NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Maret 2020



NO.



URAIAN



SATUAN



VOLUME



1



2



3



4



I



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



PEKERJAAN PEMBERSIHAN AREA Pembersihan, Stripping, Potong Pohon



M2



301,614



9,000



Total Harga Pekerjaan 1



KET



2,714,526,000 2,714,526,000



INFLOW / Dana Masuk Pembersihan, Stripping, Potong Pohon



M2



301,614



9,000



Sub Total Dana Masuk (Inflow)



2,714,526,000 2,714,526,000



OUTFLOW / Biaya Produksi / Operasional 1



SEWA EXCAVATOR PC 200 BBM Solar Industri



2



60,000,000



21,600



15,000 6,000,000



Ass Operator



Orang



2



3,000,000



Unit



1



60,000,000



60,000,000



Ltr



7,200



15,000



108,000,000



SEWA BULLDOZER D6



18,000,000 100 btg/hr 6,000,000 bbm=30 ltr/jam



Operator



Orang



1



6,000,000



6,000,000



Ass Operator



Orang



1



3,000,000



3,000,000



Bh



5



5,000,000



25,000,000



Orang



5



6,000,000



30,000,000



Unit



2



40,000,000



80,000,000



Ltr



4,800



15,000



2



6,000,000



Pembelian Mesin Potong Kayu / Senso



SEWA DUMPT TRUCK 25 - 30 TON Supir



Orang



Sub Total (Outflow) / Biaya Produksi (1-4)



72,000,000 1 unit 80 ltr/hr 12,000,000 840,000,000



Keuntungan Pekerjaan Pembersihan



1,874,526,000



PEKERJAAN PERSIAPAN TANAH DASAR INFLOW / Dana Masuk Persiapan Tanah Dasar Sub Total Dana Masuk (Inflow)



1



324,000,000 pot kayu 1 alat



3



BBM Solar Industri



II



180,000,000 1hr=1ha/alat



Orang



Upah Operator Senso 4



3



Ltr



Operator



BBM Solar Industri



3



Unit



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200



M2



3,500



1,050,000,000 1,050,000,000



1



60,000,000



BBM Solar Industri Operator Ass Operator



Ltr Orang Orang



4,800 1 1



15,000 6,000,000 3,000,000



2



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (1-4) Keuntungan Pek Persiapan Tanah Dasar



Unit Ltr Orang



2 4,800 1



40,000,000 15,000 6,000,000



80,000,000 72,000,000 6,000,000 299,000,000 751,000,000



III



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk



1



Galian Tanah dibuang Sub Total Dana Masuk (Inflow)



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit



4



60,000,000



1



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200



Unit



300,000



Page 1



60,000,000 1 alat/hr=1 ha 72,000,000 =10.000 M2 6,000,000 3,000,000



240,000,000 1 alat/jam=60M3



1



NO.



URAIAN



SATUAN



VOLUME



1



2



3



4



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



BBM Solar Industri Operator Ass Operator



Ltr Orang Orang



28,800 4 2



15,000 6,000,000 3,000,000



432,000,000 24,000,000 6,000,000



2



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (1-3) Keuntungan Pekerjaan Galian dibuang



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



IV



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow)



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 954,000,000 1,004,400,000



65,000,000



1



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



KET



240,000,000 1 alat/jam=60M3 432,000,000 24,000,000 6,000,000



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pekerjaan Galian dibuang



V



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



DEMOBILISASI ALAT BERAT



Unit



13



5,000,000



2



DEMOBILISASI DUMPT TRUCK



Unit



14



2,500,000



35,000,000



3



DIREKSI KIT, KANTOR, MESS



Ls



1



200,000,000



200,000,000



4



GAJI



Ls



1



470,000,000



470,000,000



5



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



6



TOYOTA HILUX DOUBLE CABIN



Unit



1



100,000,000



100,000,000 DP Kredit



7



TOYOTA KIJANG DIESEL



Unit



1



100,000,000



100,000,000 DP Kredit



8



PICK UP ISUZU PANTHER



Unit



1



50,000,000



50,000,000 DP Kredit



9



MOTOR KAWASAKI KLX



Unit



4



5,000,000



20,000,000 DP Kredit



10



MOTOR HONDA VARIO



Unit



1



5,000,000



5,000,000 DP Kredit



Sub Total (Outflow) / Biaya Overhead (1-10)



1,345,000,000



Outflow / Dana yg dibutuhkan



4,632,000,000



Inflow / Dana yg masuk



7,450,926,000



2,818,926,000



Keuntungan Maret 2020



Page 2



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : April 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Persiapan Tanah Dasar



II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow)



1



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 19,200 6



40,000,000 15,000 6,000,000



240,000,000 288,000,000 36,000,000 1,266,000,000 462,000,000



M3



86,400



34,000



2,937,600,000 2,937,600,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



KET



OUTFLOW / Biaya Produksi / Operasional 2



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timbunan dari Hasil Galian



III



PEKERJAAN TIMBUNAN DARI BORROW MATERIAL



1



Timbunan Tanah Merah dari Quarry Borrow Sub Total Dana Masuk (Inflow)



Unit



12



40,000,000



480,000,000



Ltr Orang



28,800 12



15,000 6,000,000



432,000,000 72,000,000 1,686,000,000 1,251,600,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



OUTFLOW / Biaya Produksi / Operasional 2



Beli Timbunan Tanah Merah dari Quarry



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 di quarry & lokasi 540,000,000 kerja 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 di lokasi kerja 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



78,000,000 15,000 6,000,000 3,000,000



78,000,000 di lokasi kerja 108,000,000 6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON



30



40,000,000



BBM Solar Industri Supir



Unit Ltr Orang



72,000 30



15,000 6,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 siram jalan, dll 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM



Unit



2



45,000,000



90,000,000 di lokasi kerja



Page 3



1,200,000,000 1 dt =22-24 m3/rit 1,080,000,000 180,000,000



9



BBM Solar Industri Operator Ass Operator



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



Unit Ltr Orang Orang



1 12,000 2 1



50,000,000 15,000 6,000,000 3,000,000



Keuntungan Pek Timbunan Tanah Merah IV



180,000,000 12,000,000 3,000,000 50,000,000 di lokasi kerja 180,000,000 12,000,000 3,000,000 6,094,500,000 9,205,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



DEMOBILISASI ALAT BERAT



Unit



10



5,000,000



2



DEMOBILISASI DUMPT TRUCK



Unit



31



2,500,000



77,500,000



3



GAJI



Ls



1



470,000,000



470,000,000



4



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



5



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



6



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



7



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



8



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



9



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-9)



50,000,000



1,000,000 DP Kredit 942,500,000



Outflow / Dana yg dibutuhkan



9,989,000,000



Inflow / Dana yg masuk



19,965,600,000



9,976,600,000



Keuntungan April 2020



Page 4



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Mei 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-4) Keuntungan Pekerjaan Pembersihan



II 1



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk Timb dari Hasil Galian



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



240,000,000 Sewa / Bln 432,000,000 24,000,000 6,000,000



OUTFLOW / Biaya Produksi / Operasional 2



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian



III



TIMBUNAN TANAH MERAH QUARRY BORROW



1



INFLOW / Dana Masuk Timbunan dari Borrow Material /Tanah Merah Sub Total Dana Masuk Timb Tanah Merah



Unit



6



40,000,000



240,000,000



38,400 6



15,000 6,000,000



576,000,000 36,000,000 1,554,000,000 404,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



Ltr Orang



OUTFLOW / Biaya Produksi / Operasional 2



Beli Tanah Merah dari Quarry Borrow



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



78,000,000 15,000 6,000,000 3,000,000



78,000,000 108,000,000 6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON



Unit



30



40,000,000



1,200,000,000



BBM Solar Industri Supir



Ltr Orang



72,000 30



15,000 6,000,000



1,080,000,000 180,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM



Unit



2



45,000,000



90,000,000



Page 5



KET



9



BBM Solar Industri Operator Ass Operator



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-3)



Unit Ltr Orang Orang



2 12,000 2 1



50,000,000 15,000 6,000,000 3,000,000



100,000,000 180,000,000 12,000,000 3,000,000 6,144,500,000



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,707,500,000



Inflow / Dana yg masuk



18,986,400,000



9,278,900,000



Keuntungan Mei 2020



Page 6



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Juni 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



pekerjaan GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang



II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Galian Tanah



1



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



OUTFLOW / Biaya Produksi / Operasional 2



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timbunan dari Hasil Galian



III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah dari Borrow Sub Total Dana Masuk (Inflow) Tanah Merah



Unit



6



40,000,000



240,000,000



19,200 6



15,000 6,000,000



288,000,000 36,000,000 1,266,000,000 692,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



Ltr Orang



OUTFLOW / Biaya Produksi / Operasional 2



Beli Tanah Merah Quarry Borrow



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



78,000,000 15,000 6,000,000 3,000,000



78,000,000 108,000,000 6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON



30



40,000,000



1,200,000,000



BBM Solar Industri Supir



Unit Ltr Orang



72,000 30



15,000 6,000,000



1,080,000,000 180,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



7



SEWA VIBRO BOMAG DRUM



Unit



2



45,000,000



90,000,000



Page 7



KET



8



BBM Solar Industri Operator Ass Operator



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-8)



Unit Ltr Orang Orang



2 12,000 2 1



50,000,000 15,000 6,000,000 3,000,000



100,000,000 180,000,000 12,000,000 3,000,000 6,144,500,000



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,419,500,000



Inflow / Dana yg masuk



18,986,400,000



9,566,900,000



Keuntungan Juni 2020



Page 8



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Juli 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



pekerjaan GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang



II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



1



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian



III



PEKERJAAN TIMB TANAH MERAH QUARRY



1



Timbunan Tanah Merah Quarry Sub Total Dana Masuk (Inflow) Tanah Merah



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



8 19,200 8



40,000,000 15,000 6,000,000



320,000,000 288,000,000 48,000,000 1,358,000,000 600,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



OUTFLOW / Biaya Produksi / Operasional 2



Timbunan Tanah Merah Quarry



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri



Unit Ltr



1 7,200



78,000,000 15,000



78,000,000 108,000,000



Page 9



KET



Operator Ass Operator



Orang Orang



1 1



6,000,000 3,000,000



6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Unit Ltr Orang



30 72,000 30



40,000,000 15,000 6,000,000



1,200,000,000 1,080,000,000 180,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM



Unit



BBM Solar Industri Operator Ass Operator 9



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



2



45,000,000



90,000,000



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



Unit Ltr



2 12,000



50,000,000 15,000



100,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000 6,144,500,000



Orang Orang



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,511,500,000



Inflow / Dana yg masuk



18,986,400,000



9,474,900,000



Keuntungan Juli 2020



Page 10



Jun



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Agustus 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang



II



SEWA TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



1



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian



III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah Borrow Sub Total Dana Masuk (Inflow) Tanah Merah



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



OUTFLOW / Biaya Produksi / Operasional 2



Timbunan dari Borrow Material



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri



Unit Ltr



1 7,200



78,000,000 15,000



78,000,000 108,000,000



Page 11



KET



Operator Ass Operator



Orang Orang



1 1



6,000,000 3,000,000



6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Unit Ltr Orang



30 72,000 30



40,000,000 15,000 6,000,000



1,200,000,000 1,080,000,000 180,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM



Unit



BBM Solar Industri Operator Ass Operator 9



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



2



45,000,000



90,000,000



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



Unit Ltr



2 12,000



50,000,000 15,000



100,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000 6,144,500,000



Orang Orang



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan Agustus 2020



Page 12



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : September 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang



II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



1



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian



III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah dari Quarry Borrow Sub Total Dana Masuk (Inflow) Tanah Merah



2



OUTFLOW / Biaya Produksi / Operasional Timbunan dari Borrow Material



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri



Unit Ltr



1 7,200



78,000,000 15,000



78,000,000 108,000,000



Page 13



KET



Operator Ass Operator



Orang Orang



1 1



6,000,000 3,000,000



6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Unit Ltr Orang



30 72,000 30



40,000,000 15,000 6,000,000



1,200,000,000 1,080,000,000 180,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM



Unit



BBM Solar Industri Operator Ass Operator 9



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



2



45,000,000



90,000,000



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



Unit Ltr



2 12,000



50,000,000 15,000



100,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000 6,144,500,000



Orang Orang



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan September 2020



Page 14



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Oktober 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang



II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



1



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian



III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah Quarry Borrow Sub Total Dana Masuk (Inflow) Tanah Merah



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



OUTFLOW / Biaya Produksi / Operasional 2



Timbunan dari Borrow Material



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri



Unit Ltr



1 7,200



78,000,000 15,000



78,000,000 108,000,000



Page 15



KET



Operator Ass Operator



Orang Orang



1 1



6,000,000 3,000,000



6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Unit Ltr Orang



30 72,000 30



40,000,000 15,000 6,000,000



1,200,000,000 1,080,000,000 180,000,000



7



WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM BBM Solar Industri Operator Ass Operator



9



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



Unit



2



45,000,000



90,000,000



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



Unit Ltr



2 12,000



50,000,000 15,000



100,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000 6,144,500,000



Orang Orang



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan Oktober 2020



Page 16



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Nopember 2020



NO.



URAIAN



Okt



VOLUME



1



2



3



4



I 1



2



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang



II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN INFLOW / Dana Masuk Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



1



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian



III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah Borrow Sub Total Dana Masuk (Inflow) Tanah Merah



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



M3



57,600



30,000



1,728,000,000 1,728,000,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr Orang Orang



4 28,800 4 2



60,000,000 15,000 6,000,000 3,000,000



240,000,000 432,000,000 24,000,000 6,000,000



Unit Ltr Orang



6 14,400 6



40,000,000 15,000 6,000,000



240,000,000 216,000,000 36,000,000 1,194,000,000 764,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



M3



180,000



10,000



1,800,000,000



OUTFLOW / Biaya Produksi / Operasional 2



Timbunan dari Borrow Material



3



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



5 36,000 5 3



60,000,000 15,000 6,000,000 3,000,000



300,000,000 540,000,000 30,000,000 9,000,000



4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Unit Ltr Orang Orang



1 7,200 1 1



75,000,000 15,000 6,000,000 3,000,000



75,000,000 108,000,000 6,000,000 3,000,000



5



SEWA MOTOR GREDER 180 HP BBM Solar Industri



Unit Ltr



1 7,200



78,000,000 15,000



78,000,000 108,000,000



Page 17



KET



Operator Ass Operator



Orang Orang



1 1



6,000,000 3,000,000



6,000,000 3,000,000



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Unit Ltr Orang



30 72,000 30



40,000,000 15,000 6,000,000



1,200,000,000 1,080,000,000 180,000,000



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



Unit Ltr Orang



1 900 1



20,000,000 15,000 5,000,000



20,000,000 13,500,000 5,000,000



8



SEWA VIBRO BOMAG DRUM



Unit



BBM Solar Industri Operator Ass Operator 9



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



2



45,000,000



90,000,000



Ltr Orang Orang



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



Unit Ltr



2 12,000



50,000,000 15,000



100,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000 6,144,500,000



Orang Orang



Keuntungan Pek Timb Tanah Merah IV



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan Nopember 2020



Page 18



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Desember 2020



NO.



URAIAN



1



2



I



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk



1



Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah



2



3



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200



Okt



3



M3



VOLUME



4



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



57,600



30,000



1,728,000,000 1,728,000,000



4



60,000,000



240,000,000



BBM Solar Industri Operator



Ltr Orang



28,800 4



15,000 6,000,000



432,000,000 24,000,000



Ass Operator



Orang



2



3,000,000



6,000,000



6 14,400



40,000,000 15,000



240,000,000 216,000,000



6



6,000,000



36,000,000 1,194,000,000



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)



Unit



Unit Ltr Orang



Keuntungan Pek Galian Tanah di buang II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN OUTFLOW / Biaya Produksi / Operasional



1



Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



2



3



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200



534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



4



60,000,000



240,000,000



BBM Solar Industri Operator



Ltr Orang



28,800 4



15,000 6,000,000



432,000,000 24,000,000



Ass Operator



Orang



2



3,000,000



6,000,000



6 14,400



40,000,000 15,000



240,000,000 216,000,000



6



6,000,000



36,000,000 1,194,000,000



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)



Unit



Unit Ltr Orang



Keuntungan Pek Timb dari Hasil Galian III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah Quarry



764,400,000



M3



180,000



85,000



Sub Total Dana Masuk (Inflow) Tanah Merah



15,300,000,000



2



OUTFLOW / Biaya Produksi / Operasional Timbunan Tanah Merah Quarry Borrow



M3



3



SEWA EXCAVATOR PC 200



Unit



4



15,300,000,000



180,000



10,000



1,800,000,000



5



60,000,000



300,000,000



BBM Solar Industri Operator



Ltr Orang



36,000 5



15,000 6,000,000



540,000,000 30,000,000



Ass Operator



Orang



3



3,000,000



9,000,000



SEWA BULLDOZER D6 BBM Solar Industri Operator



Unit Ltr Orang



1 7,200 1



75,000,000 15,000 6,000,000



75,000,000 108,000,000 6,000,000



Ass Operator



Orang



1



3,000,000



3,000,000



Page 19



KET



NO.



5



URAIAN



SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



8



SEWA VIBRO BOMAG DRUM BBM Solar Industri Operator Ass Operator



9



SEWA VIBRO SHEEPFOOT



Okt



VOLUME



Unit Ltr Orang Orang Unit Ltr Orang



JUMLAHHARGA



(Rp.)



(Rp.)



1 7,200



78,000,000 15,000



78,000,000 108,000,000



1 1



6,000,000 3,000,000



6,000,000 3,000,000



30



40,000,000



1,200,000,000



72,000 30



15,000 6,000,000



1,080,000,000 180,000,000



1 900



20,000,000 15,000



20,000,000 13,500,000



1



5,000,000



5,000,000



2 12,000



45,000,000 15,000



90,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000



Unit Ltr Orang Unit Ltr



HARGA SATUAN



Orang Orang



2



50,000,000



100,000,000



BBM Solar Industri Operator



Unit Ltr Orang



12,000 2



15,000 6,000,000



180,000,000 12,000,000



Ass Operator Sub Total (Outflow) / Biaya Produksi (2-9)



Orang



1



3,000,000



3,000,000 6,144,500,000



Keuntungan Pek Timb Tanah Merah IV



KET



9,155,500,000



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000



DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000



DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000



DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000



DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



1,000,000



DP Kredit



Sub Total (Outflow) / Biaya Overhead (1-7)



815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan Desember 2020



Page 20



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Januari 2021



NO.



URAIAN



1



2



I



PEKERJAAN GALIAN TANAH DIBUANG INFLOW / Dana Masuk



1



Galian Tanah dibuang Sub Total Dana Masuk (Inflow) Galian Tanah



2



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200



3



Okt



3



M3



VOLUME



4



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



57,600



30,000



1,728,000,000 1,728,000,000



4



60,000,000



240,000,000



BBM Solar Industri Operator



Ltr Orang



28,800 4



15,000 6,000,000



432,000,000 24,000,000



Ass Operator



Orang



2



3,000,000



6,000,000



6 14,400



40,000,000 15,000



240,000,000 216,000,000



6



6,000,000



36,000,000 1,194,000,000



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)



Unit



Unit Ltr Orang



Keuntungan Pek Galian Tanah di buang II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN OUTFLOW / Biaya Produksi / Operasional



1



Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



2



3



OUTFLOW / Biaya Produksi / Operasional SEWA EXCAVATOR PC 200



534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



4



60,000,000



240,000,000



BBM Solar Industri Operator



Ltr Orang



28,800 4



15,000 6,000,000



432,000,000 24,000,000



Ass Operator



Orang



2



3,000,000



6,000,000



6 14,400



40,000,000 15,000



240,000,000 216,000,000



6



6,000,000



36,000,000 1,194,000,000



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir Sub Total (Outflow) / Biaya Produksi (2-3)



Unit



Unit Ltr Orang



Keuntungan Pek Timb dari Hasil Galian III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan dari Borrow Material



764,400,000



M3



180,000



85,000



Sub Total Dana Masuk (Inflow) Tanah Merah



2



OUTFLOW / Biaya Produksi / Operasional Timbunan dari Borrow Material



M3



3



SEWA EXCAVATOR PC 200



Unit



4



15,300,000,000 15,300,000,000



180,000



10,000



1,800,000,000



5



60,000,000



300,000,000



BBM Solar Industri Operator



Ltr Orang



36,000 5



15,000 6,000,000



540,000,000 30,000,000



Ass Operator



Orang



3



3,000,000



9,000,000



SEWA BULLDOZER D6 BBM Solar Industri Operator



Unit Ltr Orang



1 7,200 1



75,000,000 15,000 6,000,000



75,000,000 108,000,000 6,000,000



Ass Operator



Orang



1



3,000,000



3,000,000



Page 21



KET



NO.



5



6



URAIAN



SEWA MOTOR GREDER 180 HP



9



(Rp.)



(Rp.)



1



78,000,000



78,000,000



15,000 6,000,000



108,000,000 6,000,000



Ass Operator



Orang



1



3,000,000



3,000,000



30 72,000



40,000,000 15,000



1,200,000,000 1,080,000,000



30



6,000,000



180,000,000



WATER TANKTRUCK



SEWA VIBRO BOMAG DRUM



Unit Ltr Orang Unit Ltr Orang



20,000,000



20,000,000



15,000 5,000,000



13,500,000 5,000,000



2



45,000,000



90,000,000



Ltr Orang



12,000 2



15,000 6,000,000



180,000,000 12,000,000



Ass Operator



Orang



1



3,000,000



3,000,000



2 12,000



50,000,000 15,000



100,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000



SEWA VIBRO SHEEPFOOT BBM Solar Industri



Unit



1 900 1



BBM Solar Industri Operator



Operator Ass Operator



IV



JUMLAHHARGA



7,200 1



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri



Unit



HARGA SATUAN



Ltr Orang



BBM Solar Industri Supir 8



VOLUME



BBM Solar Industri Operator



Supir 7



Okt



Unit Ltr Orang Orang



Sub Total (Outflow) / Biaya Produksi (2-9)



6,144,500,000



Keuntungan Pek Timb Tanah Merah



9,155,500,000



KET



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan Januari 2021



Page 22



NERACA PEKERJAAN /RENCANA ANGGARAN BIAYA PROYEK PEMBANGNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR



Nama Proyek : Pembangunan Jalan Tol Tebing Tinggi - Pematang Siantar STA 30+000 s/d STA 58+000 Lokasi : Sumatera Utara Periode : Februari 2021



NO.



