0 0 554 KB
SYMBOLS
NUMBERING SYSTEM
LINES AND FITTINGS
NUMBERING OF PIPE
MAJOR EQUIPMENT FUNCTION IDENTIFIERS
DRIVES MAIN PROCESS LINES
½"
M
–
0
–
ELECTRIC MOTOR
TUBING
ATMOSPHERIC TANKS
FLUID CODE
A – MISC. EQIUPMENT
PIPING MATERIALS
B – CRANES, HOIST, LIFTING, HANDLING EQUIPMENT
NOMINAL LINE SIZE (INCHES)
C – COLUMNS
SKID OUTLINE
PIPE MATERIAL CODE
D – DRYER INSTRUMENT SIGNAL LINE
E – EXCHANGERS, HEAT TRANSFER EQUIPMENT
CONICAL BOTTOM TANK
PNEUMATIC SIGNAL LINE
F – FURNACES, HEATERS, STEAM BOILERS
FLANGED CONNECTION
0 1 2 3 4
– – – – –
SS304 PIPE, SCH. 40 SS316L TUBING CARBON STEEL PIPE, SCH. 40 GALVANISED IRON PIPE PVC PIPE, SCH. 40
INSTRUMENT AIR SUPPLY AIR UTILITY AIR CHILLED WATER COOLING WATER STEAM CONDENSATE NITROGEN GAS PROCESS STREAM (EG + H2O) PROCESS STREAM (>90% H2O) PROCESS STREAM (>90% EG) SATURATED STEAM ATMOSPHERIC VENT WATER VAPOUR
MAJOR EQUIPMENT NUMBERING SYSTEM
H – HVAC I – INSTRUMENT / CONTROL EQUIPMENT J – NOT USED
INSTRUMENTS – LOCALLY MOUNTED
BLIND FLANGE INSTRUMENTS ON LOCAL PANEL HOSE COUPLING FUNCTION ACCESSIBLE BY OPERATOR IN CONTROL ROOM
THREAD UNION
– – – – – – – – – – – – –
G – GENERATORS, POWER GENERATION
INSTRUMENTS SPOOL PIECE END CAP
AI AS AU CHW CW CS N2 PS1 PS2 PS3 ST VA WV
AI
FIRST CHARACTER
SECONDARY PROCESS/UTILITIES LINES
FLUID DESCRIPTION
FUNCTION IDENTIFIER (MAXIMUM TWO CHARACTERS) EQUIPMENT CODE (SEE BELOW)
K – COMPRESSORS, BLOWERS, FANS L – VAC. PUMP, LIQUID RING PUMPS
SEQUENCE NUMBER (01 TO 99)
M – MIXERS, STIRRERS, JETS, NOZZLES, BLENDERS
SUFFIX (WHERE 2 OR MORE ITEMS ARE PARALLEL OR USED)
N – NOT USED FUNCTION IN SDS (SAFETY AND SHUTDOWN ONLY)
REDUCER ECCENTRIC REDUCER (TOP FLAT)
O – NOT USED P
P – PUMPS (CENTRIFUGAL, RECIP., ROTARY) Q – NOT USED
FT
FLOW ELEMENT TUNDISH CONTROL VALVE WITH FAILURE CLOSED (FC) ACTION DRAIN TRAP CONTROL VALVE WITH FAILURE OPEN (FO) ACTION OPEN VENT ACTUATOR FOR CONTROLLING DEVICE
–
02
A
CODE
DESCRIPTION
R – REACTORS, CONVERTERS, REGENERATORS S – NOT USED
1
TANK / VESSEL / PUMP / COMPRESSOR
2
COLUMN / SIDE STRIPPER
T – TANKS (ATMOSPHERIC, STORAGE)
3
HEAT EXCHANGER / REBOILER / CONDENSER
U – NOT USED
4
CHILLER
V – VESSELS, PRESSURE STORAGE INCLUDING SCRUBBERS, PULSATION DAMPENERS W – NOT USED X – MULTIFUNCTION EQUIPMENT
INSTRUMENT IDENTIFICATION 1
2 FIRST LETTER MEASURED VALUE OR INPUT FUNCTION
Y – TELECOMS EQUIPMENT
FILLING POINT
1
3
MODIFIER
A
Z – SAFETY EQUIPMENT SELF CONTAINED PRESSURE REGULATOR
CONTROLLING RATIO INDICATING (GAUGE)
H
HIGH
I
INDICATING
L
LEVEL
M
MOTOR
P
PRESSURE RELIEF
S
SIGHT GLASS
T
S
SWITCHING CONTROL TEMPERATURE
V
SOLENOID VALVE
X
PG, TG
LOW
R
SG
REMARKS
ALARM FLOW
G
SELF CONTAINED BACK PRESSURE REGULATOR
5 OUTPUT FUNCTION
C F
STRAINER (Y-TYPE)
4 SUCCEEDING LETTER(S) DISPLAY FUNCTION
NOT FOR EMERGENCY ACTING (Z)
TRANSMITTING VALVE
ACTUATOR EMERGENCY OR SAFETY ACTION
Z
FT
LG
LEVEL GAUGE
TURBINE FLOW METER
FT
FLEXIBLE HOSE
NOTES:
VORTEX FLOW METER
1. FI
BUG SCREEN
ROTAMETER
VALVES
NO SPACE SHALL BE LEFT BETWEEN THE SYSTEM IDENTIFIER, THE SEQUENCE NUBMER AND THE SUFFIX. A HYPHEN SHALL BE INSERTED BETWEEN THE FUNCTION IDENTIFIER AND THE SERIAL NUMBER. EACH EQUIPMENT TAG NUMBER SHALL BE UNIQUE.
