PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No.



0.1



Revision Page



dari



7



Date



ELT



Location : KONDARA_KLU Site ID : 25KLU018



= Yes = No



RECTIFIER SYSTEM Rectifier Series



:HUAWEI



System Propose:: Indoor



Outdoor PS 2.3kW



Area :SULSEL



PS 3.3kW



PS5.3KW



Rectifier Type



: Rectifier ELTEK FP2 3000W



Rectifier Capacity



: 3x 63A/ 230 V VoltageInput



: 220V(Linetoneutral)



I.



VISUAL CHECK INDOOR CABINET



NO.



DESCRIPTION



1.



Dimension



2.



Outdoor cabinet



Traybatteryadjustable Adjustablebatterybeltor 4. stopper battery Indoor cabinetshall have IP 20 5. Indoor cabinetusingmaterial 6. steel oraluminium Cabinetshall bepowder coating 7. Cableentryindoor viathetop 8. behind GroundingbarCabinet 9. GroundingCableuseNYAF 10. 35mm(Green-Yellow) 3.



STATUS



CAPACITY



RESULT



H xWxD



600 mmW x 600mmD x 2000mmH (+/- 3%)



600 x 550 x 2000



OK NOK







OK NOK







OK NOK







OK NOK







OK NOK







OK NOK







OK NOK







OK NOK







OUTDOOR CABINET NO. 1.



DESCRIPTION Dimension



2.



Outdoor cabinet (H xWxD)



3.



Innerdepth outdoor



4.



Traybatteryadjustable Adjustablebatterybeltor stopper battery Outdoor cabinethavefreespace 17U,19”forBTS transmission



5. 6.



STATUS



CAPACITY



RESULT



H xWxD



H xWxD



2060x800x770mm



2060x800x770mm



Min 580mm



Min 580mm



OK OK



NOK NOK



 



OK



NOK







PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page



0.1 dari



Date



outdoor cabinetshall have IP 55 outdoor cabinet usingmaterial aluminium Cabinetshall bepowder coating



7. 8. 9.



Cableentryoutdoor viathe 10. bottom of baseplinth 11. Gasketoutdoor cabinet 12. FanAxial 48VDC 13. Grounding Bar Cabinet 14. GroundingCable GSW3x25



OK OK



NOK NOK



 



OK



NOK



 



OK NOK OK NOK OK NOK OK NOK OK NOK



   



INSTALLATION QUALITY CHEKLIST NO. 1. 2. 3. 4. 5. 6.



7.



8. 9. 10. 11. 12. 13.



14. 15. 16.



DESCRIPTION ACPDBCableEntriessealedwith IP cablegland ACcablefrom AC PDBtoservice cabinet protectedinapproved conduit ACcableburied>=minimum required depth(60cm) Verifythat allACpower Cables/ wiringuses correct phasecolours Verifyusescrimpedferrules/cable shoesonwire terminations ACPower Cablemusthave an appropriatesizeofconduit andfitted to theglandcorrectly Anchorhardwaremustbe12mm diameter,andHD galvanisedor stainless steelandinstalledinall4 corner ofthecabinet base Confirmthatnumber ofFaninstalled as per specificationandrunning properly(2fansforWestindoand3 fansfor Hariff)faultymotor bearings Groundingwireconnectedtodoor Groundingbar inCabinetis installed properly Groundingbar inplinthbaseis installedcorrectly Rear Groundingis usecorrect material 3xGSW25mm Groundingcable oftheservice cabinetroutedwithgoingdown directiontotheBusbar.(noupward direction) Rear Groundinglugis properly Integrated tosite's Main Earth Terminal Cables areprotectedfromsharp objects Noloose,unconnectedcables



STATUS



SEVERITY



OK NOK NA OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA OK NOK NA



MAJOR



MAJOR



MAJOR



OK NOK NA OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MINOR



OK NOK NA



MAJOR



REMARK



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision



0.1



Page



POWERSUPPLY INDOSAT



dari



Date



All Power supplymodules& 17. replaceableunitshave Indosatbarcodes



OK NOK NA



18. All Baterrieshave Indosatbar-codes ACcableinsulationjacketmustcome 19. allthewayup totheAC board Rectifier canbeeasily withdrawn on 20. rails 21. fullsetofDC MCBsinstalled 2x4xBatteries(Standard External 22. Cabinet). Brand of batteries(Narada,Shoto, 23. Enersys,Northstar) 24. Rectifier moduleis asAs plan All Rectifier moduleisworking 25. properly All baterrycableconnectionis done 26. properly Timeanddatesettingaccordingto 27. specification(real time) All batteryconnectionsare tightand 28. covers are notdamaged and replaced correctly Bothbatterybankshave thebatteries 29. labelled1to4 Cabinet Ambienttemperaturesensor 30. locatedinplinth. Batterytemperaturesensor #1fixed 31. betweenbattery2 and 3 Batterytemperaturesensor #2fixed 32. betweenlower battery2 and3(or in theslavecainet) Cabinetsensor isfixedsecurelyto 33. thecabinetonthelefthandsideat thetop.



OK NOK NA OK NOK NA



MINOR



OK NOK NA



MAJOR



OK NOK NA OK NOK NA



MAJOR



OK NOK NA



MINOR



OK NOK NA OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



OK NOK NA



MAJOR



II.



MINOR



MINOR



MAJOR



MAJOR



VOLTAGE INPUT



NO. 1.



DESCRIPTION ACInput: - ACInputR –S - ACInputS–T - ACInput T –R - ACInputR –N - ACInputS–N - ACInput T –N



SPECIFICATION/ CONDITION



RESULT



350Volt ~ 410Volt 350Volt ~ 410Volt 350Volt ~ 410Volt 90Volt ~ 242Volt 90Volt ~ 242Volt 90Volt ~ 242Volt



382Vac 380Vac 385Vac 221Vac 220Vac 220Vac



2.



VoltageN–G



0 Volt ~ 2Volt



5,28Vac



3.



Frequency



50Hz~ 60Hz



52Hz



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No.



0.1



Revision Page



POWERSUPPLY INDOSAT



7



dari



Date



III.



RECTIFIER MODULE



NO. 1. 2.



IV.



DESCRIPTION Part number of rectifier modules



P/N : WPSU50A05



Serial number of rectifier modules : Rectifier 1st Rectifier 2nd Rectifier 3rd Rectifier 4th Rectifier 5th Rectifier 6th Rectifier 7th Rectifier 8th



S/N 1: 2102310FFAHVK5007326 S/N 2: 2102310FFAHVK5007354 S/N 3: 2102310FFAHVK5007281 S/N4:_____________________ S/N 5:_____________________ S/N 6:_____________________ S/N 7:_____________________ S/N 8:_____________________



SYSTEMVOLTAGELEVELTEST



NO. 1.



DESCRIPTION



SPECIFICATION/ CONDITION



Rectifier Setting: - NominalFloat - BoostVolt - RectifierStandbyVoltage - BatteryDisconnect - BatteryReconnect - Load Disconnect - LoadReconnect - BatteryChargeCurrentLimit



2.



LoadCurrent



3.



Back UpBattery



V.



ALARM CONTROL



NO



RESULT



DESCRIPTION



54,48 Vdc 56,40 Vdc 45,0 Vdc 43,2 Vdc 47,0 Vdc 46,0 Vdc 47,0 Vdc 10%x 190Ah 0Amp~200 Amp



RESULT



51.52Vdc 52.13Vdc 45.17Vdc 43.12Vdc 49.39Vdc 45.52Vdc 52.39Vdc 19Ah 27 Amp



OK/NOTOK



RELAYALARM MAPPING



ACTIVE LEVEL



RELAY STATE







RELAYTEST



1.



Relay1



st



Mainsfail



Energize



NC



ActiveRelay1



st



2.



Relay2



nd



Rectifier Fail



Energize



NC



ActiveRelay 2



3.



Relay3



rd



High Temp



Energize



NC



ActiveRelay3



4.



Relay4



th



PLVDFail



Energize



NC



ActiveRelay4



th



5.



Relay5



th



Arrester Fail



Energize



NC



ActiveRelay5



th



6.



Relay6



th



DoorOpen



Energize



NC



ActiveRelay6



th



7.



Relay7



th



FuseFail



Energize



NC



ActiveRelay7



th



nd



rd



RESULT



      



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No.



0.1



Revision Page



POWERSUPPLY INDOSAT



dari



Date



VI.



BATTERY



NO.



SPECIFICATION/ CONDITION



DESCRIPTION



RESULT



1.



Total batteryper bank



2.



Total batterybank



1/2/3/4/5



3.



Voltagenominal per battery



2 Vdc/12Vdc



Vdc



4.



Capacitynominalper battery



100/170/ 180Ah



Ah



5.



Voltagenominal per bank



6.



Total batterycapacity



NO.



4/8/12/16/20



48Vdc



Vdc



Bank xAh



DESCRIPTION



RESULT



7.



BatteryPartNumber



P/N :6-FMX-170



8.