URAIAN



1



2



I



PEKERJAAN GALIAN TANAH DIBUANG



1



INFLOW / Dana Masuk Galian Tanah dibuang



Okt



3



VOLUME



4



M3



57,600



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



5



6



30,000



Sub Total Dana Masuk (Inflow) Galian Tanah



1,728,000,000 1,728,000,000



OUTFLOW / Biaya Produksi / Operasional 2



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Unit Ltr Orang Orang Unit Ltr Orang



4 28,800



60,000,000 15,000



240,000,000 432,000,000



4 2



6,000,000 3,000,000



24,000,000 6,000,000



6



40,000,000



240,000,000



14,400 6



15,000 6,000,000



216,000,000 36,000,000



Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Galian Tanah di buang II



PEKERJAAN TIMBUNAN DARI HASIL GALIAN



1



OUTFLOW / Biaya Produksi / Operasional Timbunan Dari Hasil Galian Sub Total Dana Masuk (Inflow) Hasil Galian



1,194,000,000 534,000,000



M3



57,600



34,000



1,958,400,000 1,958,400,000



Unit Ltr



4 28,800



60,000,000 15,000



240,000,000 432,000,000



4 2



6,000,000 3,000,000



24,000,000 6,000,000



6



40,000,000



240,000,000



14,400 6



15,000 6,000,000



216,000,000 36,000,000



OUTFLOW / Biaya Produksi / Operasional 2



SEWA EXCAVATOR PC 200 BBM Solar Industri Operator Ass Operator



3



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



Orang Orang Unit Ltr Orang



Sub Total (Outflow) / Biaya Produksi (2-3) Keuntungan Pek Timb dari Hasil Galian III



PEKERJAAN TIMB TANAH MERAH BORROW



1



Timbunan Tanah Merah Quarry Borrow Sub Total Dana Masuk (Inflow) Tanah Merah



1,194,000,000 764,400,000



M3



180,000



85,000



15,300,000,000 15,300,000,000



OUTFLOW / Biaya Produksi / Operasional 2



Timbunan Tanah Merah Quarry



M3



180,000



10,000



1,800,000,000



3



SEWA EXCAVATOR PC 200 BBM Solar Industri



Unit Ltr



5 36,000



60,000,000 15,000



300,000,000 540,000,000



5 3



6,000,000 3,000,000



30,000,000 9,000,000



1 7,200



75,000,000 15,000



75,000,000 108,000,000



1 1



6,000,000 3,000,000



6,000,000 3,000,000



Operator Ass Operator 4



SEWA BULLDOZER D6 BBM Solar Industri Operator Ass Operator



Orang Orang Unit Ltr Orang Orang



Page 23



KET



NO.



5



URAIAN



SEWA MOTOR GREDER 180 HP BBM Solar Industri Operator Ass Operator



6



SEWA DUMPT TRUCK 25 - 30 TON BBM Solar Industri Supir



7



SEWA WATER TANKTRUCK BBM Solar Industri Supir



8



VIBRO BOMAG DRUM BBM Solar Industri Operator Ass Operator



9



SEWA VIBRO SHEEPFOOT BBM Solar Industri Operator Ass Operator



IV



Okt



VOLUME



Unit Ltr Orang Orang Unit Ltr Orang Unit Ltr Orang Unit Ltr Orang Orang Unit Ltr Orang Orang



HARGA SATUAN



JUMLAHHARGA



(Rp.)



(Rp.)



1 7,200



78,000,000 15,000



78,000,000 108,000,000



1 1



6,000,000 3,000,000



6,000,000 3,000,000



30



40,000,000



1,200,000,000



72,000 30



15,000 6,000,000



1,080,000,000 180,000,000



1 900



20,000,000 15,000



20,000,000 13,500,000



1



5,000,000



5,000,000



2 12,000



45,000,000 15,000



90,000,000 180,000,000



2 1



6,000,000 3,000,000



12,000,000 3,000,000



2



50,000,000



100,000,000



12,000 2 1



15,000 6,000,000 3,000,000



180,000,000 12,000,000 3,000,000



Sub Total (Outflow) / Biaya Produksi (2-9)



6,144,500,000



Keuntungan Pek Timb Tanah Merah



9,155,500,000



KET



OUTFLOW / Biaya Produksi / Operasional



I



BIAYA OVERHEAD



1



GAJI



Ls



1



470,000,000



470,000,000



2



OPERASIONAL, MAKAN, DLL



Ls



1



300,000,000



300,000,000



3



TOYOTA HILUX DOUBLE CABIN



Unit



1



15,000,000



15,000,000 DP Kredit



4



TOYOTA KIJANG DIESEL



Unit



1



15,000,000



15,000,000 DP Kredit



5



PICK UP ISUZU PANTHER



Unit



1



10,000,000



10,000,000 DP Kredit



6



MOTOR KAWASAKI KLX



Unit



4



1,000,000



4,000,000 DP Kredit



7



MOTOR HONDA VARIO



Unit



1



1,000,000



Sub Total (Outflow) / Biaya Overhead (1-7)



1,000,000 DP Kredit 815,000,000



Outflow / Dana yg dibutuhkan



9,347,500,000



Inflow / Dana yg masuk



18,986,400,000



9,638,900,000



Keuntungan Februari 2021



Page 24



Prep Sistem Kontrak MPU Nama Paket PAGU HPS Waktu Pelaksanaan Masa Mobilisasi Masa Pemeliharaan Ditujukan Kpd P Efektif P Fungsional Jembatan P Jembatan Eskalasi Bhs. Penawaran Pengguna Jasa



Unit Price



Rp Rp



20,000,000,000.00 19,999,944,000.00 180 Hari 30 Hari 180 Hari



6 bln



7.28 Km Km Buah m tidak Ada Indonesia Nama Jabatan Alamat



Uang Muka Pembayaran Prestasi Pemasukan Penawaran Surat Penawaran Berlaku Jaminan Penawaran



20% Bulanan (Monthly Certificate) 5-May-10 90 118



Daftar Simak



Surat Penawaran Surat Kuasa Jaminan Penawaran Daftar Kuantitas dan Harga Analisa harga Satuan mata Pembayaran Utama Daftar Upah Daftar Harga Bahan Daftar Harga Peralatan Metoda Pelaksanaan Jadual Waktu Pelaksanaan Daftar Personil Inti Daftar Perlatan Utama Bagian Pekerjaan yang Disubkontrakkan Rekaman Surat Perjanjian Kemitraan



10:00 WITA 3-Aug-10



maks



20%



APPENDIX 3d TO BID



ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK



NO



: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum



AMOUNT



UNIT



1.1 -



Compaction Test Standard Proctor Mould Standard Proctor Hammer Modified Compaction Mould Modified Compaction Hammer Straight Edge Sample Ejector Mixing Spoon Mixing Trowel Spatula Mixing Pan Alumunium Pan 25 cm Diameter Wash Bottle Moisture Cans Sub Total 1.1



Each Each Each Each Each Each Each Each Each Each Each Each Each



5.00 1.00 5.00 1.00 1.00 1.00 1.00 1.00 1.00 5.00 1.00 1.00 36.00



550,000.00 550,000.00 770,000.00 660,000.00 55,000.00 1,639,000.00 110,000.00 44,000.00 44,000.00 495,000.00 55,000.00 55,000.00 11,000.00



2,750,000.00 550,000.00 3,850,000.00 660,000.00 55,000.00 1,639,000.00 110,000.00 44,000.00 44,000.00 2,475,000.00 55,000.00 55,000.00 396,000.00 12,683,000.00



1.2 -



Laboratory CBR Mechanical Loading Press 6000 lbs Capacity Proving Ring CBR Mould Spacer Disk Swell Plate Surcharge Plate Tripod Attachment Swell Dial Indicator Surcharge Weight Slotted Surcharge Weight Steel Cutting Edge Sub Total 1.2



Each Each Each Each Each Each Each Each Each Each



1.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00



5,500,000.00 2,750,000.00 825,000.00 330,000.00 660,000.00 330,000.00 2,200,000.00 220,000.00 165,000.00 110,000.00



5,500,000.00 2,750,000.00 4,950,000.00 1,980,000.00 3,960,000.00 1,980,000.00 13,200,000.00 1,320,000.00 990,000.00 110,000.00 36,740,000.00



1.3 -



Specific Gravity Pyrometer Bottles of 100 cc Cap. Porcelain Mortar and Pestle Hot Plate, 1000 Watts, 220 Volts 50 Cycles Sub Total 1.3



Each Each Each



3.00 1.00 1.00



275,000.00 165,000.00 1,100,000.00



825,000.00 165,000.00 1,100,000.00 2,090,000.00



1



QUANTITY



UNIT COST Rp



DESCRIPTION



FC¹



Rp



SOIL TESTING



Sub Total of Sheet 1.1 - 3



51,513,000.00



FC¹



APPENDIX 3d TO BID



ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK



NO



: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum



DESCRIPTION



1.4 -



Attenberg Limits Standard Liquid Limit Device ASTM Grooving Tools Evaporating Dish Flexible Spatula 100 cm Graduated Cylinder Casagrande Grooving Tool Plastic Limit Glass Plate Sub Total 1.4



1.5 -



Grain Size Analysis Hidrometer Jars Mechanical Stirrer, Electric Powered 220 V, 50 Cycle Dispersion Cups with Baffles Hydrometer Scale 0-60 gr Set Brass Sieve, 8 inch Diameter, 75 mm 50, 38, 25, 19, 12.5, 9, 5, N0.4, 10, 30, 60, 100 including Cover and Pan No. 200 Brass Sieves Wet Washing Sieve 50 ml Graduated Cylinder Sieve Brushes for Fine Sieve Sieve Brushes for Coarse Sieve Sub Total 1.5



-



-



UNIT



QUANTITY



UNIT COST Rp



AMOUNT FC¹



Rp



Each Each Each Each Each Each Each



1.00 1.00 3.00 2.00 2.00 1.00 1.00



1,650,000.00 165,000.00 77,000.00 44,000.00 137,500.00 110,000.00 110,000.00



1,650,000.00 165,000.00 231,000.00 88,000.00 275,000.00 110,000.00 110,000.00 2,629,000.00



Each Each



3.00 1.00



440,000.00 1,650,000.00



1,320,000.00 1,650,000.00



Each Each Each



2.00 1.00 2.00



550,000.00 330,000.00 8,580,000.00



1,100,000.00 330,000.00 17,160,000.00



Each Each Each Each Each



4.00 1.00 1.00 2.00 2.00



660,000.00 1,100,000.00 165,000.00 55,000.00 55,000.00



2,640,000.00 1,100,000.00 165,000.00 110,000.00 110,000.00 25,685,000.00



1.6 -



Field Density Test, Sand Cone Method Sand Cone Replacement Jug Field Density Plate Spoon Steel Chisel, 1 Inch Rubber Mallet Sand Scoop 1 Gallon Field Cans Sub Total 1.6



