8 0 208 KB
HIRARC
KPG SYNERGY SDN BHD Client: SCOMI
Project: MONORAIL CAR PROJECT
Sheet 1 of 2
HIRARC No.: KPG-001
Contact No.: -
Department: NDT (KPG)
Work/Job Description: RADIOGRAPHY TESTING (DRT-FRT)
Activity Transport of equipment's to Bunker or pipe storage area / lay down area
R/NR /E NR
Hazard • Slip, Trip and Fall • Heavy Load
X-ray system set-up
NR
• • • •
Equipment malfunction (If any)
NR
• Expose of radiation to worker and public
Warming up of x-ray tube or Gamma-ray in progress
Radiation exposure work
NR
NR
Electrical shock Heavy load Pinch point Slip, trip and fall
• Expose of radiation to worker and public
• Expose of radiation to worker and public
Consequences
Analysis by: M. RIDUAN B. ZAINAL Date: 03-MAR-2021 Existing Control
RISK RATING (L) (S) (R)
Control Measure/ Recommendation
• Injuries to personnel • Equipment damage • Back Injuries
• Follow radiation transportation procedure • Road safety requirement • Approved vehicles to be used
• • •
Walk carefully & don’t run. Removed any tripping hazard and clean up any slippery floor Good housekeeping at work area & walk slowly while carrying load. Proper way of lifting & handling of heavy load. Ask for help or use crane
• Injuries to personnel • Back injuries • Injuries to hand or finger • Injuries to personnel • Equipment's damage
• Proper manual handling procedure to be followed • Check Equipment is in good working order • Use necessary PPE (Hand gloves, Safety shoes, etc.) • Only authorized personnel shall be allowed to handle && setup the equipment
• • • • • •
Wear hand glove & rubber boot Make sure all cable is in good condition & all connection is properly tied Proper way of lifting & handling of heavy load. Ask for help or use crane Always be alert of what you are doing and stay focus at all time Walk carefully & don't run and removed any tripping hazards Good housekeeping at work area & walk slowly while carrying load
• Damage to body cell and blood cell
• Permit • Daily personnel dose log to be maintained and closely monitored • Radiation area shall be checked to avoid any activities • The area around the radiography activity must be barricade according to the calculated distance • Warning shall be provided on all side
• •
Radiographer shall notify RPS Radiographer measure radiation level around barricaded area to ensure dose rate less than 0.25mR/hr. RPS will initiate Emergency Response Plan
• Radiation area shall be checked to avoid any activities • The area around the radiography activity must be barricade according to the calculated distance • Warning shall be provided on all side
• •
• Radiation area shall be checked to avoid any activities • The area around the radiography activity must be barricade according to the calculated distance • Warning shall be provided on all side
• •
• Damage to body and blood cell
• Damage to body and blood cell
•
• • • • •
• • • • •
Keep radiation monitoring device near you or work area at all time Make sure unauthorized personnel is not inside the control area during radiation exposure work Switch on the radiation alarm and warning light if radiation work started Follow the company radiation safety guideline and procedure Extra lead shielding requires if the radiation dose recorded is to high Survey all barricade area is below 0.25mR/hr Make sure the radiation exposure is finish before moving in (use survey meter) Keep radiation monitoring device near you or work area at all time Make sure unauthorized personnel is not inside the control area during radiation exposure work Switch on the radiation alarm and warning light if radiation work started Follow the company radiation safety guideline and procedure Extra lead shielding requires if the radiation dose recorded is to high Survey all barricade area is below 0.25mR/hr Make sure the radiation exposure is finish before moving in (use survey meter)
HIRARC
KPG SYNERGY SDN BHD Client: SCOMI
Project: MONORAIL CAR PROJECT
Work/Job Description: RADIOGRAPHY TESTING (DRT-FRT)
Sheet 1 of 2
HIRARC No.: KPG-001
Contact No.: -
Department: NDT (KPG) Analysis by: M. RIDUAN B. ZAINAL Date: 03-MAR-2021
Legend: R - Routine Risk Rating
S - Severity
NR - Non Routine
E - Emergency
L
- Likelihood
R - Risk
Likelihood (L) 1 - Inconceivable
2
- Remote
3 - Conceivable
4 - Possible
5 - Most Likely
Severity (S)
2
- Minor
3 - Serious
4 - Fatal
5 - Catastrophic
1 - Negligible
Prepared by :
Checked by:
Approved by:
Name
:
MOHD HUZAIRI
Name
:
Name
:
Date
:
3/03/2021
Date
:
Date
: