NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Maret 2020
NO.
URAIAN
SATUAN
VOLUME
1
2
3
4
I
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
PEKERJAAN PEMBERSIHAN AREA Pembersihan, Stripping, Potong Pohon
M2
301,614
9,000
Total Harga Pekerjaan 1
KET
2,714,526,000 2,714,526,000
INFLOW / Dana Masuk Pembersihan, Stripping, Potong Pohon
M2
301,614
9,000
Sub Total Dana Masuk (Inflow)
2,714,526,000 2,714,526,000
OUTFLOW / Biaya Produksi / Operasional 1
SEWA EXCAVATOR PC 200 BBM Solar Industri
2
60,000,000
21,600
15,000 6,000,000
Ass Operator
Orang
2
3,000,000
Unit
1
60,000,000
60,000,000
Ltr
7,200
15,000
108,000,000
SEWA BULLDOZER D6
18,000,000 100 btg/hr 6,000,000 bbm=30 ltr/jam
Operator
Orang
1
6,000,000
6,000,000
Ass Operator
Orang
1
3,000,000
3,000,000
Bh
5
5,000,000
25,000,000
Orang
5
6,000,000
30,000,000
Unit
2
40,000,000
80,000,000
Ltr
4,800
15,000
2
6,000,000
Pembelian Mesin Potong Kayu / Senso
SEWA DUMPT TRUCK 25 - 30 TON Supir
Orang
Sub Total (Outflow) / Biaya Produksi (1-4)
72,000,000 1 unit 80 ltr/hr 12,000,000 840,000,000
Keuntungan Pekerjaan Pembersihan
1,874,526,000
PEKERJAAN PERSIAPAN TANAH DASAR INFLOW / Dana Masuk Persiapan Tanah Dasar Sub Total Dana Masuk (Inflow)
1
324,000,000 pot kayu 1 alat
3
BBM Solar Industri
II
180,000,000 1hr=1ha/alat
Orang
Upah Operator Senso 4
3
Ltr
Operator
BBM Solar Industri
3
Unit
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200
M2
3,500
1,050,000,000 1,050,000,000
1
60,000,000
BBM Solar Industri Operator Ass Operator
Ltr Orang Orang
4,800 1 1
15,000 6,000,000 3,000,000
2
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (1-4) Keuntungan Pek Persiapan Tanah Dasar
Unit Ltr Orang
2 4,800 1
40,000,000 15,000 6,000,000
80,000,000 72,000,000 6,000,000 299,000,000 751,000,000
III
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk
1
Galian Tanah dibuang Sub Total Dana Masuk (Inflow)
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit
4
60,000,000
1
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200
Unit
300,000
Page 1
60,000,000 1 alat/hr=1 ha 72,000,000 =10.000 M2 6,000,000 3,000,000
240,000,000 1 alat/jam=60M3
1
NO.
URAIAN
SATUAN
VOLUME
1
2
3
4
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
BBM Solar Industri Operator Ass Operator
Ltr Orang Orang
28,800 4 2
15,000 6,000,000 3,000,000
432,000,000 24,000,000 6,000,000
2
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (1-3) Keuntungan Pekerjaan Galian dibuang
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
IV
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow)
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 954,000,000 1,004,400,000
65,000,000
1
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
KET
240,000,000 1 alat/jam=60M3 432,000,000 24,000,000 6,000,000
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pekerjaan Galian dibuang
V
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
DEMOBILISASI ALAT BERAT
Unit
13
5,000,000
2
DEMOBILISASI DUMPT TRUCK
Unit
14
2,500,000
35,000,000
3
DIREKSI KIT, KANTOR, MESS
Ls
1
200,000,000
200,000,000
4
GAJI
Ls
1
470,000,000
470,000,000
5
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
6
TOYOTA HILUX DOUBLE CABIN
Unit
1
100,000,000
100,000,000 DP Kredit
7
TOYOTA KIJANG DIESEL
Unit
1
100,000,000
100,000,000 DP Kredit
8
PICK UP ISUZU PANTHER
Unit
1
50,000,000
50,000,000 DP Kredit
9
MOTOR KAWASAKI KLX
Unit
4
5,000,000
20,000,000 DP Kredit
10
MOTOR HONDA VARIO
Unit
1
5,000,000
5,000,000 DP Kredit
Sub Total (Outflow) / Biaya Overhead (1-10)
1,345,000,000
Outflow / Dana yg dibutuhkan
4,632,000,000
Inflow / Dana yg masuk
7,450,926,000
2,818,926,000
Keuntungan Maret 2020
Page 2
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : April 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Persiapan Tanah Dasar
II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow)
1
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 19,200 6
40,000,000 15,000 6,000,000
240,000,000 288,000,000 36,000,000 1,266,000,000 462,000,000
M3
86,400
34,000
2,937,600,000 2,937,600,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
KET
OUTFLOW / Biaya Produksi / Operasional 2
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timbunan dari Hasil Galian
III
PEKERJAAN TIMBUNAN DARI BORROW MATERIAL
1
Timbunan Tanah Merah dari Quarry Borrow Sub Total Dana Masuk (Inflow)
Unit
12
40,000,000
480,000,000
Ltr Orang
28,800 12
15,000 6,000,000
432,000,000 72,000,000 1,686,000,000 1,251,600,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
OUTFLOW / Biaya Produksi / Operasional 2
Beli Timbunan Tanah Merah dari Quarry
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 di quarry & lokasi 540,000,000 kerja 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 di lokasi kerja 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
78,000,000 15,000 6,000,000 3,000,000
78,000,000 di lokasi kerja 108,000,000 6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON
30
40,000,000
BBM Solar Industri Supir
Unit Ltr Orang
72,000 30
15,000 6,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 siram jalan, dll 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM
Unit
2
45,000,000
90,000,000 di lokasi kerja
Page 3
1,200,000,000 1 dt =22-24 m3/rit 1,080,000,000 180,000,000
9
BBM Solar Industri Operator Ass Operator
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
Unit Ltr Orang Orang
1 12,000 2 1
50,000,000 15,000 6,000,000 3,000,000
Keuntungan Pek Timbunan Tanah Merah IV
180,000,000 12,000,000 3,000,000 50,000,000 di lokasi kerja 180,000,000 12,000,000 3,000,000 6,094,500,000 9,205,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
DEMOBILISASI ALAT BERAT
Unit
10
5,000,000
2
DEMOBILISASI DUMPT TRUCK
Unit
31
2,500,000
77,500,000
3
GAJI
Ls
1
470,000,000
470,000,000
4
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
5
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
6
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
7
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
8
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
9
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-9)
50,000,000
1,000,000 DP Kredit 942,500,000
Outflow / Dana yg dibutuhkan
9,989,000,000
Inflow / Dana yg masuk
19,965,600,000
9,976,600,000
Keuntungan April 2020
Page 4
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Mei 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-4) Keuntungan Pekerjaan Pembersihan
II 1
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk Timb dari Hasil Galian
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
240,000,000 Sewa / Bln 432,000,000 24,000,000 6,000,000
OUTFLOW / Biaya Produksi / Operasional 2
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian
III
TIMBUNAN TANAH MERAH QUARRY BORROW
1
INFLOW / Dana Masuk Timbunan dari Borrow Material /Tanah Merah Sub Total Dana Masuk Timb Tanah Merah
Unit
6
40,000,000
240,000,000
38,400 6
15,000 6,000,000
576,000,000 36,000,000 1,554,000,000 404,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
Ltr Orang
OUTFLOW / Biaya Produksi / Operasional 2
Beli Tanah Merah dari Quarry Borrow
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
78,000,000 15,000 6,000,000 3,000,000
78,000,000 108,000,000 6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON
Unit
30
40,000,000
1,200,000,000
BBM Solar Industri Supir
Ltr Orang
72,000 30
15,000 6,000,000
1,080,000,000 180,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM
Unit
2
45,000,000
90,000,000
Page 5
KET
9
BBM Solar Industri Operator Ass Operator
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-3)
Unit Ltr Orang Orang
2 12,000 2 1
50,000,000 15,000 6,000,000 3,000,000
100,000,000 180,000,000 12,000,000 3,000,000 6,144,500,000
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,707,500,000
Inflow / Dana yg masuk
18,986,400,000
9,278,900,000
Keuntungan Mei 2020
Page 6
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Juni 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
pekerjaan GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang
II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Galian Tanah
1
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
OUTFLOW / Biaya Produksi / Operasional 2
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timbunan dari Hasil Galian
III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah dari Borrow Sub Total Dana Masuk (Inflow) Tanah Merah
Unit
6
40,000,000
240,000,000
19,200 6
15,000 6,000,000
288,000,000 36,000,000 1,266,000,000 692,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
Ltr Orang
OUTFLOW / Biaya Produksi / Operasional 2
Beli Tanah Merah Quarry Borrow
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
78,000,000 15,000 6,000,000 3,000,000
78,000,000 108,000,000 6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON
30
40,000,000
1,200,000,000
BBM Solar Industri Supir
Unit Ltr Orang
72,000 30
15,000 6,000,000
1,080,000,000 180,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
7
SEWA VIBRO BOMAG DRUM
Unit
2
45,000,000
90,000,000
Page 7
KET
8
BBM Solar Industri Operator Ass Operator
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-8)
Unit Ltr Orang Orang
2 12,000 2 1
50,000,000 15,000 6,000,000 3,000,000
100,000,000 180,000,000 12,000,000 3,000,000 6,144,500,000
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,419,500,000
Inflow / Dana yg masuk
18,986,400,000
9,566,900,000
Keuntungan Juni 2020
Page 8
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Juli 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
pekerjaan GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang
II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
1
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian
III
PEKERJAAN TIMB TANAH MERAH QUARRY
1
Timbunan Tanah Merah Quarry Sub Total Dana Masuk (Inflow) Tanah Merah
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
8 19,200 8
40,000,000 15,000 6,000,000
320,000,000 288,000,000 48,000,000 1,358,000,000 600,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
OUTFLOW / Biaya Produksi / Operasional 2
Timbunan Tanah Merah Quarry
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri
Unit Ltr
1 7,200
78,000,000 15,000
78,000,000 108,000,000
Page 9
KET
Operator Ass Operator
Orang Orang
1 1
6,000,000 3,000,000
6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Unit Ltr Orang
30 72,000 30
40,000,000 15,000 6,000,000
1,200,000,000 1,080,000,000 180,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM
Unit
BBM Solar Industri Operator Ass Operator 9
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
2
45,000,000
90,000,000
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
Unit Ltr
2 12,000
50,000,000 15,000
100,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000 6,144,500,000
Orang Orang
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,511,500,000
Inflow / Dana yg masuk
18,986,400,000
9,474,900,000
Keuntungan Juli 2020
Page 10
Jun
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Agustus 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang
II
SEWA TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
1
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian
III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah Borrow Sub Total Dana Masuk (Inflow) Tanah Merah
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
OUTFLOW / Biaya Produksi / Operasional 2
Timbunan dari Borrow Material
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri
Unit Ltr
1 7,200
78,000,000 15,000
78,000,000 108,000,000
Page 11
KET
Operator Ass Operator
Orang Orang
1 1
6,000,000 3,000,000
6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Unit Ltr Orang
30 72,000 30
40,000,000 15,000 6,000,000
1,200,000,000 1,080,000,000 180,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM
Unit
BBM Solar Industri Operator Ass Operator 9
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
2
45,000,000
90,000,000
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
Unit Ltr
2 12,000
50,000,000 15,000
100,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000 6,144,500,000
Orang Orang
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan Agustus 2020
Page 12
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : September 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang
II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
1
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian
III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah dari Quarry Borrow Sub Total Dana Masuk (Inflow) Tanah Merah
2
OUTFLOW / Biaya Produksi / Operasional Timbunan dari Borrow Material
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri
Unit Ltr
1 7,200
78,000,000 15,000
78,000,000 108,000,000
Page 13
KET
Operator Ass Operator
Orang Orang
1 1
6,000,000 3,000,000
6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Unit Ltr Orang
30 72,000 30
40,000,000 15,000 6,000,000
1,200,000,000 1,080,000,000 180,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM
Unit
BBM Solar Industri Operator Ass Operator 9
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
2
45,000,000
90,000,000
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
Unit Ltr
2 12,000
50,000,000 15,000
100,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000 6,144,500,000
Orang Orang
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan September 2020
Page 14
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Oktober 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang
II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
1
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian
III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah Quarry Borrow Sub Total Dana Masuk (Inflow) Tanah Merah
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
OUTFLOW / Biaya Produksi / Operasional 2
Timbunan dari Borrow Material
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri
Unit Ltr
1 7,200
78,000,000 15,000
78,000,000 108,000,000
Page 15
KET
Operator Ass Operator
Orang Orang
1 1
6,000,000 3,000,000
6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Unit Ltr Orang
30 72,000 30
40,000,000 15,000 6,000,000
1,200,000,000 1,080,000,000 180,000,000
7
WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM BBM Solar Industri Operator Ass Operator
9
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
Unit
2
45,000,000
90,000,000
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
Unit Ltr
2 12,000
50,000,000 15,000
100,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000 6,144,500,000
Orang Orang
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan Oktober 2020
Page 16
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Nopember 2020
NO.
