26,800.00
L.03 L.03 L.04
JUMLAH TENAGA KERJA BAHAN Bilik bambu Kaso-kaso 5 x 7 Paku List kayu 2/4
C D E F
Harga (Rp)
Kode
m2
1.5
m3 kg
0.014 0.012
m3
50,000.00 2,600,000.00
75,000.00 36,400.00
28,000.00
336.00
0.003
8,500.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
25.50 111,761.50 138,561.50 13,856.15 152,417.65
m²
4.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA 4.4.6.2.1.
A
Pemasangan 1 buah kunci tanam antik
No
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
TENAGA KERJA Pekerja Tukang kayu
L.01 L.02
OH OH
0.06 0.6
150,000.00 190,000.00
9,000.00 114,000.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.06 0.003
230,000.00 230,000.00
13,800.00 690.00
JUMLAH TENAGA KERJA
B
BAHAN Kunci tanam antik
Bh
1
555,000.00
JUMLAH HARGA BAHAN
C
137,490.00 555,000.00 555,000.00
PERALATAN -
JUMLAH HARGA ALAT D
692,490.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.2.
69,249.00 761,739.00
Pemasangan 1 buah kunci tanam biasa Harga Satuan (Rp)
A
No
Kode
Satuan
Koefisien
L.01
OH
0.01
150,000.00
1,500.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.5 0.05
190,000.00 230,000.00
95,000.00 11,500.00
Mandor
L.04
OH
0.005
230,000.00
1,150.00 109,150.00
BAHAN Kunci tanam biasa
(Rp)
Bh
1
165,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Uraian TENAGA KERJA Pekerja
JUMLAH TENAGA KERJA
B
bh
165,000.00 165,000.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10 x D
301,565.00
Harga Satuan Pekerjaan (D+E)
4.4.6.2.3.
Pemasangan 1 buah kunci kamar mandi Harga Satuan (Rp)
No
274,150.00 27,415.00
Uraian
Kode
Satuan
Koefisien
Jumlah Harga
bh
A
No
Uraian TENAGA KERJA
Kode
Satuan
Koefisien
(Rp)
Pekerja Tukang kayu
L.01 L.02
OH OH
0.005 0.5
150,000.00 190,000.00
750.00 95,000.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.05 0.003
230,000.00 230,000.00
11,500.00 690.00
JUMLAH TENAGA KERJA
B
BAHAN Kunci tanam KM
Bh
1
137,000.00
JUMLAH HARGA BAHAN
C
107,940.00 137,000.00 137,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.4.
A
244,940.00
Jumlah (A+B+C)
24,494.00 269,434.00
Pemasangan 1 buah kunci silinder
No
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
TENAGA KERJA Pekerja
L.01
OH
0.005
150,000.00
750.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.5 0.05
190,000.00 230,000.00
95,000.00 11,500.00
Mandor
L.04
OH
0.003
230,000.00
690.00 107,940.00
JUMLAH TENAGA KERJA
B
BAHAN Kunci silinder
Bh
1
64,000.00
JUMLAH HARGA BAHAN
C
64,000.00 64,000.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10
171,940.00 17,194.00
xD
189,134.00
Harga Satuan Pekerjaan (D+E)
4.4.6.2.5.
Pemasangan 1 buah engsel pintu Harga Satuan (Rp)
A
bh
No
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
Pekerja Tukang kayu
L.01 L.02
OH OH
0.015 0.15
150,000.00 190,000.00
2,250.00 28,500.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.015 0.0008
230,000.00 230,000.00
3,450.00 184.00 34,384.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA
bh
B
BAHAN Engsel pintu
Bh
1
21,000.00
JUMLAH HARGA BAHAN
C
21,000.00 21,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.6.
A
55,384.00
Jumlah (A+B+C)
5,538.40 60,922.40
Pemasangan 1 buah engsel jendela kupu-kupu
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.01
150,000.00
1,500.00
Tukang kayu Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.1 0.01 0.0005
190,000.00 230,000.00 230,000.00
19,000.00 2,300.00 115.00
JUMLAH TENAGA KERJA
B
BAHAN Engsel kupu-kupu
Bh
1
10,500.00
JUMLAH HARGA BAHAN
C
22,915.00 10,500.00 10,500.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.7.
Pemasangan 1 buah engsel angin
33,415.00 0.10 x D
3,341.50 36,756.50
Harga Satuan (Rp) A
B
C
bh
No
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
Pekerja Tukang kayu Kepala tukang
L.01 L.02 L.03
OH
0.1
150,000.00
15,000.00
0.2 0.02
190,000.00 230,000.00
38,000.00 4,600.00
Mandor
L.04
OH
0.0005
230,000.00
115.00 57,715.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Engsel angin
Bh
1
7,000.00
JUMLAH HARGA BAHAN
7,000.00 7,000.00
PERALATAN JUMLAH HARGA ALAT
-
bh
D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10 x D
71,186.50
Harga Satuan Pekerjaan (D+E)
4.4.6.2.8.
A
64,715.00 6,471.50
Pemasangan 1 buah spring knip
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
Pekerja Tukang kayu
L.01 L.02
OH
0.015 0.15
150,000.00 190,000.00
2,250.00 28,500.00
Kepala tukang Mandor
L.03 L.04
0.015 0.008
230,000.00 230,000.00
3,450.00 1,840.00
TENAGA
OH
JUMLAH TENAGA KERJA
B
BAHAN Spring knip
C
Bh
36,040.00
1 JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
D
36,040.00
Jumlah (A+B+C)
E F
0.10
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.9.
xD
3,604.00 -
No
B
C
Uraian
F
4.4.6.2.10.
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.015
150,000.00
2,250.00
Tukang kayu Kepala tukang
L.02 L.03
0.15 0.015
190,000.00 230,000.00
28,500.00 3,450.00
Mandor
L.04
OH
0.008
230,000.00
1,840.00 36,040.00
JUMLAH TENAGA KERJA BAHAN Kait angin
Bh
1
10,000.00
JUMLAH HARGA BAHAN
10,000.00 10,000.00
PERALATAN JUMLAH HARGA ALAT
D E
bh
Pemasangan 1 buah kait angin Harga Satuan (Rp)
A
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah door closer
0.10 x D
46,040.00 4,604.00 50,644.00
bh
Harga Satuan (Rp) A
No
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang kayu
L.01 L.02
OH
0.05 0.5
150,000.00 190,000.00
7,500.00 95,000.00
Kepala tukang Mandor
L.03 L.04
0.05 0.003
230,000.00 230,000.00
11,500.00 690.00
TENAGA
OH
(Rp)
JUMLAH TENAGA KERJA
B
BAHAN Door closer
set
1
245,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
114,690.00 245,000.00 245,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.11.
A
359,690.00
Jumlah (A+B+C)
35,969.00 395,659.00
Pemasangan 1 buah kunci slot
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.02
150,000.00
3,000.00
Tukang kayu Kepala tukang
L.02 L.03
Mandor
L.04
0.2 0.02 0.001
190,000.00 230,000.00 230,000.00
38,000.00 4,600.00 230.00
OH
JUMLAH TENAGA KERJA
B
BAHAN Kunci slot
Bh
1
137,000.00
JUMLAH HARGA BAHAN
C
45,830.00 137,000.00 137,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
4.4.6.2.12.
Pemasangan 1 buah Door holder
182,830.00 18,283.00 201,113.00
0.10 x D
Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp) A
bh
No
Uraian
Kode
Satuan
Koefisien
L.01 L.02 L.03
OH
0.05 0.5 0.05
TENAGA Pekerja Tukang kayu Kepala tukang
Jumlah Harga (Rp)
150,000.00 190,000.00 230,000.00
7,500.00 95,000.00 11,500.00
bh
Mandor
L.04
OH
0.003
230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Door holder
Bh
1
245,000.00
JUMLAH HARGA BAHAN
C
690.00 114,690.00 245,000.00 245,000.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10 x D
395,659.00
Harga Satuan Pekerjaan (D+E)
4.4.6.2.13.
A
359,690.00 35,969.00
Pemasangan 1 buah door stop
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang kayu
L.01 L.02
OH
0.01 0.1
150,000.00 190,000.00
1,500.00 19,000.00
Kepala tukang Mandor
L.03 L.04
0.01 0.005
230,000.00 230,000.00
2,300.00 1,150.00
OH
JUMLAH TENAGA KERJA
B
BAHAN Door stop
Bh
1
65,000.00
JUMLAH HARGA BAHAN
C
23,950.00 65,000.00 65,000.00
PERALATAN -
JUMLAH HARGA ALAT D
88,950.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.14.
8,895.00 97,845.00
Pemasangan 1 buah rel pintu sorong Harga Satuan (Rp)
A
B
C
bh
No
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
TENAGA Pekerja
(Rp)
L.01
OH
0.06
150,000.00
9,000.00
Tukang kayu Kepala tukang
L.02 L.03
0.6 0.06
190,000.00 230,000.00
114,000.00 13,800.00
Mandor
L.04
OH
0.003
230,000.00
690.00 137,490.00
JUMLAH TENAGA KERJA BAHAN Rel pintu sorong
Set
1
42,000.00
JUMLAH HARGA BAHAN PERALATAN
42,000.00 42,000.00
bh
-
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10
179,490.00 17,949.00
xD
197,439.00
Harga Satuan Pekerjaan (D+E)
4.4.6.2.15.
Pemasangan 1 buah kunci lemari Harga Satuan (Rp)
A
No
Uraian
Satuan
Koefisien
Pekerja Tukang kayu
L.01 L.02
OH
0.025 0.25
150,000.00 190,000.00
3,750.00 47,500.00
Kepala tukang Mandor
L.03 L.04
0.025 0.0013
230,000.00 230,000.00
5,750.00 299.00
OH
(Rp)
JUMLAH TENAGA KERJA BAHAN Kunci lemari
C
Set
1 JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
57,299.00
Jumlah (A+B+C)
E F
0.10
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.16.
xD
5,729.90 -
No
Uraian
Satuan
Koefisien
Pekerja Tukang kayu Kepala tukang
L.01 L.02 L.03
OH
0.015 0.15 0.015
150,000.00 190,000.00 230,000.00
2,250.00 28,500.00 3,450.00
Mandor
L.04
OH
0.0008
230,000.00
184.00 34,384.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Kaca tebal 3mm
m2 Kg
1.1
115,000.00
126,500.00
0.05
35,000.00
1,750.00 128,250.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah Harga
Kode
SEalant C
bh
Pemasangan 1 m2 kaca tebal 3 mm Harga Satuan (Rp)
B
57,299.00
PERALATAN
D
A
Jumlah Harga
Kode
TENAGA
B
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
162,634.00
0.10 x D
16,263.40 178,897.40
m²
4.4.6.2.17.