Each Each Each Each Each Each Each Each



1.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00



660,000.00 220,000.00 440,000.00 110,000.00 44,000.00 55,000.00 110,000.00 38,500.00



660,000.00 220,000.00 440,000.00 110,000.00 44,000.00 55,000.00 110,000.00 231,000.00 1,870,000.00



1.7 -



Moisture Content Speedy Moisture Tester, 26 Grams Capacity Cans "Speedy" Regeant Sub Total 1.7



Each Each



1.00 6.00



8,250,000.00 165,000.00



8,250,000.00 990,000.00 9,240,000.00



Sub Total of Sheet 1.4 - 7



39,424,000.00



FC¹



APPENDIX 3d TO BID



ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK



NO



2 2.1 -



-



2.2 -



2.3



: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum



DESCRIPTION



UNIT



QUANTITY



UNIT COST Rp



AMOUNT FC¹



Rp



BITUMINOUS TESTING Marshall Asphalt Test Stability compression machine 220 volt 50 cycles, complete with 6000 lbs proving Ring Stability compaction mould 4" Stability compaction mould 6" Mechanical compaction hammer for 4" Mechanical compaction hammer for 6" Mould holder for 4" mould Mould holder for 6" mould Stability mould 4" Stability mould 6" Dial flow indicator Pedestal Water bath 220 V,50 cycle Sample extractor Stainless steel mixing bowls Sub Total 2.1 Extraction Test, Centrifuge Method Centrifuge extraction, 1500 gram capacity, 220 V,50 cycle Boxes filter paper rings (100-box) Extractor Bowl Bowl cover Bowl nut Sub Total 2.2 Extraction Test, Reflux Method Reflux extractor set , 1000 gram capacity, boxes filter paper (50 - box), included Sub Total 2.3 Sub Total of Sheet 2.1 - 2.3



Each



1.00



12,100,000.00



12,100,000.00



Each Each Each Each Each Each Each Each Each Each Each Each Each



15.00 15.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00



495,000.00 660,000.00 1,925,000.00 2,750,000.00 550,000.00 715,000.00 1,925,000.00 2,750,000.00 1,650,000.00 1,650,000.00 4,950,000.00 1,650,000.00 165,000.00



7,425,000.00 9,900,000.00 1,925,000.00 2,750,000.00 550,000.00 715,000.00 1,925,000.00 2,750,000.00 1,650,000.00 1,650,000.00 4,950,000.00 1,650,000.00 330,000.00 50,270,000.00



Each



1.00



8,250,000.00



8,250,000.00



Each Each Each Each



10.00 1.00 1.00 1.00



825,000.00 550,000.00 275,000.00 275,000.00



8,250,000.00 550,000.00 275,000.00 275,000.00 17,600,000.00



Each



1.00



7,150,000.00



7,150,000.00 7,150,000.00 75,020,000.00



FC¹



APPENDIX 3d TO BID



ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK



NO



: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum



DESCRIPTION



UNIT



QUANTITY



UNIT COST Rp



AMOUNT FC¹



Rp



2.4 -



Specific Gravity of Coarse Aggregate Density basket Sample Splitter 1" Sample Splitter 1/2" Sub Total 2.4



Each Each Each



1.00 1.00 1.00



550,000.00 1,540,000.00 1,760,000.00



550,000.00 1,540,000.00 1,760,000.00 3,850,000.00



2.5 -



Specific Gravity of Fine Aggregate Cone Tamper Pycnometer Thermometer (Glass) 0-150 celcius Desicator Sub Total 2.5



Each Each Each Each Each



1.00 1.00 1.00 3.00 1.00



440,000.00 110,000.00 275,000.00 55,000.00 1,980,000.00



440,000.00 110,000.00 275,000.00 165,000.00 1,980,000.00 2,970,000.00



2.6 -



Mix Air Voids Content (Accurate Method) 220 Conial Flask with neck large enough to admint 25 mm aggregate, with airtight ground glass stopper Vacuum pump Rubber tubing Warm air fan Sub Total 2.6



Each



2.00



3,300,000.00



6,600,000.00



Each Each Each



1.00 1.00 1.00



550,000.00 275,000.00 275,000.00



550,000.00 275,000.00 275,000.00 7,700,000.00



-



2.7 -



Core Drilling Core drill machine 9" Extension shaft 18" Strap Wrench Diamond bit 4" diameter Expanding adaptor Sub Total 2.7



Each Each Each Each Each



1.00 1.00 1.00 2.00 1.00



17,325,000.00 550,000.00 550,000.00 550,000.00 550,000.00



17,325,000.00 550,000.00 550,000.00 1,100,000.00 550,000.00 20,075,000.00



2.8 -



Metal Thermometer 0-100 celcius Metal thermometer 0-200 celcius Metal thermometer Sub Total 2.8



Each Each



1.00 1.00



440,000.00 440,000.00



440,000.00 440,000.00 880,000.00



Sub Total of Sheet 2.4 - 2.8



35,475,000.00



FC¹



APPENDIX 3d TO BID



ANALYSIS OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT NAME OF BIDDER ITEM NUMBER DESCRIPTION OF WORK UNIT OF WORK



NO



: #REF! : 1.2 : Mobilization and Demobilization : Lump Sum



DESCRIPTION



UNIT



QUANTITY



UNIT COST Rp



AMOUNT FC¹



Rp



2.9 -



Accessories and Tools Heavy duty balance complete Triple beam complete Generator, 10 KVA Double wall oven, 1600 W, 240 Volt Plastic Funnel Sodium hexametaphosphate Pairs asbestos gloves Laboratory tongs Sub Total 2.9



Each Each Each Each Each Sheet Each Each



1.00 1.00 1.00 2.00 3.00 1.00 1.00 2.00



11,000,000.00 3,850,000.00 5,500,000.00 25,300,000.00 11,000.00 110,000.00 110,000.00 165,000.00



11,000,000.00 3,850,000.00 5,500,000.00 50,600,000.00 33,000.00 110,000.00 110,000.00 330,000.00 71,533,000.00



2.10 -



Penetrometer Penetration Apparatus Penetration Needle Sample Container Diameter 55 mm Water Batch min. 10 litres Transfer Dish min . 350 ml Timing device, accurte Thermometer Sub Total 2.10



Each Each Each Each Each Each Each



1.00 2.00 6.00 1.00 1.00 1.00 1.00



5,500,000.00 1,100,000.00 1,100,000.00 1,100,000.00 550,000.00 550,000.00 275,000.00



5,500,000.00 2,200,000.00 6,600,000.00 1,100,000.00 550,000.00 550,000.00 275,000.00 16,775,000.00



2.11 -



Softening Point Ring Pouring plate Ball Ball Center Guide Bath Ring Holder and Assembly Sub Total 2.11



Each Each Each Each Each Each



2.00 1.00 2.00 2.00 1.00 1.00



1,100,000.00 550,000.00 275,000.00 275,000.00 550,000.00 275,000.00



2,200,000.00 550,000.00 550,000.00 550,000.00 550,000.00 275,000.00 4,675,000.00



2.12 Refusal Density Compactor



Set



1.00



11,000,000.00



11,000,000.00



2.13 Bitumen Content Tester NCA Automatic Oven Type Sub Total 2.13



Set



1.00



27,500,000.00



27,500,000.00 27,500,000.00



Each Each Each Each



1.00 10.00 1.00 1.00



2,200,000.00 4,620,000.00 8,250,000.00 52,800,000.00



2,200,000.00 46,200,000.00 8,250,000.00 52,800,000.00 109,450,000.00



2.14 -



Concrete Testing Slump cone Cube mould Speedy Moisture tester Cube crushing machine Sub Total 2.14



Sub Total of Sheet 2.9 - 2.14 Total Laboratory Equipment (New Equipment Laboratory) Assumption of Equipment of Laboratory in Rent (40% x New Equipment Laboratory)



240,933,000.00 442,365,000.00 176,946,000.00



FC¹



REKAPITULASI CASH FLOW PEMASUKAN (INFLOW) DAN PENGELUARAN (OUTFLOW) PROYEK PEMBANGUNAN JALAN TOL TEBING TINGGI - PEMATANG SIANTAR PROPINSI SUMATERA UTARA NO



URAIAN



JUMLAH HARGA PEKERJAAN RP



INFLOW 1



Inflow Maret 2020



7,450,926,000.00



2



Inflow April 2020



19,965,600,000.00



3



Inflow Mei 2020



18,986,400,000.00



4



Inflow Juni 2020



18,986,400,000.00



5



Inflow Juli 2020



18,986,400,000.00



6



Inflow Agustus 2020



18,986,400,000.00



7



Inflow September 2020



18,986,400,000.00



8



Inflow Oktober 2020



18,986,400,000.00



9



Inflow Nopember 2020



18,986,400,000.00



10



Inflow Desember 2020



18,986,400,000.00



11



Inflow Januari 2021



18,986,400,000.00



12



Inflow Februari 2021



18,986,400,000.00



TOTAL INFLOW (PEMASUKAN) OUTFLOW



217,280,526,000.00



Outflow Mareti 2020



4,632,000,000.00



1



Outflow April 2020



9,989,000,000.00



2



Outflow Mei 2020



9,707,500,000.00



3



Outflow Juni 2020



9,419,500,000.00



5



Outflow Juli 2020



9,511,500,000.00



6



Outflow Agustus 2020



9,347,500,000.00



7



Outflow September 2020



9,347,500,000.00



8



Outflow Oktober 2020



9,347,500,000.00



9



Outflow Nopember 2020



9,347,500,000.00



10



Outflow Desember 2020



9,347,500,000.00



11



Outflow Januari 2021



9,347,500,000.00



12



Outflow Februari 2021



9,347,500,000.00



TOTAL OUT FLOW (PENGELUARAN)



108,692,000,000.00



(A)



Total Inflow / Total Masuk



217,280,526,000.00



(B)



Total Outflow / Total Keluar



108,692,000,000.00



(C)



TOTAL KEUNTUNGAN



108,588,526,000.00



Terbilang :



Seratus Delapan Milyar Lima Ratus Delapan Puluh Dua Juta Lima Ratus Dua Puluh Enam Ribu Rupiah,-



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN



PARDAMEAN SITINJAK Direktur Utama



FASILITAS LABORATORIUM SATUAN PENGUKURAN HARGA SATUAN



NO



I 1



: Lump Sum : 237,719,100.00



URAIAN



SATUAN



Laboratory Building Laboratory Building



VOLUME



HARGA SATUAN



m2



108.00



300,000.00



32,400,000.00 32,400,000.00



set set set set set set set Bln



1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00



1,672,000.00 998,400.00 530,000.00 674,000.00 8,790,500.00 345,700.00 3,977,800.00 2,000,000.00



1,672,000.00 998,400.00 530,000.00 674,000.00 8,790,500.00 691,400.00 7,955,600.00 4,000,000.00 25,311,900.00



set set set set set set set set Bln set set



1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00 1.00 1.00



15,819,000.00 10,271,000.00 1,138,500.00 1,592,000.00 2,691,500.00 14,558,000.00 251,000.00 34,893,500.00 4,406,000.00 311,700.00 7,590,000.00