URAIAN
Okt
VOLUME
1
2
3
4
I 1
2
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang
II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
1
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian
III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah Borrow Sub Total Dana Masuk (Inflow) Tanah Merah
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
M3
57,600
30,000
1,728,000,000 1,728,000,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr Orang Orang
4 28,800 4 2
60,000,000 15,000 6,000,000 3,000,000
240,000,000 432,000,000 24,000,000 6,000,000
Unit Ltr Orang
6 14,400 6
40,000,000 15,000 6,000,000
240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
M3
180,000
10,000
1,800,000,000
OUTFLOW / Biaya Produksi / Operasional 2
Timbunan dari Borrow Material
3
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
5 36,000 5 3
60,000,000 15,000 6,000,000 3,000,000
300,000,000 540,000,000 30,000,000 9,000,000
4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Unit Ltr Orang Orang
1 7,200 1 1
75,000,000 15,000 6,000,000 3,000,000
75,000,000 108,000,000 6,000,000 3,000,000
5
SEWA MOTOR GREDER 180 HP BBM Solar Industri
Unit Ltr
1 7,200
78,000,000 15,000
78,000,000 108,000,000
Page 17
KET
Operator Ass Operator
Orang Orang
1 1
6,000,000 3,000,000
6,000,000 3,000,000
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Unit Ltr Orang
30 72,000 30
40,000,000 15,000 6,000,000
1,200,000,000 1,080,000,000 180,000,000
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
Unit Ltr Orang
1 900 1
20,000,000 15,000 5,000,000
20,000,000 13,500,000 5,000,000
8
SEWA VIBRO BOMAG DRUM
Unit
BBM Solar Industri Operator Ass Operator 9
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
2
45,000,000
90,000,000
Ltr Orang Orang
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
Unit Ltr
2 12,000
50,000,000 15,000
100,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000 6,144,500,000
Orang Orang
Keuntungan Pek Timb Tanah Merah IV
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan Nopember 2020
Page 18
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Desember 2020
NO.
URAIAN
1
2
I
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk
1
Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah
2
3
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200
Okt
3
M3
VOLUME
4
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
57,600
30,000
1,728,000,000 1,728,000,000
4
60,000,000
240,000,000
BBM Solar Industri Operator
Ltr Orang
28,800 4
15,000 6,000,000
432,000,000 24,000,000
Ass Operator
Orang
2
3,000,000
6,000,000
6 14,400
40,000,000 15,000
240,000,000 216,000,000
6
6,000,000
36,000,000 1,194,000,000
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)
Unit
Unit Ltr Orang
Keuntungan Pek Galian Tanah di buang II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN OUTFLOW / Biaya Produksi / Operasional
1
Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
2
3
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200
534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
4
60,000,000
240,000,000
BBM Solar Industri Operator
Ltr Orang
28,800 4
15,000 6,000,000
432,000,000 24,000,000
Ass Operator
Orang
2
3,000,000
6,000,000
6 14,400
40,000,000 15,000
240,000,000 216,000,000
6
6,000,000
36,000,000 1,194,000,000
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)
Unit
Unit Ltr Orang
Keuntungan Pek Timb dari Hasil Galian III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah Quarry
764,400,000
M3
180,000
85,000
Sub Total Dana Masuk (Inflow) Tanah Merah
15,300,000,000
2
OUTFLOW / Biaya Produksi / Operasional Timbunan Tanah Merah Quarry Borrow
M3
3
SEWA EXCAVATOR PC 200
Unit
4
15,300,000,000
180,000
10,000
1,800,000,000
5
60,000,000
300,000,000
BBM Solar Industri Operator
Ltr Orang
36,000 5
15,000 6,000,000
540,000,000 30,000,000
Ass Operator
Orang
3
3,000,000
9,000,000
SEWA BULLDOZER D6 BBM Solar Industri Operator
Unit Ltr Orang
1 7,200 1
75,000,000 15,000 6,000,000
75,000,000 108,000,000 6,000,000
Ass Operator
Orang
1
3,000,000
3,000,000
Page 19
KET
NO.
5
URAIAN
SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
8
SEWA VIBRO BOMAG DRUM BBM Solar Industri Operator Ass Operator
9
SEWA VIBRO SHEEPFOOT
Okt
VOLUME
Unit Ltr Orang Orang Unit Ltr Orang
JUMLAHHARGA
(Rp.)
(Rp.)
1 7,200
78,000,000 15,000
78,000,000 108,000,000
1 1
6,000,000 3,000,000
6,000,000 3,000,000
30
40,000,000
1,200,000,000
72,000 30
15,000 6,000,000
1,080,000,000 180,000,000
1 900
20,000,000 15,000
20,000,000 13,500,000
1
5,000,000
5,000,000
2 12,000
45,000,000 15,000
90,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000
Unit Ltr Orang Unit Ltr
HARGA SATUAN
Orang Orang
2
50,000,000
100,000,000
BBM Solar Industri Operator
Unit Ltr Orang
12,000 2
15,000 6,000,000
180,000,000 12,000,000
Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)
Orang
1
3,000,000
3,000,000 6,144,500,000
Keuntungan Pek Timb Tanah Merah IV
KET
9,155,500,000
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000
DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000
DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000
DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000
DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
1,000,000
DP Kredit
Sub Total (Outflow) / Biaya Overhead (1-7)
815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan Desember 2020
Page 20
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Januari 2021
NO.
URAIAN
1
2
I
PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk
1
Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah
2
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200
3
Okt
3
M3
VOLUME
4
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
57,600
30,000
1,728,000,000 1,728,000,000
4
60,000,000
240,000,000
BBM Solar Industri Operator
Ltr Orang
28,800 4
15,000 6,000,000
432,000,000 24,000,000
Ass Operator
Orang
2
3,000,000
6,000,000
6 14,400
40,000,000 15,000
240,000,000 216,000,000
6
6,000,000
36,000,000 1,194,000,000
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)
Unit
Unit Ltr Orang
Keuntungan Pek Galian Tanah di buang II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN OUTFLOW / Biaya Produksi / Operasional
1
Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
2
3
OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200
534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
4
60,000,000
240,000,000
BBM Solar Industri Operator
Ltr Orang
28,800 4
15,000 6,000,000
432,000,000 24,000,000
Ass Operator
Orang
2
3,000,000
6,000,000
6 14,400
40,000,000 15,000
240,000,000 216,000,000
6
6,000,000
36,000,000 1,194,000,000
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)
Unit
Unit Ltr Orang
Keuntungan Pek Timb dari Hasil Galian III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan dari Borrow Material
764,400,000
M3
180,000
85,000
Sub Total Dana Masuk (Inflow) Tanah Merah
2
OUTFLOW / Biaya Produksi / Operasional Timbunan dari Borrow Material
M3
3
SEWA EXCAVATOR PC 200
Unit
4
15,300,000,000 15,300,000,000
180,000
10,000
1,800,000,000
5
60,000,000
300,000,000
BBM Solar Industri Operator
Ltr Orang
36,000 5
15,000 6,000,000
540,000,000 30,000,000
Ass Operator
Orang
3
3,000,000
9,000,000
SEWA BULLDOZER D6 BBM Solar Industri Operator
Unit Ltr Orang
1 7,200 1
75,000,000 15,000 6,000,000
75,000,000 108,000,000 6,000,000
Ass Operator
Orang
1
3,000,000
3,000,000
Page 21
KET
NO.
5
6
URAIAN
SEWA MOTOR GREDER 180 HP
9
(Rp.)
(Rp.)
1
78,000,000
78,000,000
15,000 6,000,000
108,000,000 6,000,000
Ass Operator
Orang
1
3,000,000
3,000,000
30 72,000
40,000,000 15,000
1,200,000,000 1,080,000,000
30
6,000,000
180,000,000
WATER TANKTRUCK
SEWA VIBRO BOMAG DRUM
Unit Ltr Orang Unit Ltr Orang
20,000,000
20,000,000
15,000 5,000,000
13,500,000 5,000,000
2
45,000,000
90,000,000
Ltr Orang
12,000 2
15,000 6,000,000
180,000,000 12,000,000
Ass Operator
Orang
1
3,000,000
3,000,000
2 12,000
50,000,000 15,000
100,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000
SEWA VIBRO SHEEPFOOT BBM Solar Industri
Unit
1 900 1
BBM Solar Industri Operator
Operator Ass Operator
IV
JUMLAHHARGA
7,200 1
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri
Unit
HARGA SATUAN
Ltr Orang
BBM Solar Industri Supir 8
VOLUME
BBM Solar Industri Operator
Supir 7
Okt
Unit Ltr Orang Orang
Sub Total (Outflow) / Biaya Produksi (2-9)
6,144,500,000
Keuntungan Pek Timb Tanah Merah
9,155,500,000
KET
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan Januari 2021
Page 22
NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR
Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Februari 2021
NO.
