PT. ANGKASA PURA I (PERSERO)
BILL OF QUANTITY (BoQ) PEKERJAAN : PENGADAAN APPROACH LIGHT DAN SEQUENCED
DANA
: Rp7,261,122,000.00
NO. M.A. : TAHUN ANGGARAN
NO I 1 2 3 4 5 6 7 8
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 II 1 2 3 4 III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
: 2014
FLASHING RUNWAY 25
LOKASI
URAIAN PEKERJAAN PENGADAAN Unidirectional Elevated Approach Light High Intensity 150 W; 6,6 Unidirectional Inset Approach Light High Intensity 300 W; 6,6A Isolating Transformer 100 W 6,6 A (Threshold Wingbar) Isolating Transformer 150 W 6,6 A Isolating Transformer 300 W 6,6 A Breakable coupling Base plate Sequenced Flashing Light Complete 30 Bar : a. Flashing Head Inset b. Flashing Head Elevated c. Individual control unit / Flasher control unit / Power Control d. Master Control Unit / Supervision box Junction Box Panel outdoor ukuran 20 x 25 x 10 cm Kabel NYfGbY 4 x 25 mm² 0,6/1 kV Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) Kabel NYYHY 5 x 25 mm² Kabel Series FL2XCY 6 mm² 3/6kv Kabel Sekunder NYYHY 2 x 2,5 mm² BC 16 mm² Primary Connector Kit Secondary connector kit / Two Pole Plug Tiang tunggal tambahan untuk FCU + Flashing head elevated dan Master Control Unit (1,5 m x 10 buah) - pipa alumunium Pipa Galvanis 1/2" Sock pipa Galvanis 1/2" Pipa Galvanis 1" Sock pipa Galvanis 1" Pipa Fleksibel Almunium 1/2" (pembungkus kabel ke Flashing hea PEKERJAAN PERSIAPAN, PENGUKURAN, PEMBONGKARAN Pembuatan Pas Masuk Area Bandara dan area terbatas Pengukuran Kembali Elevasi area approach. Pembongkaran Instalasi Approach Light Existing Pembongkaran Instalasi Squenced Flashing Light Existing
: BANDARA ELTARI KUPANG
VOLUME
161 5 10 161 5 9 9
Unit unit buah buah buah unit unit
HARGA SATUAN
Rp Rp
1 29 30 1 30 1132 1132 80 1690 220 60 3 5 3
Unit Unit Unit unit unit m m m m m m Set Set Batan
Rp Rp Rp Rp Rp Rp Rp Rp
25 24 5 4 50
batan buah batan buah m
Rp Rp Rp Rp Rp
lot Lot Unit Unit
Rp
1 1 161 21
PEKERJAAN PEMASANGAN 60 lot Pembuatan tutup bak trafo Approach (tiap bak 2 tutup = 60 lot) 6 lot Pembuatan tutup bak trafo untuk cross bar (tiap bak 3 buah tutup 29 lot Perapihan bak trafo eksisting 1 lot Pembuatan bak trafo baru untuk bar 30 145 lot Pembuatan pondasi Approah light elevated (29 bar x 5 buah) 16 lot Pembuatan pondasi Cross Bar Light Elevated (2 bar x 8 buah) 5 lot Pembuatan / pengecoran dudukan untuk armature Inset Approach Instalasi dan setting unidirectional elevated high intensity Approac 161 Unit 5 Unit Instalasi dan setting unidirectional inset high intensity Approach li 10 unit Pembongkaran & pemasangan Isolating Transformer 100 Watt / un Pembongkaran & pemasangan Isolating Transformer 150 Watt / un 161 Unit 5 Unit Pemasangan Isolating Transformer 300 Watt / unit 9 Unit Instalasi base plate 9 Unit Instalasi Breakble coupling 1 Lot Setting Kontrol Flashing dan Instalasi Master Control Instalasi Flash Control Unit 30 lot 1 Unit Instalasi Flashing Head inset 29 Unit Instalasi Flashing head elevated 2480 m Galian dan timbun jalur kabel tanah biasa 110 m Galian dan Timbun Jalur Kabel tanah perkerasan RESA 1132 m Pemasangan kabel NYfGbY 4 x 25 mm²
Rp
Rp
Rp Rp
Rp
Rp Rp Rp Rp Rp Rp Rp Rp
JUMLAH SATUAN
#REF! #REF! #REF! #REF! #REF! - Rp - Rp
#REF! #REF! #REF! #REF! #REF! -
53,519,319 Rp 13,949,993 Rp 124,675,686 Rp 83,623,936 Rp 427,500 Rp 203,000 Rp 112,200 Rp 35,700 Rp #REF! #REF! 35,000 Rp #REF! #REF! #REF!