EQUIPMENT
3-WAY VALVE CENTRIFUGAL PUMP
HORIZONTAL VESSEL
GEAR PUMP
VERTICAL VESSEL / COLUMN
GATE VALVE GLOBE VALVE BALL VALVE THIS DRAWING AND DESIGN MUST NOT BE COPIED, REPRODUCED OR DISCLOSED TO A THIRD PARTY OR MADE USE WITHOUT THE WRITTEN PERMISSION FROM SOLUTION ENGINEERING SDN. BHD. THE ORIGINAL AND ALL COPIES OF THIS DRAWING AND THE COPYRIGHT ARE THE SOLE PROPERTY OF SOLUTION ENGINEERING SDN. BHD. WE RESERVE THE RIGHT TO MAKE CHANGES FOR PROCESS IMPROVEMENTS DURING PROJECT IMPLEMENTATION STAGE.
NEEDLE VALVE GAS COMPRESSOR (DIAPHRAGM TYPE)
CHECK VALVE
REBOILER (WITH ELECTRICAL HEATERS) E CLIENT:
PROJECT TITLE:
HEAT EXCHANGER (SHEEL & TUBE TYPE)
PSV
PRESSURE SAFETY / RELIEF VALVE E
FURNACE (WITH ELECTRICAL HEATER
ELECTRICAL HEATER E
VENDOR:
WEIGHT
UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (MITEC)
MANUFACTURER:
CADANGAN MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENTAULIAH PERALATAN LATIHAN DAN PEMBELAJARAN BAGI PROGRAM “BACHELOR OF ENGINEERING TECHNOLOGY IN OIL AND GAS ENGINEERING (OPERATION AND SAFETY)” UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (UNIKL MITEC)
DRAWING TITLE:
PIPING & INSTRUMENTATION DIAGRAM (SOLTEQ® SE991) LEGEND SHEET
UNIT
A3
AB
18.03.2021
REV
DATE
As-Built MODIFICATION
FIT
MQA
MSS
DRAWN
CHECKED
APPROVED
GLOBAL PLUS SOLUTIONS SDN. BHD. No. 6, Jalan BK 1/15, Bandar Kinrara 47180 Puchong, Selangor D.E., Malaysia Tel: +603 5888 8963, +6012 655 8963 Fax: (603) 8070 2640
SOLUTION ENGINEERING SDN. BHD. PT13796, Jalan Tekno Usahawan 2 Technology Park Malaysia, Bukit Jalil 57000 Kuala Lumpur WP, MALAYSIA Tel: (603) 2780 3890 / (603) 2780 3891
DRAWN BY:
FIT
MODEL:
CHECKED BY:
MQA
DATE:
APPROVED BY:
MSS
SCALE:
PROJ. REF: 1405/19/GPS
18.03.2021 NTS
DRWG. NO.: 2019-1405-PID-LGD
SHT. NO.: 1 REV.: AB
ITEM NO. SERVICE DESIGN / OPERATING PRESS. (kPag) DESIGN / OPERATING TEMP. (°C) SIZE (mm) / DUTY (kW) CAPACITY MATERIAL
V-101 FEED (GLYCOL) TANK ATM + Full H2O / ATM 60 / 25 – 40 750 (D) x 1250 (H) 0.500 m 3 SS 304
ITEM NO. SERVICE TYPE
E-301 CDU FEED EXCHANGER SHELL & TUBE 150 / 100 450 / 300 150 / 110 60 / 25 – 40 DN150 x 1000 (SL) 2.1 kW / 1.50 m2 SS 304
SHELL TUBE SHELL TUBE
DESIGN / OPERATING PRESS. (kPag) DESIGN / OPERATING TEMP. (°C)
V-102 DESALTER ATM + Full H2O / ATM 60 / 25 – 40 400 (D) x 600 (L) 0.075 m3 SS 304
SIZE (mm) DUTY / TRANSFER AREA MATERIAL
V-103 FLASH TOWER 200 / 100 150 / 110 150 (D) x 1500 (H) 0.025 m3 SS 304
E-302 PRODUCT EXCHANGER SHELL & TUBE 150 / 100 150 / 100 180 / 160 150 / 100 DN150 x 1000 (SL) 1.1 kW / 1.50 m2 SS 304
HP STEAM SUPPLY PID-002 SHEET 1
P-101 FEED PUMP 450 25 – 40 0.75 kW 2.0 m3/hr SS304
E-303 RETURN STREAM COOLER SHELL & TUBE 150 / 100 150 / 100 60 / 30 100 / 70 DN150 x 1000 (SL) 2.1 kW / 1.50 m2 SS 304