URAIAN
1
2
I
PEKERJAAN GALIAN TANAH DIBUANG
1
INFLOW / Dana Masuk Galian Tanah dibuang
Okt
3
VOLUME
4
M3
57,600
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
5
6
30,000
Sub Total Dana Masuk (Inflow) Galian Tanah
1,728,000,000 1,728,000,000
OUTFLOW / Biaya Produksi / Operasional 2
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Unit Ltr Orang Orang Unit Ltr Orang
4 28,800
60,000,000 15,000
240,000,000 432,000,000
4 2
6,000,000 3,000,000
24,000,000 6,000,000
6
40,000,000
240,000,000
14,400 6
15,000 6,000,000
216,000,000 36,000,000
Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang II
PEKERJAAN TIMBUNAN DARI HASIL GALIAN
1
OUTFLOW / Biaya Produksi / Operasional Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian
1,194,000,000 534,000,000
M3
57,600
34,000
1,958,400,000 1,958,400,000
Unit Ltr
4 28,800
60,000,000 15,000
240,000,000 432,000,000
4 2
6,000,000 3,000,000
24,000,000 6,000,000
6
40,000,000
240,000,000
14,400 6
15,000 6,000,000
216,000,000 36,000,000
OUTFLOW / Biaya Produksi / Operasional 2
SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator
3
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
Orang Orang Unit Ltr Orang
Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian III
PEKERJAAN TIMB TANAH MERAH BORROW
1
Timbunan Tanah Merah Quarry Borrow Sub Total Dana Masuk (Inflow) Tanah Merah
1,194,000,000 764,400,000
M3
180,000
85,000
15,300,000,000 15,300,000,000
OUTFLOW / Biaya Produksi / Operasional 2
Timbunan Tanah Merah Quarry
M3
180,000
10,000
1,800,000,000
3
SEWA EXCAVATOR PC 200 BBM Solar Industri
Unit Ltr
5 36,000
60,000,000 15,000
300,000,000 540,000,000
5 3
6,000,000 3,000,000
30,000,000 9,000,000
1 7,200
75,000,000 15,000
75,000,000 108,000,000
1 1
6,000,000 3,000,000
6,000,000 3,000,000
Operator Ass Operator 4
SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator
Orang Orang Unit Ltr Orang Orang
Page 23
KET
NO.
5
URAIAN
SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator
6
SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir
7
SEWA WATER TANKTRUCK BBM Solar Industri Supir
8
VIBRO BOMAG DRUM BBM Solar Industri Operator Ass Operator
9
SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator
IV
Okt
VOLUME
Unit Ltr Orang Orang Unit Ltr Orang Unit Ltr Orang Unit Ltr Orang Orang Unit Ltr Orang Orang
HARGA SATUAN
JUMLAHHARGA
(Rp.)
(Rp.)
1 7,200
78,000,000 15,000
78,000,000 108,000,000
1 1
6,000,000 3,000,000
6,000,000 3,000,000
30
40,000,000
1,200,000,000
72,000 30
15,000 6,000,000
1,080,000,000 180,000,000
1 900
20,000,000 15,000
20,000,000 13,500,000
1
5,000,000
5,000,000
2 12,000
45,000,000 15,000
90,000,000 180,000,000
2 1
6,000,000 3,000,000
12,000,000 3,000,000
2
50,000,000
100,000,000
12,000 2 1
15,000 6,000,000 3,000,000
180,000,000 12,000,000 3,000,000
Sub Total (Outflow) / Biaya Produksi (2-9)
6,144,500,000
Keuntungan Pek Timb Tanah Merah
9,155,500,000
KET
OUTFLOW / Biaya Produksi / Operasional
I
BIAYA OVERHEAD
1
GAJI
Ls
1
470,000,000
470,000,000
2
OPERASIONAL, MAKAN, DLL
Ls
1
300,000,000
300,000,000
3
TOYOTA HILUX DOUBLE CABIN
Unit
1
15,000,000
15,000,000 DP Kredit
4
TOYOTA KIJANG DIESEL
Unit
1
15,000,000
15,000,000 DP Kredit
5
PICK UP ISUZU PANTHER
Unit
1
10,000,000
10,000,000 DP Kredit
6
MOTOR KAWASAKI KLX
Unit
4
1,000,000
4,000,000 DP Kredit
7
MOTOR HONDA VARIO
Unit
1
1,000,000
Sub Total (Outflow) / Biaya Overhead (1-7)
1,000,000 DP Kredit 815,000,000
Outflow / Dana yg dibutuhkan
9,347,500,000
Inflow / Dana yg masuk
18,986,400,000
9,638,900,000
Keuntungan Februari 2021
Page 24
Prep Sistem Kontrak MPU Nama Paket PAGU HPS Waktu Pelaksanaan Masa Mobilisasi Masa Pemeliharaan Ditujukan Kpd P Efektif P Fungsional Jembatan P Jembatan Eskalasi Bhs. Penawaran Pengguna Jasa
Unit Price
Rp Rp
20,000,000,000.00 19,999,944,000.00 180 Hari 30 Hari 180 Hari
6 bln
7.28 Km Km Buah m tidak Ada Indonesia Nama Jabatan Alamat
Uang Muka Pembayaran Prestasi Pemasukan Penawaran Surat Penawaran Berlaku Jaminan Penawaran
20% Bulanan (Monthly Certificate) 5-May-10 90 118
Daftar Simak
Surat Penawaran Surat Kuasa Jaminan Penawaran Daftar Kuantitas dan Harga Analisa harga Satuan mata Pembayaran Utama Daftar Upah Daftar Harga Bahan Daftar Harga Peralatan Metoda Pelaksanaan Jadual Waktu Pelaksanaan Daftar Personil Inti Daftar Perlatan Utama Bagian Pekerjaan yang Disubkontrakkan Rekaman Surat Perjanjian Kemitraan
10:00 WITA 3-Aug-10
maks
20%
APPENDIX 3d TO BID
ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK
NO
: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum
AMOUNT
UNIT
1.1 -
Compaction Test Standard Proctor Mould Standard Proctor Hammer Modified Compaction Mould Modified Compaction Hammer Straight Edge Sample Ejector Mixing Spoon Mixing Trowel Spatula Mixing Pan Alumunium Pan 25 cm Diameter Wash Bottle Moisture Cans Sub Total 1.1
Each Each Each Each Each Each Each Each Each Each Each Each Each
5.00 1.00 5.00 1.00 1.00 1.00 1.00 1.00 1.00 5.00 1.00 1.00 36.00
550,000.00 550,000.00 770,000.00 660,000.00 55,000.00 1,639,000.00 110,000.00 44,000.00 44,000.00 495,000.00 55,000.00 55,000.00 11,000.00
2,750,000.00 550,000.00 3,850,000.00 660,000.00 55,000.00 1,639,000.00 110,000.00 44,000.00 44,000.00 2,475,000.00 55,000.00 55,000.00 396,000.00 12,683,000.00
1.2 -
Laboratory CBR Mechanical Loading Press 6000 lbs Capacity Proving Ring CBR Mould Spacer Disk Swell Plate Surcharge Plate Tripod Attachment Swell Dial Indicator Surcharge Weight Slotted Surcharge Weight Steel Cutting Edge Sub Total 1.2
Each Each Each Each Each Each Each Each Each Each
1.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00
5,500,000.00 2,750,000.00 825,000.00 330,000.00 660,000.00 330,000.00 2,200,000.00 220,000.00 165,000.00 110,000.00
5,500,000.00 2,750,000.00 4,950,000.00 1,980,000.00 3,960,000.00 1,980,000.00 13,200,000.00 1,320,000.00 990,000.00 110,000.00 36,740,000.00
1.3 -
Specific Gravity Pyrometer Bottles of 100 cc Cap. Porcelain Mortar and Pestle Hot Plate, 1000 Watts, 220 Volts 50 Cycles Sub Total 1.3
Each Each Each
3.00 1.00 1.00
275,000.00 165,000.00 1,100,000.00
825,000.00 165,000.00 1,100,000.00 2,090,000.00
1
QUANTITY
UNIT COST Rp
DESCRIPTION
FC¹
Rp
SOIL TESTING
Sub Total of Sheet 1.1 - 3
51,513,000.00
FC¹
APPENDIX 3d TO BID
ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK
NO
: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum
DESCRIPTION
1.4 -
Attenberg Limits Standard Liquid Limit Device ASTM Grooving Tools Evaporating Dish Flexible Spatula 100 cm Graduated Cylinder Casagrande Grooving Tool Plastic Limit Glass Plate Sub Total 1.4
1.5 -
Grain Size Analysis Hidrometer Jars Mechanical Stirrer, Electric Powered 220 V, 50 Cycle Dispersion Cups with Baffles Hydrometer Scale 0-60 gr Set Brass Sieve, 8 inch Diameter, 75 mm 50, 38, 25, 19, 12.5, 9, 5, N0.4, 10, 30, 60, 100 including Cover and Pan No. 200 Brass Sieves Wet Washing Sieve 50 ml Graduated Cylinder Sieve Brushes for Fine Sieve Sieve Brushes for Coarse Sieve Sub Total 1.5
-
-
UNIT
QUANTITY
UNIT COST Rp
AMOUNT FC¹
Rp
Each Each Each Each Each Each Each
1.00 1.00 3.00 2.00 2.00 1.00 1.00
1,650,000.00 165,000.00 77,000.00 44,000.00 137,500.00 110,000.00 110,000.00
1,650,000.00 165,000.00 231,000.00 88,000.00 275,000.00 110,000.00 110,000.00 2,629,000.00
Each Each
3.00 1.00
440,000.00 1,650,000.00
1,320,000.00 1,650,000.00
Each Each Each
2.00 1.00 2.00
550,000.00 330,000.00 8,580,000.00
1,100,000.00 330,000.00 17,160,000.00
Each Each Each Each Each
4.00 1.00 1.00 2.00 2.00
660,000.00 1,100,000.00 165,000.00 55,000.00 55,000.00
2,640,000.00 1,100,000.00 165,000.00 110,000.00 110,000.00 25,685,000.00
1.6 -
Field Density Test, Sand Cone Method Sand Cone Replacement Jug Field Density Plate Spoon Steel Chisel, 1 Inch Rubber Mallet Sand Scoop 1 Gallon Field Cans Sub Total 1.6
Each Each Each Each Each Each Each Each
1.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00
660,000.00 220,000.00 440,000.00 110,000.00 44,000.00 55,000.00 110,000.00 38,500.00
660,000.00 220,000.00 440,000.00 110,000.00 44,000.00 55,000.00 110,000.00 231,000.00 1,870,000.00
1.7 -
Moisture Content Speedy Moisture Tester, 26 Grams Capacity Cans "Speedy" Regeant Sub Total 1.7
Each Each
1.00 6.00
8,250,000.00 165,000.00
8,250,000.00 990,000.00 9,240,000.00
Sub Total of Sheet 1.4 - 7
39,424,000.00
FC¹
APPENDIX 3d TO BID
ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK
NO
2 2.1 -
-
2.2 -
2.3
: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum
DESCRIPTION
UNIT
QUANTITY
UNIT COST Rp
AMOUNT FC¹
Rp
BITUMINOUS TESTING Marshall Asphalt Test Stability compression machine 220 volt 50 cycles, complete with 6000 lbs proving Ring Stability compaction mould 4" Stability compaction mould 6" Mechanical compaction hammer for 4" Mechanical compaction hammer for 6" Mould holder for 4" mould Mould holder for 6" mould Stability mould 4" Stability mould 6" Dial flow indicator Pedestal Water bath 220 V,50 cycle Sample extractor Stainless steel mixing bowls Sub Total 2.1 Extraction Test, Centrifuge Method Centrifuge extraction, 1500 gram capacity, 220 V,50 cycle Boxes filter paper rings (100-box) Extractor Bowl Bowl cover Bowl nut Sub Total 2.2 Extraction Test, Reflux Method Reflux extractor set , 1000 gram capacity, boxes filter paper (50 - box), included Sub Total 2.3 Sub Total of Sheet 2.1 - 2.3