15,819,000.00 10,271,000.00 1,138,500.00 1,592,000.00 2,691,500.00 14,558,000.00 251,000.00 34,893,500.00 26,436,000.00 311,700.00 7,590,000.00 115,552,200.00



set set set set



1.00 1.00 1.00 1.00



350,000.00 225,000.00 2,000,000.00 22,500,000.00



350,000.00 225,000.00 2,000,000.00 22,500,000.00 25,075,000.00



Unit set set



1.00 1.00 1.00



0.00 6,000,000.00 3,000,000.00



0.00 6,000,000.00 3,000,000.00 9,000,000.00



Bln Bln



7.00 7.00



1,500,000.00 2,000,000.00



10,500,000.00 14,000,000.00 24,500,000.00



ls



1.00



5,880,000.00



5,880,000.00



Sub Total I II 1 2 3 4 5 6 7 8



Soil & Aggregate Testing Compaction Test CBR Test Specifik Gravity Atterberg Limits Grain Size Analysis Field Density Test By Sand Cone Methode Moisture Content Abrasion af Aggregate by loss Angeles machine Sub Total II



III 1 2 3 4 5 6 7 8 9 10 11



Bituminous Testing Marshall Asphalt test Extarctoin Test, Centrifuge/Fefflux Method Specific Gravity for Coarse aggregate Specific Gravity for Fine aggregate Mix Air Void Content (Accurete Method) Core Drill Metal Thermometer Accessories and Toll Penetration Test Softening Point Refusal Density Compactor Sub Total III



IV 1 2 3 4



Concrete Testing Slump Cone Cylinder/cube Mould for Compressive Strength Beam Mould for Flexural Strenght (RIGID) Crushing Machine Sub Total IV



V 1 2 3



Peralatan Pendukung Mobil Pick Up Komputer + Printer Furniture Sub Total V



VI 1 2



Operasional Teknisi Labratorium Tenaga Kerja Terampil Sub Total VI



VII 1



Test Luar Test Luar, Sesuai kebutuhan atau atas Perintah Direksi



TOTAL



Sub Total VI



5,880,000.00



TOTAL HARGA (I - VII)



237,719,100.00



KETERANGAN



ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



No.



I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15



II.



#REF! : Pemeliharaan Rutin Perkerasan : Lump Sum / Bulan



URAIAN



DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Campuran Aspal Panas/Dingin Rata-rata Tebal Penetrasi Macadam Rata-rata Aplikasi Aspal Pengisian Retak Rata-rata Panjang Jalan Proyek Prosentase permukaan yang perlu dipelihara (Wr < 6m) Prosentase permukaan yang perlu dipelihara (Wr > 6m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan permukaan Prosentase waktu mandor utk pemeliharaan permukaan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor



KODE



KOEF.



SATUAN



Tk Wr Ws t h Ar Lp Ap1 Ap2 Tp Tpk Tmd Te Pk Md



7.00 4.50 1.00 0.04 0.055 1.50 14.90 1.00 2.00 210.00 1.00 1.00 1.00 15.00 3.00



jam Meter Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang



(L01) (L03)



220.50 44.10



Jam Jam



10.73 10.73 7.38 1,006 10.00



M3 M3 M3 Liter %



14.70 14.70 14.70



Jam Jam Jam



KETERANGAN



Retak sedang Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu



PEKERJA 1 2



III.



Kebutuhan Pekerja Kebutuhan Mandor



= Pk x Tpk x Tp x Tk = Md x Tmd x Tp x Tk



BAHAN 1 2 3 4 5



IV.



Camp. Aspal Panas = (Ap x t x Wr x Lp x 1000) x % Camp. Aspal Dingin = (Ap x t x Wr x Lp x 1000) x % Penetrasi Macadam = (Ap x h x Wr x Lp x 1000) x % Aspal Pengisi Retak = Ar x Ap x Wr x Lp x 1000 Bahan-bahan lainnya (diasumsikan)



(EI-10B) (EI-10D) (EI-10C) (EI-10E)



ALAT 1 2 3



Motor Grader Flat Bed Truck Air Compressor



File : 540767354.xlsx



= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk



(E13) (E11) (E05)



40% 40% 20% Thd.Biaya Bahan



ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



No.



I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15



II.



: 10.1 (2) : Pemeliharaan Rutin Bahu Jalan : Lump Sum / Bulan



URAIAN



DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Agregat Base Kelas B untuk bahu jalan Aplikasi Aspal Pengisian Retak Panjang Jalan Proyek Prosentase permukaan bahu yang dipelihara (Ws < 3m) Prosentase permukaan bahu yang dipelihara (Ws > 3m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan bahu jln Prosentase waktu mandor utk pemeliharaan bahu jln Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 2.00 regu kerja @ 5orang Jumlah Mandor



KODE



KOEF.



SATUAN



Tk Wr Ws t Ar Lp As1 As2 Tp Tpk Tmd Te Pk Md



7.00 4.50 1.00 0.15 0.50 14.90 2.00 4.00 240.00 0.50 0.50 0.50 10.00 2.00



jam Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang



(L01) (L03)



84.00 16.80



Jam Jam



(EI-10A)



44.70 10.00



M3 %



8.40 8.40 8.40



Jam Jam Jam



KETERANGAN



Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu



PEKERJA 1 2



III.



Kebutuhan Pekerja Kebutuhan Mandor



= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk



BAHAN 1 2



IV.



Lap.Pond.Agr.Kls.B = As x t x Ws x Lp x 1000 Bahan-bahan lainnya (diasumsikan)



ALAT 1 2 3



Motor Grader Flat Bed Truck Roller



File : 540767354.xlsx



= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk



(E13) (E11) (E16)



Thd.Biaya Bahan



ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



No.



I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15



II.



: 10.1 (3) : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan : Lump Sum / Bulan



URAIAN



DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Lebar Saluran/Selokan Rata-rata Timbunan Pilihan diperlukan untuk selokan/sal.air Pas.Bt.Dgn.Mortar diperlukan untuk selokan/sal.air Panjang Jalan Proyek Prosentase saluran yang dipelihara (Wsd < 1m) Prosentase saluran yang dipelihara (Wsd > 1m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan saluran air Prosentase waktu mandor utk pemeliharaan saluran air Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 2.00 regu kerja @ 5orang Jumlah Mandor



KODE



KOEF.



SATUAN



Tk Wr Ws Wsd Vtp Vpb Lp Ad1 Ad2 Tp Tpk Tmd Te Pk Md



7.00 4.50 1.00 0.60 220.00 330.00 14.90 0.50 1.00 240.00 1.00 1.00 2.00 10.00 2.00



jam Meter Meter Meter M3/Km M3/Km Km % % Hari % % % orang orang



(L01) (L03)



168.00 33.60



Jam Jam



(EI-22)



24.59 16.39 10.00



M3 M3 %



33.60 33.60



Jam Jam



KETERANGAN



Thd.Total Pjg.Jln Thd.Total Pjg.Jln Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu



PEKERJA 1 2



III.



Kebutuhan Pekerja Kebutuhan Mandor



= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk



BAHAN 1



IV.



Bahan Umum, antara lain : a. Pasangan Batu Dgn. Mortar = Ad x Lp x Vpb b. Bahan Timbunan Pilihan = Ad x Lp x Vtp c. Bahan-bahan lainnya (diasumsikan)



(EI-323)



ALAT 1 2



Motor Grader Dump Truck



File : 540767354.xlsx



= Te x Tp x Tk = Te x Tp x Tk



(E13) (E08)



Thd.Biaya Bahan



ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



No.



I. 1 2 3 4 5 6 7 8 9 10 11



II.



: 10.1 (4) : Pemeliharaan Rutin Perlengkapan Jalan : Lump Sum / Bulan



URAIAN



DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Lebar Saluran/Selokan Rata-rata Panjang Jalan Proyek Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemel. perlengk. jalan Prosentase waktu mandor utk pemel. perlengk. Jalan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 1.00 regu kerja @ 5orang Jumlah Mandor



KODE



KOEF.



SATUAN



Tk Wr Ws Wsd Lp Tp Tpk Tmd Te Pk Md



7.00 4.50 1.00 0.60 14.90 240.00 0.50 0.25 0.50 5.00 1.00



jam Meter Meter Meter Km Hari % % % orang orang



(L01) (L03)



42.00 4.20



Jam Jam



(M42) (M12) (M01) -



29.80 298.00 14.90 100.00



Kg Kg M3 %



(E11)



8.40



Jam



KETERANGAN



Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu



PEKERJA 1 2



III.



Kebutuhan Pekerja Kebutuhan Mandor



= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk



BAHAN 1



IV.



Bahan Umum, antara lain : a. Cat 2.00 kg per KM b. Semen 20.00 kg per KM b. Pasir 1.00 M3 per KM c. Bahan-bahan lainnya (diasumsikan) ALAT



1



Flat Bed Truck



File : 540767354.xlsx



= Te x Tp x Tk



745,000.00 208,600.00 807,282.00 Thd.Biaya Bahan



ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



No.



I. 1 2 3 4 5 6 7 8 9 10 11 12 13



II.



: 10.1 (5) : Pemeliharaan Rutin Jembatan : Lump Sum / Bulan



URAIAN



DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Rata-rata Jumlah Jembatan per Km panjang jalan Rata-rata Bentang Jembatan Rata-rata Lebar Jembatan Panjang Jalan Proyek Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan jembatan Prosentase waktu mandor utk pemeliharaan jembatan Prosentase waktu alat berat untuk pemel. jembatan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor



KODE



KOEF.



SATUAN



Tk Wr Ws Kj Lj Wj Lp Tp Tpk Tmd Te Pk Md



7.00 4.50 1.00 3.00 15.00 5.50 14.90 240.00 2.00 2.00 5.00 15.00 3.00



jam Meter Meter Buah Meter Meter Km Hari % % % orang orang



(L01) (L03)



504.00 100.80



Jam Jam



(M42) (M12) (M01) -



223.50 2,235.00 7.76 25.00



Kg Kg M3 %



(E13) (E08)



84.00 84.00



Jam Jam



KETERANGAN



Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu



PEKERJA 1 2



III.



Kebutuhan Pekerja Kebutuhan Mandor



= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk



BAHAN 1



IV.



Bahan Umum, antara lain : a. Cat 0.33 kg per M' jembatan b. Semen 3.33 kg per M' jembatan b. Pasir 0.01157 M3 per M' jembatan c. Bahan-bahan lainnya (diasumsikan) ALAT



1 2



Motor Grader Dump Truck



File : 540767354.xlsx



= Te x Tp x Tk = Te x Tp x Tk



5,587,500.00 1,564,500.00 420,459.38 Thd.Biaya Bahan



LAMPIRAN 2 PENAWARAN



DAFTAR MATA PEMBAYARAN UTAMA #REF! ### ###



### ### ### PT. NINDYA KARYA



No.



No. MATA PEMBAYARAN



1.



#REF!



1,04166666666667.#REF!



URAIAN JENIS PEKERJAAN



SATUAN



VOLUME



#REF!



m3



#REF!



#REF!



#REF!



#REF!