Pemasangan 1 m2 kaca tebal 5 mm Harga Satuan (Rp)
A
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.015
150,000.00
2,250.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.15 0.015
190,000.00 230,000.00
28,500.00 3,450.00
Mandor
L.04
OH
0.0008
230,000.00
184.00 34,384.00
JUMLAH TENAGA KERJA
B
BAHAN Kaca tebal 5 mm
m2
1.1
170,000.00
187,000.00
SEalant
Kg
0.05
35,000.00
1,750.00 188,750.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
PERALATAN -
JUMLAH HARGA ALAT D
223,134.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
22,313.40 245,447.40
m²
4.4.6.2.17.A. Pemasangan 1 m2 kaca tebal 8 mm
A
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.015
150,000.00
2,250.00
Tukang kayu Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.15 0.015 0.0008
190,000.00 230,000.00 230,000.00
28,500.00 3,450.00 184.00
JUMLAH TENAGA KERJA
B
BAHAN Kaca tebal 5 mm SEalant
m2 Kg
1.1 0.05
150,000.00 35,000.00
JUMLAH HARGA BAHAN
C
34,384.00 165,000.00 1,750.00 166,750.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
201,134.00 20,113.40
0.10 x D
221,247.40
Harga Satuan Pekerjaan (D+E)
4.4.6.2.18.
No
Pemasangan 1 m2 kaca tebal 8 mm
Uraian
Kode
Satuan
Koefisien
Harga Satuan
Jumlah
(Rp)
Harga
m²
A
No
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang kayu
L.01 L.02
OH OH
0.017 0.17
150,000.00 190,000.00
2,550.00 32,300.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.017 0.0009
230,000.00 230,000.00
3,910.00 207.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA
B
BAHAN Kaca tebal 8 mm SEalant
m2 Kg
1.1 0.07
200,000.00 35,000.00
JUMLAH HARGA BAHAN
C
38,967.00 220,000.00 2,450.00 222,450.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
261,417.00 26,141.70
xD
287,558.70
Harga Satuan Pekerjaan (D+E)
4.4.6.2.19.
A
0.10
Pemasangan 1 m2 kaca buram tebal 12 mm
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang kayu
L.01 L.02
OH OH
0.025 0.25
150,000.00 190,000.00
3,750.00 47,500.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.025 0.0013
230,000.00 230,000.00
5,750.00 299.00
JUMLAH TENAGA KERJA
B
BAHAN Kaca buram 12 mm SEalant
m2 Kg
1.1 0.07
35,000.00
JUMLAH HARGA BAHAN
C
57,299.00 2,450.00 2,450.00
PERALATAN -
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
0.10
59,749.00 5,974.90
xD
-
Harga Satuan Pekerjaan (D+E)
4.4.6.2.20.
A
m²
Pemasangan 1 m2 kaca cermin tebal 5 mm
No
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
0.015
150,000.00
2,250.00
Tukang kayu
L.02
OH
0.15
190,000.00
28,500.00
m²
Kepala tukang Mandor
L.03 L.04
0.015 0.008
OH OH
230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Kaca cermin 5 mm
m2
1.1
135,000.00
JUMLAH HARGA BAHAN
C
3,450.00 1,840.00 36,040.00 148,500.00 148,500.00
PERALATAN -
JUMLAH HARGA ALAT D
184,540.00
Jumlah (A+B+C)
E F
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.21.
18,454.00 202,994.00
Pemasangan 1 m2 kaca cermin tebal 8 mm Harga Satuan (Rp)
A
No
Uraian
Satuan
Koefisien
(Rp)
Pekerja Tukang kayu
L.01 L.02
OH OH
0.017 0.17
150,000.00 190,000.00
2,550.00 32,300.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.017 0.009
230,000.00 230,000.00
3,910.00 2,070.00
JUMLAH TENAGA KERJA BAHAN Kaca cermin 8 mm
1.1
m2
169,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
TENAGA
B
40,830.00 185,900.00 185,900.00
PERALATAN -
JUMLAH HARGA ALAT D
226,730.00
Jumlah (A+B+C)
E F
0.10
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.6.2.22.
xD
22,673.00 249,403.00
Pemasangan 1 m2 kaca wireglassed tebal 5 mm Harga Satuan (Rp)
A
B
m²
No
Uraian
Jumlah Harga
Kode
Satuan
Koefisien
(Rp)
TENAGA Pekerja
L.01
OH
0.015
150,000.00
2,250.00
Tukang kayu Kepala tukang
L.02 L.03
OH OH
0.15 0.015
190,000.00 230,000.00
28,500.00 3,450.00
Mandor
L.04
OH
0.008
230,000.00
1,840.00 36,040.00
JUMLAH TENAGA KERJA BAHAN Kaca wireglassed 5 mm
m2
1.1 JUMLAH HARGA BAHAN
-
m²
C
PERALATAN
-
JUMLAH HARGA ALAT D E
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
F
B
36,040.00 3,604.00
xD
-
Harga Satuan Pekerjaan (D+E)
4.4.6.2.23.
A
0.10
No
Pemasangan 1 m2 kaca patri tebal 5 mm
Uraian
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang kayu
L.01 L.02
OH OH
0.075 0.15
150,000.00 190,000.00
11,250.00 28,500.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.015 0.004
230,000.00 230,000.00
3,450.00 920.00
JUMLAH TENAGA KERJA BAHAN Kaca patri 5mm Sealant
m2 Kg
1.1 0.05
170,000.00 35,000.00
JUMLAH HARGA BAHAN C
PERALATAN JUMLAH HARGA ALAT
D E F
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10
xD
44,120.00 187,000.00 1,750.00 188,750.00
232,870.00 23,287.00 -
m²
4.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN 4.4.7.1.1.
1 m2 Pengikisan/pengerokan permukaan cat lama Harga Satuan (Rp)
A
No
Uraian
Kode
Satuan
Koefisien
L.01 L.04
OH OH
0.15 0.003
TENAGA Pekerja Mandor
150,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Soda api
Kg
0.05
66,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp) 22,500.00 690.00 23,190.00 3,300.00 3,300.00
PERALATAN -
JUMLAH HARGA ALAT D
26,490.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
0.10 x D
2,649.00 29,139.00
Harga Satuan Pekerjaan (D+E)
4.4.7.1.2.
1 m2 Pencucian bidang permukaan tembok yang pernah dicat Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Mandor
Satuan
Koefisien
L.01 L.04
OH OH
0.15
150,000.00
22,500.00
0.003
230,000.00
690.00 23,190.00
BAHAN Sabun
Kg
0.05
20,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
B
1,000.00 1,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.3.
1 m2 Pengerokan karat pada permukaan baja cara manual
24,190.00 2,419.00 26,609.00
0.10 x D
Harga Satuan (Rp) A
m²
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Mandor
L.04
OH
0.15 0.008
150,000.00 230,000.00
Jumlah Harga (Rp) 22,500.00 1,840.00
m²
JUMLAH TENAGA KERJA
B
BAHAN Sabun
Kg
0.05
20,000.00
JUMLAH HARGA BAHAN
C
24,340.00 1,000.00 1,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
25,340.00 2,534.00 27,874.00
4.4.7.1.4.
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
0.10 x D
Harga Satuan (Rp) A
No
Uraian
Kode
Satuan
Koefisien
L.01
OH
Tukang cat Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.07 0.009 0.006
150,000.00 190,000.00 230,000.00
10,500.00 1,710.00 1,380.00
0.003
230,000.00
690.00 14,280.00
BAHAN Cat menie Plamuur Cat dasar Cat penutup Kuas Pengencer Ampelas
Kg Kg Kg
0.2 0.15 0.17
35,000.00 29,000.00 72,000.00
7,000.00 4,350.00 12,240.00
Kg Bh Kg Lbr
0.26 0.01 0.03 0.2
72,000.00 25,000.00 39,000.00 9,000.00
18,720.00 250.00 1,170.00 1,800.00 45,530.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
TENAGA Pekerja
JUMLAH TENAGA KERJA
B
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.5.
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
59,810.00 5,981.00 65,791.00
0.10 x D
Harga Satuan (Rp) A
m²
No
Uraian
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang cat Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.07 0.105 0.004
150,000.00 190,000.00 230,000.00
10,500.00 19,950.00 920.00
0.003
230,000.00
690.00
m²
JUMLAH TENAGA KERJA
B
BAHAN Cat menie Plamuur Cat dasar Cat penutup Kuas Pengencer Ampelas
Kg Kg Kg
0.2 0.15 0.17
35,000.00 29,000.00 72,000.00
7,000.00 4,350.00 12,240.00
Kg Bh Kg Lbr
0.35 0.01 0.03 0.2
72,000.00 25,000.00 39,000.00 9,000.00
25,200.00 250.00 1,170.00 1,800.00 52,010.00
JUMLAH HARGA BAHAN
C
32,060.00
PERALATAN -
JUMLAH HARGA ALAT D
84,070.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
0.10 x D
8,407.00 92,477.00
Harga Satuan Pekerjaan (D+E)
4.4.7.1.6.
Pelaburan 1 m2 bidang kayu dengan teak oil Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang cat Kepala tukang Mandor
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.04 0.063 0.063
150,000.00 190,000.00 230,000.00
6,000.00 11,970.00 14,490.00
0.003
230,000.00
690.00 33,150.00
BAHAN Teak oil
(Rp)
L
0.36
25,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga
Kode
JUMLAH TENAGA KERJA
B
9,000.00 9,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.7.
Pelaburan 1 m2 bidang kayu dengan politur
42,150.00 4,215.00 46,365.00
0.10 x D
Harga Satuan (Rp) A
m²
No
Uraian
Jumlah Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang cat Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.04 0.06 0.016
150,000.00 190,000.00 230,000.00
6,000.00 11,400.00 3,680.00
0.003
230,000.00
690.00
m²
JUMLAH TENAGA KERJA
B
BAHAN Politur Politur jadi Ampelas
L L Lbr
0.15 0.372 2
37,000.00 37,000.00 9,000.00
JUMLAH HARGA BAHAN
C
21,770.00 5,550.00 13,764.00 18,000.00 37,314.00
PERALATAN -
JUMLAH HARGA ALAT D
59,084.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
0.10 x D
5,908.40 64,992.40
Harga Satuan Pekerjaan (D+E)
4.4.7.1.8.
Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Mandor
Satuan
Koefisien
L.01 L.04
OH OH
0.1
150,000.00
15,000.00
0.006
230,000.00
1,380.00 16,380.00
BAHAN Residu atau ter
L
0.35
25,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
B
8,750.00 8,750.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.9.
Pelaburan 1 m2 bidang kayu dengan vernis
25,130.00 2,513.00 27,643.00
0.10 x D
Harga Satuan (Rp) A
B
m²
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang cat Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.16 0.16 0.016 0.003
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Vernis Dempul Ampelas
L Kg Lbr
0.15 0.05 0.1
37,000.00 29,000.00 9,000.00
JUMLAH HARGA BAHAN
Jumlah Harga (Rp) 24,000.00 30,400.00 3,680.00 690.00 58,770.00 5,550.00 1,450.00 900.00 7,900.00
m²
C
PERALATAN -
JUMLAH HARGA ALAT D
66,670.00
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
E F
0.10
xD
6,667.00 73,337.00
Harga Satuan Pekerjaan (D+E)
4.4.7.1.10.
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Harga Satuan (Rp)
A
No
Uraian TENAGA Pekerja Tukang cat Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.02 0.063 0.0063 0.003
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
Jumlah Harga (Rp) 3,000.00 11,970.00 1,449.00 690.00 17,109.00
BAHAN Plamuur
Kg
0.1
50,000.00
5,000.00
Cat dasar Cat penutup
Kg Kg
0.1 0.26
35,000.00 35,000.00
3,500.00 9,100.00 17,600.00
JUMLAH HARGA BAHAN
C
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.11.
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
A
B
C
m²
No
Uraian
34,709.00 3,470.90 38,179.90
0.10 x D
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang cat Kepala tukang
L.01 L.02 L.03
OH OH OH
0.028 0.042
150,000.00 190,000.00
4,200.00 7,980.00
Mandor
L.04
OH
0.0042 0.003
230,000.00 230,000.00
966.00 690.00 13,836.00
JUMLAH TENAGA KERJA BAHAN Cat dasar Cat penutup
Kg Kg
0.12 0.18
35,000.00 35,000.00
JUMLAH HARGA BAHAN
4,200.00 6,300.00 10,500.00
PERALATAN JUMLAH HARGA ALAT
-
m²
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.12.
Pelaburan 1 m2 tembok dengan kalkarium
24,336.00 2,433.60 26,769.60
0.10 x D
Harga Satuan (Rp) A
No
Uraian
Satuan
Koefisien
TENAGA Pekerja Tukang cat
L.01 L.02
OH OH
0.028
150,000.00
4,200.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.042 0.0042 0.003
190,000.00 230,000.00 230,000.00
7,980.00 966.00 690.00 13,836.00
BAHAN Kalkarium
Kg
0.1
5,200.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA
B
520.00 520.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.13.
Pelaburan 1 m2 tembok dengan kapur sirih
14,356.00 1,435.60 15,791.60
0.10 x D
Harga Satuan (Rp) A
B
C
No
Kode
Satuan
Koefisien
L.01 L.02
OH OH
0.15
150,000.00
22,500.00
Kepala tukang Mandor
L.03 L.04
OH OH
0.001 0.0001 0.0025
190,000.00 230,000.00 230,000.00
190.00 23.00 575.00 23,288.00
JUMLAH TENAGA KERJA BAHAN Kapur sirih
Kg
0.15
2,000.00
300.00
Ampelas Alang-alang
Lbr Ikat
0.1 0.25
9,000.00 -
900.00 1,200.00
JUMLAH HARGA BAHAN
F
m²
Jumlah Harga (Rp)
Uraian TENAGA Pekerja Tukang cat
PERALATAN JUMLAH HARGA ALAT
D E
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10
xD
24,488.00 2,448.80 -
m²
4.4.7.1.14.
Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) Harga Satuan (Rp)
A
No
Uraian
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.04 0.005 0.0005 0.0025
TENAGA Pekerja Tukang cat Kepala tukang Mandor
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Kapur sirih Ampelas Alang-alang
Kg Lbr Ikat
0.3 0.2 0.25
2,000.00 9,000.00 -
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp) 6,000.00 950.00 115.00 575.00 7,640.00 600.00 1,800.00 2,400.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.7.1.15.
Pemasangan 1 m2 wallpaper
0.10
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
10,040.00 1,004.00 -
xD
Harga Satuan (Rp) A
No
B
C
Uraian TENAGA Pekerja Tukang cat Kepala tukang Mandor
Satuan
Koefisien
(Rp)
L.01 L.02 L.03 L.04
OH OH OH OH
0.02 0.2 0.02
150,000.00 190,000.00 230,000.00
3,000.00 38,000.00 4,600.00
0.0025
230,000.00
575.00 46,175.00
JUMLAH TENAGA KERJA m2 Kg
1.2 0.2
50,000.00 55,000.00
JUMLAH HARGA BAHAN
60,000.00 11,000.00 71,000.00
PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga
Kode
BAHAN Wall paper Lem
m²
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.16.
Pengecatan 1 m2 permukaan baja dengan menie besi
0.10 x D
117,175.00 11,717.50 128,892.50
m²
Harga Satuan (Rp) A
No
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
OH
Tukang cat Kepala tukang Mandor
L.02 L.03 L.04
OH OH OH
0.02 0.2 0.02 0.0025
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
B
BAHAN Menie besi Kwas
Kg Bh
0.1 0.01
35,000.00 25,000.00
JUMLAH HARGA BAHAN
C
Jumlah Harga (Rp) 3,000.00 38,000.00 4,600.00 575.00 46,175.00 3,500.00 250.00 3,750.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
49,925.00 4,992.50 54,917.50
4.4.7.1.17.
Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah
0.10 x D
Harga Satuan (Rp) A
No
Uraian
C
Satuan
Koefisien
L.01 L.02 L.02 L.04
OH OH OH OH
0.25 0.225 0.0225 0.0075
TENAGA Pekerja Tukang cat Kepala tukang Mandor
B
Kode
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Menie besi Pengencer Kwas Perancah kayu
Kg L Bh m3
0.1 0.01 0.01 0.002
35,000.00 39,000.00 25,000.00 2,600,000.00
JUMLAH HARGA BAHAN
m²
Jumlah Harga (Rp) 37,500.00 42,750.00 5,175.00 1,725.00 87,150.00 3,500.00 390.00 250.00 5,200.00 9,340.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.7.1.18.
Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
Harga Satuan
96,490.00 9,649.00 106,139.00
Jumlah
m²
(Rp) A
No
Uraian
Satuan
Koefisien
TENAGA Pekerja Tukang cat Kepala tukang
L.01 L.02 L.03
OH OH OH
0.25 0.25
150,000.00 190,000.00
37,500.00 47,500.00
Mandor
L.04
OH
0.025 0.0013
230,000.00 230,000.00
5,750.00 299.00 91,049.00
JUMLAH TENAGA KERJA
B
BAHAN Menie A Menie B
Kg Kg
0.1 0.1
35,000.00 35,000.00
3,500.00 3,500.00
Cat Kwas Pengencer
Kg Bh L
0.08 0.01 0.01
70,000.00 25,000.00 39,000.00
5,600.00 250.00 390.00 13,240.00
JUMLAH HARGA BAHAN
C
Harga (Rp)
Kode
PERALATAN -
JUMLAH HARGA ALAT D E
104,289.00 10,428.90
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.19.
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
0.10 x D
114,717.90
Harga Satuan (Rp) A
No
B
C
Uraian TENAGA Pekerja Tukang cat Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.06 0.06 0.012 0.003
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Cat Kwas Pengencer
Kg Bh L
0.3 0.01 0.01
70,000.00 25,000.00 39,000.00
JUMLAH HARGA BAHAN
m²
Jumlah Harga (Rp) 9,000.00 11,400.00 2,760.00 690.00 23,850.00 21,000.00 250.00 390.00 21,640.00
PERALATAN -
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C)
4.4.7.1.20.
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
Harga Satuan
45,490.00 4,549.00 50,039.00
Jumlah
m²
(Rp) A
No
Uraian
Satuan
Koefisien
TENAGA Pekerja Tukang cat Kepala tukang
L.01 L.02 L.03
OH OH OH
0.4 0.8
150,000.00 190,000.00
60,000.00 152,000.00
Mandor
L.04
OH
0.08 0.02
230,000.00 230,000.00
18,400.00 4,600.00 235,000.00
JUMLAH TENAGA KERJA
B
BAHAN Cat dasar Cat antara
Kg Kg
0.11 0.17
70,000.00 70,000.00
7,700.00 11,900.00
Cat penutup Kwas Pengencer
Kg Bh L
0.08 0.01 0.01
70,000.00 25,000.00 39,000.00
5,600.00 250.00 390.00 25,840.00
JUMLAH HARGA BAHAN
C
Harga (Rp)
Kode
PERALATAN -
JUMLAH HARGA ALAT D E
260,840.00 26,084.00
F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
4.4.7.1.21.
Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
0.10 x D
286,924.00
Harga Satuan (Rp) A
B
C
No
Uraian TENAGA Pekerja Tukang cat Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.4 0.7 0.07 0.02
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Cat dasar Pengencer
Kg L
0.3 0.01
70,000.00 39,000.00
JUMLAH HARGA BAHAN
E F
Jumlah Harga (Rp) 60,000.00 133,000.00 16,100.00 4,600.00 213,700.00 21,000.00 390.00 21,390.00
PERALATAN JUMLAH HARGA ALAT
D
m²
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
235,090.00
0.10 x D
23,509.00 258,599.00
m²
5.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG 5.5.1.1.1.