Each
1.00
12,100,000.00
12,100,000.00
Each Each Each Each Each Each Each Each Each Each Each Each Each
15.00 15.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00
495,000.00 660,000.00 1,925,000.00 2,750,000.00 550,000.00 715,000.00 1,925,000.00 2,750,000.00 1,650,000.00 1,650,000.00 4,950,000.00 1,650,000.00 165,000.00
7,425,000.00 9,900,000.00 1,925,000.00 2,750,000.00 550,000.00 715,000.00 1,925,000.00 2,750,000.00 1,650,000.00 1,650,000.00 4,950,000.00 1,650,000.00 330,000.00 50,270,000.00
Each
1.00
8,250,000.00
8,250,000.00
Each Each Each Each
10.00 1.00 1.00 1.00
825,000.00 550,000.00 275,000.00 275,000.00
8,250,000.00 550,000.00 275,000.00 275,000.00 17,600,000.00
Each
1.00
7,150,000.00
7,150,000.00 7,150,000.00 75,020,000.00
FC¹
APPENDIX 3d TO BID
ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK
NO
: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum
DESCRIPTION
UNIT
QUANTITY
UNIT COST Rp
AMOUNT FC¹
Rp
2.4 -
Specific Gravity of Coarse Aggregate Density basket Sample Splitter 1" Sample Splitter 1/2" Sub Total 2.4
Each Each Each
1.00 1.00 1.00
550,000.00 1,540,000.00 1,760,000.00
550,000.00 1,540,000.00 1,760,000.00 3,850,000.00
2.5 -
Specific Gravity of Fine Aggregate Cone Tamper Pycnometer Thermometer (Glass) 0-150 celcius Desicator Sub Total 2.5
Each Each Each Each Each
1.00 1.00 1.00 3.00 1.00
440,000.00 110,000.00 275,000.00 55,000.00 1,980,000.00
440,000.00 110,000.00 275,000.00 165,000.00 1,980,000.00 2,970,000.00
2.6 -
Mix Air Voids Content (Accurate Method) 220 Conial Flask with neck large enough to admint 25 mm aggregate, with airtight ground glass stopper Vacuum pump Rubber tubing Warm air fan Sub Total 2.6
Each
2.00
3,300,000.00
6,600,000.00
Each Each Each
1.00 1.00 1.00
550,000.00 275,000.00 275,000.00
550,000.00 275,000.00 275,000.00 7,700,000.00
-
2.7 -
Core Drilling Core drill machine 9" Extension shaft 18" Strap Wrench Diamond bit 4" diameter Expanding adaptor Sub Total 2.7
Each Each Each Each Each
1.00 1.00 1.00 2.00 1.00
17,325,000.00 550,000.00 550,000.00 550,000.00 550,000.00
17,325,000.00 550,000.00 550,000.00 1,100,000.00 550,000.00 20,075,000.00
2.8 -
Metal Thermometer 0-100 celcius Metal thermometer 0-200 celcius Metal thermometer Sub Total 2.8
Each Each
1.00 1.00
440,000.00 440,000.00
440,000.00 440,000.00 880,000.00
Sub Total of Sheet 2.4 - 2.8
35,475,000.00
FC¹
APPENDIX 3d TO BID
ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK
NO
: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum
DESCRIPTION
UNIT
QUANTITY
UNIT COST Rp
AMOUNT FC¹
Rp
2.9 -
Accessories and Tools Heavy duty balance complete Triple beam complete Generator, 10 KVA Double wall oven, 1600 W, 240 Volt Plastic Funnel Sodium hexametaphosphate Pairs asbestos gloves Laboratory tongs Sub Total 2.9
Each Each Each Each Each Sheet Each Each
1.00 1.00 1.00 2.00 3.00 1.00 1.00 2.00
11,000,000.00 3,850,000.00 5,500,000.00 25,300,000.00 11,000.00 110,000.00 110,000.00 165,000.00
11,000,000.00 3,850,000.00 5,500,000.00 50,600,000.00 33,000.00 110,000.00 110,000.00 330,000.00 71,533,000.00
2.10 -
Penetrometer Penetration Apparatus Penetration Needle Sample Container Diameter 55 mm Water Batch min. 10 litres Transfer Dish min . 350 ml Timing device, accurte Thermometer Sub Total 2.10
Each Each Each Each Each Each Each
1.00 2.00 6.00 1.00 1.00 1.00 1.00
5,500,000.00 1,100,000.00 1,100,000.00 1,100,000.00 550,000.00 550,000.00 275,000.00
5,500,000.00 2,200,000.00 6,600,000.00 1,100,000.00 550,000.00 550,000.00 275,000.00 16,775,000.00
2.11 -
Softening Point Ring Pouring plate Ball Ball Center Guide Bath Ring Holder and Assembly Sub Total 2.11
Each Each Each Each Each Each
2.00 1.00 2.00 2.00 1.00 1.00
1,100,000.00 550,000.00 275,000.00 275,000.00 550,000.00 275,000.00
2,200,000.00 550,000.00 550,000.00 550,000.00 550,000.00 275,000.00 4,675,000.00
2.12 Refusal Density Compactor
Set
1.00
11,000,000.00
11,000,000.00
2.13 Bitumen Content Tester NCA Automatic Oven Type Sub Total 2.13
Set
1.00
27,500,000.00
27,500,000.00 27,500,000.00
Each Each Each Each
1.00 10.00 1.00 1.00
2,200,000.00 4,620,000.00 8,250,000.00 52,800,000.00
2,200,000.00 46,200,000.00 8,250,000.00 52,800,000.00 109,450,000.00
2.14 -
Concrete Testing Slump cone Cube mould Speedy Moisture tester Cube crushing machine Sub Total 2.14
Sub Total of Sheet 2.9 - 2.14 Total Laboratory Equipment (New Equipment Laboratory) Assumption of Equipment of Laboratory in Rent (40% x New Equipment Laboratory)
240,933,000.00 442,365,000.00 176,946,000.00
FC¹
REKAPITULASI CASH FLOW PEMASUKAN (INFLOW) DAN PENGELUARAN (OUTFLOW) PROYEK PEMBANGUNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR PROPINSI SUMATERA UTARA NO
URAIAN
JUMLAH HARGA PEKERJAAN RP
INFLOW 1
Inflow Maret 2020
7,450,926,000.00
2
Inflow April 2020
19,965,600,000.00
3
Inflow Mei 2020
18,986,400,000.00
4
Inflow Juni 2020
18,986,400,000.00
5
Inflow Juli 2020
18,986,400,000.00
6
Inflow Agustus 2020
18,986,400,000.00
7
Inflow September 2020
18,986,400,000.00
8
Inflow Oktober 2020
18,986,400,000.00
9
Inflow Nopember 2020
18,986,400,000.00
10
Inflow Desember 2020
18,986,400,000.00
11
Inflow Januari 2021
18,986,400,000.00
12
Inflow Februari 2021
18,986,400,000.00
TOTAL INFLOW (PEMASUKAN) OUTFLOW
217,280,526,000.00
Outflow Mareti 2020
4,632,000,000.00
1
Outflow April 2020
9,989,000,000.00
2
Outflow Mei 2020
9,707,500,000.00
3
Outflow Juni 2020
9,419,500,000.00
5
Outflow Juli 2020
9,511,500,000.00
6
Outflow Agustus 2020
9,347,500,000.00
7
Outflow September 2020
9,347,500,000.00
8
Outflow Oktober 2020
9,347,500,000.00
9
Outflow Nopember 2020
9,347,500,000.00
10
Outflow Desember 2020
9,347,500,000.00
11
Outflow Januari 2021
9,347,500,000.00
12
Outflow Februari 2021
9,347,500,000.00
TOTAL OUT FLOW (PENGELUARAN)
108,692,000,000.00
(A)
Total Inflow / Total Masuk
217,280,526,000.00
(B)
Total Outflow / Total Keluar
108,692,000,000.00
(C)
TOTAL KEUNTUNGAN
108,588,526,000.00
Terbilang :
Seratus Delapan Milyar Lima Ratus Delapan Puluh Dua Juta Lima Ratus Dua Puluh Enam Ribu Rupiah,-
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN
PARDAMEAN SITINJAK Direktur Utama
FASILITAS LABORATORIUM SATUAN PENGUKURAN HARGA SATUAN
NO
I 1
: Lump Sum : 237,719,100.00
URAIAN
SATUAN
Laboratory Building Laboratory Building
VOLUME
HARGA SATUAN
m2
108.00
300,000.00
32,400,000.00 32,400,000.00
set set set set set set set Bln
1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
1,672,000.00 998,400.00 530,000.00 674,000.00 8,790,500.00 345,700.00 3,977,800.00 2,000,000.00
1,672,000.00 998,400.00 530,000.00 674,000.00 8,790,500.00 691,400.00 7,955,600.00 4,000,000.00 25,311,900.00
set set set set set set set set Bln set set
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00 1.00 1.00
15,819,000.00 10,271,000.00 1,138,500.00 1,592,000.00 2,691,500.00 14,558,000.00 251,000.00 34,893,500.00 4,406,000.00 311,700.00 7,590,000.00
15,819,000.00 10,271,000.00 1,138,500.00 1,592,000.00 2,691,500.00 14,558,000.00 251,000.00 34,893,500.00 26,436,000.00 311,700.00 7,590,000.00 115,552,200.00
set set set set
1.00 1.00 1.00 1.00
350,000.00 225,000.00 2,000,000.00 22,500,000.00
350,000.00 225,000.00 2,000,000.00 22,500,000.00 25,075,000.00
Unit set set
1.00 1.00 1.00
0.00 6,000,000.00 3,000,000.00
0.00 6,000,000.00 3,000,000.00 9,000,000.00
Bln Bln
7.00 7.00
1,500,000.00 2,000,000.00
10,500,000.00 14,000,000.00 24,500,000.00
ls
1.00
5,880,000.00
5,880,000.00
Sub Total I II 1 2 3 4 5 6 7 8
Soil & Aggregate Testing Compaction Test CBR Test Specifik Gravity Atterberg Limits Grain Size Analysis Field Density Test By Sand Cone Methode Moisture Content Abrasion af Aggregate by loss Angeles machine Sub Total II
III 1 2 3 4 5 6 7 8 9 10 11
Bituminous Testing Marshall Asphalt test Extarctoin Test, Centrifuge/Fefflux Method Specific Gravity for Coarse aggregate Specific Gravity for Fine aggregate Mix Air Void Content (Accurete Method) Core Drill Metal Thermometer Accessories and Toll Penetration Test Softening Point Refusal Density Compactor Sub Total III
IV 1 2 3 4
Concrete Testing Slump Cone Cylinder/cube Mould for Compressive Strength Beam Mould for Flexural Strenght (RIGID) Crushing Machine Sub Total IV
V 1 2 3
Peralatan Pendukung Mobil Pick Up Komputer + Printer Furniture Sub Total V
VI 1 2
Operasional Teknisi Labratorium Tenaga Kerja Terampil Sub Total VI
VII 1
Test Luar Test Luar, Sesuai kebutuhan atau atas Perintah Direksi
TOTAL
Sub Total VI
5,880,000.00
TOTAL HARGA (I - VII)
237,719,100.00
KETERANGAN
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
No.