P-102 A/B DESALTER OUTLET PUMP 500 25 – 40 0.37 kW 1.5 LPM SS316 / PEEK / PTFE
P-103 DESALTER WASTE PUMP 450 25 – 40 0.75 kW 2.0 m3/hr SS304
P-104 FURNACE TRANSFER PUMP 500 120 0.37 kW 1.5 LPM SS316 / PEEK / PTFE
E-304 CDU FEED PRE-HEATER SHELL & TUBE 150 / 100 150 / 100 200 / 165 150 / 110 DN100 x 1000 (SL) 3.0 kW / 0.42 m2 SS 304
PSV-201 VENT LINE 1"–0–ST
1"–0–VA
PID-001 Sheet 2
TG
142
HH
PZA
205 CHILLED WATER RETURN
PZT
1"–0–VA
1"–0–ST
½"–0–CHW
PID-002 SHEET 1
TG
205 TG
143 CHILLED WATER SUPPLY
½"x1"
½"–0–CHW
PID-002 SHEET 1
TIC
V103
141
V104
TT
TG
141
140
I
P
½" AFC TCV ½" 103 NC 1" NC
½" NO ½"x1"
¾"–0–PS1
PG
V003
1"–0–PS1
1"x2"
V072
AI
TG
501
1"–0–ST
138
FIC
S
SGB
501
C
SDV
SGS
O
501
501
C
V009
I
AI
P
½"
V-102
½" NO ½"x1" ½"x1"
V008
1" NC
GI
FAULT ALARM
XA
H
401
L
½"–0–PS1
HS START STOP 102A LOR
LOGIC
½"
HSP START
½"–0–PS1
½"–0–PS1
¾"–0–PS1
1"–0–PS1
STOP
102B
GI
XA
102B STOP
I
STOP PUMP
HS
LOGIC
302 ½" NO
½" NO
½"
V026
½" NC
Drain
FAULT ALARM
102B
RUN
GI
104
FAULT ALARM
RUN
FICA
H
304
L
STOP
STOP PUMP
HS
LOGIC
104
START STOP LOR
204 RV
FT
104
M
V034
Drain
½"–0–PS1
½" NO
TG
304 ½" NO
V035
P-104
½"
104 ½" NO
V036 V037
I
AI
P
½" AFC FCV ½" 304 NC ½" NC
½" NO
TO STREAM 7 PID-001 SHEET 2
V038
V039
FT ½" NO
V025
P-102A HST
104
STOP
FIC
202 V024
V021
102B
104
E-302
PG
RV
102 ½" NO
½" NC
XA HSP
302
STOP PUMP
V020 V022
START
104
ST01
V031
102A
RUN
½" NO
½"–0–PS1
LICA
HST
½" NC
V107
½" NC
M
½" NC
L
½"x1"
V027 V028
I
P
AI
½" AFC FCV ½" 302 NC ½" NC
TG
136
½" NO
½"–0–PS1
FROM STREAM 15 PID-001 SHEET 2
½"–0–PS3
V029
V030 ½"–0–PS1
FROM STREAM 18 PID-001 SHEET 2
½"–0–PS2
FROM STREAM 14 PID-001 SHEET 2
½"–0–PS1
V011
H
402
I
102A STOP
I
LICA
To Steam Condensate Drain Line
½"–0–PS2
STOP
102A
102A
SGV 2A
137
½"
102 PT
LL
PG
V010 HSP
401
144
TG
V007
FCV AFC
301
HST
HH
301 ½" ½"x1" NO
1" NC
LG
LZA
LT
313
FT
1" NC
START
LZT
403 403
FI
301
1"–0–PS1
SGV 2B
LG
103
E-304 TG
Drain
LT
402 LT
V006 ½" NC
I
Top Product Sampling
½"x1"
E-301
O
TT
103
101 1" NO
P-101 SXV
TG
102
½"–0–PS1
1"x2"
¾"x1"
1"
¼" NC
1"–0–PS1
V002
1"–0–PS1
½" NO
V-103 ½"–0–PS1
½"–0–PS1
Drain
1" 1"
V073
TG
201 V005
103
½" NC
1"–0–ST
101
TIC
V075
V074
½"–0–PS1
2"–0–PM
START STOP LOR
HS
LOGIC
2" NO
FI
314
½" NC
½"–0–PS2
STOP PUMP
M 1" NC
V122
141
V123
¾" NO
V004
STOP
TCV
½"–0–PS1
101 101
V001
FAULT ALARM
XA RUN
GI
½" ½" NC
½" NO
1"–0–PS1
STOP
101 2" LC
V120
½"x1"
½" LO
V032
1"–0–PS1
¾"-SS304-10S
HSP
LT
V033
139
½" NO
V121
101
101
Future HTU
201
TG ½" NO
START
PID-001 Sheet 2
½" NC
LG
101
HST
TO STREAM 8
PSV
E-303
M
LSL
205
½"–0–PS2
1"–0–PS1
V-101
SGV 1A
PCV
V105
315 SGV 1B
105
½" NO
V040
AI
V106
FI
1"–0–PS1
½" NO
START STOP
102B LOR