Pemasangan 1 buah closet duduk/monoblock Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
3.3 1.1 0.01 0.16
TENAGA
JUMLAH TENAGA KERJA BAHAN Closet duduk Perlengkapan
C
OH
150,000.00 190,000.00 230,000.00 230,000.00
Jumlah Harga (Rp) 495,000.00 209,000.00 2,300.00 36,800.00 743,100.00
Unit
1
3,660,000.00
3,660,000.00
Ls
6% x closet
3,660,000.00
219,600.00
JUMLAH HARGA BAHAN
4,622,700.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 2.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
5,365,800.00 536,580.00 5,902,380.00
0.10 x D
Pemasangan 1 buah closet jongkok porslen Harga Satuan (Rp)
No
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
1 1.5
150,000.00 190,000.00
150,000.00 285,000.00
Mandor
L.04
OH
0.15 0.16
230,000.00 230,000.00
34,500.00 36,800.00 506,300.00
JUMLAH TENAGA KERJA BAHAN Closet jongkok Semen Portland Pasir pasang
C
Unit Kg
1 6
260,000.00 1,700.00
260,000.00 10,200.00
M3
0.01
225,000.00
2,250.00 272,450.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E F
Jumlah Harga (Rp)
Uraian TENAGA
B
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
778,750.00 77,875.00 856,625.00
bh
5.5.1.1 3.
Pemasangan 1 buah closet jongkok teraso Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
1 1.5 0.15 0.05
TENAGA
JUMLAH TENAGA KERJA BAHAN Closet jongkok Semen Portland Pasir pasang Bata merah
C
OH
150,000.00 190,000.00 230,000.00 230,000.00
Jumlah Harga (Rp) 150,000.00 285,000.00 34,500.00 11,500.00 481,000.00
Unit Kg
1 6
126,000.00 1,700.00
126,000.00 10,200.00
M3 Bh
0.01 7
225,000.00 850.00
2,250.00 5,950.00 144,400.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 4.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
625,400.00 62,540.00 687,940.00
0.10 x D
Pemasangan 1 buah urinoir Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
1 1 0.1
150,000.00 190,000.00 230,000.00
150,000.00 190,000.00 23,000.00
OH
0.05
230,000.00
11,500.00 374,500.00
TENAGA
JUMLAH TENAGA KERJA BAHAN Urinoir Semen Portland Pasir pasang Perlengkapan
C
Unit Kg M3
1 6 0.01
126,000.00 1,700.00 225,000.00
126,000.00 10,200.00 2,250.00
%
30
126,000.00
37,800.00 176,250.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga (Rp)
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
550,750.00 55,075.00
bh
F
5.5.1.1 5.
605,825.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah wastafel Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
1.2 1.45 0.15 0.06
TENAGA
OH
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Wastafel Semen Portland Pasir pasang Perlengkapan
C
Jumlah Harga (Rp) 180,000.00 275,500.00 34,500.00 13,800.00 503,800.00
Unit
1.2
2,400,000.00
2,880,000.00
Kg M3 %
6 0.01 12
1,700.00 225,000.00 2,400,000.00
10,200.00 2,250.00 288,000.00 3,180,450.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 6.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
3,684,250.00 368,425.00 4,052,675.00
0.10 x D
B
C
E F
Jumlah Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
0.075 0.75
150,000.00 190,000.00
11,250.00 142,500.00
Mandor
L.04
OH
0.075 0.003
230,000.00 230,000.00
17,250.00 690.00 171,690.00
TENAGA
JUMLAH TENAGA KERJA BAHAN Bathcup Perlengkapan
Unit %
1 20
6,800,000.00 6,800,000.00
JUMLAH HARGA BAHAN
6,800,000.00 1,360,000.00 8,160,000.00
PERALATAN JUMLAH HARGA ALAT
D
bh
Pemasangan 1 buah bathcuip porselen Harga Satuan (Rp)
No A
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
8,331,690.00
0.10
xD
833,169.00 9,164,859.00
bh
5.5.1.1 7.
Pemasangan 1 buah bak fibreglass vol 1 m3 Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
3
150,000.00
450,000.00
Kepala tukang Mandor
L.03 L.04
4.5 0.05 0.9
190,000.00 230,000.00 230,000.00
855,000.00 11,500.00 207,000.00 1,523,500.00
TENAGA
OH
JUMLAH TENAGA KERJA BAHAN Bak fibreglass Perlengkapan
C
Jumlah Harga (Rp)
Unit
1
1,250,000.00
1,250,000.00
%
12
1,250,000.00
150,000.00 1,400,000.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 8.
Jumlah (A+B+C)
2,923,500.00 292,350.00 3,215,850.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
6 3 0.3 0.03
TENAGA
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Bata merah Semen portlan Pasir pasang Porselen 11x11 Semen warna
M3 Kg M3 bh Kg
150 120 0.3 360 6
F
Jumlah Harga (Rp)
850.00 1,700.00 225,000.00 1,694.00 15,000.00
JUMLAH HARGA BAHAN
900,000.00 570,000.00 69,000.00 6,900.00 1,545,900.00 127,500.00 204,000.00 67,500.00 609,840.00 90,000.00 1,098,840.00
PERALATAN JUMLAH HARGA ALAT
D E
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
2,644,740.00 264,474.00 2,909,214.00
bh
5.5.1.1 9.
Pemasangan 1 buah bak mandi teraso vol 0,30 m3 Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
3
150,000.00
450,000.00
Kepala tukang Mandor
L.03 L.04
4.5 0.05 0.9
190,000.00 230,000.00 230,000.00
855,000.00 11,500.00 207,000.00 1,523,500.00
TENAGA
OH
JUMLAH TENAGA KERJA BAHAN Bak teraso Perlengkapan
C
Jumlah Harga (Rp)
Unit
1
485,000.00
485,000.00
%
12
485,000.00
58,200.00 543,200.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 10.
Jumlah (A+B+C)
2,066,700.00 206,670.00 2,273,370.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah bak air fibreglass vol 1 m3 Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.3 0.45 0.045 0.015
TENAGA
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Bak air fibreglass Perlengkapan
Unit %
1 12
5.5.1.1 11.
Jumlah Harga (Rp)
525,000.00 525,000.00
JUMLAH HARGA BAHAN
45,000.00 85,500.00 10,350.00 3,450.00 144,300.00 525,000.00 63,000.00 588,000.00
PERALATAN JUMLAH HARGA ALAT
D E F
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah bak beton volume 1 m3
0.10 x D
732,300.00 73,230.00 805,530.00
bh
No A
B
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
3.5 4.5
150,000.00 190,000.00
525,000.00 855,000.00
Mandor
L.04
OH
0.05 0.018
230,000.00 230,000.00
11,500.00 4,140.00 1,395,640.00
TENAGA
JUMLAH TENAGA KERJA BAHAN Beton 1:2:3 Baja tulangan Kayu bekisting Ubin porselen Perlengkapan
C
Harga Satuan
M3 Kg
0.9 180
2,474,035.14 16,000.00
2,226,631.63 2,880,000.00
M2 Bh %
8 500 10
52,000.00 140,000.00 70,000,000.00
416,000.00 70,000,000.00 7,000,000.00
JUMLAH HARGA BAHAN
82,522,631.63
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 12.
No A
B
C
83,918,271.63
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
8,391,827.16 -
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah bak cuci piring stainlessteel Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
0.03 0.3
150,000.00 190,000.00
4,500.00 57,000.00
Mandor
L.04
OH
0.03 0.015
230,000.00 230,000.00
6,900.00 3,450.00 71,850.00
TENAGA
JUMLAH TENAGA KERJA BAHAN Bak cuci piring Waterdrain
Unit Bh
1 1
530,000.00 27,000.00
JUMLAH HARGA BAHAN
5.5.1.1 13.
530,000.00 27,000.00 557,000.00
PERALATAN JUMLAH HARGA ALAT
D E F
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah bak cuci piring teraso
0.10 x D
628,850.00 62,885.00 691,735.00
bh
No A
B
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
0.05 0.5
150,000.00 190,000.00
7,500.00 95,000.00
Mandor
L.04
OH
0.05 0.025
230,000.00 230,000.00
11,500.00 5,750.00 119,750.00
TENAGA
JUMLAH TENAGA KERJA BAHAN Bak cuci piring Waterdrain Semen portland Pasir pasang
C
Harga Satuan
Unit Bh
1 1
530,000.00 27,000.00
530,000.00 27,000.00
Kg M3
20 0.05
1,700.00 225,000.00
34,000.00 11,250.00 602,250.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 14.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
722,000.00 72,200.00
0.10 x D
794,200.00
Pemasangan 1 buah floor drain Harga Satuan (Rp)
No A
B
C
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.01 0.1 0.01
150,000.00 190,000.00 230,000.00
1,500.00 19,000.00 2,300.00
OH
0.005
230,000.00
1,150.00 23,950.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Floor drain
Unit
1
27,000.00
JUMLAH HARGA BAHAN
27,000.00 27,000.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 15.
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
50,950.00 5,095.00 56,045.00
Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm Harga Satuan
Jumlah
bh
(Rp) No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
2.16 0.72 0.072 0.011
TENAGA
JUMLAH TENAGA KERJA BAHAN Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan
C
OH
150,000.00 190,000.00 230,000.00 230,000.00
Harga (Rp) 324,000.00 136,800.00 16,560.00 2,530.00 479,890.00
bh Kg M3 M3
40 44 0.07 0.06
850.00 1,700.00 225,000.00 355,000.00
34,000.00 74,800.00 15,750.00 21,300.00
M3 Kg
0.07 1.6
570,000.00 16,000.00
39,900.00 25,600.00 211,350.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 16.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
691,240.00 69,124.00
0.10 x D
760,364.00
Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm Harga Satuan (Rp)
No A
B
C
E F
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
3.2 1.15 0.011
150,000.00 190,000.00 230,000.00
480,000.00 218,500.00 2,530.00
OH
0.016
230,000.00
3,680.00 704,710.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan
bh Kg M3 M3 M3 Kg
70 77 0.13 0.09 0.02 2.6
850.00 1,700.00 225,000.00 355,000.00 570,000.00 16,000.00
JUMLAH HARGA BAHAN
59,500.00 130,900.00 29,250.00 31,950.00 11,400.00 41,600.00 304,600.00
PERALATAN JUMLAH HARGA ALAT
D
bh
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1,009,310.00
0.10 x D
100,931.00 1,110,241.00
bh
5.5.1.1 17.
Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
3.2 1.15 0.011 0.016
TENAGA
JUMLAH TENAGA KERJA BAHAN Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan
C
OH
150,000.00 190,000.00 230,000.00 230,000.00
bh Kg
123 114
M3 M3 M3 Kg
0.184 0.12 0.033 4.85
Jumlah Harga (Rp) 480,000.00 218,500.00 2,530.00 3,680.00 704,710.00
850.00 1,700.00
104,550.00 193,800.00
225,000.00 355,000.00 570,000.00 16,000.00
41,400.00 42,600.00 18,810.00 77,600.00 478,760.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 18.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1,183,470.00 118,347.00 1,301,817.00
0.10 x D
Pemasangan 1 m’ pipa galvanis diameter ½” Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
0.054
150,000.00
8,100.00
Kepala tukang Mandor
L.03 L.04
0.09 0.009 0.027
190,000.00 230,000.00 230,000.00
17,100.00 2,070.00 6,210.00 33,480.00
TENAGA
OH
JUMLAH TENAGA KERJA BAHAN Pipa galvanis ½” Perlengkapan
C
M
1.2
7,400.00
8,880.00
%
35
7,400.00
2,590.00 11,470.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E
Jumlah Harga (Rp)
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
44,950.00 4,495.00
bh
F
5.5.1.1 19.
49,445.00
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah kran diameter ½” atau 3/4” Harga Satuan (Rp)
No A
B
Uraian TENAGA KERJA Pekerja Tukang batu Kepala tukang Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH
0.01 0.4 0.04 0.005
OH
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Kran air Sealtape
C
Jumlah Harga (Rp) 1,500.00 76,000.00 9,200.00 1,150.00 87,850.00
M
1
22,000.00
22,000.00
Buah
0.025
6,000.00
150.00 22,150.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 20.
Jumlah (A+B+C)
110,000.00 11,000.00 121,000.00
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
B
C
Jumlah Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
0.054
150,000.00
8,100.00
Kepala tukang Mandor
L.03 L.04
0.09 0.009 0.027
190,000.00 230,000.00 230,000.00
17,100.00 2,070.00 6,210.00
TENAGA
OH
JUMLAH TENAGA KERJA BAHAN Pipa galvanis 3/4” Perlengkapan
M %
1.2 35
9,000.00 9,000.00
JUMLAH HARGA BAHAN
33,480.00 10,800.00 3,150.00 13,950.00
PERALATAN JUMLAH HARGA ALAT
D E F
bh
Pemasangan 1 m pipa galvanis diameter 3/4” Harga Satuan (Rp)
No A
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
47,430.00 4,743.00 52,173.00
m'
5.5.1.1 21.
Pemasangan 1 m’ pipa galvanis diameter 1” Harga Satuan (Rp)
No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
0.054
150,000.00
8,100.00
Kepala tukang Mandor
L.03 L.04
0.09 0.009 0.027
190,000.00 230,000.00 230,000.00
17,100.00 2,070.00 6,210.00 33,480.00
TENAGA
OH
JUMLAH TENAGA KERJA BAHAN Pipa galvanis 1” Perlengkapan
C
Jumlah Harga (Rp)
M
1.2
11,400.00
13,680.00
%
35
11,400.00
3,990.00 17,670.00
JUMLAH HARGA BAHAN PERALATAN
-
JUMLAH HARGA ALAT D E F
5.5.1.1 22.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
51,150.00 5,115.00 56,265.00
0.10 x D
Pemasangan 1 m’ pipa galvanis diameter 1 ½” Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.108 0.18 0.018 0.005
TENAGA
OH
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
5.5.1.1 23.
Jumlah Harga (Rp) 16,200.00 34,200.00 4,140.00 1,150.00 55,690.00
BAHAN Pipa galvanis 11/2”
M
1.2
23,900.00
28,680.00
Perlengkapan
%
35
23,900.00
8,365.00 37,045.00
JUMLAH HARGA BAHAN PERALATAN JUMLAH HARGA ALAT
D E F
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ pipa galvanis diameter 3”
0.10 x D
92,735.00 9,273.50 102,008.50
m'
Harga Satuan (Rp) No A
B
C
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.135 0.225 0.023
150,000.00 190,000.00 230,000.00
20,250.00 42,750.00 5,290.00
OH
0.007
230,000.00
1,610.00 69,900.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Pipa galvanis 3” Perlengkapan
M %
1.2 35
65,100.00 65,100.00
JUMLAH HARGA BAHAN
78,120.00 22,785.00 100,905.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 24.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
170,805.00 17,080.50 187,885.50
0.10 x D
Pemasangan 1 m’ pipa galvanis diameter 4” Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.135 0.225 0.023 0.007
TENAGA
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Pipa galvanis 4” Perlengkapan
M %
1.2 35
94,900.00 94,900.00
JUMLAH HARGA BAHAN
Jumlah Harga (Rp) 20,250.00 42,750.00 5,290.00 1,610.00 69,900.00 113,880.00 33,215.00 147,095.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 25.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
216,995.00 21,699.50 238,694.50
Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” Harga Satuan (Rp)
No
m'
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m'
A
B
C
TENAGA Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.036 0.06 0.006 0.002
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Pipa PVC 1/2” Perlengkapan
M %
1.2 35
9,000.00 9,000.00
JUMLAH HARGA BAHAN
5,400.00 11,400.00 1,380.00 460.00 18,640.00 10,800.00 3,150.00 13,950.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 26.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10
32,590.00 3,259.00
xD
-
Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” Harga Satuan (Rp)
No A
B
C
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.036 0.06 0.006
150,000.00 190,000.00 230,000.00
5,400.00 11,400.00 1,380.00
OH
0.002
230,000.00
460.00 18,640.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Pipa PVC 3/4” Perlengkapan
M %
1.2 35
16,600.00 16,600.00
JUMLAH HARGA BAHAN
19,920.00 5,810.00 25,730.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 27.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
44,370.00 4,437.00 48,807.00
0.10 x D
Pemasangan 1 m’ pipa PVC tipe AW diameter 1” Harga Satuan (Rp)
No A
m'
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu
L.02
0.036 0.06
TENAGA
150,000.00 190,000.00
Jumlah Harga (Rp) 5,400.00 11,400.00
m'
Kepala tukang Mandor B
C
L.03 L.04
OH
0.006
230,000.00
1,380.00
0.002
230,000.00
460.00 18,640.00
JUMLAH TENAGA KERJA BAHAN Pipa PVC 1” Perlengkapan
M %
1.2 35
20,600.00 20,600.00
JUMLAH HARGA BAHAN
24,720.00 7,210.00 31,930.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 28.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
50,570.00 5,057.00
0.10 x D
55,627.00
Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.054 0.09 0.009 0.003
TENAGA
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Pipa PVC 11/2” Perlengkapan
M %
1.2 35
30,900.00 30,900.00
JUMLAH HARGA BAHAN
Jumlah Harga (Rp) 8,100.00 17,100.00 2,070.00 690.00 27,960.00 37,080.00 10,815.00 47,895.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 29.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
75,855.00 7,585.50
0.10 x D
83,440.50
Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Harga Satuan (Rp)
No A
m'
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.054 0.09 0.009
150,000.00 190,000.00 230,000.00
8,100.00 17,100.00 2,070.00
OH
0.003
230,000.00
690.00 27,960.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA
m'
B
C
BAHAN Pipa PVC 2” Perlengkapan
M %
1.2 35
45,200.00 45,200.00
JUMLAH HARGA BAHAN
54,240.00 15,820.00 70,060.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 30.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
98,020.00 9,802.00 107,822.00
0.10 x D
Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” Harga Satuan (Rp)
No A
B
C
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.081 0.135 0.0135
150,000.00 190,000.00 230,000.00
12,150.00 25,650.00 3,105.00
OH
0.004
230,000.00
920.00 41,825.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Pipa PVC 21/2” Perlengkapan
M %
1.2 35
66,200.00 66,200.00
JUMLAH HARGA BAHAN
79,440.00 23,170.00 102,610.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 31.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
144,435.00 14,443.50
0.10 x D
158,878.50
Pemasangan 1 m’ pipa PVC tipe AW diameter 3” Harga Satuan (Rp)
No A
B
m'
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.081 0.135 0.0135 0.004
TENAGA
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Pipa PVC 3” Perlengkapan
M %
1.2 35
91,500.00 91,500.00
Jumlah Harga (Rp) 12,150.00 25,650.00 3,105.00 920.00 41,825.00 109,800.00 32,025.00
m'
C
JUMLAH HARGA BAHAN
141,825.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 32.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
183,650.00 18,365.00
0.10 x D
202,015.00
Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.081 0.135 0.0135 0.004
TENAGA
(Rp) 150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA BAHAN Pipa PVC 4” Perlengkapan
M %
Jumlah Harga
1.2 35
133,400.00 133,400.00
JUMLAH HARGA BAHAN
12,150.00 25,650.00 3,105.00 920.00 41,825.00 160,080.00 46,690.00 206,770.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 33.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
248,595.00 24,859.50 273,454.50
0.10 x D
Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm Harga Satuan (Rp)
No A
B
m'
Jumlah Harga
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.08 0.04 0.004
150,000.00 190,000.00 230,000.00
12,000.00 7,600.00 920.00
OH
0.004
230,000.00
920.00 21,440.00
TENAGA
(Rp)
JUMLAH TENAGA KERJA BAHAN Pipa tanah Semen portlan Pasir pasang
Bh Kg M3
1.6 35 0.014
1,700.00 225,000.00
Pasir urug
M3
0.014
195,000.00
JUMLAH HARGA BAHAN
59,500.00 3,150.00 2,730.00 65,380.00
m'
C
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 34.
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10
86,820.00 8,682.00 -
xD
Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm Harga Satuan (Rp)
No A
B
Jumlah Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
0.06
150,000.00
9,000.00
Kepala tukang Mandor
L.03 L.04
0.03 0.003 0.003
190,000.00 230,000.00 230,000.00
5,700.00 690.00 690.00 16,080.00
TENAGA
OH
JUMLAH TENAGA KERJA BAHAN Pipa tanah dia 15 Semen portlan Pasir pasang Pasir urug
C
Bh
1.6
Kg M3 M3
0.68 0.013 0.011
1,700.00 225,000.00 195,000.00
JUMLAH HARGA BAHAN
1,156.00 2,925.00 2,145.00 6,226.00
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1 35.