BatterySerial Number: BatteryCell1 BatteryCell2 BatteryCell3 BatteryCell4 BatteryCell5 BatteryCell6 BatteryCell7 BatteryCell8 BatteryCell9 BatteryCell10 BatteryCell 11 BatteryCell12



S/N :EE1314200890 Battery Vot 13,2  OK  NOK S/N :EE1823434865 Battery Vot 13,2  OK  NOK S/N :EE1307844098 Battery Vot 13,2  OK  NOK S/N : EE1961983144 Battery Vot 13,2  OK  NOK S/N :EE1497105037 Battery Vot 13,2  OK  NOK S/N :EE1781171169 Battery Vot 13,2  OK  NOK S/N :EE1918336492 Battery Vot 13,2  OK  NOK S/N :EE1607260137 Battery Vot 13,2  OK  NOK



Ah



DE S



RESULT



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No.



0.1



Revision Page



POWERSUPPLY INDOSAT



dari



Date



VII. REMAKS



TestDate :…………………………………. Approvedby,



Testedby, PT.



PT. INDOSAT



(



)



(



Huawei Tech. Investment



)



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



Date 1.Foto Team Di Site



Comment



2.Site Name Plate/Site ID



Comment 3.Tampak Tower



Comment



4.Site Tampak Dari Depan (Over View)



Comment 5.Cabinet Rectifier Tertutup



Comment



6.Cabinet Rectifer Terbuka



Comment



7.Foto Kabel Grounding di Pintu ke Cabinet Rectifier 8.Foto Gland Cable Bagian Belakang



13.Foto Module (belakang All ) 11.Foto 15.Busbar Gland Grounding KabelRectifier bagian Cabinet



Comment



Comment Comment



16.Busbargrounding inBattery Base Plate 12.Foto 14.Fan cabinet Bank 1 & 2



Comment



Comment Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page Date



9.Foto Module Rectifier (All)



Comment



10.Foto Battery Bank 1 & 2 (All)



Comment 11.Fan Cabinet



Comment 13.Busbar Grounding in Base Plate



Comment 15.Pengukuran Vtotal Bank Battery (All) #Bank 2



Comment



12.Busbar Grounding Cabinet



Comment 14.Pengukuran Vtotal Bank Battery (All) #Bank 1



Comment 16.Pengukuran Vtotal Bank Battery (All) #Bank 3



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



Date 17.Pengukuran Vtotal Bank Battery (All) #Bank 4



Comment 19.Sensor Temperature di atas kiri Rectifier



Comment 21..Sensor Temperature yang diletakan di base plit



Comment



18.DDF alarm yang diberi label



Comment 20..Sensor Temperature pada Bank1 (Diantara Block 2&3)



Comment 22.Koneksi G Wire ke Cabinet Rectifier



Comment 24..Label Kapasitas Battery



23.Akses Kabel Power di Gland Rectifier sebelah kanan depan yang sudah di flash band



Comment



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



Date 25.Barcode Module 1



Comment



26.Barcode Module 2



Comment 27.Barcode Module 3



Comment 29.Smartpack/Display Monitoring (tampak depan)



Comment 31.Barcode Battery Bank 1 Block 2



Comment



28.Barcode Module 4



Comment 30.Barcode Battery Bank 1 Block 1



Comment 32.Barcode Battery Bank 1 Block 3



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



Date 33.Barcode Battery Bank 1 Block 4



Comment 35.Barcode Battery Bank 2 Block 2



Comment 37.Barcode Battery Bank 2 Block 4



Comment 39.Barcode Battery Bank 3 Block 2



Comment



34.Barcode Battery Bank 2 Block 1



Comment 36.Barcode Battery Bank 2 Block 3



Comment 38.Barcode Battery Bank 3 Block 1



Comment 40.Barcode Battery Bank 3 Block 3



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



Date 41.Barcode Battery Bank 3 Block 4



Comment 43 Barcode Battery Bank 4 Block 2



Comment 46. Barcode Battery Bank 4 Block 4



Comment 48.Pengukuran Tegangan Fasa R-N di MCB Input



Comment



42.Barcode Battery Bank 4 Block 1



Comment 44 Barcode Battery Bank 4 Block 3



Comment 47.Input Kabel Power Ke ACPDB (melalui kabel gland)