M ½" ½" NC
V023
P-102B ½"–0–PS1
CLIENT: 1"–0–PS1
HSP
STOP
103 HST
START
103 I
XA
103 GI
103
RUN STOP
STOP PUMP
HS
LOGIC
103
Drain
1" 1"
1"
P-103
303
PG ¾" NO ¾"x1"
1"–0–PS1
V012
UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (MITEC)
FI
START STOP LOR
V013
M ½" NC
FAULT ALARM
203 V014
½" NO
1" NO
V015
½"x1"
½" NO
V016 V017
I
P
AI
½" AFC LCV ½" 401 NC 1" NC
V019
½" NO ½"x1"
NOTE:
VENDOR:
WEIGHT
MANUFACTURER:
PROJECT TITLE:
CADANGAN MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENTAULIAH PERALATAN LATIHAN DAN PEMBELAJARAN BAGI PROGRAM “BACHELOR OF ENGINEERING TECHNOLOGY IN OIL AND GAS ENGINEERING (OPERATION AND SAFETY)” UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (UNIKL MITEC)
DRAWING TITLE:
PIPING & INSTRUMENTATION DIAGRAM (SOLTEQ® SE991)
V018 UNIT
A3
2.5
9.12.2021
Updated.
FIT
MQA
MSS
THIS DRAWING AND DESIGN MUST NOT BE COPIED, REPRODUCED OR DISCLOSED TO A THIRD PARTY OR MADE USE WITHOUT THE WRITTEN PERMISSION FROM SOLUTION ENGINEERING SDN. BHD. THE ORIGINAL AND ALL COPIES OF THIS DRAWING AND THE COPYRIGHT ARE THE SOLE PROPERTY OF SOLUTION ENGINEERING SDN. BHD. WE RESERVE THE RIGHT TO MAKE CHANGES FOR PROCESS IMPROVEMENTS DURING PROJECT IMPLEMENTATION STAGE.
1.5
20.10.2020
Updated.
FIT
MQA
MSS
0
9.10.2019
Issued for construction.
FIT
MQA
MSS
REV
DATE
DRAWN
CHECKED
APPROVED
MODIFICATION
GLOBAL PLUS SOLUTIONS SDN. BHD. No. 6, Jalan BK 1/15, Bandar Kinrara 47180 Puchong, Selangor D.E., Malaysia Tel: +603 5888 8963, +6012 655 8963 Fax: (603) 8070 2640
SOLUTION ENGINEERING SDN. BHD. PT13796, Jalan Tekno Usahawan 2 Technology Park Malaysia, Bukit Jalil 57000 Kuala Lumpur WP, MALAYSIA Tel: (603) 2780 3890 / (603) 2780 3891
DRAWN BY:
FIT
MODEL:
CHECKED BY:
MQA
DATE:
APPROVED BY:
MSS
SCALE:
PROJ. REF: 1405/19/GPS
9.12.2021 NTS
DRWG. NO.: 2019-1405-PID-001
SHT. NO.: 1 of 2 REV.: 2.5
ITEM NO. SERVICE TYPE SHELL TUBE SHELL TUBE
SIZE (mm) DUTY / TRANSFER AREA MATERIAL
E-306 FRACTIONATOR REBOILER SIPHON c/w ELECTRIC HEATER
V-107 VAPOUR TRAP 200 / 100 150 / 110 150 (D) x 200 (H) 0.0035 m3 SS 304
E-307 N2 GAS PRE-COOLER SHELL & TUBE 150 / 100 150 / 100 60 / 30 120 / 80 DN150 x 1000 (SL) 2.0 kW / 1.50 m2 SS 304
150 / 100 250 / 200 DN200 x 700 (SL) 3 x 3.0 kW SS 304
P-105
P-106
P-107
REFLUX PUMP
FRACTIONATOR BOTTOM PUMP
SIDE STRIPPER BOTTOM PUMP
500 110 0.37 kW 1.5 LPM SS316 / PEEK / PTFE
500 160 0.37 kW 1.5 LPM SS316 / PEEK / PTFE
500 110 0.37 kW 1.5 LPM SS316 / PEEK / PTFE
E-308 N 2 GAS COOLER SHELL & TUBE 150 / 100 150 / 100 60 / 30 150 / 100 DN150 x 500 (SL) 0.2 kW / 0.75 m2 SS 304
ITEM NO. SERVICE TYPE DESIGN / OPERATING PRESS. (kPag) DESIGN / OPERATING TEMP. (°C) SIZE (mm) CAPACITY HEATER POWER MATERIAL