No A
B
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10
22,306.00 2,230.60 -
xD
Pemasangan 1 m’ pipa beton diameter 15 – 20 cm Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
0.14 0.07
150,000.00 190,000.00
21,000.00 13,300.00
Mandor
L.04
OH
0.007 0.007
230,000.00 230,000.00
JUMLAH TENAGA KERJA
1,610.00 1,610.00 37,520.00
Bh M3
1.1 0.027
150,000.00 850.00
165,000.00 22.95
Kg M3
3.92 0.056
1,700.00 225,000.00
6,664.00 12,600.00
TENAGA
BAHAN Pipa tanah dia 20 Bata merah Semen portlan Pasir pasang
m'
Pasir urug C
M3
0.024
195,000.00
JUMLAH HARGA BAHAN
4,680.00 188,966.95
PERALATAN -
JUMLAH HARGA ALAT D E F
5.5.1.1.36.
No A
B
C
226,486.95
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
22,648.70 249,135.65
Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ pipa beton diameter 30 – 100 cm
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
0.38 0.19 0.019 0.019
TENAGA
BAHAN Pipa tanah dia 30 Bata merah Semen portlan Pasir pasang Pasir urug
OH
Bh M3 Kg M3 M3
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
150,000.00 190,000.00 230,000.00 230,000.00
JUMLAH TENAGA KERJA
57,000.00 36,100.00 4,370.00 4,370.00 101,840.00
1.1 0.55 10.3 0.061 0.069
198,000.00 467.50 17,510.00 13,725.00 13,455.00
180,000.00 850.00 1,700.00 225,000.00 195,000.00
JUMLAH HARGA BAHAN
E F
243,157.50
PERALATAN JUMLAH HARGA ALAT
D
m'
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
344,997.50
0.10 x D
34,499.75 379,497.25
m'
6.6.1.1. HARGA SATUAN PEKERJAAN SISTEM DISTRIBUSI JARINGAN LISTRIK 6.6.1.1.1. Pemasangan 1 buah MCCB Harga Satuan (Rp) No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
3.3
#REF!
-
Kepala tukang Mandor
L.03 L.04
1.1 0.01 0.16
#REF! #REF! #REF!
-
TENAGA
D E F
OH
JUMLAH TENAGA KERJA BAHAN Closet duduk Perlengkapan
C
Jumlah Harga (Rp)
Unit
1
3,660,000.00
-
Ls
6% x closet
3,660,000.00
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
0.10 x D
6.6.2.1. HARGA SATUAN PEKERJAAN SISTEM PENCAHAYAAN 6.6.2.1.1. Pemasangan 1 buah titik lampu Harga Satuan (Rp) No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
3.5 4.5 0.05 0.018
TENAGA
#REF! #REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Beton 1:2:3 Baja tulangan Kayu bekisting
M3 Kg M2
0.9 180 8
2,474,035.14 Err:509 52,000.00
Jumlah Harga (Rp) -
bh
C
D E F
Ubin porselen
Bh
500
Perlengkapan
%
10
140,000.00
-
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C)
-
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
bh
6.6.3.1. HARGA SATUAN PEKERJAAN SISTEM KOMUNIKASI 6.6.3.1.1. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”
No A
B
C
D E F
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang
L.01 L.02 L.03
OH
0.081 0.135
#REF! #REF!
-
Mandor
L.04
OH
0.0135 0.004
#REF! #REF!
-
TENAGA
JUMLAH TENAGA KERJA BAHAN Pipa PVC 3” Perlengkapan
M %
1.2 35
Err:509 Err:509
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
0.10 x D
6.6.4.1. HARGA SATUAN PEKERJAAN PENCEGAHAN PETIR 6.6.4.1.1. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm Harga Satuan (Rp) No
Uraian
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m'
A
B
C
D E F
TENAGA Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.38 0.19 0.019 0.019
#REF! #REF! #REF! #REF!
JUMLAH TENAGA KERJA
-
BAHAN Pipa tanah dia 30 Bata merah Semen portlan
Bh M3 Kg
1.1 0.55 10.3
180,000.00 850.00 1,700.00
-
Pasir pasang Pasir urug
M3 M3
0.061 0.069
225,000.00 195,000.00
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
-
m'
9.9.1.1. HARGA SATUAN PEKERJAAN PAVING, PERPARKIRAN, PEDESTRIAN 9.9.1.1.1. Pemasangan paving, perparkiran, pedestrian Harga Satuan (Rp) No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu
L.01 L.02
OH
3.3
#REF!
-
Kepala tukang Mandor
L.03 L.04
1.1 0.01 0.16
#REF! #REF! #REF!
-
TENAGA
D E F
OH
JUMLAH TENAGA KERJA BAHAN Closet duduk Perlengkapan
C
Jumlah Harga (Rp)
Unit
1
3,660,000.00
-
Ls
6% x closet
3,660,000.00
-
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
-
0.10 x D
9.9.2.1. HARGA SATUAN PEKERJAAN PAGAR DAN GERBANG 9.9.2.1.1. Pemasangan pagar dan gerbang Harga Satuan (Rp) No A
B
Uraian
Kode
Satuan
Koefisien
Pekerja
L.01
OH
Tukang batu Kepala tukang Mandor
L.02 L.03 L.04
OH
0.075 0.75 0.075 0.003
TENAGA
#REF! #REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Bathcup Perlengkapan
Unit %
1 20
Err:509 Err:509
JUMLAH HARGA BAHAN
Jumlah Harga (Rp) -
m²
C
D E F
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA ALAT
-
0.10
-
xD
bh
9.9.3.1. HARGA SATUAN PEKERJAAN PERTAMANAN DAN LANDSCAPING 9.9.3.1.1. Pembuatan pertamanan dan landscaping Harga Satuan (Rp) No A
B
C
D E F
Uraian
Kode
Satuan
Koefisien
Pekerja Tukang batu Kepala tukang Mandor
L.01 L.02 L.03 L.04
OH
3.5 4.5 0.05 0.018
TENAGA
OH
#REF! #REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Beton 1:2:3 Baja tulangan Kayu bekisting Ubin porselen Perlengkapan
M3 Kg M2 Bh %
0.9 180 8 500 10
2,474,035.14 Err:509 52,000.00 140,000.00 -
Jumlah Harga (Rp) -
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
PERALATAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
-
bh
10.10.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA 10.10.4.1.1.
Pemasangan 1 m pipa PVC Ø 63 mm Harga Satuan (Rp)
No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01
Tukang pipa Mandor
L.02 L.04
OH OH
0.081 0.041
OH
0.008 JUMLAH TENAGA KERJA
#REF!
m
Err:509 1 JUMLAH HARGA BAHAN
Err:509
BAHAN Pipa PVC Ø 63 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah Harga (Rp)
hari
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! 0.006 JUMLAH HARGA ALAT
Err:509
#REF! #REF! #REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
Harga Satuan Pekerjaan (D+E)
#REF! #REF!
m'
Catatan: Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada tambahan p 10.10.4.1.2.
Pemasangan 1 m pipa PVC Ø 90 mm Harga Satuan (Rp)
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.094 0.047 0.009
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 90 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.008 JUMLAH HARGA ALAT
#REF! #REF!
D E F
10.10.4.1.3.
No A
B
C
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
Harga Satuan Pekerjaan (D+E)
10.10.4.1.4.
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.105 0.053 0.011
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 110 mm
m
B
C
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF! hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.01 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
Pemasangan 1 m pipa PVC Ø 150 mm Harga Satuan (Rp)
No A
m'
Pemasangan 1 m pipa PVC Ø 110 mm
Sewa Tripot/Tackel & handle crane 2 T
D E F
#REF! #REF!
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.118 0.059 0.012
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 150 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.012 JUMLAH HARGA ALAT
#REF! #REF!
D E F
10.10.4.1.5.
No A
B
C
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
Harga Satuan Pekerjaan (D+E)
10.10.4.1.6.
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.189 0.095 0.019
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 200 mm
m
B
C
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF! hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.024 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
Pemasangan 1 m pipa PVC Ø 250 mm Harga Satuan (Rp)
No A
m'
Pemasangan 1 m pipa PVC Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
D E F
#REF! #REF!
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.256 0.128 0.026
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 250 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.034 JUMLAH HARGA ALAT
#REF! #REF!
D E F
10.10.4.1.7.
No A
B
C
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
Harga Satuan Pekerjaan (D+E)
10.10.4.1.8.
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.294 0.147 0.029
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 300 mm
m
B
C
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF! hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.04 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
Pemasangan 1 m pipa PVC Ø 400 mm Harga Satuan (Rp)
No A
m'
Pemasangan 1 m pipa PVC Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
D E F
#REF! #REF!
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.544 0.272 0.054
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 400 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.08 JUMLAH HARGA ALAT
#REF! #REF!
D E F
10.10.4.1.9.
No A
B
C
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan 1 m pipa PVC Ø 450 mm
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH OH OH
BAHAN Pipa PVC Ø 450 mm
m
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 0.669 #REF! 0.335 #REF! 0.067 #REF! JUMLAH TENAGA KERJA
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
#REF! #REF!
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.1 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.10. Pemasangan 1 m pipa PVC Ø 500 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor BAHAN Pipa PVC Ø 500 mm
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.809
OH OH
0.405 0.081 JUMLAH TENAGA KERJA
m
1 JUMLAH HARGA BAHAN
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp)
#REF! #REF! #REF!