Comment 49.Pengukuran Tegangan Fasa S-N di MCB Input



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page Date



50.Pengukuran Tegangan Fasa T-N di MCB Input



Comment



51.Pengukuran Tegangan Fasa R-S di MCB Input



Comment



52.Pengukuran Tegangan Fasa R-T di MCB Input



Comment



53.Pengukuran Tegangan Fasa S-T di MCB Input



Comment 54.Pengukuran N-G di Rectifier



Comment



55.Foto Jalur Kabel Input



Comment



56.Koneksi G-Wire ke Busbar Grounding



Comment



57.Posisi Penempatan Rectifier



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



Date 58.Foto Bak Kontrol Dalam Keadaan Terbuka



Comment



59.Foto Dynabolt Depan Kanan



Comment 60Foto Dynabolt Depan Kiri



Comment



61.Foto Dynabolt Belakang Kanan



Comment 62.Foto Dynabolt Belakang Kiri



Comment



63.Barcode Smartpack/Monitoring Control



Comment 64.Barcode Smartnode



Comment



65.Barcode Subrack Rectifier



Comment



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision



0.1



Page



POWERSUPPLY INDOSAT



dari



Date 66Barcode Cabinet Rectifier



Comment



Comment



68.Koneksi Kabel Alarm Arrester di MCB Output



Comment



Comment



71.Pengukuran Tegangan Battery Bank 1 Block 3



Comment



72.Pengukuran Tegangan Battery Bank 1 Block 4



15.Busbar Grounding Cabinet



Comment



69.Pengukuran Tegangan Battery Bank 1 Block 1



Comment



70.Pengukuran Tegangan Battery Bank 1 Block 2



Comment



67.Koneksi Kabel Alarm Arrester (dibawah Arrester)



73.Pengukuran Tegangan Battery Bank 2 Block.1



16.Busbargrounding in Base Plate



Comment



Comment



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



0.1 dari



Date 74.Pengukuran Tegangan Battery Bank 2 Block 2



Comment 76.Pengukuran Tegangan Battery Bank 2 Block 4



Comment 78.Pengukuran Tegangan Battery Bank 3 Block 2



Comment 80.Pengukuran Tegangan Battery Bank 3 Block 4



Comment



75.Pengukuran Tegangan Battery Bank 2 Block 3



Comment 77.Pengukuran Tegangan Battery Bank 3 Block 1



Comment 79.Pengukuran Tegangan Battery Bank 3 Block 3



Comment 81.Pengukuran Tegangan Battery Bank 4 Block 1



Comment



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP)



Doc. No. Revision Page



POWERSUPPLY INDOSAT



0.1 dari



Date 82 Pengukuran Tegangan Battery Bank 4 Block 2



Comment 84 Pengukuran Tegangan Battery Bank 4 Block 4



Comment 86. Pengukuran Pondasi Rectifier (kiri)



Comment 88..Simulasi Pemanasan Temperature Shelter



Comment



83 Pengukuran Tegangan Battery Bank 4 Block 3



Comment 85 .Pengukuran Pondasi Rectifier (Depan)



Comment 87.Pengukuran Pondasi Rectifier (Kanan)



Comment 89.Foto Capture Alarm Temperature



Comment



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page Date



Capture Active Module (Home)



Capture Active Module (Monitoring – Rectifier 3 /Module Rectifier 1)



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page Date



Capture Active Module (Monitoring – Rectifier 4 /Module Rectifier 2)



Capture Active Module (Monitoring – Rectifier 5/Module Rectifier 3)



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page Date



Capture Active Module (Monitoring – Rectifier 6 / Module Rectifier 4)



0.1 dari



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page



0.1 dari



7



Date



ATP TRANSMITTAL



Site ID



:



KONDARA_KLU



Site Name



:



25KLU018



ATP Date



:



ATP Scope



\



Applicable



Vendor



Mini CME



Ericsson / Huawei / NSN / Other:....................



CME



Hariff/ Westindo / Other: ..............................



Transmission



Ericsson / NSN / ALU / NEC / Other: ................



RAN



Ericsson / Huawei / NSN / Other:....................



PUNCHLIST



NO 1 2 3 4 5 6



Punchlist Item



Responsible Company



Remarks Accept



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page



0.1 dari



Date



PHOTO REVISI ITEM PUNCHIST AFTER



BEFORE



Comment 20..Sensor Temperature pada Bank1 (Diantara Block 2&3)



Comment



Comment 24.



Comment



BEFORE



Label Kapasitas Batterai BEFORE



Comment 31.Barcode Battery Bank 1 Block 2 BEFORE



Comment 33.Barcode Battery Bank 1 Block 4



23.Akses Kabel Power di Gland Rectifier sebelah kanan depan yang sudah di flash band AFTER



30.Barcode Battery Bank 1 Block 1 AFTER



Comment 32.Barcode Battery Bank 1 Block 3 AFTER



Comment 34.Barcode Battery Bank 2 Block 1



7



PT.HUAWEI TECH INVESTMENT ACCEPTANCE TEST PROTOCOL (ATP) POWERSUPPLY INDOSAT



Doc. No. Revision Page



0.1 dari



Date



BEFORE



Comment 35.Barcode Battery Bank 2 Block 2 BEFORE



36.Barcode Battery Bank 2 Block 4



AFTER



Comment 36.Barcode Battery Bank 2 Block 3 AFTER



47.Input Kabel Power Ke ACPDB (melalui kabel gland)



7