I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
II.
#REF! : Pemeliharaan Rutin Perkerasan : Lump Sum / Bulan
URAIAN
DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Campuran Aspal Panas/Dingin Rata-rata Tebal Penetrasi Macadam Rata-rata Aplikasi Aspal Pengisian Retak Rata-rata Panjang Jalan Proyek Prosentase permukaan yang perlu dipelihara (Wr < 6m) Prosentase permukaan yang perlu dipelihara (Wr > 6m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan permukaan Prosentase waktu mandor utk pemeliharaan permukaan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor
KODE
KOEF.
SATUAN
Tk Wr Ws t h Ar Lp Ap1 Ap2 Tp Tpk Tmd Te Pk Md
7.00 4.50 1.00 0.04 0.055 1.50 14.90 1.00 2.00 210.00 1.00 1.00 1.00 15.00 3.00
jam Meter Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang
(L01) (L03)
220.50 44.10
Jam Jam
10.73 10.73 7.38 1,006 10.00
M3 M3 M3 Liter %
14.70 14.70 14.70
Jam Jam Jam
KETERANGAN
Retak sedang Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu
PEKERJA 1 2
III.
Kebutuhan Pekerja Kebutuhan Mandor
= Pk x Tpk x Tp x Tk = Md x Tmd x Tp x Tk
BAHAN 1 2 3 4 5
IV.
Camp. Aspal Panas = (Ap x t x Wr x Lp x 1000) x % Camp. Aspal Dingin = (Ap x t x Wr x Lp x 1000) x % Penetrasi Macadam = (Ap x h x Wr x Lp x 1000) x % Aspal Pengisi Retak = Ar x Ap x Wr x Lp x 1000 Bahan-bahan lainnya (diasumsikan)
(EI-10B) (EI-10D) (EI-10C) (EI-10E)
ALAT 1 2 3
Motor Grader Flat Bed Truck Air Compressor
File : 540767354.xlsx
= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk
(E13) (E11) (E05)
40% 40% 20% Thd.Biaya Bahan
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
No.
I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
II.
: 10.1 (2) : Pemeliharaan Rutin Bahu Jalan : Lump Sum / Bulan
URAIAN
DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Agregat Base Kelas B untuk bahu jalan Aplikasi Aspal Pengisian Retak Panjang Jalan Proyek Prosentase permukaan bahu yang dipelihara (Ws < 3m) Prosentase permukaan bahu yang dipelihara (Ws > 3m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan bahu jln Prosentase waktu mandor utk pemeliharaan bahu jln Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 2.00 regu kerja @ 5orang Jumlah Mandor
KODE
KOEF.
SATUAN
Tk Wr Ws t Ar Lp As1 As2 Tp Tpk Tmd Te Pk Md
7.00 4.50 1.00 0.15 0.50 14.90 2.00 4.00 240.00 0.50 0.50 0.50 10.00 2.00
jam Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang
(L01) (L03)
84.00 16.80
Jam Jam
(EI-10A)
44.70 10.00
M3 %
8.40 8.40 8.40
Jam Jam Jam
KETERANGAN
Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu
PEKERJA 1 2
III.
Kebutuhan Pekerja Kebutuhan Mandor
= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk
BAHAN 1 2
IV.
Lap.Pond.Agr.Kls.B = As x t x Ws x Lp x 1000 Bahan-bahan lainnya (diasumsikan)
ALAT 1 2 3
Motor Grader Flat Bed Truck Roller
File : 540767354.xlsx
= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk
(E13) (E11) (E16)
Thd.Biaya Bahan
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
No.
I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
II.
: 10.1 (3) : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan : Lump Sum / Bulan
URAIAN
DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Lebar Saluran/Selokan Rata-rata Timbunan Pilihan diperlukan untuk selokan/sal.air Pas.Bt.Dgn.Mortar diperlukan untuk selokan/sal.air Panjang Jalan Proyek Prosentase saluran yang dipelihara (Wsd < 1m) Prosentase saluran yang dipelihara (Wsd > 1m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan saluran air Prosentase waktu mandor utk pemeliharaan saluran air Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 2.00 regu kerja @ 5orang Jumlah Mandor
KODE
KOEF.
SATUAN
Tk Wr Ws Wsd Vtp Vpb Lp Ad1 Ad2 Tp Tpk Tmd Te Pk Md
7.00 4.50 1.00 0.60 220.00 330.00 14.90 0.50 1.00 240.00 1.00 1.00 2.00 10.00 2.00
jam Meter Meter Meter M3/Km M3/Km Km % % Hari % % % orang orang
(L01) (L03)
168.00 33.60
Jam Jam
(EI-22)
24.59 16.39 10.00
M3 M3 %
33.60 33.60
Jam Jam
KETERANGAN
Thd.Total Pjg.Jln Thd.Total Pjg.Jln Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu
PEKERJA 1 2
III.
Kebutuhan Pekerja Kebutuhan Mandor
= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk
BAHAN 1
IV.
Bahan Umum, antara lain : a. Pasangan Batu Dgn. Mortar = Ad x Lp x Vpb b. Bahan Timbunan Pilihan = Ad x Lp x Vtp c. Bahan-bahan lainnya (diasumsikan)
(EI-323)
ALAT 1 2
Motor Grader Dump Truck
File : 540767354.xlsx
= Te x Tp x Tk = Te x Tp x Tk
(E13) (E08)
Thd.Biaya Bahan
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
No.
I. 1 2 3 4 5 6 7 8 9 10 11
II.
: 10.1 (4) : Pemeliharaan Rutin Perlengkapan Jalan : Lump Sum / Bulan
URAIAN
DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Lebar Saluran/Selokan Rata-rata Panjang Jalan Proyek Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemel. perlengk. jalan Prosentase waktu mandor utk pemel. perlengk. Jalan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 1.00 regu kerja @ 5orang Jumlah Mandor
KODE
KOEF.
SATUAN
Tk Wr Ws Wsd Lp Tp Tpk Tmd Te Pk Md
7.00 4.50 1.00 0.60 14.90 240.00 0.50 0.25 0.50 5.00 1.00
jam Meter Meter Meter Km Hari % % % orang orang
(L01) (L03)
42.00 4.20
Jam Jam
(M42) (M12) (M01) -
29.80 298.00 14.90 100.00
Kg Kg M3 %
(E11)
8.40
Jam
KETERANGAN
Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu
PEKERJA 1 2
III.
Kebutuhan Pekerja Kebutuhan Mandor
= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk
BAHAN 1
IV.
Bahan Umum, antara lain : a. Cat 2.00 kg per KM b. Semen 20.00 kg per KM b. Pasir 1.00 M3 per KM c. Bahan-bahan lainnya (diasumsikan) ALAT
1
Flat Bed Truck
File : 540767354.xlsx
= Te x Tp x Tk
745,000.00 208,600.00 807,282.00 Thd.Biaya Bahan
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
No.
I. 1 2 3 4 5 6 7 8 9 10 11 12 13
II.
: 10.1 (5) : Pemeliharaan Rutin Jembatan : Lump Sum / Bulan
URAIAN
DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Rata-rata Jumlah Jembatan per Km panjang jalan Rata-rata Bentang Jembatan Rata-rata Lebar Jembatan Panjang Jalan Proyek Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan jembatan Prosentase waktu mandor utk pemeliharaan jembatan Prosentase waktu alat berat untuk pemel. jembatan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor
KODE
KOEF.
SATUAN
Tk Wr Ws Kj Lj Wj Lp Tp Tpk Tmd Te Pk Md
7.00 4.50 1.00 3.00 15.00 5.50 14.90 240.00 2.00 2.00 5.00 15.00 3.00
jam Meter Meter Buah Meter Meter Km Hari % % % orang orang
(L01) (L03)
504.00 100.80
Jam Jam
(M42) (M12) (M01) -
223.50 2,235.00 7.76 25.00
Kg Kg M3 %
(E13) (E08)
84.00 84.00
Jam Jam
KETERANGAN
Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu
PEKERJA 1 2
III.
Kebutuhan Pekerja Kebutuhan Mandor
= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk
BAHAN 1
IV.
Bahan Umum, antara lain : a. Cat 0.33 kg per M' jembatan b. Semen 3.33 kg per M' jembatan b. Pasir 0.01157 M3 per M' jembatan c. Bahan-bahan lainnya (diasumsikan) ALAT
1 2
Motor Grader Dump Truck
File : 540767354.xlsx
= Te x Tp x Tk = Te x Tp x Tk
5,587,500.00 1,564,500.00 420,459.38 Thd.Biaya Bahan
LAMPIRAN 2 PENAWARAN
DAFTAR MATA PEMBAYARAN UTAMA #REF! ### ###
### ### ### PT. NINDYA KARYA
No.