###



#REF!



#REF!



#REF!



#REF!



###



#REF!



#REF!



#REF!



#REF!



###



#REF!



#REF!



#REF!



#REF!



###



#REF!



#REF!



#REF!



#REF!



###



#REF!



#REF!



#REF!



#REF!



Catatan : Mata Pembayaran Utama adalah setiap mata Pembayaran bukan lump sum yang jumlah nilainya diurutkan dari nilai terbesar sampai nilai



terkecil, membentuk maksimum 80 (delapan puluh) persen dari harga penawaran. Bilamana jumlah nilainya tidak tepat 80% maka prosentase yang mendekati 80% yang digunakan, tetapi bukan yang melampaui 80%



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 6a PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!



: : : :



No. I



Err:509 #REF! #REF! Lump Sum / Bulan



Uraian



III



Kuantitas



Biaya Satuan



Jumlah



(Rp.)



(Rp.)



Tenaga Kerja : Mandor Pekerja Sub Total I



II



Satuan



Bahan-bahan : Campur Aspal Panas Campur Aspal Dingin Aspal untuk pengisian Retak-retak Bahan-bahan lainnya Sub Total II



Jam Jam



M3 M3 liter Ls



A.



Peralatan + Bahan Bakar : Motor Grader Flat Bed Truck Air Compresor Sub Total III Jumlah (I + II + III)



B. C. D. E.



Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan



Rp. Rp. Rp.



= 5/8 x C / (Periode Pelaksanaan - 3)



Rp.



Jam Jam Jam Rp.



Catatan :



● ● ●



Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.



● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 6b PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!



: : : :



No. I



Err:509 #REF! #REF! Lump Sum / Bulan



Uraian



III



Kuantitas



Biaya Satuan



Jumlah



(Rp.)



(Rp.)



Tenaga Kerja : Mandor Pekerja Sub Total I



II



Satuan



Bahan-bahan : Lapis Pondasi Agregate Kelas B Bahan-bahan Lainnya Sub Total II Peralatan + Bahan Bakar : Motor Grader



Jam Jam



M3 Ls



#REF! 5,000,000.00



Jam



A. B. C.



Flat Bed Truck Roller Sub Total III Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B)



Jam Jam



D. E.



Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan



Rp.



= 5/8 x C / (Periode Pelaksanaan - 3)



Rp.



Rp. Rp. Rp.



Catatan :



● ● ●



Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.



● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 6c PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!



: : : :



No. I



Err:509 #REF! #REF! Lump Sum / Bulan



Uraian



III



A. B. C. D. E.



Kuantitas



Biaya Satuan



Jumlah



(Rp.)



(Rp.)



Tenaga Kerja : Mandor Pekerja Sub Total I



II



Satuan



Bahan-bahan : Umum Sub Total II Peralatan + Bahan Bakar : Motor Grader Dump Truck



Jam Jam



Ls



Jam Jam



Sub Total III Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan



Rp. Rp. Rp. Rp.



= 5/8 x C / (Periode Pelaksanaan - 3)



Rp.



Catatan :



● ● ●



Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.



● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 6d PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!



: : : :



No. I



Err:509 #REF! #REF! Lump Sum / Bulan



Uraian



III



A. B. C. D. E.



Kuantitas



Biaya Satuan



Jumlah



(Rp.)



(Rp.)



Tenaga Kerja : Mandor Pekerja Sub Total I



II



Satuan



Bahan-bahan : Umum Sub Total I Peralatan + Bahan Bakar : Flat Bed Truck Sub Total I



Jam Jam



Ls



Jam



Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan



Rp. Rp. Rp. Rp.



= 5/8 x C / (Periode Pelaksanaan - 3)



Rp.



Catatan :



● ● ●



Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.



● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 6e PENAWARAN ANALISA HARGA LUMP SUM UNTUK PEKERJAAN PEMELIHARAAN RUTIN #REF! #REF! #REF! #REF!



: : : :



No. I



Err:509 #REF! #REF! Lump Sum / Bulan



Uraian



III



A. B. C. D. E.



Kuantitas



Biaya Satuan



Jumlah



(Rp.)



(Rp.)



Tenaga Kerja : Mandor Pekerja Sub Total I



II



Satuan



Bahan-bahan : Umum Sub Total II Peralatan + Bahan Bakar : Flat Bed Truck Air Compressor



Jam Jam



Ls



Jam Jam



Sub Total III Jumlah (I + II + III) Biaya Umum dan Keuntungan (10% x A) Harga Lump Sum (A + B) Harga Lump Sum / bulan untuk 3 bulan pertama = C / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan



Rp. Rp. Rp. Rp.



= 5/8 x C / (Periode Pelaksanaan - 3)



Rp.



Catatan :



● ● ●



Kuantitas-kuantitas yang dicantumkan harus diperkirakan oleh Peserta Lelang. Harga Lumpsum yang diajukan Peserta Lelang harus mencakup seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan Kuantitas yang ditunjukkan dalam Analisa Harga di atas adalah perkiraan Peserta Lelang semata-mata untuk menjadi dasar penetapan Mata pembayaran Pekerjaan Pemeliharaan Rutin ini dan tidak perlu menggambarkan kebutuhan pekerjaan yang sesungguhnya Pembayaran kepada Kontraktor berdasarkan kewajibannya untuk memelihara kondisi jalan agar tetap memuaskan sepanjang waktu sebagaimana ditentukan dalam Spesifikasi dan tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa Harganya.



● Meskipun Analisa Harga di atas ditentukan untuk Periode Pelaksanaan, Kontraktor yang juga bertanggung jawab untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan sesuai dengan Spesifikasi. Namun demeikian, tidak ada pembayaran terpisah untuk Pekerjaan Pemeliharaan Rutin selama Periode Pemeliharaan tersebut, sedangkan biaya yang dikeluarkan untuk pekerjaan dianggap sudah termasuk dalam Harga-harga Satuan yang berkaitan.



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



#REF!



:



Err:509 #REF! #REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / Kg



#REF!



dari …………. 2.



Penanganan / Perawatan



12.50 / Kg



12.50



3.



Angkutan ke Lapangan (Km…………)



50.00 / Kg



50.00



4.



Bongkar muatan, penyimpanan, dll



12.50 / Kg



12.50 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



#REF!



:



Err:509 #REF! #REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / Kg



#REF!



dari …………. 2.



Penanganan / Perawatan



12.50 / Kg



12.50



3.



Angkutan ke Lapangan (Km…………)



50.00 / Kg



50.00



4.



Bongkar muatan, penyimpanan, dll



12.50 / Kg



12.50 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



Err:509 #REF!



#REF!



:



#REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / M3



#REF!



dari …………. 2.



Penanganan / Perawatan



/ M3



3.



Angkutan ke Lapangan (Km…………)



/ M3



4.



Bongkar muatan, penyimpanan, dll



/ M3 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



Err:509 #REF!



#REF!



:



#REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / M3



#REF!



dari …………. 2.



Penanganan / Perawatan



/ M3



3.



Angkutan ke Lapangan (Km…………)



/ M3



4.



Bongkar muatan, penyimpanan, dll



/ M3 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



Err:509 #REF!



#REF!



:



#REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / M3



#REF!



dari …………. 2.



Penanganan / Perawatan



/ M3



3.



Angkutan ke Lapangan (Km…………)



/ M3



4.



Bongkar muatan, penyimpanan, dll



/ M3 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



Err:509 #REF!



#REF!



:



#REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / M3



#REF!



dari …………. 2.



Penanganan / Perawatan



/ M3



3.



Angkutan ke Lapangan (Km…………)



/ M3



4.



Bongkar muatan, penyimpanan, dll



/ M3 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



#REF!



:



Err:509 #REF! #REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / M3



#REF!



dari …………. 2.



Penanganan / Perawatan



3.



Angkutan ke Lapangan (Km…………)



4.



Bongkar muatan, penyimpanan, dll



/ M3 50,000.00 / M3



50,000.00



/ M3 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 7 PENAWARAN



ANALISA MATERIAL ON SITE #REF! BAHAN *)



: :



#REF!



:



Err:509 #REF! #REF!



ELEMEN BIAYA



1.



Biaya CIF di Pelabuhan / Penambangan



Rp. / SATUAN



JUMLAH HARGA



#REF! / Kg



#REF!



dari …………. 2.



Penanganan / Perawatan



25.00 / Kg



25.00



3.



Angkutan ke Lapangan (Km…………)



50.00 / Kg



50.00



4.



Bongkar muatan, penyimpanan, dll



25.00 / Kg



25.00 #REF!



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 9 PENAWARAN



KONFIRMASI KAPASITAS PLANT PEMECAH BATU ### 1.



2.



3.



#REF!



Waktu Bekerja Yang Tersedia (a) Jangka Waktu Pelaksanaan (b) Mobilisasi dan Jangka Waktu Pemasangan Peralatan (min = 60 hari) (c) Demobilisasi pada akhir masa Kontrak (min. = 30 hari) (d) Hari-hari Libur, kerusakan-kerusan/gangguan-gangguan dsb (e)



Jumlah Hari Kerja yang sesungguhnya (a)-(b)-(c)-(d)



(A)



Jumlah Jam Kerja Plant yang sesungguhnya



Kebutuhan Bahan Batu Pecah (1) Lapis Pondasi Agregat (2) Pondasi Jalan Tanpa Penutup



130 Hari 60 Hari 30 Hari 17 Hari



7 jam/hari



#REF! M3 x M3 x



2.2000 x 2.2000 x



1.00 x 1.00 x



1.05 1.05



=



23 Hari



=



161 Jam



= =



#REF! ton - ton



1.05 = 1.05 =



- ton - ton



(3) (4)



Agregat Penutup Burtu Agregat Penutup Burda



M2 x M2 x



0.0165 x 0.0250 x



2.00 x 2.00 x



1.00 x 1.00 x



(5)



Latasir (SS) Kelas A



0.50 x



1.05



=



- ton



Latasir (SS) Kelas B Lataston Lapis Aus (HRS-WC)



M2 x M2 x M2 x



0.0150 x



(6) (7)



0.0200 x 0.0300 x



2.30 x 2.30 x



0.50 x 0.75 x



1.05 = 1.05 =



- ton - ton



(8) (9)



Lataston Lapis Pondasi (HRS-Base) Laston Lapis Aus (AC-WC)



M3 x #REF! M2 x



2.300 x 0.0400 x



0.75 x 2.30 x



1.05 0.75 x



= 1.05 =



- ton #REF! ton



(10) (10a) (11) (12)



Laston Lapis Pengikat (AC-BC) Laston Lapis Pengikat (AC - BC) Leveling Laston Lapis Pondasi (AC-Base) Lain-lain (Agregat Beton, Drainage Porous dll)



#REF! M3 x



2.3000 x



0.75 x



1.05



M3 x



2.3000 x



0.75 x



1.05



= = = =



#REF! ton #REF! ton - ton - ton



(B)



Jumlah Kebutuhan batu Pecah



=



#REF! ton



=



#REF! ton/jam



Kapasitas Plant Pemecah Batu Kapasitas yang diperlukan = (B) / (A) Kapasitas yang sesungguhnya



Jumlah Kapasitas yang sesungguhnya



Plant 1 Plant 2 lain-lain



= = =



48.00 ton/jam 48.00 ton/jam 48.00 ton/jam



=



144.00 ton/jam



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 10 PENAWARAN



KONFIRMASI KAPASITAS PLANT PENCAMPUR ASPAL ### 1.