#REF! 0.122 JUMLAH HARGA ALAT
#REF! #REF! #REF! #REF! #REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.11. Pemasangan 1 m pipa PVC Ø 600 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.957 0.479 0.096
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 600 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.145 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.12. Pemasangan 1 m pipa PVC Ø 800 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
1.618 0.809 0.162
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 800 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.25 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.13. Pemasangan 1 m pipa PVC Ø 900 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
1.691 0.846 0.169
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 900 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.262 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.14. Pemasangan 1 m pipa PVC Ø 1000 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
1.895 0.948 0.19
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 1000 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.294 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.15. Pemasangan 1 m pipa PVC Ø 1100 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
2.099 1.05 0.21
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 1100 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.327 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.16. Pemasangan 1 m pipa PVC Ø 1200 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
2.303 1.152 0.23
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa PVC Ø 1200 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.359 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.17. Pemasangan 1 m pipa HDPE Ø 63 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.035 0.017 0.003
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 63 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.019 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.18. Pemasangan 1 m pipa HDPE Ø 100 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.04 0.02 0.004
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 100 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.019 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.19. Pemasangan 1 m pipa HDPE Ø 125 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.045 0.023 0.005
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 125 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.019 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.20. Pemasangan 1 m pipa HDPE Ø 150 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.062 0.031 0.006
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 150 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.019 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.21. Pemasangan 1 m pipa HDPE Ø 200 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.102 0.051 0.01
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 200 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.019 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.22. Pemasangan 1 m pipa HDPE Ø 250 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.133 0.067 0.013
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 250 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.042 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.23. Pemasangan 1 m pipa HDPE Ø 300 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.17 0.085 0.017
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 300 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.065 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.24. Pemasangan 1 m pipa HDPE Ø 400 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.29 0.145 0.029
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 400 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.152 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.25. Pemasangan 1 m pipa HDPE Ø 450 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.359 0.18 0.036
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 450 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.2 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.26. Pemasangan 1 m pipa HDPE Ø 500 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.433 0.216 0.043
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 500 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.251 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.27. Pemasangan 1 m pipa HDPE Ø 600 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.512 0.256 0.051
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 500 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.307 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.28. Pemasangan 1 m pipa HDPE Ø 800 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.893 0.446 0.089
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 800 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.573 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.29. Pemasangan 1 m pipa HDPE Ø 900 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
1.353 0.677 0.135
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 900 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.883 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.30. Pemasangan 1 m pipa HDPE Ø 1000 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
1.659 0.83 0.166
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 1000 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 1.093 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.31. Pemasangan 1 m pipa HDPE Ø 1100 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
1.818 0.909 0.182
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 1100 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
1.205 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.32. Pemasangan 1 m pipa HDPE Ø 1200 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
2.37 1.185 0.237
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa HDPE Ø 1200 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 1.584 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.33. Pemasangan 1 m pipa GIP Ø 63 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.345 0.172 0.034
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 63 mm
m
#REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari JUMLAH HARGA ALAT
D E F
#REF! #REF! #REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.34. Pemasangan 1 m pipa GIP Ø 100 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.4 0.2 0.04
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 100 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.35. Pemasangan 1 m pipa GIP Ø 125 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.448 0.224 0.045
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 125 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.36. Pemasangan 1 m pipa GIP Ø 150 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.506 0.253 0.051
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 150 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.37. Pemasangan 1 m pipa GIP Ø 200 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.796 0.398 0.08
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 200 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.38. Pemasangan 1 m pipa GIP Ø 250 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.949 0.475 0.095
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 250 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.39. Pemasangan 1 m pipa GIP Ø 300 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.958 0.479 0.096
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 300 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.40. Pemasangan 1 m pipa GIP Ø 400 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
1.212 0.606 0.121
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 400 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.41. Pemasangan 1 m pipa GIP Ø 450 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
1.353 0.676 0.135
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 450 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.42. Pemasangan 1 m pipa GIP Ø 500 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
1.469 0.735 0.147
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 500 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.43. Pemasangan 1 m pipa GIP Ø 600 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
1.327 0.664 0.133
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 600 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.44. Pemasangan 1 m pipa GIP Ø 800 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
2.327 1.163 0.233
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 800 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.45. Pemasangan 1 m pipa GIP Ø 900 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
2.623 1.312 0.262
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 900 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.46. Pemasangan 1 m pipa GIP Ø 1000 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
2.911 1.456 0.291
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 1000 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.47. Pemasangan 1 m pipa GIP Ø 1100 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
3.2 1.6 0.32
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 1100 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
hari
-
JUMLAH HARGA ALAT D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF! #REF!
m'
10.10.4.1.48. Pemasangan 1 m pipa GIP Ø 1200 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
3.488 1.744 0.349
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa GIP Ø 1200 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF! #REF! -
#REF! hari JUMLAH HARGA ALAT
-
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.49. Pemasangan 1 m pipa DCI Ø 100 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.489 0.098 0.049
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa DCI Ø 100 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.38 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.50. Pemasangan 1 m pipa DCI Ø 125 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.547 0.109 0.055
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa DCI Ø 125 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.38 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.51. Pemasangan 1 m pipa DCI Ø 150 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.613 0.123 0.061
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa DCI Ø 150 mm
m
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.38 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.52. Pemasangan 1 m pipa DCI Ø 200 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.855 0.171 0.085
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa DCI Ø 200 mm
M
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.38 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.53. Pemasangan 1 m pipa DCI Ø 250 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
0.951 0.19 0.095
Jumlah
(Rp)
Harga (Rp)
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa DCI Ø 250 mm
M
#REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN
PERALATAN
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.05 JUMLAH HARGA ALAT
0.10 x D
#REF! #REF! #REF! #REF! #REF!
m'
10.10.4.1.54. Pemasangan 1 m pipa DCI Ø 300 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH
0.973 0.195 0.097
OH OH
#REF! #REF! #REF!
JUMLAH TENAGA KERJA BAHAN Pipa DCI Ø 300 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah Harga (Rp) #REF! #REF! #REF! #REF! -
1 JUMLAH HARGA BAHAN #REF! 0.071 JUMLAH HARGA ALAT
#REF! #REF!
D E F
#REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.55. Pemasangan 1 m pipa DCI Ø 400 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Operator alat berat Mandor
F
Jumlah
(Rp)
Harga (Rp)
Kode
Satuan
Koefisien
L.01 L.02 L.08 L.04
OH OH OH OH
1.545 0.309
m
1 JUMLAH HARGA BAHAN
BAHAN Pipa DCI Ø 400 mm PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
#REF! #REF! 0.093 #REF! 0.154 #REF! JUMLAH TENAGA KERJA #REF!
#REF! #REF! #REF! #REF!
-
#REF! hari
Sewa Tripot/Tackel & handle crane 2 T
D E
Harga Satuan
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
0.023
#REF! 0.031 JUMLAH HARGA ALAT #REF!
0.10 x D
#REF!
#REF! #REF! #REF!
m'
10.10.4.1.56. Pemasangan 1 m pipa DCI Ø 450 mm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa Operator alat berat
L.01 L.02 L.08
1.813 0.363
Mandor
L.04
OH OH OH OH
m
1 JUMLAH HARGA BAHAN
BAHAN Pipa DCI Ø 450 mm PERALATAN
Jumlah Harga (Rp)
#REF! #REF! #REF!
0.143 0.181 #REF! JUMLAH TENAGA KERJA #REF!
#REF! #REF! #REF! #REF!
-
Sewa excavator type 225 kap 0,5 -1,0 m3
hari
0.029
Sewa Tripot/Tackel & handle crane 2 T
hari
0.039
#REF! #REF!
#REF! #REF!
JUMLAH HARGA ALAT #REF! D E F
Jumlah (A+B+C)
#REF! #REF! #REF!
0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.57. Pemasangan 1 m pipa DCI Ø 500 mm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien
L.01 L.02 L.08 L.04
OH OH OH OH
2.047 0.409
BAHAN Pipa DCI Ø 500 mm
m
1 JUMLAH HARGA BAHAN
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
0.034
hari
0.045 JUMLAH HARGA ALAT #REF!
TENAGA Pekerja Tukang pipa Operator alat berat Mandor
0.193 0.205
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
JUMLAH TENAGA KERJA #REF! -
#REF!
Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah Harga (Rp)
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
0.10 x D
#REF! #REF!
#REF! #REF! #REF!
m'
10.10.4.1.58. Pemasangan 1 m pipa DCI Ø 600 mm Harga Satuan (Rp) No A
Uraian TENAGA Pekerja Tukang pipa Operator alat berat Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.08 L.04
OH OH OH OH
2.011 0.402 0.293 0.201
#REF! #REF! #REF! #REF!
Jumlah Harga (Rp) #REF! #REF! #REF! #REF!
JUMLAH TENAGA KERJA #REF! B
C
BAHAN Pipa DCI Ø 600 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
0.058
hari
0.077 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF!
Sewa Tripot/Tackel & handle crane 2 T D E F
-
1 JUMLAH HARGA BAHAN
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
#REF! #REF!
m'
10.10.4.1.59. Pemasangan 1 m pipa DCI Ø800 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Operator alat berat Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.08 L.04
OH OH OH OH
3.859 0.772
BAHAN Pipa DCI Ø 800 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
#REF! #REF! 0.493 #REF! 0.386 #REF! JUMLAH TENAGA KERJA #REF!
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF! #REF! #REF! #REF!
-
1 JUMLAH HARGA BAHAN #REF!
Sewa Tripot/Tackel & handle crane 2 T D E F
Jumlah Harga (Rp)
0.084
#REF!
#REF! 0.225 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF!
10.10.4.1.60. Pemasangan 1 m pipa DCI Ø900 mm Harga Satuan (Rp) No A
Uraian TENAGA
Kode
Satuan
Koefisien
Jumlah Harga (Rp)
m'
B
C
Pekerja
L.01
Tukang pipa Operator alat berat Mandor
L.02 L.08 L.04
OH OH OH OH
BAHAN Pipa DCI Ø 900 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
4.995
#REF!
#REF!
0.999 #REF! 0.593 #REF! 0.499 #REF! JUMLAH TENAGA KERJA #REF!
-
1 JUMLAH HARGA BAHAN
-
#REF!
#REF!
#REF!
#REF!
hari
0.093
hari
0.248 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF! #REF! #REF!
m'
10.10.4.1.61. Pemasangan 1 m pipa DCI Ø1000 mm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa Operator alat berat
L.01 L.02 L.08
OH
5.931 1.186 0.793
Mandor
L.04
OH OH OH
BAHAN Pipa DCI Ø 1000 mm PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
10.10.4.1.62. Pemasangan 1 m pipa DCI Ø1100 mm
m
Jumlah Harga (Rp)
#REF! #REF! #REF!
0.693 #REF! JUMLAH TENAGA KERJA #REF! 1 JUMLAH HARGA BAHAN #REF!
hari hari
0.112
#REF! 0.298 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
m'
Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa Operator alat berat
L.01 L.02 L.08
6.949 1.39 0.793
Mandor
L.04
OH OH OH OH
E F
(Rp) #REF! #REF! #REF!
#REF! #REF! #REF!
0.695 #REF! JUMLAH TENAGA KERJA #REF!
BAHAN Pipa DCI Ø 1100 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
0.152
hari
0.304 JUMLAH HARGA ALAT #REF! #REF!
Sewa Tripot/Tackel & handle crane 2 T D
Jumlah Harga
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
#REF!
-
1 JUMLAH HARGA BAHAN #REF!
#REF!
#REF!
#REF!