K-108 N2 COMPRESSOR 400 40 0.10 kW 1.6 m3/hr -
ITEM NO. SERVICE DESIGN / OPERATING PRESS. (kPag) DESIGN / OPERATING TEMP. (°C) SIZE (mm) COLUMN TYPE MATERIAL
C-201 MAIN FRACTIONATOR 700 / 100 250 / 200 150 (D) x 5500 (H) 15-TRAY BUBBLE CAP SS 304
C-202 SIDE STRIPPER 300 / 200 150 / 130 150 (D) x 1500 (H) CERAMIC BERL SADDLES PACKINGS SS 304
F-309 FURNACE ELECTRICAL 130 / 100 180 / 150 100 (D) x 700 (H) (3 sets) 0.005 m 3 (3 sets) 20 kW (3 sets) SS 304
1"–0–VA
1"–0–CW
FIC
312 TZA
3"–0–PS2
V057
1"–0–CW
1" NO
310
I
¾" NO
¾"x1"
FT
310
FIC FT P
½" FCV AFC 311 V113 1" NC
AI
TG
V114
S1
½" NC
1"–0–PS2
1"x2"
122
½" NO
TT
V065
I
AI
P
½" FCV AFC 305
119
306
TT
208
V070
113
HST
HSP
XA
106
106
START
GI
106
106
FAULT ALARM
STOP
TG
PG
209
I
STOP PUMP
HS
LOGIC
106
RV
TO STREAM 15 PID-001 SHEET 1
½" NO
V052
I
AI
P
½"
V050
LCV AFC
405
V051 ½" NC
½" NO
V047 ½" NO
½" NC
½" NO
V049
¼" NC
106
133
START STOP LOR
S15
P-106
HSP
STOP
XA
107
FIC
HST
307
START
107
107 GI
RUN
107
STOP
FAULT ALARM
1"–0–PS3
PG
210
I
FT
TO STREAM 18 PID-001 SHEET 1
½" NO
V083
P
AI
½" FCV AFC 307 V082 ½" NC
V079 ½" NO
V081 ½" NC
STOP PUMP
LOGIC
RV
307 I
½"
½" NO
V080
V076 TT
V045
½" NO
TIC 109B
109
I
½" NO
107
LG
201
HS
107
LICA
H
405
L
½" NC
HS
105
START STOP LOR
V059
½" NO
HH
211 PZT
LL
V077
V099
V060
503
C
SDV
SGS
O
503
503
C
214
V091 PG
½" NO
C
SGS
O
504
C
TIA
L
108 108
RUN
108
STOP
STOP PUMP
½" NO
PSV
308
PICA
H
216
L
204
V042
½" NC
H-306A
E
E
START STOP LOR
K-108
HH
215 PZT
215
TG TT
TICA
H
130 130
½" NO
V102
PT
216
½" NC
V089
V088 V087
½" LO
V090
M ½" NO
E-308
½" NO
½" NO
½"–0–CHW
½" NO ½"
V132 TG
TCV
½" NC
V131
V130
130 ½" NC
½"–0–N2
V133
V-106
½" NC
V043
½"x2"
108
½" NC
131
E-306
½" NO
HS
LOGIC
½"–0–CHW
217
FI
TT
FAULT ALARM
XA
108 GI
217
LICA
H
406
L
LT
LG
406
202
SXV
AI
216
LT SGB
O
216
C
XV
SGS
O
216
216
C
S
V044 V078
H-306B/C
½" NO
SXV
AI
V086
½" NC
1"–0–PS1
I
P-107
S
SGB
O
502
C
SGS
O
502
C
PCV
½" NC
V085
CLIENT: SDV
502 1"–0–ST
1"–0–PS2
UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (MITEC)
VENDOR:
WEIGHT
MANUFACTURER:
216
¼" NO
½"–0–N2
502
1"–0–PS1
NOTE:
O
504
504
1" NC
TO STREAM 14 PID-001 SHEET 1
SGB
SDV
½"–0–N2
½" NO
STOP
108
S
I
½" NO
V097
¼" NO
Drain
HSP
I
129
309
M
V084
START
504
TG
FI
PCV
O
HST
AI
SXV
PG
½" NC
AI SGB
½"–0–N2
108
PZA
S
½" NO
V100
V101
V067
PZA
AI
P
134 H
½" NC
V093
V125
128
½" AFC PCV ½" 213 NC ½" NC
V098
M
C-202
V046
START STOP LOR
STOP PUMP
VENT
TIC 109A
LT
Bottom Product Sampling
V053
LT
405
STOP
LOGIC
I
½" NO
P-105
½" NC
1"–0–PS3
XA
105 RUN
GI
105
105
½" NC
SXV
1"–0–PS3
V048
LG
104
½"–0–PS2
503
PG
206
110
M
V068
½" NO
TT
¼" NC
START
½"
211
111
S14
LT
404 FAULT ALARM
1"–0–PS2
TT
¼" NC
RUN
½" NO
PCV
TT
S13
L
STOP
211
1"–0–PS1
STOP
Feed Sampling
I
½" NO
V061
V071
112
¼" NC
½" NO
1"–0–PS2
¼" NC
V041
1"–0–PS2
TT
S12
½"–0–PS1
½" FCV AFC 306
1"–0–PS2
TT
¼" NC
P
½" NC
114
S11
H
404
RV ½" NO
V062
1"–0–PS1
1"–0–PS1
1"–0–ST
1"–0–ST
E H-309C
AI
V069
¼" NC
¼" NC
I
½" NO
115 S10
LICA
105
FT
TT
S9
V126
PG
116
¼" NC
H-309B E
HSP HST
105
306 117
TCV
½" NC
SGV 5A
LT
FIC
S8
½"
V127
105
V128
½" NC
V064
TT
309
V-104
½" NO
V063
½" NC
LG
V-105
½" NO
½"
S7
LSH
½" LO
V094
M
½" NC
V058
TT
¼" NC
1"–0–PS2
½" NO
118
¼" NC
218
L
SGV 5B
V-107
TT
S6
dPT
TT
128
E-307
V066
S5
L
F-309
FROM STREAM 7 PID-001 SHEET 1
½" NO
V092
FT
120
¼" NC
H-309A E
128 TG
132
305
TT
¼" NC
H
305
121
S4
TICA 107B
124 124
TT
S2
¼" NC
TT
FIC
TT
¼" NC
1"–0–PS1
107
212
2"–0–PS2
TIC
123
¼" NC
S3
L
½" NC
TICA
H
½" NO
V096
½"–0–N2
¼" NC
1"–0–PS2
H
PT
PICA
213 213
PT
½" NC
V095
H
½"–0–N2
TT
½" NO ½"x1"
V115
FROM STREAM 8
TICA 107A
L
½"–0–N2
V112
PID-001 SHEET 1
H
½"–0–N2
1"–0–ST
PIA
212
126 I
½" ½"x1" ½"x1" NO
½"x1"
½"
V119
127
½" LO
311
V111 LP STEAM SUPPLY PID-002 SHEET 1
TT
C-201
V055 V054
311
1" NC
¾" NO ¾"x1"
V116
203
1"–0–VA
½"–0–N2
½" NC
V117
E-305
312
1"–0–ST
1" NC
125
¾" FCV AFO 312
135
PSV
½"–0–CHW
PID-002 SHEET 1
1"–0–PS2
V110
V109
½" NC
1"–0–ST
AI
P
FT
½"–0–PS2
½"
FCV AFC
310
½" NO ½"x1"
½"–0–PS2
V108
202
AI
P
TT
3"–0–PS2
I
½" ½"x1" ½"x1" NO
½"x1"
1"–0–ST
PSV
V118
CHILLED WATER RETURN
135 TZT
½" NO
V124
½" NO
V155
½"–0–N2
1"–0–VA
FIC
HP STEAM SUPPLY PID-002 SHEET 1
HH
½"–0–CHW
½" NO
1"–0–VA
½"–0–CHW
V129
1"–0–CW
PSV-201 VENT LINE
½"–0–CHW
PID-002 SHEET 1
1"–0–VA
L
½"–0–CHW
H
207
½"–0–CHW
PICA
1"–0–CW
PT
207 V056
PID-001 SHEET 1
½" NO
CHILLED WATER SUPPLY
C.W. RETURN
PID-002 SHEET 1
VENT
1"–0–VA
1"–0–CW
1"–0–VA
C.W. SUPPLY PID-002 SHEET 1
1"–0–VA
½"–0–CHW
DESIGN / OPERATING TEMP. (°C)
E-305 FRACTIONATOR CONDENSER SHELL & TUBE 150 / 100 220 / 150 50 / 30 130 / 101 DN200 x 1500 (SL) 49.0 kW / 2.10 m2 SS 304
V-106 N2 BUFFER TANK 300 / 200 60 / 25 – 40 130 (D) x 455 (H) 0.006 m3 SS 304
½"–0–N2
DESIGN / OPERATING PRESS. (kPag)
V-105 KNOCK-OUT DRUM 200 / 100 60 / 25 – 40 130 (D) x 455 (H) 0.006 m3 SS 304
½"–0–CHW
V-104 REFLUX DRUM 200 / 100 150 / 110 150 (D) x 1750 (H) 0.030 m 3 SS 304
½"–0–N2
ITEM NO. SERVICE DESIGN / OPERATING PRESS. (kPag) DESIGN / OPERATING TEMP. (°C) SIZE (mm) / DUTY (kW) CAPACITY MATERIAL
N2 GAS SUPPLY ¼"–1–N2
N2 SOURCE
¼"
PROJECT TITLE:
CADANGAN MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENTAULIAH PERALATAN LATIHAN DAN PEMBELAJARAN BAGI PROGRAM “BACHELOR OF ENGINEERING TECHNOLOGY IN OIL AND GAS ENGINEERING (OPERATION AND SAFETY)” UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (UNIKL MITEC)
DRAWING TITLE:
PIPING & INSTRUMENTATION DIAGRAM (SOLTEQ® SE991)
UNIT
A3
2.5
18.03.2021
Updated.