53,519,319 404,549,796 3,740,270,592 83,623,936 12,825,000 229,796,000 127,010,400 2,856,000 #REF! #REF! 2,100,000 #REF! #REF! #REF!
152,200 4,500 304,400 4,500 35,000
Rp Rp Rp Rp Rp
3,805,000 108,000 1,522,000 18,000 1,750,000 #REF!
3,660,000 Rp #REF! #REF! 47,250 Rp
3,660,000 #REF! #REF! 992,250 #REF!
806,168 Rp 102,479 Rp #REF! #REF! #REF! #REF! 867,760 Rp #REF! #REF! #REF! #REF! #REF! #REF! 27,813 Rp 1,140,000 Rp 545,000 Rp 158,250 Rp 114,375 Rp 40,600 Rp 43,800 Rp 25,310 Rp
48,370,078.56 614,873.88 #REF! #REF! #REF! #REF! 4,338,799.78 #REF! #REF! #REF! #REF! #REF! #REF! 250,312.50 1,140,000.00 16,350,000.00 158,250.00 3,316,875.00 100,688,000.00 4,818,000.00 28,650,920.00
22 23 24 25 26 27 IV 1 2 3 4 5
Pemasangan kabel kontrol SQFL Pemasangan kabel series FL2XCY Pemasangan kabel NYYHY 2 x 2,5 mm² Pemasangan kabel BC 16 mm² Instalasi primary connector kit Instalasi secondary connector kit PEKERJAAN LAIN-LAIN Factory Acceptance Test kabel di Pabrik (Dalam Negeri) Factory Acceptance Test Approach Light dan SQFL di Pabrik Pembuat di Luar Negeri Factory Familiarisasi di pabrik pembuat di luar negeri Site Familiarisasi Test dan Commissioning terhadap keseluruhan pekerjaan
1132 1690 220 60 3 5
m m m m Set Set
Rp
10,628 #REF! 6,600 7,600 #REF! #REF!
Rp
1 Lot 1 Lot
Rp 11,000,000.00 ###
Rp Rp
11,000,000 145,970,000
1 Lot 1 Lot 1 Lot
### Rp 16,390,000.00 Rp 12,280,000.00
Rp Rp Rp Rp
218,220,000 16,390,000 12,280,000 403,860,000 #REF! #REF! #REF! #REF!
Rp Rp
Jumlah Dibulatkan PPN 10% Total Terbilang Err:511
Rp Rp
12,030,330.00 #REF! 1,452,000.00 456,000.00 #REF! #REF! #REF!
PT. ANGKASA PURA I (PERSERO)
BILL OF QUANTITY (BoQ) PEKERJAAN : PENGADAAN APPROACH LIGHT DAN SEQUENCED
DANA
: Rp7,261,122,000.00
NO. M.A. : TAHUN ANGGARAN
NO I 1 2 3 4 5 6 7 8
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 II 1 2 3 4 III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
: 2014
FLASHING RUNWAY 25
LOKASI
URAIAN PEKERJAAN PENGADAAN Unidirectional Elevated Approach Light High Intensity 150 W; 6,6 Unidirectional Inset Approach Light High Intensity 300 W; 6,6A Isolating Transformer 100 W 6,6 A (Threshold Wingbar) Isolating Transformer 150 W 6,6 A Isolating Transformer 300 W 6,6 A Breakable coupling Base plate Sequenced Flashing Light Complete 30 Bar : a. Flashing Head Inset b. Flashing Head Elevated c. Individual control unit / Flasher control unit / Power Control d. Master Control Unit / Supervision box Junction Box Panel outdoor ukuran 20 x 25 x 10 cm Kabel NYfGbY 4 x 25 mm² 0,6/1 kV Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) Kabel NYYHY 5 x 25 mm² Kabel Series FL2XCY 6 mm² 3/6kv Kabel Sekunder NYYHY 2 x 2,5 mm² BC 16 mm² Primary Connector Kit Secondary connector kit / Two Pole Plug Tiang tunggal tambahan untuk FCU + Flashing head elevated dan Master Control Unit (1,5 m x 10 buah) - pipa alumunium Pipa Galvanis 1/2" Sock pipa Galvanis 1/2" Pipa Galvanis 1" Sock pipa Galvanis 1" Pipa Fleksibel Almunium 1/2" (pembungkus kabel ke Flashing hea PEKERJAAN PERSIAPAN, PENGUKURAN, PEMBONGKARAN Pembuatan Pas Masuk Area Bandara dan area terbatas Pengukuran Kembali Elevasi area approach. Pembongkaran Instalasi Approach Light Existing Pembongkaran Instalasi Squenced Flashing Light Existing