No. MATA PEMBAYARAN
1.
#REF!
1,04166666666667.#REF!
URAIAN JENIS PEKERJAAN
SATUAN
VOLUME
#REF!
m3
#REF!
#REF!
#REF!
#REF!
###
#REF!
#REF!
#REF!
#REF!
###
#REF!
#REF!
#REF!
#REF!
###
#REF!
#REF!
#REF!
#REF!
###
#REF!
#REF!
#REF!
#REF!
###
#REF!
#REF!
#REF!
#REF!
Catatan : Mata Pembayaran Utama adalah setiap mata Pembayaran bukan lump sum yang jumlah nilainya diurutkan dari nilai terbesar sampai nilai
terkecil, membentuk maksimum 80 (delapan puluh) persen dari harga penawaran. Bilamana jumlah nilainya tidak tepat 80% maka prosentase yang mendekati 80% yang digunakan, tetapi bukan yang melampaui 80%
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 6a PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!
: : : :
No. I
Err:509 #REF! #REF! Lump Sum / Bulan
Uraian
III
Kuantitas
Biaya Satuan
Jumlah
(Rp.)
(Rp.)
Tenaga Kerja : Mandor Pekerja Sub Total I
II
Satuan
Bahan-bahan : Campur Aspal Panas Campur Aspal Dingin Aspal untuk pengisian Retak-retak Bahan-bahan lainnya Sub Total II
Jam Jam
M3 M3 liter Ls
A.
Peralatan + Bahan Bakar : Motor Grader Flat Bed Truck Air Compresor Sub Total III Jumlah (I + II + III)
B. C. D. E.
Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan
Rp. Rp. Rp.
= 5/8 x C / (Periode Pelaksanaan - 3)
Rp.
Jam Jam Jam Rp.
Catatan :
● ● ●
Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.
● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 6b PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!
: : : :
No. I
Err:509 #REF! #REF! Lump Sum / Bulan
Uraian
III
Kuantitas
Biaya Satuan
Jumlah
(Rp.)
(Rp.)
Tenaga Kerja : Mandor Pekerja Sub Total I
II
Satuan
Bahan-bahan : Lapis Pondasi Agregate Kelas B Bahan-bahan Lainnya Sub Total II Peralatan + Bahan Bakar : Motor Grader
Jam Jam
M3 Ls
#REF! 5,000,000.00
Jam
A. B. C.
Flat Bed Truck Roller Sub Total III Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B)
Jam Jam
D. E.
Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan
Rp.
= 5/8 x C / (Periode Pelaksanaan - 3)
Rp.
Rp. Rp. Rp.
Catatan :
● ● ●
Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.
● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 6c PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!
: : : :
No. I
Err:509 #REF! #REF! Lump Sum / Bulan
Uraian
III
A. B. C. D. E.
Kuantitas
Biaya Satuan
Jumlah
(Rp.)
(Rp.)
Tenaga Kerja : Mandor Pekerja Sub Total I
II
Satuan
Bahan-bahan : Umum Sub Total II Peralatan + Bahan Bakar : Motor Grader Dump Truck
Jam Jam
Ls
Jam Jam
Sub Total III Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan
Rp. Rp. Rp. Rp.
= 5/8 x C / (Periode Pelaksanaan - 3)
Rp.
Catatan :
● ● ●
Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.
● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 6d PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!
: : : :
No. I
Err:509 #REF! #REF! Lump Sum / Bulan
Uraian
III
A. B. C. D. E.
Kuantitas
Biaya Satuan
Jumlah
(Rp.)
(Rp.)
Tenaga Kerja : Mandor Pekerja Sub Total I
II
Satuan
Bahan-bahan : Umum Sub Total I Peralatan + Bahan Bakar : Flat Bed Truck Sub Total I
Jam Jam
Ls
Jam
Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan
Rp. Rp. Rp. Rp.
= 5/8 x C / (Periode Pelaksanaan - 3)
Rp.
Catatan :
● ● ●
Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.
● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 6e PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!
: : : :
No. I
Err:509 #REF! #REF! Lump Sum / Bulan
Uraian
III
A. B. C. D. E.
Kuantitas
Biaya Satuan
Jumlah
(Rp.)
(Rp.)
Tenaga Kerja : Mandor Pekerja Sub Total I
II
Satuan
Bahan-bahan : Umum Sub Total II Peralatan + Bahan Bakar : Flat Bed Truck Air Compressor
Jam Jam
Ls
Jam Jam
Sub Total III Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan
Rp. Rp. Rp. Rp.
= 5/8 x C / (Periode Pelaksanaan - 3)
Rp.
Catatan :
● ● ●
Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.
● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
#REF!
:
Err:509 #REF! #REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / Kg
#REF!
dari …………. 2.
Penanganan / Perawatan
12.50 / Kg
12.50
3.
Angkutan ke Lapangan (Km…………)
50.00 / Kg
50.00
4.
Bongkar muatan, penyimpanan, dll
12.50 / Kg
12.50 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
#REF!
:
Err:509 #REF! #REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / Kg
#REF!
dari …………. 2.
Penanganan / Perawatan
12.50 / Kg
12.50
3.
Angkutan ke Lapangan (Km…………)
50.00 / Kg
50.00
4.
Bongkar muatan, penyimpanan, dll
12.50 / Kg
12.50 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
Err:509 #REF!
#REF!
:
#REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / M3
#REF!
dari …………. 2.
Penanganan / Perawatan
/ M3
3.
Angkutan ke Lapangan (Km…………)
/ M3
4.
Bongkar muatan, penyimpanan, dll
/ M3 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
Err:509 #REF!
#REF!
:
#REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / M3
#REF!
dari …………. 2.
Penanganan / Perawatan
/ M3
3.
Angkutan ke Lapangan (Km…………)
/ M3
4.
Bongkar muatan, penyimpanan, dll
/ M3 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
Err:509 #REF!
#REF!
:
#REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / M3
#REF!
dari …………. 2.
Penanganan / Perawatan
/ M3
3.
Angkutan ke Lapangan (Km…………)
/ M3
4.
Bongkar muatan, penyimpanan, dll
/ M3 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
Err:509 #REF!
#REF!
:
#REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / M3
#REF!
dari …………. 2.
Penanganan / Perawatan
/ M3
3.
Angkutan ke Lapangan (Km…………)
/ M3
4.
Bongkar muatan, penyimpanan, dll
/ M3 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
#REF!
:
Err:509 #REF! #REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / M3
#REF!
dari …………. 2.
Penanganan / Perawatan
3.
Angkutan ke Lapangan (Km…………)
4.
Bongkar muatan, penyimpanan, dll
/ M3 50,000.00 / M3
50,000.00
/ M3 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 7 PENAWARAN
ANALISA MATERIAL ON SITE #REF! BAHAN *)
: :
#REF!
:
Err:509 #REF! #REF!
ELEMEN BIAYA
1.
Biaya CIF di Pelabuhan / Penambangan
Rp. / SATUAN
JUMLAH HARGA
#REF! / Kg
#REF!
dari …………. 2.
Penanganan / Perawatan
25.00 / Kg
25.00
3.
Angkutan ke Lapangan (Km…………)
50.00 / Kg
50.00
4.
Bongkar muatan, penyimpanan, dll
25.00 / Kg
25.00 #REF!
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 9 PENAWARAN
KONFIRMASI KAPASITAS PLANT PEMECAH BATU ### 1.
2.
3.
#REF!
Waktu Bekerja Yang Tersedia (a) Jangka Waktu Pelaksanaan (b) Mobilisasi dan Jangka Waktu Pemasangan Peralatan (min = 60 hari) (c) Demobilisasi pada akhir masa Kontrak (min. = 30 hari) (d) Hari-hari Libur, kerusakan-kerusan/gangguan-gangguan dsb (e)
Jumlah Hari Kerja yang sesungguhnya (a)-(b)-(c)-(d)
(A)
Jumlah Jam Kerja Plant yang sesungguhnya
Kebutuhan Bahan Batu Pecah (1) Lapis Pondasi Agregat (2) Pondasi Jalan Tanpa Penutup
130 Hari 60 Hari 30 Hari 17 Hari
7 jam/hari
#REF! M3 x M3 x
2.2000 x 2.2000 x
1.00 x 1.00 x
1.05 1.05
=
23 Hari
=
161 Jam
= =
#REF! ton - ton
1.05 = 1.05 =
- ton - ton
(3) (4)
Agregat Penutup Burtu Agregat Penutup Burda
M2 x M2 x
0.0165 x 0.0250 x
2.00 x 2.00 x
1.00 x 1.00 x
(5)
Latasir (SS) Kelas A
0.50 x
1.05
=
- ton
Latasir (SS) Kelas B Lataston Lapis Aus (HRS-WC)
M2 x M2 x M2 x
0.0150 x
(6) (7)
0.0200 x 0.0300 x
2.30 x 2.30 x
0.50 x 0.75 x
1.05 = 1.05 =
- ton - ton
(8) (9)
Lataston Lapis Pondasi (HRS-Base) Laston Lapis Aus (AC-WC)
M3 x #REF! M2 x
2.300 x 0.0400 x
0.75 x 2.30 x
1.05 0.75 x
= 1.05 =
- ton #REF! ton
(10) (10a) (11) (12)
Laston Lapis Pengikat (AC-BC) Laston Lapis Pengikat (AC - BC) Leveling Laston Lapis Pondasi (AC-Base) Lain-lain (Agregat Beton, Drainage Porous dll)
#REF! M3 x
2.3000 x
0.75 x
1.05
M3 x
2.3000 x
0.75 x
1.05
= = = =
#REF! ton #REF! ton - ton - ton
(B)
Jumlah Kebutuhan batu Pecah
=
#REF! ton
=
#REF! ton/jam
Kapasitas Plant Pemecah Batu Kapasitas yang diperlukan = (B) / (A) Kapasitas yang sesungguhnya
Jumlah Kapasitas yang sesungguhnya
Plant 1 Plant 2 lain-lain
= = =
48.00 ton/jam 48.00 ton/jam 48.00 ton/jam
=
144.00 ton/jam
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 10 PENAWARAN
KONFIRMASI KAPASITAS PLANT PENCAMPUR ASPAL ### 1.
2.
3.
#REF!