FIT
MQA
MSS
THIS DRAWING AND DESIGN MUST NOT BE COPIED, REPRODUCED OR DISCLOSED TO A THIRD PARTY OR MADE USE WITHOUT THE WRITTEN PERMISSION FROM SOLUTION ENGINEERING SDN. BHD. THE ORIGINAL AND ALL COPIES OF THIS DRAWING AND THE COPYRIGHT ARE THE SOLE PROPERTY OF SOLUTION ENGINEERING SDN. BHD. WE RESERVE THE RIGHT TO MAKE CHANGES FOR PROCESS IMPROVEMENTS DURING PROJECT IMPLEMENTATION STAGE.
1.5
20.10.2020
Updated.
FIT
MQA
MSS
0
9.10.2019
Issued for construction.
FIT
MQA
MSS
REV
DATE
DRAWN
CHECKED
APPROVED
MODIFICATION
GLOBAL PLUS SOLUTIONS SDN. BHD. No. 6, Jalan BK 1/15, Bandar Kinrara 47180 Puchong, Selangor D.E., Malaysia Tel: +603 5888 8963, +6012 655 8963 Fax: (603) 8070 2640
SOLUTION ENGINEERING SDN. BHD. PT13796, Jalan Tekno Usahawan 2 Technology Park Malaysia, Bukit Jalil 57000 Kuala Lumpur WP, MALAYSIA Tel: (603) 2780 3890 / (603) 2780 3891
DRAWN BY:
FIT
MODEL:
CHECKED BY:
MQA
DATE:
APPROVED BY:
MSS
SCALE:
PROJ. REF: 1405/19/GPS
9.12.2021 NTS
DRWG. NO.: 2019-1405-PID-001
SHT. NO.: 2 of 2 REV.: 2.5
ITEM NO. SERVICE DESIGN / OPERATING PRESS. (kPag) DESIGN / OPERATING TEMP. (°C) SIZE (mm) / DUTY (kW) CAPACITY MATERIAL
Fulton (FBA-020) STEAM BOILER 1,000 / 800 690 lbs/hr -
Liang Chi (LBCH-15) COOLING TOWER 58,500 kcal/hr -
P-109
P-110
COOLING WATER PUMP
CHILLED WATER PUMP
500 25 – 40 1.10 kW 3.0 m3/hr SS304
550 0 – 40 0.75 kW 1.8 m3/hr SS304
ITEM NO. SERVICE COOLING CAPACITY (kW) COMPRESSOR INPUT POWER (kW) REFRIGERANT TYPE EVAPORATOR WATER FLOW CHILLED WATER PUMP HEAD (mH2O) CONNECTIONS (mm)
B-401 AIR COOLED CHILLER
14.5 5.75 R410A 2.5 m3/hr 10 DN32
ITEM NO. SERVICE TYPE OPERATING PRESSURE (BarG) OPERATING TEMPERATURE (°C) CONNECTIONS INLET / OUTLET CARTRIDGE SIZE QUALITY
S-501 WATER FILTER
CARTRIDGE MANUFACTURER STD 25 – 40
¾" 2.5" x 10" MANUFACTURER STD
VENT
1"–2–ST
AI 1" NC
505 I
Existing Steam Plant 1"–2–ST
SGB
O
505
C
SDV
SGS
O
505
505
C
S
1"–0–ST
1" NC
V135
PG
220
221 ½" NO
V138
PCV
1" NO
220
PG
219
220
1" NO
V136
1"
V142
PCV
1" NO
1"–0–ST
½" NO
221
1" NO
1"–0–ST
V141
HI-PRESSURE STEAM TO COLUMN C-201 1"–0–ST
1"–2–ST
1"–0–ST
1"–0–ST
1"–2–ST
1"–0–ST
1"–0–ST
1"–2–ST
1"–0–ST
PID 001 Sheet 2
V143
1"
PT
222 PG
1"–2–ST
To other equipments
223 ½" NO
V144
223 1"–0–ST
1" NO
V134
PCV
1"–2–ST
Steam Boiler (FBA-020)
RV
V137
PT
1"–2–CS
SXV
1" NO
HI-PRESSURE STEAM TO PRE-HEATER E-304
PID 001 Sheet 1
V145
1"
PT
224 PG
V139
Steam Header
225
1" NC
V146
PCV
225
V140
1" NC
½" NO
ST02
1" NO
LO-PRESSURE STEAM TO STRIPPER C-202
PID 001 Sheet 2
V147
1"
TO STEAM CONDENSATE DRAIN LINE 1"–2–CS
-
Existing Cooling Tower System Cooling Tower (LBCH-15)