: BANDARA ELTARI KUPANG
VOLUME
161 5 10 161 5 9 191
Unit unit buah buah buah unit unit
HARGA SATUAN
Rp Rp
1 29 30 1 30 1132 1132 80 1690 220 60 3 5 3
Unit Unit Unit unit unit m m m m m m Set Set Batan
25 24 5 4 50
batan buah batan buah m
Rp Rp Rp Rp Rp
lot Lot Unit Unit
Rp
1 1 161 21
PEKERJAAN PEMASANGAN 60 lot Pembuatan tutup bak trafo Approach (tiap bak 2 tutup = 60 lot) 6 lot Pembuatan tutup bak trafo untuk cross bar (tiap bak 3 buah tutup 29 lot Perapihan bak trafo eksisting 1 lot Pembuatan bak trafo baru untuk bar 30 145 lot Pembuatan pondasi Approah light elevated (29 bar x 5 buah) 16 lot Pembuatan pondasi Cross Bar Light Elevated (2 bar x 8 buah) 5 lot Pembuatan / pengecoran dudukan untuk armature Inset Approach Instalasi dan setting unidirectional elevated high intensity Approac 161 Unit 5 Unit Instalasi dan setting unidirectional inset high intensity Approach li 10 unit Pembongkaran & pemasangan Isolating Transformer 100 Watt / un Pembongkaran & pemasangan Isolating Transformer 150 Watt / un 161 Unit 5 Unit Pemasangan Isolating Transformer 300 Watt / unit 191 Unit Instalasi base plate 9 Unit Instalasi Breakble coupling 1 Lot Setting Kontrol Flashing dan Instalasi Master Control Instalasi Flash Control Unit 30 lot 1 Unit Instalasi Flashing Head inset 29 Unit Instalasi Flashing head elevated 2480 m Galian dan timbun jalur kabel tanah biasa 110 m Galian dan Timbun Jalur Kabel tanah perkerasan RESA 1132 m Pemasangan kabel NYfGbY 4 x 25 mm²
Rp Rp Rp Rp
Rp
Rp
Rp Rp
Rp
Rp Rp Rp Rp Rp Rp Rp Rp
JUMLAH SATUAN
#REF! #REF! #REF! #REF! #REF! - Rp - Rp
#REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! 427,500 Rp 203,000 Rp 112,200 Rp 35,700 Rp #REF! #REF! 35,000 Rp #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 12,825,000 229,796,000 127,010,400 2,856,000 #REF! #REF! 2,100,000 #REF! #REF! #REF!
152,200 4,500 304,400 4,500 35,000
Rp Rp Rp Rp Rp
3,805,000 108,000 1,522,000 18,000 1,750,000 #REF!
3,660,000 Rp #REF! #REF! 47,250 Rp
3,660,000 #REF! #REF! 992,250 #REF!
806,168 102,479 #REF! #REF! #REF! #REF! 867,760 #REF! #REF! #REF! #REF! #REF! #REF! 27,813 1,140,000 545,000 158,250 114,375 40,600 43,800 25,310
Rp Rp
Rp
Rp Rp Rp Rp Rp Rp Rp Rp
48,370,078.56 614,873.88 #REF! #REF! #REF! #REF! 4,338,799.78 #REF! #REF! #REF! #REF! #REF! #REF! 250,312.50 1,140,000.00 16,350,000.00 158,250.00 3,316,875.00 100,688,000.00 4,818,000.00 28,650,920.00
22 23 24 25 26 27 IV 1 2 3 4 5
Pemasangan kabel kontrol SQFL Pemasangan kabel series FL2XCY Pemasangan kabel NYYHY 2 x 2,5 mm² Pemasangan kabel BC 16 mm² Instalasi primary connector kit Instalasi secondary connector kit PEKERJAAN LAIN-LAIN Factory Acceptance Test kabel di Pabrik (Dalam Negeri) Factory Acceptance Test Approach Light dan SQFL di Pabrik Pembuat di Luar Negeri Factory Familiarisasi di pabrik pembuat di luar negeri Site Familiarisasi Test dan Commissioning terhadap keseluruhan pekerjaan
1132 1690 220 60 3 5
m m m m Set Set
Rp Rp Rp
12,030,330.00 #REF! 1,452,000.00 456,000.00 #REF! #REF! #REF!
1 Lot 1 Lot
Rp 11,000,000.00 Rp 145,970,000.00
Rp Rp
11,000,000 145,970,000
1 Lot 1 Lot 1 Lot
Rp 218,220,000.00 Rp 16,390,000.00 Rp 12,280,000.00
Rp Rp Rp Rp
218,220,000 16,390,000 12,280,000 403,860,000 #REF! #REF! #REF! #REF!
Jumlah Dibulatkan PPN 10% Total Terbilang Err:511
10,628 Rp #REF! 6,600 Rp 7,600 Rp #REF! #REF!
PT. ANGKASA PURA I (PERSERO)
RENCANA ANGGARAN DAN BIAYA PEKERJAAN : PENGADAAN APPROACH LIGHT DAN SEQUENCED
DANA
: Rp7,261,122,000.00
FLASHING RUNWAY 28
NO. M.A. : TAHUN ANGGARAN
I
: 2016
LOKASI
: BANDARA JUANDA SURABAYA
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
JUMLAH SATUAN
1
2
3
4
5
Rp 53,519,319.04 Rp 13,949,992.96 ### Rp 83,623,936.00 Rp 203,000.00 Rp Rp 112,200.00 Rp 35,700.00 Rp 21,000.00 Rp 35,000.00 Rp 85,700.00 Rp 400,000.00 Rp 85,000.00 Rp 35,000.00
Rp 160,557,957.12 Rp 376,649,809.92 Rp 3,740,270,592.00 Rp 83,623,936.00 Rp 284,200,000.00 Rp Rp 157,080,000.00 Rp 3,570,000.00 Rp 3,150,000.00 Rp 42,000,000.00 Rp 22,282,000.00 Rp 80,000,000.00 Rp 17,000,000.00 Rp 1,750,000.00 Rp 4,972,134,295.04
1 set 1 lot 27 Unit
Rp 150,000.00 Rp 3,660,000.00 Rp 47,250.00
Rp Rp Rp Rp
150,000.00 3,660,000.00 1,275,750.00 5,085,750.00
27 lot
Rp 1,161,990.26
Rp
31,373,736.97
3 1 30 30
Rp 867,759.96 Rp 1,140,000.00 Rp 545,000.00 Rp 172,500.00
Rp Rp Rp Rp
2,603,279.87 1,140,000.00 16,350,000.00 5,175,000.00
PENGADAAN 1 Sequenced Flashing Light Complete 30 Bar : a. Flashing Head Inset b. Flashing Head Elevated c. Individual control unit / Flasher control unit / Power Control d. Master Control Unit / Supervision box 3 Kabel NYFGbY 4 x 25 mm² 0,6/1 kV 4 Kabel Kontrol SQFL 3 pair x 0.8 mm² 5 Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) 6 Kabel NYYHY 5 x 2.5 mm² Kabel NYY 3 X 4 mm² 7 BC 16 mm² 8 Pipa PVC 2.5" 9 Pipa Galvanis 2.5" 10 Sock pipa Galvanis 2.5" 11 Pipa Fleksibel Almunium 1/2" (pembungkus kabel ke Flashing hea
II 1 2 3 III 1 2 3 4 5
PEKERJAAN PERSIAPAN, PENGUKURAN, PEMBONGKARAN Pencetakan gambar kerja Pembuatan Pas Masuk Area Bandara dan area terbatas Pembongkaran Instalasi Squenced Flashing Light Existing PEKERJAAN PEMASANGAN Pembuatan pondasi untuk Individual control unit dan Flashing He elevated Pembuatan / pengecoran dudukan untuk armature Flashing Head i Setting Kontrol Flashing dan Instalasi Master Control Instalasi Individual Flash Control Unit Pemasangan Junction box dan kabel NYY 3 x 4 mm²
3 27 30 1 1400 1000 1400 100 150 1200 260 200 200 50
Unit Unit Unit unit m m m m m m bh bh bh m
lot Lot lot lot
1 6 7 8 9 10
11 12 13 14 15 16 IV
2 Instalasi Flashing Head inset Instalasi Flashing head elevated Instalasi Breakoble Coupling Galian dan timbun jalur kabel tanah biasa Galian dan Timbun Jalur Kabel tanah perkerasan RESA Pembuatan dan pemasangan Patok tanda jalur kabel Pembuatan Bak Handhole kabel Pembuatan tutup Handhole kabel Pemasangan kabel NYfGbY 4 x 25 mm² Pemasangan Kabel Kontrol SQFL (10 pairs x 0,8 mm²) Penyambungan Kabel Kontrol SQFL Pemasangan kabel NYYHY 5 x 2,5 mm² (kabel dari FCU ke Flashing Head - termasuk dalam instalasi Flashing Head) Pemasangan kabel BC 16 mm² Instalasi sistem kontrol pada Control Desk Tower
3 3 Unit 27 Unit 30 Unit 1500 m 110 m 29 lot 30 bh 30 bh 1400 m 1400 m 2 lot 80 m
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4 314,201.93 114,375.00 27,812.50 40,600.00 43,800.00 16,289.00 806,167.98 102,478.98 25,310.00 10,627.50 111,250.00 6,600.00
1200 m 1 lot
Rp Rp
7,600.00 395,000.00
PEKERJAAN LAIN-LAIN 1 Factory Acceptance Test kabel di Pabrik (Dalam Negeri) 2 Factory Acceptance Test SQFL di Pabrik Pembuat di Luar Negeri 3 Factory Familiarisasi di pabrik pembuat di luar negeri 4 Site Familiarisasi 5 Test dan Commissioning terhadap keseluruhan pekerjaan
1 Lot 1 Lot 1 Lot 1 Lot 1 Lot
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
5 942,605.78 3,088,125.00 834,375.00 60,900,000.00 4,818,000.00 478,896.60 24,185,039.28 3,074,369.40 35,434,000.00 14,878,500.00 222,500.00 528,000.00
Rp Rp Rp
9,120,000.00 395,000.00 215,541,427.90
Rp 11,000,000.00 Rp ### Rp
11,000,000.00 145,970,000.00
### Rp 218,220,000.00 Rp 16,390,000.00 Rp 16,390,000.00 Rp 12,280,000.00 Rp 12,280,000.00 Rp 403,860,000.00 Jumlah Rp 5,596,621,472.94 Dibulatkan Rp 5,596,621,000.00 PPN 10% Rp 559,662,100.00 Total Rp 6,156,283,100.00
Terbilang : Err:511
Jakarta,
Mei 2014
Diperiksa oleh:
Dibuat oleh:
Airport Equipment Readiness Group Head
Electrical Department Head
YUDI MAISA
PIPIN YUSUF ARIFIN
Disetujui oleh: Technical Director
POLANA B. PRAMESTI
Mengetahui, President Director
TOMMY SOETOMO
DAFTAR HARGA SATUAN UPAH DAN BAHAN PEKERJAAN LOKASI
Pengadaan Approach Light dan Sequenced Flashing Runway 25 Bandar Udara El Tari Kupang
U P A H. Pekerjaan Elektrikal khusus 1 Tenaga Ahli 2 Kepala Teknisi 3 Teknisi 4 Pembantu Teknisi
Rp Rp Rp Rp
350,000 95,000 75,000 50,000
/ / / /
hari hari hari hari
Pekerjaan Sipil / kontruksi 5 Kepala tukang 6 Mandor 7 Tukang 8 Pekerja
Rp Rp Rp Rp
75,000 75,000 60,000 50,000
/ / / /
hari hari hari hari
B A H A N. 1 2 3
