Nomor Tanggal
: 07 / 11 / HAR / SIPIL / 17 : 10 NOV 2017
Halaman Group
: 02 HALAMAN : PEK. FASILITAS SIPIL ( Gedung Kantor & Workshop, Emplasement & Jalan, MCK & Drainase )
RENCANA ANGGARAN BIAYA MATERIAL / JASA ( ESTIMASI HARGA / OWNER ESTIMATE ) DEPARTEMEN PEMELIHARAAN MACAM /
LOKASI /
URAIAN PEKERJAAN
BAGIAN
No
02
03
04
NO 01
01 PERBAIKAN PARKIRAN SEPEDA MOTOR
RENCANA KEBUTUHAN MATERIAL / PART / JASA
NO. SPR /
KETERANGAN
Sat
Per Satuan
Total
OKR / MEMO
(SKOPE OF WORK)
07
08
09
10
11
12
1
ls
# Pembongkaran box evaporator & condensator
14.00
Unit
130,000.00
1,820,000.00
# Pembongkaran atap eksisting
613.2
m2
2,500.00
1,533,000.00
# Pembongkaran rangka atap
613.2
m2
12,900.00
7,910,280.00
# Pembongkaran kolom & kuda-kuda
613.2
m2
2,500.00
1,533,000.00
1
ls
1,000,000.00
1,000,000.00
709.376
kg
4,800.00
3,405,004.80
0.408
m3
2,800,000.00
1,142,400.00
682
m2
145,000.00
98,890,000.00
3093.74
kg
18,700.00
57,852,881.90
05
I
MATERIAL & JASA
1
PERSIAPAN (PREPARE), #
LOKASI :
2
SELATAN GEDUNG K3
06
2,000,000.00
Mobilisasi, Equipment, Tools, Cleaning Area
2,000,000.00
PEMBONGKARAN
(RUSH ORDER)
U/. PERBAIKAN SESUAI
2,000,000.00 13,796,280.00
# Mobilisasi 3
ESTIMASI HARGA Jml
Nama (Material / Part / Jasa) dan Spesifikasi
PEKERJAAN KOLOM
4,547,404.80
# Kolom pipa 2,5", tinggi : 3,2 m ; qty : 34 bh (material by INKA) berat : 6,52 kg/m # Sepatu kolom ; uk. 20 x 20 x 30 cm ; qty : 34 bh PEKERJAAN : 1 PERSIAPAN (PREPARE),
4
PEKERJAAN ATAP
167,527,881.90
2 PEMBONGKARAN
# Penutup atap zincalume 0,3 mm
3 PEKERJAAN KOLOM
# Rangka atap Hollow square 50x50 tb 2 mm, berat : 3,05 kg/m
4 PEKERJAAN ATAP
# Dinding zincalume 0,3 mm
64
m2
145,000.00
9,280,000.00
5 PEKERJAAN TALANG
# Pengecatan atap kanopi
43
m2
35,000.00
1,505,000.00
31
m
157,000.00
4,867,000.00
142.755
kg
18,700.00
2,669,518.50
31
m
105,000.00
3,255,000.00
102
m2
180,000.00
6 PEKERJAAN PENUTUP SELOKAN 7 PEKERJAAN ELECTRICAL
5
PEKERJAAN TALANG
10,791,518.50
# Lebar talang 90 cm, # Rangka siku 50x50 mm # Papan kayu kamfer, lebar 20 cm tebal 2 cm 6
PEKERJAAN PENUTUP SELOKAN
18,360,000.00
# Grill Besi siku 50 x 50 mm, besi ulir 10 mm. include painting
Page 1 of 2
18,360,000.00
472540295.xls
Nomor Tanggal
: 07 / 11 / HAR / SIPIL / 17 : 10 NOV 2017
Halaman Group
: 02 HALAMAN : PEK. FASILITAS SIPIL ( Gedung Kantor & Workshop, Emplasement & Jalan, MCK & Drainase )
RENCANA ANGGARAN BIAYA MATERIAL / JASA ( ESTIMASI HARGA / OWNER ESTIMATE ) DEPARTEMEN PEMELIHARAAN MACAM /
LOKASI /
URAIAN PEKERJAAN
BAGIAN
No
02
03
04
NO 01
RENCANA KEBUTUHAN MATERIAL / PART / JASA
7
Nama (Material / Part / Jasa) dan Spesifikasi 05
06
ESTIMASI HARGA Jml
Sat
Per Satuan
07
08
09
PEKERJAAN ELECTRICAL
NO. SPR /
KETERANGAN
Total
OKR / MEMO
(SKOPE OF WORK)
10
11
12
STAFF
MANAGER
SENIOR MANAGER
HAR
HAR - GEDUNG
DEPT HAR
10 NOV 2017
10 NOV 2017
10 NOV 2017
PUPUT INDRA
DARMAJI
PRAJITNO
16,141,000.00
# Box panel uk 20x25 cm, qty : 2 bh
2
unit
3,100,000.00
6,200,000.00
# Lampu philips visicom 42 watt
19
titik
250,000.00
4,750,000.00
19.00
titik
35,000.00
665,000.00
# saklar MCB 10 A
10
titik
150,000.00
1,500,000.00
# kabel NYM 2 x 2,5
2
roll
1,513,000.00
3,026,000.00
# fitting lampu
Catatan : 1. PEKERJAAN OLEH PIHAK LUAR (SUBKONT)
JUMLAH
RP.
233,164,085.20
( Incl. material, equipment, tools) 2. PEKERJAAN SEGERA 3. REFERENSI HARGA SATUAN POKOK KOTA MADIUN TAHUN 2017 Tanggal Nama Tanda Tangan
Page 2 of 2