2.



3.



#REF!



Waktu Bekerja Yang Tersedia (a) Jangka Waktu Pelaksanaan (b) Mobilisasi dan Jangka Waktu Pemasangan Peralatan (min = 60 hari) (c) Demobilisasi pada akhir masa Kontrak (min. = 30 hari) (d) Hari-hari Libur, kerusakan-kerusan/gangguan-gangguan dsb (e)



Jumlah Hari Kerja yang sesungguhnya (a)-(b)-(c)-(d)



(C)



Jumlah Jam Kerja Plant yang sesungguhnya



130 Hari 60 Hari 30 Hari 17 Hari



7 jam/hari



=



23 Hari



=



161 Jam



Kebutuhan Bahan Aspal Campuran Panas (1) Latasir (SS) Kelas A (2) Latasir (SS) Kelas B



M2 x M2 x



0.0150 x 0.0200 x



2.30 x 2.30 x



1.05 1.05



= =



- ton - ton



(3) (4)



Lataston Lapis Aus (HRS-WC) Lataston Lapis Pondasi (HRS-Base)



M2 x M3 x



0.0300 x 2.3000 x



2.30 x 1.05



1.05



= =



- ton - ton



(5)



Laston Lapis Aus (AC-WC)



#REF! M2 x



0.0400 x



2.30 x



1.05



=



#REF! ton



(6) (6a) (7) (8)



Laston Lapis Pengikat (AC-BC) Laston Lapis Pengikat (AC - BC) Leveling Laston Lapis Pondasi (AC-Base) Lain-lain



#REF! M3 x



2.3000 x



1.05



M3 x



2.3000 x



1.05



= = = =



#REF! ton #REF! ton - ton ton



(D)



Jumlah kebutuhan Aspal Campuran Panas



=



#REF! ton



=



#REF! ton/jam



Kapasitas Peralatan Pencampuran Aspal Kapasitas yang diperlukan = Jumlah kebutuhan Campuran Aspal / Jumlah Jam Kerja = (D) / (C) Kapasitas yang sesungguhnya



Jumlah Kapasitas yang sesungguhnya



Plant 1 Plant 2 Lain-lain



= = =



#REF! ton/jam #REF! ton/jam ton/jam



=



#REF! ton/jam



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



LAMPIRAN 11 PENAWARAN



KONFIRMASI KAPASITAS PLANT PENCAMPUR BETON ### 1.



2.



#REF!



Waktu Bekerja Yang Tersedia (a) Jangka Waktu Pelaksanaan (b) Mobilisasi, Jangka Waktu Pemasangan Peralatan dan Persediaan material (min = 120 hari) (c) Demobilisasi / Waktu Tidak Produktif pada akhir masa Kontrak (min. = 30 hari) (d) Hari-hari Libur, kerusakan-kerusan/gangguan-gangguan dsb (e)



Total Actual Working Days (a)-(b)-(c)-(d)



(C)



Total Actual Plant Working Hours



Kebutuhan Beton Struktur (1) K-500 (2) K-400 (3) K-350 (4) K-300 (5) K-250 (6) K-175 (7) Siklop (8) Lain-lain (D)



3.



130 Days 60 Days 30 Days 17 Days



7 hours/day



m3 m3 m3 m3 #REF! m3 #REF! m3 m3



x x x x x x x



2.4000 x 2.4000 x 2.4000 x 2.4000 x 2.4000 x 2.4000 x 2.4000 x



1.05 1.05 1.05 1.05 1.05 1.05 1.05



Jumlah kebutuhan Plant Campuran Beton



Kapasitas Peralatan Plant Pencampur Beton Kapasitas yang diperlukan = Jumlah kebutuhan Campuran Beton / Jumlah Jam Kerja = (D) / (C) Kapasitas yang sesungguhnya



Jumlah Kapasitas yang sesungguhnya



Plant 1 Plant 2 lain-lain



=



23 Days



=



161 Hours



= = = = = = = =



- tonnes - tonnes - tonnes - tonnes #REF! tonnes #REF! tonnes - tonnes tonnes



=



#REF! tonnes



=



#REF! tonnes/hr



= = =



48.00 tonnes/hr 48.00 tonnes/hr tonnes/hr



=



96.00 tonnes/hr



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK Direktur Utama



DATA KONTRAK YANG DISELEKSI Penyesuaian Harga



IPL 13.4



"tidak dapat"



Masa laku Surat Penawaran



IPL. 16.1



120 ( Seratus Dua Puluh ) hari



Jaminan Penawaran



IPL. 17.2



Rp. 601.000.000,- (Enam ratus satu juta Rupiah) disampaikan kepada Ketua Panitia Lelang



Masa laku Jaminan Penawaran



IPL. 17.2



Minimal 148 ( seratus empat puluh delapan ) hari, terhitung dari tanggal akhir pemasukan penawaran.



Periode Pelaksanaan



IPL. 1.2



Tanggal Mulai Kerja



SSU 1.1 (u)



Nilai Minimum Asuransi



SSU 13.1



130 ( Seratus Tiga Puluh ) hari 1-Nov-10 ( a ) Besarnya asuransi kecelakaan Manusia atau asuransi



kematian



untuk



setiap



karyawan



Kontraktor / orang lain adalah sebesar Rp.



( b ) 50.000.000,Besarnya maksimum



Asuransi



Harta



Benda



( property ) adalah sebesar Rp. 50.000.000,-



Periode Pemeliharaan



SSU 35.1



( a ) 365 (Tiga ratus enam puluh lima) hari untuk pekerjaan permanen



Uang Retensi



SSU 48.1



10 (



sepuluh



dibayarkan Nilai dari Denda Pekerjaan



SSU 49.1



)



persen



dari nilai yang



dapat



0,1 % dari Nilai Kontrak per hari dan maksimum 5 % dari Nilai Kontrak



Uang Muka



SSU 51.1



Maksimum 20 ( dua puluh ) persen dari Nilai Kontrak.



Nilai dan masa laku Jaminan Pelaksanaan



SSU 52.1



( a ) Minimal 10 (sepuluh) persen dari nilai kontrak



dalam bentuk Bank Garansi. ( b ) Jika penawaran dianggap rendah atau kurang dari 80 % HPS, jaminan Pelaksanaan dapat



dinaikkan jaminan Pelaksanaan



ini



disampaikan



pimpinan Bagian Proyek / Pimpinan Proyek Priode Mobilisasi



S 1.2



kepada



37 hari (Laboratorium dalam 37 hari)



Bekasi, 2 Maret 2020 PT. CIPTA KARYA PEMBANGUNAN 0



PARDAMEAN SITINJAK



Direktur Utama



DAFTAR LAMPIRAN-LAMPIRAN SURAT PENAWARAN



NAMA PEKERJAAN



: EMBANGUNAN JALAN RUAS SUNGGUMINASA-MALINO 7 DI KAB. GOWA



NAMA PESERTA LELANG : PT. NINDYA KARYA (Persero) NO



URAIAN



TANDA PERIKSA



A.



Salian Kemitraan yang disahkan untuk kerja sama gabungan atau kerja sama operasi (jika digunakan)







B.



Perjanjian Kemitraan untuk usulan kerja sama operasi (jika yang di atas tidak digunakan)







C.



Surat Kuasa (jika digunakan)







D.



Jaminan Penawaran







E.



Surat Penawaran







F.



Daftar Kuantitas dan Harga yang telah diisi harganya







G.



Daftar lampiran-lampiran Penawaran







1.



Analisa harga Satuan mata Pembayaran Utama







2.



Analisa harga Lump Sum Untuk Mobilisasi







3a. Daftar Harga Satuan Dasar Upah







3b. Daftar Harga Satuan Dasar Bahan







3c.



Daftar Harga Satuan Dasar Peralatan







4.



Jadwal Pelaksanaan Pekerjaan







5.



Metoda Pelaksanaan







6.



Daftar Usulan Peralatan konstruksi







7.



Daftar Usulan Personil Inti







8.



Daftar Usulan Pekerjaan yang disubkontrakkan







9.



Dokumen Kualifikasi







Pay Item No.



Description



a



b



Unit c



Estimated Quantity d



Unit Price (IDR) e



Total Bid Price (IDR) g = (d x e)



6.3.6a



Asphaltic Concrete Binder Course (AC-BC) (fine/coarse)



Cu.M



8,840.00



#REF!



#REF!



6.3.5a



Asphaltic Concrete - Wearing Course (AC-WC) 4 cm (fine/coarse)



Sq.M



151,066.00



#REF!



#REF!



5.1.1



Aggregate Base Class A



Cu.M



27,925.00



#REF!



#REF!



5.1.2



Aggregate Base Class B



Cu.M



19,703.00



#REF!



#REF!



U Ditch Type DS-2



Ln.M



5,098.00



#REF!



#REF!



4.2.2



Aggregate Base Class B



Cu.M



16,081.00



#REF!



#REF!



4.2.1



Aggregate Base Class A



Cu.M



15,136.00



#REF!



#REF!



Stone Masonry



Cu.M



6,708.00



#REF!



#REF!



3.2.1



Common Embankment



Cu.M



69,000.00



#REF!



#REF!



3.1.1



Common Excavation



Cu.M



138,728.00



#REF!



#REF!



2.3.2



RCP Culvert Inside Diamater (Nominal 60 cm) 55-65 cm



Ln.M



3,403.00



#REF!



#REF!



2.3.9.2



7.9



1.2



Mobilization



LS



1.00



#REF!



#REF!



7.3.4



Reinforcing Steel Deformed BJTD40



Kg



184,947.00



#REF!



#REF!



7.1.3



Structural Concrete Class K350



Cu.M



1,771.00



#REF!



#REF!



Mini Reinforced Concrete Piles Type 1, Furnished & Driven



Ln.M



5,904.00



#REF!



#REF!



4.2.2a



Aggregate Base Class S



Cu.M



7,096.00



#REF!



#REF!



8.4.7a



Guard Rail (excluding terminal end)



Ln.M



2,838.00



#REF!



#REF!



6.1.1



Prime Coat



Litre



118,680.00



#REF!



#REF!



6.6.1



Surface Coarse Penetration Macadam



Cu.M



872.00



#REF!



#REF!



8.4.1



Pavement Markings Thermoplastic Type



Sq.M



9,443.00



#REF!



#REF!



2.2



Mortared Stonework



Cu.M



1,621.00



#REF!



#REF!



2.1



Excavation for Drainage Ditches & Waterways



Cu.M



30,422.00



#REF!



#REF!



SS.7.6.1b



6.3.6c



Asphaltic Concrete Binder Course Levelling (AC-BC(L)) (fine/coarse)



Ton



740.00



#REF!



#REF!



2.3.11



Reinforcing Steel for Minor Concrete Drainage Structures



Kg



45,943.00



#REF!



#REF!



2.3.10



Concrete Class K-250 for Minor Concrete Drainage Structures



Cu.M



512.00



#REF!