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Breakable coupling Base plate Sequenced Flashing Light Complete 30 Bar : a. Flashing Head Inset b. Flashing Head Elevated c. Individual control unit / Flasher control unit / Power Control b d. Master Control Unit Hand hole Kabel NYfGbY 4 x 25 mm² 0,6/1 kV Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) Kabel NYYHY 5 x 2,5 mm² Kabel Kontrol SQFL 3 pair x 0.8 mm² Kabel NYY 3 x 4 mm² BC 16 mm² Pipa Galvanis 2.5" Sock pipa Galvanis 2.5" Pipa PVC 2.5" Pipa Fleksibel Almunium 1/2" (pembungkus kabel ke Flashing hea Semen Portland Pasir beton Pasir Split beton Papan kelas II Balok kelas II Paku Besi beton Kawat beton
Rp Rp
- /unit - /unit
Rp 53,519,319 /unit Rp 13,949,993 /unit Rp 124,675,686 /unit Rp 83,623,936 /unit Rp 427,500 /unit Rp 203,000 /meter Rp 112,200 /meter Rp 35,700 /meter Rp Rp 21,000 /meter Rp 35,000 /meter Rp 200,800.00 /batang Rp 4,500.00 /buah Rp 51,850 /batang Rp 35,000 /meter Rp 1,050 /kg Rp 183,750 /m³ #REF! /m³ Rp 236,250 /m³ Rp 3,990,000 /m³ Rp 3,675,000 /m³ Rp 20,200 /kg Rp 13,400 /kg Rp 23,100 /kg
DAFTAR HARGA SATUAN UPAH DAN BAHAN PEKERJAAN LOKASI
Pengadaan Approach Light dan Sequenced Flashing Light Runway 25 Bandar Udara El Tari Kupang
U P A H. Pekerjaan Elektrikal khusus 1 Tenaga Ahli 2 Kepala Teknisi 3 Teknisi 4 Pembantu Teknisi
Rp Rp Rp Rp
350,000.00 95,000.00 75,000.00 50,000.00
/ / / /
hari hari hari hari
Pekerjaan Sipil / kontruksi 1 Kepala tukang 2 Mandor 3 Tukang 4 Pekerja
Rp Rp Rp Rp
75,000.00 75,000.00 60,000.00 50,000.00
/ / / /
hari hari hari hari
B A H A N. 1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Sequenced Flashing Light Complete 30 Bar : a. Flashing Head Inset b. Flashing Head Elevated c. Individual control unit / Flasher control unit / Power Control b d. Master Control Unit / Supervision box Junction Box Panel outdoor ukuran 20 x 25 x 10 cm Kabel NYfGbY 4 x 25 mm² 0,6/1 kV Kabel NYY 3 x 4 mm² Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) Kabel NYYHY 5 x 25 mm² Kabel Series FL2XCY 6 mm² 3/6kv Kabel Sekunder NYYHY 2 x 2,5 mm² BC 16 mm² Primary Connector Kit Secondary connector kit / Two Pole Plug Tiang tunggal tambahan untuk FCU + Flashing head elevated dan Master Control Unit - pipa alumunium Pipa Galvanis 1/2" Sock pipa Galvanis 1/2" Pipa Galvanis 1" Sock pipa Galvanis 1" Pipa Fleksibel Almunium 1/2" (pembungkus kabel ke Flashing hea Semen Portland Pasir beton Pasir Split beton Papan kelas II Balok kelas II Paku Besi beton Kawat beton semi-flexible polyester resin compound / pourable grout
Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
### ### ### ### 427,500.00 203,000.00 29,400.00 112,200.00 35,700.00 19,950.00 35,000.00 #REF! #REF! #REF!
/unit /unit /unit /unit /unit /meter /meter /meter /meter /meter /meter /meter /set /set /batang
51,850.00 #REF! 35,000.00 1,050.00 183,750.00 #REF! 236,250.00 3,990,000.00 3,675,000.00 20,200.00 13,400.00 23,100.00 #REF!