1" NO
C.W. RETURN FROM CONDENSER E-305 PID 001 Sheet 2
1"–2–CW
V155 1½" NO
V154
PG
1"–2–CW
227 V152
1½" NO
START
GI
109
P-105
109
109 HST
1"-CS-40S
MV-142
HSP
109
1" NO
C.W. SUPPLY TO CONDENSER E-305 PID 001 Sheet 2
1"–2–CW
V153
HS
LOGIC
109
START STOP LOR
PG
226 1" NO
V149
P-104 1" 1"
1"-CS-40S
S-501
STOP
M 1" NO
½" NO
RUN
STOP PUMP
I
FAULT ALARM
1"–2–CW
Water Tank
XA
STOP
1"
V148
V150
½" NO
1" NO
V151
P-109
VENT PCV
N2 GAS SUPPLY TO TANK V-106
HV01 ¼"–1–N2
N2 CYLINDER
¼"–1–N2
PID 001 Sheet 2
HV02
¼"
INSTRUMENTS & UTILITIES AIR SUPPLY
COMPRESSED AIR (DRY) ½"–3–AS
-
½"–3–AS
PCV
HV03
PID 001 Sheet 1 & 2
PCV
228 ½"–3–AS
¼"
HV04
HV05
¼"
CHILLED WATER RETURN ½"–0–CHW
PID-001 Sheet 1
CHILLED WATER RETURN ½"–0–CHW
½"–0–CHW
PID-001 Sheet 2
TG
CHILLED WATER SUPPLY
146
½"–0–CHW
½"–0–CHW
PID 001 Sheet 1
CHILLED WATER SUPPLY
Chilled Water System
½"–0–CHW
½" NC
½"–0–CHW
PID 001 Sheet 2
V157
B-401
½" ½"
½" NC
CLIENT:
TG ½" NO
V158 UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (MITEC)
½"–0–CHW
1¼"x½" 1¼"x½"
P-110
PROJECT TITLE:
145
V156
CADANGAN MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENTAULIAH PERALATAN LATIHAN DAN PEMBELAJARAN BAGI PROGRAM “BACHELOR OF ENGINEERING TECHNOLOGY IN OIL AND GAS ENGINEERING (OPERATION AND SAFETY)” UNIVERSITI KUALA LUMPUR – MALAYSIAN INSTITUTE OF INDUSTRIAL TECHNOLOGY (UNIKL MITEC)
FSL
400
NOTE:
VENDOR:
WEIGHT
MANUFACTURER:
DRAWING TITLE:
PIPING & INSTRUMENTATION DIAGRAM (SOLTEQ® SE991) UNIT
UTILITIES – STEAM, COOLING WATER & CHILLED WATER
A3
2.5
9.12.2021
Updated.
FIT
MQA
MSS
THIS DRAWING AND DESIGN MUST NOT BE COPIED, REPRODUCED OR DISCLOSED TO A THIRD PARTY OR MADE USE WITHOUT THE WRITTEN PERMISSION FROM SOLUTION ENGINEERING SDN. BHD. THE ORIGINAL AND ALL COPIES OF THIS DRAWING AND THE COPYRIGHT ARE THE SOLE PROPERTY OF SOLUTION ENGINEERING SDN. BHD. WE RESERVE THE RIGHT TO MAKE CHANGES FOR PROCESS IMPROVEMENTS DURING PROJECT IMPLEMENTATION STAGE.
1.5
20.10.2020
Updated.
FIT
MQA
MSS
0
9.10.2019
Issued for construction.
FIT
MQA
MSS
REV
DATE
DRAWN
CHECKED
APPROVED
MODIFICATION
GLOBAL PLUS SOLUTIONS SDN. BHD. No. 6, Jalan BK 1/15, Bandar Kinrara 47180 Puchong, Selangor D.E., Malaysia Tel: +603 5888 8963, +6012 655 8963 Fax: (603) 8070 2640
SOLUTION ENGINEERING SDN. BHD. PT13796, Jalan Tekno Usahawan 2 Technology Park Malaysia, Bukit Jalil 57000 Kuala Lumpur WP, MALAYSIA Tel: (603) 2780 3890 / (603) 2780 3891
DRAWN BY:
FIT
MODEL:
CHECKED BY:
MQA
DATE:
APPROVED BY:
MSS
SCALE:
PROJ. REF: 1405/19/GPS
9.12.2021 NTS
DRWG. NO.: 2019-1405-PID-002
SHT. NO.: 1 of 1 REV.: 2.5