#REF!



7.1.8



Concrete Class K125



Cu.M



451.00



#REF!



#REF!



Grade Preparation



Sq.M



203,980.00



#REF!



#REF!



6.1.2



Tack Coat



Litre



27,220.00



#REF!



#REF!



8.4.6b



ROW Posts



Each



1,912.00



#REF!



#REF!



Selected Embankment Drain PVC Pipe, 10 cm Dia. With Fittings and Supports



Cu.M Ln.M



3,421.00 2,868.00



#REF! #REF!



#REF! #REF!



7.10.1



Grouted Rip Rap



Cu.M



867.00



#REF!



#REF!



8.4.3b



Road Signs with Reflector of Engineering Grade Single (size 750)



Each



347.00



#REF!



#REF!



Stabilization by Vegetation (Use Vertiver System)



Sq.M



13,875.00



#REF!



#REF!



1.19.2



Relocation of Existing PLN Utility Pole-Low Voltage



Each



7.00



#REF!



#REF!



3.1.7



Excavation of Existing Asphaltic Pavement Without Cold Milling Mach



Cu.M



4,208.00



#REF!



#REF!



Guard Rail with Base Plate Mounting



Ln.M



280.00



#REF!



#REF!



7.1.5



Structural Concrete Class K250



Cu.M



185.00



#REF!



#REF!



1.8



Traffic Management and Safety



LS



1.00



#REF!



#REF!



1.21



Quality Management



LS



1.00



168,000,000.00



168,000,000.00



3.3



3.2.2 SS.7.23.1



SS.8.3.1a



SS.8.4.7h



7.6.18



Cast in Place Concrete Pile, Diameter 60 cm



Ln.M



144.00



#REF!



#REF!



2.3.4



RCP Culvert Inside Diamater (Nominal 100 cm) 95-105 cm



Ln.M



136.00



#REF!



#REF!



3.1.3



Structure Excavation, 0-2 m Depth



Cu.M



3,660.00



#REF!



#REF!



4.2.7



Prime Coat



Litre



10,583.00



#REF!



#REF!



Patching Concrete with Polymer Modified Cement Material



Cu.M



7.00



#REF!



#REF!



8.3.3



Trees



Each



578.00



#REF!



#REF!



7.10.3



Gabions



Cu.M



132.00



#REF!



#REF!



2.4.3



Perforated or Porous Pipe for Subsurface Drainage Works



Ln.M



1,020.00



#REF!



#REF!



2.3.12



Blinding Stone



Cu.M



470.00



#REF!



#REF!



1.00



70,000,000.00



70,000,000.00



497.00



#REF!



#REF!



SS.7.18.1



1.7



Employer's Share of Dispute Board Costs



PS



2.4.1



Porous Drainage of Filter Material



Cu.M



10.1.1



Routine Maintenance of Pavement



LS



1.00



Ln.M



91.00



#REF!



#REF!



7.13



Steel Bridge Railing



-



-



7.11.3



Expansion Joint Seal Rubber Type 1 (Gap 21-41 mm)



Ln.M



21.00



#REF!



#REF!



2.4.2



Plastic Filter Fabric



Sq.M



1,506.00



#REF!



#REF!



7.3.1



Reinforcing Steel Plain BJTP24



Kg



3,699.00



#REF!



#REF!



10.1.2



Routine Maintenance of Shoulder



LS



1.00



7.1.4



Structural Concrete Class K300



Cu.M



43.00



#REF!



#REF!



-



-



8.4.7c



Guard Rail BCTA Terminal



Each



75.00



#REF!



#REF!



7.16.4



Deck Drain Type 2 with Accessories



Each



14.00



#REF!



#REF!



8.4.7d



Guard Rail BCTB Terminal



Each



75.00



#REF!



#REF!



7.6.28



Dynamic Load Test (DLT) for Diameter Pile of Up to 600 mm



Each



2.00



19,000,000.00



38,000,000.00



8.4.3g



Information Guide & Warning Signs with Reflector of Engineering Gra



Sq.M



74.00



#REF!



#REF!



10.1.3



Routine Maintenance of Ditches, Drains, Cuttings & Embankments



LS



1.00



SS 8.4.3h



Additional Sign with Reflector of Engineering Grade, Without Post



Each



74.00



10.1.4 2.3.9.2a



Routine Maintenance of Road Furniture & Road Markings U Ditch Type DS-2a



#REF! -



#REF!



LS



1.00



Ln.M



25.00



#REF!



#REF!



-



9.1.11



Excavator 80 - 140 HP



Hour



67.00



#REF!



#REF!



8.4.7b



Guard Rail Bridge Terminal



Each



50.00



#REF!



#REF!



9.1.8



Motor Grader min. 100 HP



Hour



72.00



#REF!



#REF!



10.1.5



Routine Maintenance of Bridges



LS



1.00



Cu.M



35.00



#REF!



#REF!



SS.7.10.3 8.4.10a



PVC Coated Mesh Gabions



-



-



Precast Portland Cement Concrete Curb Type (A,C,E and Transitions



Ln.M



235.00



#REF!



#REF!



3.4.5



Selected Tree Removal, diameter 30-50 cm



Each



202.00



#REF!



#REF!



8.4.12



Block Paving on Sidewalks or Median 60 mm



Sq.M



294.00



#REF!



#REF!



9.1.5



Flat Bed Truck 3-4 Tonnes



Hour



53.00



#REF!



#REF!



9.1.7



Bulldozer 100-150 HP



Hour



72.00



#REF!



#REF!



2.3.3



RCP Culvert Inside Diamater (Nominal 80 cm) 75-85 cm



Ln.M



22.00



#REF!



#REF!



Pay Item No.



Description



a 9.1.9



b



Unit



Estimated Quantity



c



d



Unit Price (IDR) e



Total Bid Price (IDR) g = (d x e)



Wheel Loader 1.0 - 1.6 M3



Hour



72.00



#REF!



#REF!



Cement Mortar



Cu.M



23.00



785,000.00



18,055,000.00



Demolition of Concrete



Cu.M



137.00



#REF!



#REF!



Grouting with Special Cement Material



Cu.M



1.00



#REF!



#REF!



8.4.6a



Kilometre Posts



Each



24.00



#REF!



#REF!



7.15.1



Demolition of Stone Masonry



Cu.M



138.00



#REF!



#REF!



9.1.14



Vibratory Roller 5-8 Tonnes



Hour



34.00



#REF!



#REF!



9.1.15



Hand Vibratory Compactor 1.5 - 3.0 HP



Hour



34.00



#REF!



#REF!



Bridge Name Plate



Each



14.00



750,000.00



10,500,000.00



9.1.10



Track/Crawler Loader 75 - 100 HP



Hour



34.00



#REF!



#REF!



9.1.2



Labour



Hour



1,434.00



#REF!



#REF!



9.1.12



Crane on Wheels 10 - 15 Ton



Hour



39.00



#REF!



#REF!



9.1.17



Compressor 4000 - 6500 Litre/minute



Hour



48.00



#REF!



#REF!



3.4.4



Selected Tree Removal, diameter 15-30 cm



Each



87.00



#REF!



#REF!



9.1.16



Pneumatic Tired Roller 8 - 10 Tonnes



Hour



34.00



#REF!



#REF!



9.1.13



Tandem Roller 6-9 Tonnes



Hour



34.00



#REF!



#REF!



9.1.6



Water Tank 3000-4500 Litres



Hour



34.00



#REF!



#REF!



8.4.3a



Road Signs with Reflector of Engineering Grade Single (size 600)



Each



8.00



#REF!



#REF!



9.1.4



Dump Truck 3-4 M3



Hour



39.00



#REF!



#REF!



9.1.19



Water Pump 70 - 100 mm



Hour



72.00



#REF!



#REF!



3.1.4



Structure Excavation, 2-4 m Depth



Cu.M



82.00



#REF!



#REF!



8.1.5



Hot Asphaltic Mixture for Minor Works



Cu.M



2.00



#REF!



#REF!



9.1.18



Concrete Mixer 0.3 - 0.6 M3



Hour



48.00



#REF!



#REF!



9.1.1



Foreman



Hour



235.00



#REF!



#REF!



9.1.20



Jack Hammer



Hour



48.00



#REF!



#REF!



9.1.3



Skilled Labour



Hour



139.00



#REF!



#REF!



7.8 7.15.2 SS.7.18.2



7.14



JADWAL PELAKSANAAN PEKERJAAN KONSTRUKSI Nama Paket



###



Prop / Kab/Kodya



###



No.



NILAI DALAM %



URAIAN



Waktu Pelaksanaan Konstruksi = 25 Bulan = (750 Hari kalender) Bulan 1



2



3



4



5



6



7



8



9



10



11



12



13



14



15



16



17



18



19



20



21



22



23



24



25 100%



1



Umum



1.2



Mobilisasi



#REF!



#REF!



#REF!



#REF!



#REF!



1.8



Manajemen dan Keselamatan Lalu Lintas



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



2



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



Drainase



2.1



Galian untuk Selokan Drainase dan Saluran Air



#REF!



2.2



Pasangan Batu dengan Mortar



#REF!



3



#REF!



Pekerjaan Tanah



3.1.1



Galian Biasa



#REF!



#REF!



#REF!



#REF!



#REF!



3.1.6



Galian Perkerasan Beraspal Dengan Cold Milling Machine



#REF!



#REF!



#REF!



#REF!



#REF!



3.1.8



Galian Perkerasan Berbutir



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



3.2.1



Timbunan Biasa



#REF!



#REF!



#REF!



#REF!



#REF!



3.2.2



Timbunan Pilihan



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



4



Pelebaran Perkerasan dan bahu Jalan



5



Perkerasan Berbutir



5.1.1



Lapis Pondasi Agregat Kelas A



#REF!



5.1.2



Lapis Pondasi Agregat Kelas B



#REF!



5.1.3



Lapis Pondasi Agregat Kelas S



#REF!



#REF!



#REF!



50% 6



Perkerasan Aspal



6.1 (1).(b)



Lapis Resap Pengikat - Aspal Emulsi



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



6.1 (2) (b)



Lapis Perekat - Aspal Emulsi



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



6.3 (3).(a)



Lataston Lapis Aus (HRS-WC) 0.3 cm (gradasi senjang/semi senjang)



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



6.3 (4).(a)



Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



6.3 (8)



Aspal Minyak



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



6.3 (9)



Aditif Anti Pengelupasan



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



Bahan Pengisi (Filter) Tambahan (semen)



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!



#REF!



6.3 (10)b 7 7.9 8



#REF!



#REF!



Struktur Pasangan Batu



#REF!



Pengembalian Kondisi dan Pekerjaan Minor



8.1 (1)



Lapis Pondasi agregat Kelas A untuk Pekerjaan Minor



8.4 (1)



Marka Jalan Thermoplastic



#REF!



8.4 (6)a



Patok Kilometer



#REF!



9



Pekerjaan Harian



10



Pekerjaan Pemeliharaan Rutin



A B C



JUMLAH NILAI PEKERJAAN KEMAJUAN BULANAN DALAM KUMULATIF KEMAJUAN DALAM



0% #REF!



(%) (%)



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF!



#REF! #REF! #REF!



#REF! #REF!