/batang /buah /batang /buah /meter /kg /m³ /m³ /m³ /m³ /m³ /kg /kg /kg / packs
ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN
PENGGANTIAN APPROACH LIGHT DAN SEQUENCED FLASHING LIGHT RUNWAY 25 DI BANDARA ELTARI KUPANG
LOKASI
BANDARA ELTARI KUPANG
1. Pencetakan gambar kerja/set (1 set berisi gambar 6 lembar ) Ongkos cetak dan Jilid = 1 set
x
6.00 lbr
x
Rp
x x x x x x x x
Rp Rp Rp Rp Rp Rp Rp Rp
25,000 =
Rp
150,000.00
= = = = = = = =
Rp Rp Rp Rp Rp Rp Rp Rp
270,000.00 90,000.00 360,000.00 720,000.00 720,000.00 180,000.00 720,000.00 600,000.00
Jumlah =
Rp
3,660,000.00
2. Pengurusan PAS Bandara 1 2 3 4 5 6 7 9
Supervisor / Project Manager Tenaga Ahli Kepala Teknisi Teknisi Pembantu Teknisi Mandor Pekerja Pas Apron Kendaraan Roda 4 (kurang 2
= = = = = = = =
5. Pembongkaran Sequenced Flashing Light existing Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
1 1 2 4 4 1 4 1
1 1 2
orang orang orang orang orang orang orang unit
orang orang orang
x x x x x x x x
x x x
6.00 2.00 4.00 4.00 4.00 4.00 4.00 6.00
bulan bulan bulan bulan bulan bulan bulan bulan
45,000 45,000 45,000 45,000 45,000 45,000 45,000 100,000
0.050 hari 0.100 hari 0.350 hari
x x x
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 = Jumlah
Rp Rp Rp Rp
4,750.00 7,500.00 35,000.00 47,250.00
0.010 m3 0.014 m3 0.480 m3
x x x
### = ### = Rp 20,200.00 =
Rp Rp Rp
39,900.00 51,450.00 9,696.00
0.020 0.010 0.100 0.120
x x x x
Rp Rp Rp Rp
= = = =
Rp Rp Rp Rp Rp
1,500.00 750.00 12,000.00 12,000.00 127,296.00
Rp 13,400.00 = Rp 23,100.00 =
Rp Rp
1,474,000.00 50,820.00
Rp 75,000.00 = Rp 60,000.00 = Rp 50,000.00 = Jumlah b.
Rp Rp Rp Rp
148,500.00 356,400.00 297,000.00 2,326,720.00
Rp 1,050.00 = Rp 183,750.00 = Rp 236,250.00 =
Rp Rp Rp
357,000.00 99,225.00 193,725.00
Rp Rp Rp Rp
Rp Rp Rp Rp
6,000.00 18,000.00 48,000.00 240,000.00
6. Pekerjaan Pembuatan bak trafo sambungan dengan beton cor 1:2:3 Pekerjaan Beton 1:2:3 a.
b.
c.
Bekisting Sloop, kolom, Ringbalk/ m3 Bahan : 1. Papan kelas II 2. Balok kelas II 3. Paku Upah : 1 Kepala tukang 2 Mandor 3 Tukang 4 Pekerja
1 1 2 2
Pembesian per Kg Bahan : 1. Besi beton 2. Kawat beton Upah : 1 Kepala tukang 2 Tukang 3 Pekerja
orang orang orang orang
x x x x
hari hari hari hari
110.0 kg 2.200 kg 1 1 1
Beton praktis 1:2:3 / m3 Bahan : 1. Semen Portland 2. Pasir beton 3. Split beton Upah : 1 Kepala tukang 2 Mandor 3 Tukang 4 Pekerja
orang orang orang
x x x
1.980 hari 5.940 hari 5.940 hari
x x x
340.0 kg 0.540 m3 0.820 kg 1 1 1 2
orang orang orang orang
x x x x
0.080 0.240 0.800 2.400
hari hari hari hari
x x x x
75,000.00 75,000.00 60,000.00 50,000.00 Jumlah a.
75,000.00 75,000.00 60,000.00 50,000.00
= = = =
Jumlah c. Jumalah a+b+c
Pekerjaan Beton 1 : 2 : 3 per m³
Rp 961,950.00 Rp 3,415,966.00
Pekerjaan Beton 1 : 2 : 3 ukuran 0.236m³ 0.236
x
Rp
3,415,966
=
Rp
806,167.98
3,415,966
=
Rp
102,478.98
75,000 = Rp 50,000 = Rp Jumlah = Rp = 21,875 = Rp
9,375.00 12,500.00 21,875.00
7. Pekerjaan Pembuatan Tutup bak trafo dengan beton cor 1:2:3 Pekerjaan Beton 1 : 2 : 3 ukuran 0,036 m³ (cross bar) 0.45
x
0.45
x
0.15 = 0.030 x
0.030 m³ Rp
11. Pembuatan Pondasi Individual Control dan Junction Box ukuran 0,75 x 0,75 x 0,6 m a. Galian Tanah biasa berbatu / m³ Upah : 1 Mandor 2 Pekerja
= =
1.00 orang 1.00 orang
Galian Tanah / m (panjang 75 cm x lebar 75 cm x dalam 60 cm) Harga galian / meter =
x x
0.1250 hari 0.250 hari
x x
Rp Rp
0.338 m³
x
Rp
7,393.75
b.