0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.63. Pemasangan 1 m pipa DCI Ø1200 mm
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Operator alat berat Mandor
Kode
Satuan
L.01 L.02 L.08 L.04
OH OH OH OH
BAHAN Pipa DCI Ø 1200 mm PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
m
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien
8.056 #REF! 1.611 #REF! 0.893 #REF! 0.806 #REF! JUMLAH TENAGA KERJA #REF!
-
1 JUMLAH HARGA BAHAN #REF!
hari hari
#REF!
0.18
#REF! 0.36 JUMLAH HARGA ALAT #REF! 0.10 x D
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
m'
10.10.4.1.64. Pemasangan 1 m pipa baja Ø 63 mm Harga Satuan (Rp) No A
B
C
D E F
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa
L.01 L.02
0.499 0.1
Mandor
L.04
OH OH OH
BAHAN Pipa Baja Ø 63 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
#REF! #REF!
#REF! #REF!
0.05 #REF! JUMLAH TENAGA KERJA #REF!
-
1 JUMLAH HARGA BAHAN #REF!
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
#REF!
#REF!
0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.65. Pemasangan 1 m pipa baja Ø 100 mm
No A
B
C
D E F
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH
BAHAN Pipa Baja Ø 100 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
OH OH
m
hari
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien
0.579 #REF! 0.116 #REF! 0.058 #REF! JUMLAH TENAGA KERJA #REF! 1 JUMLAH HARGA BAHAN #REF! 0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF! #REF! #REF!
#REF!
m'
10.10.4.1.66. Pemasangan 1 m pipa baja Ø 125 mm Harga Satuan (Rp) No A
B
C
D E F
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01 L.02 L.04
OH OH
0.648
Tukang pipa Mandor
OH
BAHAN Pipa Baja Ø 125 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
#REF!
#REF!
0.13 #REF! 0.065 #REF! JUMLAH TENAGA KERJA #REF!
#REF! #REF!
-
1 JUMLAH HARGA BAHAN #REF! 0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF!
m'
10.10.4.1.67. Pemasangan 1 m pipa baja Ø 150 mm Harga Satuan (Rp) No A
B
C
D E F
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa
L.01 L.02
0.708
Mandor
L.04
OH OH OH
BAHAN Pipa Baja Ø 150 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
10.10.4.1.68. Pemasangan 1 m pipa baja Ø 200 mm
m
hari
Jumlah Harga (Rp)
#REF! #REF!
0.142 0.071 #REF! JUMLAH TENAGA KERJA #REF!
#REF!
-
1 JUMLAH HARGA BAHAN #REF! 0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D
#REF! #REF!
#REF! #REF!
#REF!
m'
Harga Satuan (Rp) No A
B
C
D E F
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
1.113 0.223 0.111
BAHAN Pipa Baja Ø 200 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
Jumlah Harga (Rp)
#REF! #REF! #REF!
#REF! #REF! #REF!
JUMLAH TENAGA KERJA #REF! -
1 JUMLAH HARGA BAHAN
-
#REF! hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
m'
10.10.4.1.69. Pemasangan 1 m pipa baja Ø 250 mm Harga Satuan (Rp) No A
B
C
D E F
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH OH OH
BAHAN Pipa Baja Ø 250 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
Koefisien
Jumlah Harga (Rp)
1.325 #REF! 0.265 #REF! 0.133 #REF! JUMLAH TENAGA KERJA #REF!
#REF! #REF! #REF!
-
1 JUMLAH HARGA BAHAN #REF! 0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF!
10.10.4.1.70. Pemasangan 1 m pipa baja Ø 300 mm Harga Satuan (Rp) No
Uraian
Kode
Satuan
Koefisien
Jumlah Harga
m'
No A
B
C
D E F
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH OH OH
BAHAN Pipa Baja Ø 300 mm
m
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %)
Koefisien
(Rp)
1.415 #REF! 0.283 #REF! 0.141 #REF! JUMLAH TENAGA KERJA #REF!
#REF! #REF! #REF!
-
1 JUMLAH HARGA BAHAN #REF! 0.004 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D
#REF!
#REF! #REF!
Harga Satuan Pekerjaan (D+E)
m'
10.10.4.1.71. Pemasangan 1 m pipa baja Ø 400 mm
No A
B
C
Uraian
Kode
Satuan
TENAGA Pekerja Tukang pipa
L.01 L.02
Mandor
L.04
OH OH OH
BAHAN Pipa Baja Ø 400 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
Harga Satuan
Jumlah
(Rp)
Harga (Rp)
Koefisien 2.366 #REF! 0.473 #REF!
#REF! #REF!
0.237 #REF! JUMLAH TENAGA KERJA #REF!
#REF!
-
1 JUMLAH HARGA BAHAN
-
#REF!
#REF!
#REF!
#REF!
hari
0.027
hari
0.039 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF!
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
10.10.4.1.72. Pemasangan 1 m pipa baja Ø 450 mm Harga Satuan (Rp) No
Uraian
Kode
Satuan
Koefisien
Jumlah Harga
m'
No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH OH OH
BAHAN Pipa Baja Ø 450 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
(Rp)
2.231 #REF! 0.446 #REF! 0.223 #REF! JUMLAH TENAGA KERJA #REF!
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF! #REF! #REF!
-
1 JUMLAH HARGA BAHAN #REF!
Sewa Tripot/Tackel & handle crane 2 T D E F
Koefisien
#REF!
0.026
#REF! 0.037 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF!
m'
10.10.4.1.73. Pemasangan 1 m pipa baja Ø 500 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa
Kode
Satuan
Koefisien
L.01 L.02
2.432 0.486
Mandor
L.04
OH OH OH
BAHAN Pipa Baja Ø 500 mm PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 15 %) Harga Satuan Pekerjaan (D+E)
10.10.4.1.74. Pemasangan 1 m pipa baja Ø 600 mm
m
Jumlah Harga (Rp)
#REF! #REF!
0.243 #REF! JUMLAH TENAGA KERJA #REF! 1 JUMLAH HARGA BAHAN #REF!
hari hari
0.029
#REF! 0.045 JUMLAH HARGA ALAT #REF! #REF! 15% x D #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
m'
Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
Koefisien
L.01 L.02 L.04
OH OH OH
2.208 0.442 0.221
BAHAN Pipa Baja Ø 600 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
F
(Rp) #REF! #REF! #REF!
#REF! #REF! #REF!
JUMLAH TENAGA KERJA #REF! -
1 JUMLAH HARGA BAHAN
-
#REF! hari
Sewa Tripot/Tackel & handle crane 2 T D E
Jumlah Harga
hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
0.027
#REF! 0.039 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF!
#REF!
#REF!
m'
10.10.4.1.75. Pemasangan 1 m pipa baja Ø 800 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH
BAHAN Pipa Baja Ø 800 mm PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
OH OH
m
Jumlah Harga
Koefisien
(Rp)
3.897 #REF! 0.779 #REF! 0.39 #REF! JUMLAH TENAGA KERJA #REF!
#REF! #REF! #REF!
-
1 JUMLAH HARGA BAHAN
-
#REF!
#REF!
#REF!
#REF!
hari
0.046
hari
0.098 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
m'
10.10.4.1.76. Pemasangan 1 m pipa baja Ø 900 mm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja
L.01 L.02 L.04
OH OH
4.403
Tukang pipa Mandor BAHAN Pipa Baja Ø 900 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
#REF!
#REF!
0.081 #REF! 0.44 #REF! JUMLAH TENAGA KERJA #REF!
hari
Jumlah (A+B+C)
#REF!
0.052
#REF! 0.115 JUMLAH HARGA ALAT #REF! 0.10 x D
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF! #REF!
1 JUMLAH HARGA BAHAN #REF!
Sewa Tripot/Tackel & handle crane 2 T D E F
OH
Jumlah Harga (Rp)
#REF!
#REF! #REF! #REF!
m'
10.10.4.1.77. Pemasangan 1 m pipa baja Ø 1000 mm Harga Satuan (Rp) No A
B
C
Uraian TENAGA Pekerja Tukang pipa Mandor
Kode
Satuan
L.01 L.02 L.04
OH OH OH
BAHAN Pipa Baja Ø 1000 mm PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T
D E F
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
m
Koefisien
Jumlah Harga (Rp)
4.895 #REF! 0.979 #REF! 0.489 #REF! JUMLAH TENAGA KERJA #REF!
-
1 JUMLAH HARGA BAHAN #REF!
hari hari
#REF!
0.058
#REF! 0.133 JUMLAH HARGA ALAT #REF! 0.10 x D
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
m'
10.10.4.1.78. Pemasangan 1 m pipa baja Ø 1100 mm Harga Satuan (Rp) No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa
L.01 L.02
5.387 1.077
Mandor
L.04
OH OH OH
BAHAN Pipa Baja Ø 1100 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
#REF! #REF!
#REF! #REF!
0.539 #REF! JUMLAH TENAGA KERJA #REF!
hari hari
Jumlah (A+B+C) Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
#REF!
-
1 JUMLAH HARGA BAHAN #REF!
Sewa Tripot/Tackel & handle crane 2 T D E F
Jumlah Harga (Rp)
#REF!
0.064
#REF! 0.15 JUMLAH HARGA ALAT #REF! #REF! 0.10 x D #REF! #REF!
#REF!
m'
10.10.4.1.79. Pemasangan 1 m pipa baja Ø 1200 mm
No A
B
C
Uraian
Kode
Satuan
Koefisien
TENAGA Pekerja Tukang pipa
L.01 L.02
5.897 1.176
Mandor
L.04
OH OH OH
Jumlah
(Rp)
Harga (Rp)
#REF! #REF!
0.588 #REF! JUMLAH TENAGA KERJA #REF!
BAHAN Pipa Baja Ø 1200 mm
m
PERALATAN Sewa excavator type 225 kap 0,5 -1,0 m3
hari
0.07
hari
0.167 JUMLAH HARGA ALAT #REF! #REF!
Sewa Tripot/Tackel & handle crane 2 T D
Harga Satuan
Jumlah (A+B+C)
1 JUMLAH HARGA BAHAN
#REF! #REF! #REF!
-
#REF!
#REF!
#REF!
#REF!
E F
Overhead & Profit (Contoh 10 %) Harga Satuan Pekerjaan (D+E)
0.10 x D
#REF! #REF!
m'
KETERANGAN : PPN Overhead & Profit (Contoh 10 %)
10 10
0.10 x D 0.10 x D