Waktu Bekerja Yang Tersedia (a) Jangka Waktu Pelaksanaan (b) Mobilisasi dan Jangka Waktu Pemasangan Peralatan (min = 60 hari) (c) Demobilisasi pada akhir masa Kontrak (min. = 30 hari) (d) Hari-hari Libur, kerusakan-kerusan/gangguan-gangguan dsb (e)
Jumlah Hari Kerja yang sesungguhnya (a)-(b)-(c)-(d)
(C)
Jumlah Jam Kerja Plant yang sesungguhnya
130 Hari 60 Hari 30 Hari 17 Hari
7 jam/hari
=
23 Hari
=
161 Jam
Kebutuhan Bahan Aspal Campuran Panas (1) Latasir (SS) Kelas A (2) Latasir (SS) Kelas B
M2 x M2 x
0.0150 x 0.0200 x
2.30 x 2.30 x
1.05 1.05
= =
- ton - ton
(3) (4)
Lataston Lapis Aus (HRS-WC) Lataston Lapis Pondasi (HRS-Base)
M2 x M3 x
0.0300 x 2.3000 x
2.30 x 1.05
1.05
= =
- ton - ton
(5)
Laston Lapis Aus (AC-WC)
#REF! M2 x
0.0400 x
2.30 x
1.05
=
#REF! ton
(6) (6a) (7) (8)
Laston Lapis Pengikat (AC-BC) Laston Lapis Pengikat (AC - BC) Leveling Laston Lapis Pondasi (AC-Base) Lain-lain
#REF! M3 x
2.3000 x
1.05
M3 x
2.3000 x
1.05
= = = =
#REF! ton #REF! ton - ton ton
(D)
Jumlah kebutuhan Aspal Campuran Panas
=
#REF! ton
=
#REF! ton/jam
Kapasitas Peralatan Pencampuran Aspal Kapasitas yang diperlukan = Jumlah kebutuhan Campuran Aspal / Jumlah Jam Kerja = (D) / (C) Kapasitas yang sesungguhnya
Jumlah Kapasitas yang sesungguhnya
Plant 1 Plant 2 Lain-lain
= = =
#REF! ton/jam #REF! ton/jam ton/jam
=
#REF! ton/jam
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
LAMPIRAN 11 PENAWARAN
KONFIRMASI KAPASITAS PLANT PENCAMPUR BETON ### 1.
2.
#REF!
Waktu Bekerja Yang Tersedia (a) Jangka Waktu Pelaksanaan (b) Mobilisasi, Jangka Waktu Pemasangan Peralatan dan Persediaan material (min = 120 hari) (c) Demobilisasi / Waktu Tidak Produktif pada akhir masa Kontrak (min. = 30 hari) (d) Hari-hari Libur, kerusakan-kerusan/gangguan-gangguan dsb (e)
Total Actual Working Days (a)-(b)-(c)-(d)
(C)
Total Actual Plant Working Hours
Kebutuhan Beton Struktur (1) K-500 (2) K-400 (3) K-350 (4) K-300 (5) K-250 (6) K-175 (7) Siklop (8) Lain-lain (D)
3.
130 Days 60 Days 30 Days 17 Days
7 hours/day
m3 m3 m3 m3 #REF! m3 #REF! m3 m3
x x x x x x x
2.4000 x 2.4000 x 2.4000 x 2.4000 x 2.4000 x 2.4000 x 2.4000 x
1.05 1.05 1.05 1.05 1.05 1.05 1.05
Jumlah kebutuhan Plant Campuran Beton
Kapasitas Peralatan Plant Pencampur Beton Kapasitas yang diperlukan = Jumlah kebutuhan Campuran Beton / Jumlah Jam Kerja = (D) / (C) Kapasitas yang sesungguhnya
Jumlah Kapasitas yang sesungguhnya
Plant 1 Plant 2 lain-lain
=
23 Days
=
161 Hours
= = = = = = = =
- tonnes - tonnes - tonnes - tonnes #REF! tonnes #REF! tonnes - tonnes tonnes
=
#REF! tonnes
=
#REF! tonnes/hr
= = =
48.00 tonnes/hr 48.00 tonnes/hr tonnes/hr
=
96.00 tonnes/hr
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK Direktur Utama
DATA KONTRAK YANG DISELEKSI Penyesuaian Harga
IPL 13.4
"tidak dapat"
Masa laku Surat Penawaran
IPL. 16.1
120 ( Seratus Dua Puluh ) hari
Jaminan Penawaran
IPL. 17.2
Rp. 601.000.000,- (Enam ratus satu juta Rupiah) disampaikan kepada Ketua Panitia Lelang
Masa laku Jaminan Penawaran
IPL. 17.2
Minimal 148 ( seratus empat puluh delapan ) hari, terhitung dari tanggal akhir pemasukan penawaran.
Periode Pelaksanaan
IPL. 1.2
Tanggal Mulai Kerja
SSU 1.1 (u)
Nilai Minimum Asuransi
SSU 13.1
130 ( Seratus Tiga Puluh ) hari 1-Nov-10 ( a ) Besarnya asuransi kecelakaan Manusia atau asuransi
kematian
untuk
setiap
karyawan
Kontraktor / orang lain adalah sebesar Rp.
( b ) 50.000.000,Besarnya maksimum
Asuransi
Harta
Benda
( property ) adalah sebesar Rp. 50.000.000,-
Periode Pemeliharaan
SSU 35.1
( a ) 365 (Tiga ratus enam puluh lima) hari untuk pekerjaan permanen
Uang Retensi
SSU 48.1
10 (
sepuluh
dibayarkan Nilai dari Denda Pekerjaan
SSU 49.1
)
persen
dari nilai yang
dapat
0,1 % dari Nilai Kontrak per hari dan maksimum 5 % dari Nilai Kontrak
Uang Muka
SSU 51.1
Maksimum 20 ( dua puluh ) persen dari Nilai Kontrak.
Nilai dan masa laku Jaminan Pelaksanaan
SSU 52.1
( a ) Minimal 10 (sepuluh) persen dari nilai kontrak
dalam bentuk Bank Garansi. ( b ) Jika penawaran dianggap rendah atau kurang dari 80 % HPS, jaminan Pelaksanaan dapat
dinaikkan jaminan Pelaksanaan
ini
disampaikan
pimpinan Bagian Proyek / Pimpinan Proyek Priode Mobilisasi
S 1.2
kepada
37 hari (Laboratorium dalam 37 hari)
Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0
PARDAMEAN SITINJAK
Direktur Utama
DAFTAR LAMPIRAN-LAMPIRAN SURAT PENAWARAN
NAMA PEKERJAAN
: EMBANGUNAN JALAN RUAS SUNGGUMINASA-MALINO 7 DI KAB. GOWA
NAMA PESERTA LELANG : PT. NINDYA KARYA (Persero) NO
URAIAN
TANDA PERIKSA
A.
Salian Kemitraan yang disahkan untuk kerja sama gabungan atau kerja sama operasi (jika digunakan)
√
B.
Perjanjian Kemitraan untuk usulan kerja sama operasi (jika yang di atas tidak digunakan)
√
C.
Surat Kuasa (jika digunakan)
√
D.
Jaminan Penawaran
√
E.
Surat Penawaran
√
F.
Daftar Kuantitas dan Harga yang telah diisi harganya
√
G.
Daftar lampiran-lampiran Penawaran
√
1.
Analisa harga Satuan mata Pembayaran Utama
√
2.
Analisa harga Lump Sum Untuk Mobilisasi
√
3a. Daftar Harga Satuan Dasar Upah
√
3b. Daftar Harga Satuan Dasar Bahan
√
3c.
Daftar Harga Satuan Dasar Peralatan
√
4.
Jadwal Pelaksanaan Pekerjaan
√
5.
Metoda Pelaksanaan
√
6.
Daftar Usulan Peralatan konstruksi
√
7.
Daftar Usulan Personil Inti
√
8.
Daftar Usulan Pekerjaan yang disubkontrakkan
√
9.
Dokumen Kualifikasi
√
Pay Item No.
Description
a
b
Unit c
Estimated Quantity d
Unit Price (IDR) e
Total Bid Price (IDR) g = (d x e)
6.3.6a
Asphaltic Concrete Binder Course (AC-BC) (fine/coarse)
Cu.M
8,840.00
#REF!
#REF!
6.3.5a
Asphaltic Concrete - Wearing Course (AC-WC) 4 cm (fine/coarse)
Sq.M
151,066.00
#REF!
#REF!
5.1.1
Aggregate Base Class A
Cu.M
27,925.00
#REF!
#REF!
5.1.2
Aggregate Base Class B
Cu.M
19,703.00
#REF!
#REF!
U Ditch Type DS-2
Ln.M
5,098.00
#REF!
#REF!
4.2.2
Aggregate Base Class B
Cu.M
16,081.00
#REF!
#REF!
4.2.1
Aggregate Base Class A
Cu.M
15,136.00
#REF!
#REF!
Stone Masonry
Cu.M
6,708.00
#REF!
#REF!
3.2.1
Common Embankment
Cu.M
69,000.00
#REF!
#REF!
3.1.1
Common Excavation
Cu.M
138,728.00
#REF!
#REF!
2.3.2
RCP Culvert Inside Diamater (Nominal 60 cm) 55-65 cm
Ln.M
3,403.00
#REF!
#REF!
2.3.9.2
7.9
1.2
Mobilization
LS
1.00
#REF!
#REF!
7.3.4
Reinforcing Steel Deformed BJTD40
Kg
184,947.00
#REF!
#REF!
7.1.3
Structural Concrete Class K350
Cu.M
1,771.00
#REF!
#REF!
Mini Reinforced Concrete Piles Type 1, Furnished & Driven
Ln.M
5,904.00
#REF!
#REF!
4.2.2a
Aggregate Base Class S
Cu.M
7,096.00
#REF!
#REF!
8.4.7a
Guard Rail (excluding terminal end)
Ln.M
2,838.00
#REF!
#REF!
6.1.1
Prime Coat
Litre
118,680.00
#REF!
#REF!
6.6.1
Surface Coarse Penetration Macadam
Cu.M
872.00
#REF!
#REF!
8.4.1
Pavement Markings Thermoplastic Type
Sq.M
9,443.00
#REF!
#REF!
2.2
Mortared Stonework
Cu.M
1,621.00
#REF!
#REF!
2.1
Excavation for Drainage Ditches & Waterways
Cu.M
30,422.00
#REF!
#REF!
SS.7.6.1b
6.3.6c
Asphaltic Concrete Binder Course Levelling (AC-BC(L)) (fine/coarse)
Ton
740.00
#REF!
#REF!
2.3.11
Reinforcing Steel for Minor Concrete Drainage Structures
Kg
45,943.00
#REF!
#REF!
2.3.10
Concrete Class K-250 for Minor Concrete Drainage Structures
Cu.M
512.00
#REF!
#REF!
7.1.8
Concrete Class K125
Cu.M
451.00
#REF!
#REF!
Grade Preparation
Sq.M
203,980.00
#REF!
#REF!
6.1.2
Tack Coat
Litre
27,220.00
#REF!
#REF!
8.4.6b
ROW Posts
Each
1,912.00
#REF!
#REF!
Selected Embankment Drain PVC Pipe, 10 cm Dia. With Fittings and Supports
Cu.M Ln.M
3,421.00 2,868.00
#REF! #REF!
#REF! #REF!
7.10.1
Grouted Rip Rap
Cu.M
867.00
#REF!
#REF!
8.4.3b
Road Signs with Reflector of Engineering Grade Single (size 750)
Each
347.00
#REF!
#REF!
Stabilization by Vegetation (Use Vertiver System)
Sq.M
13,875.00
#REF!
#REF!
1.19.2
Relocation of Existing PLN Utility Pole-Low Voltage
Each
7.00
#REF!
#REF!
3.1.7
Excavation of Existing Asphaltic Pavement Without Cold Milling Mach
Cu.M
4,208.00
#REF!
#REF!
Guard Rail with Base Plate Mounting
Ln.M
280.00
#REF!
#REF!
7.1.5
Structural Concrete Class K250
Cu.M
185.00
#REF!
#REF!
1.8
Traffic Management and Safety
LS
1.00
#REF!
#REF!
1.21
Quality Management
LS
1.00
168,000,000.00
168,000,000.00
3.3
3.2.2 SS.7.23.1
SS.8.3.1a
SS.8.4.7h
7.6.18
Cast in Place Concrete Pile, Diameter 60 cm
Ln.M
144.00
#REF!
#REF!
2.3.4
RCP Culvert Inside Diamater (Nominal 100 cm) 95-105 cm
Ln.M
136.00
#REF!
#REF!
3.1.3
Structure Excavation, 0-2 m Depth
Cu.M
3,660.00
#REF!
#REF!
4.2.7
Prime Coat
Litre
10,583.00
#REF!
#REF!
Patching Concrete with Polymer Modified Cement Material
Cu.M
7.00
#REF!
#REF!
8.3.3
Trees
Each
578.00
#REF!
#REF!
7.10.3
Gabions
Cu.M
132.00
#REF!
#REF!
2.4.3
Perforated or Porous Pipe for Subsurface Drainage Works
Ln.M
1,020.00
#REF!
#REF!
2.3.12
Blinding Stone
Cu.M
470.00
#REF!
#REF!
1.00
70,000,000.00
70,000,000.00
497.00
#REF!
#REF!
SS.7.18.1
1.7
Employer's Share of Dispute Board Costs
PS
2.4.1
Porous Drainage of Filter Material
Cu.M
10.1.1
Routine Maintenance of Pavement
LS
1.00
Ln.M
91.00
#REF!
#REF!
7.13
Steel Bridge Railing
-
-
7.11.3
Expansion Joint Seal Rubber Type 1 (Gap 21-41 mm)
Ln.M
21.00
#REF!
#REF!
2.4.2
Plastic Filter Fabric
Sq.M
1,506.00
#REF!
#REF!
7.3.1
Reinforcing Steel Plain BJTP24
Kg
3,699.00
#REF!
#REF!
10.1.2
Routine Maintenance of Shoulder
LS
1.00
7.1.4
Structural Concrete Class K300
Cu.M
43.00
#REF!
#REF!
-
-
8.4.7c
Guard Rail BCTA Terminal
Each
75.00
#REF!
#REF!
7.16.4
Deck Drain Type 2 with Accessories
Each
14.00
#REF!
#REF!
8.4.7d
Guard Rail BCTB Terminal
Each
75.00
#REF!
#REF!
7.6.28
Dynamic Load Test (DLT) for Diameter Pile of Up to 600 mm
Each
2.00
19,000,000.00
38,000,000.00
8.4.3g
Information Guide & Warning Signs with Reflector of Engineering Gra
Sq.M
74.00
#REF!
#REF!
10.1.3
Routine Maintenance of Ditches, Drains, Cuttings & Embankments
LS
1.00
SS 8.4.3h
Additional Sign with Reflector of Engineering Grade, Without Post
Each
74.00
10.1.4 2.3.9.2a
Routine Maintenance of Road Furniture & Road Markings U Ditch Type DS-2a
#REF! -
#REF!
LS
1.00
Ln.M
25.00
#REF!
#REF!
-
9.1.11
Excavator 80 - 140 HP
Hour
67.00
#REF!
#REF!
8.4.7b
Guard Rail Bridge Terminal
Each
50.00
#REF!
#REF!
9.1.8
Motor Grader min. 100 HP
Hour
72.00
#REF!
#REF!
10.1.5
Routine Maintenance of Bridges
LS
1.00
Cu.M
35.00
#REF!
#REF!
SS.7.10.3 8.4.10a
PVC Coated Mesh Gabions
-
-
Precast Portland Cement Concrete Curb Type (A,C,E and Transitions
Ln.M
235.00
#REF!
#REF!
3.4.5
Selected Tree Removal, diameter 30-50 cm
Each
202.00
#REF!
#REF!
8.4.12
Block Paving on Sidewalks or Median 60 mm
Sq.M
294.00
#REF!
#REF!
9.1.5
Flat Bed Truck 3-4 Tonnes
Hour
53.00
#REF!
#REF!
9.1.7
Bulldozer 100-150 HP
Hour
72.00
#REF!
#REF!
2.3.3
RCP Culvert Inside Diamater (Nominal 80 cm) 75-85 cm
Ln.M
22.00
#REF!
#REF!
Pay Item No.
Description
a 9.1.9
b
Unit
Estimated Quantity
c
d
Unit Price (IDR) e
Total Bid Price (IDR) g = (d x e)
Wheel Loader 1.0 - 1.6 M3
Hour
72.00
#REF!
#REF!
Cement Mortar
Cu.M
23.00
785,000.00
18,055,000.00
Demolition of Concrete
Cu.M
137.00
#REF!
#REF!
Grouting with Special Cement Material
Cu.M
1.00
#REF!
#REF!
8.4.6a
Kilometre Posts
Each
24.00
#REF!
#REF!
7.15.1
Demolition of Stone Masonry
Cu.M
138.00
#REF!
#REF!
9.1.14
Vibratory Roller 5-8 Tonnes
Hour
34.00
#REF!
#REF!
9.1.15
Hand Vibratory Compactor 1.5 - 3.0 HP
Hour
34.00
#REF!
#REF!
Bridge Name Plate
Each
14.00
750,000.00
10,500,000.00
9.1.10
Track/Crawler Loader 75 - 100 HP
Hour
34.00
#REF!
#REF!
9.1.2
Labour
Hour
1,434.00
#REF!
#REF!
9.1.12
Crane on Wheels 10 - 15 Ton
Hour
39.00
#REF!
#REF!
9.1.17
Compressor 4000 - 6500 Litre/minute
Hour
48.00
#REF!
#REF!
3.4.4
Selected Tree Removal, diameter 15-30 cm
Each
87.00
#REF!
#REF!
9.1.16
Pneumatic Tired Roller 8 - 10 Tonnes
Hour
34.00
#REF!
#REF!
9.1.13
Tandem Roller 6-9 Tonnes
Hour
34.00
#REF!
#REF!
9.1.6
Water Tank 3000-4500 Litres
Hour
34.00
#REF!
#REF!
8.4.3a
Road Signs with Reflector of Engineering Grade Single (size 600)
Each
8.00
#REF!
#REF!
9.1.4
Dump Truck 3-4 M3
Hour
39.00
#REF!
#REF!
9.1.19
Water Pump 70 - 100 mm
Hour
72.00
#REF!
#REF!
3.1.4
Structure Excavation, 2-4 m Depth
Cu.M
82.00
#REF!
#REF!
8.1.5
Hot Asphaltic Mixture for Minor Works
Cu.M
2.00
#REF!
#REF!
9.1.18
Concrete Mixer 0.3 - 0.6 M3
Hour
48.00
#REF!
#REF!
9.1.1
Foreman
Hour
235.00
#REF!
#REF!
9.1.20
Jack Hammer
Hour
48.00
#REF!
#REF!
9.1.3
Skilled Labour
Hour
139.00
#REF!
#REF!
7.8 7.15.2 SS.7.18.2
7.14
JADWAL PELAKSANAAN PEKERJAAN KONSTRUKSI Nama Paket
###
Prop / Kab/Kodya
###
No.
NILAI DALAM %
URAIAN
Waktu Pelaksanaan Konstruksi = 25 Bulan = (750 Hari kalender) Bulan 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 100%
1
Umum
1.2
Mobilisasi
#REF!
#REF!
#REF!
#REF!
#REF!
1.8
Manajemen dan Keselamatan Lalu Lintas
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Drainase
2.1
Galian untuk Selokan Drainase dan Saluran Air
#REF!
2.2
Pasangan Batu dengan Mortar
#REF!
3
#REF!
Pekerjaan Tanah
3.1.1
Galian Biasa
#REF!
#REF!
#REF!
#REF!
#REF!
3.1.6
Galian Perkerasan Beraspal Dengan Cold Milling Machine
#REF!
#REF!
#REF!
#REF!
#REF!
3.1.8
Galian Perkerasan Berbutir
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3.2.1
Timbunan Biasa
#REF!
#REF!
#REF!
#REF!
#REF!
3.2.2
Timbunan Pilihan
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4
Pelebaran Perkerasan dan bahu Jalan
5
Perkerasan Berbutir
5.1.1
Lapis Pondasi Agregat Kelas A
#REF!
5.1.2
Lapis Pondasi Agregat Kelas B
#REF!
5.1.3
Lapis Pondasi Agregat Kelas S
#REF!
#REF!
#REF!
50% 6
Perkerasan Aspal
6.1 (1).(b)
Lapis Resap Pengikat - Aspal Emulsi
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6.1 (2) (b)
Lapis Perekat - Aspal Emulsi
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6.3 (3).(a)
Lataston Lapis Aus (HRS-WC) 0.3 cm (gradasi senjang/semi senjang)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6.3 (4).(a)
Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6.3 (8)
Aspal Minyak
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6.3 (9)
Aditif Anti Pengelupasan
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Bahan Pengisi (Filter) Tambahan (semen)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
6.3 (10)b 7 7.9 8
#REF!
#REF!
Struktur Pasangan Batu
#REF!
Pengembalian Kondisi dan Pekerjaan Minor
8.1 (1)
Lapis Pondasi agregat Kelas A untuk Pekerjaan Minor
8.4 (1)
Marka Jalan Thermoplastic
#REF!
8.4 (6)a
Patok Kilometer
#REF!
9
Pekerjaan Harian
10
Pekerjaan Pemeliharaan Rutin
A B C
JUMLAH NILAI PEKERJAAN KEMAJUAN BULANAN DALAM KUMULATIF KEMAJUAN DALAM
0% #REF!
(%) (%)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF! #REF!
#REF! #REF!