Pekerjaan Beton 1 : 2 : 3 ukuran m³
0.75
x
0.75 x Pekerjaan beton
0.6 = = 0.338
Jumlah a + b
0.338 0.338 m³ x
Rp
3,415,966
=
Rp
1,154,596.51
=
Rp
1,161,990.26
75,000 = Rp 50,000 = Rp Jumlah = Rp = 28,125 = Rp Jumlah a = Rp
9,375.00 18,750.00 28,125.00
Total pekerjaan galian dan pembuatan pondasi
12 Pembuatan pondasi untuk penempatan lampu inset a. Galian Tanah Perkerasan RESA / m³ Upah : 1 Mandor 2 Pekerja
= =
1.00 orang 1.00 orang
x x
0.125 hari 0.375 hari
Galian Tanah / m (Lebar 70 cm x panjang 70 cm x dalam 60 cm) Harga galian / meter =
b.
Pekerjaan Beton 1 : 2 : 3 ukuran 0,285 m³
0.7 3.14
x x
Jumlah a + b
0.294 m³
0.7 x 0.0225 x Pekerjaan beton
0.6 = 0.6 = = 0.252 x
x x
Rp Rp
x
Rp
8,268.75 8,268.75
0.294 persegi empat 0.042 tabung 12" (volume pengurang) 0.252 m³ Rp 3,415,966 = Rp 859,491.21
Total pekerjaan galian dan pembuatan bak
=
Rp
867,759.96
x x x
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 = Jumlah
Rp Rp Rp Rp
5,937.50 9,375.00 12,500.00 27,812.50
19 Instalasi Breakable coupling Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
1 1 1
orang orang orang
x x x
20 Setting Kontrol Flashing dan Instalasi Master Control Upah : 1. Tenaga Ahli 2. Kepala Teknisi 3. Teknisi 4. Pembantu Teknisi
1 1 1 1
orang orang orang orang
x x x x
2.00 2.00 2.00 2.00
hari hari hari hari
x x x x
Rp 350,000.00 Rp 95,000.00 Rp 75,000.00 Rp 50,000.00 Jumlah
= = = =
Rp Rp Rp Rp Rp
700,000.00 190,000.00 150,000.00 100,000.00 1,140,000.00
21 Instalasi Individual Flash Control Unit Upah : 1. Tenaga Ahli 2. Kepala Teknisi 3. Teknisi 4. Pembantu Teknisi
1 1 1 2
orang orang orang orang
x x x x
0.50 1.00 1.00 2.00
hari hari hari hari
x x x x
Rp 350,000.00 Rp 95,000.00 Rp 75,000.00 Rp 50,000.00 Jumlah
= = = =
Rp Rp Rp Rp Rp
175,000.00 95,000.00 75,000.00 200,000.00 545,000.00
22 Pemasangan Flashing Head Inset Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
1 2 2
orang orang orang
x x x
0.350 hari 0.500 hari 0.500 hari
x x x
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 = Jumlah
Rp Rp Rp Rp
33,250.00 75,000.00 50,000.00 158,250.00
0.044 pack
x
### = Jumlah Jumlah a + b =
Rp Rp Rp
155,951.93 155,951.93 314,201.93
0.125 hari 0.350 hari 0.500 hari
x x x
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 =
Rp Rp Rp
11,875.00 52,500.00 50,000.00
Jumlah
Rp
114,375.00
Bahan : 1. semi-flexible polyester resin compound / pourable grout 1 (1 packs = 22,5 kG = € 225 = Rp.3.544.362,00 )
23 Pemasangan Flashing Head Elevated Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
1 2 2
kg
orang orang orang
=
x x x
25 Pemasangan Kabel NYFGbY 4 x 25 mm² 0,6/1 KV per meter a. Biaya Pengiriman : 1 Transportasi Kabel NYFGbY 4 x 25 mm² 0.6/1 KV per meter Transportasi Via Laut = Asuransi (0.3% x harga barang) = b. Upah 1 2 3
: Kepala Teknisi . Teknisi . Pembantu Teknisi .
= = =
1 orang 2 orang 4 orang
2.176 kg 0.30%
x x x
26 Pemasangan Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) a. Biaya Pengiriman : 1 Transportasi Kabel Kontrol SQFL per meter Transportasi Via Laut = Asuransi (0.3% x harga barang) = b. Upah : 1 Kepala Teknisi . 2 Teknisi .
= =
1 orang 2 orang
0.0625 hari 0.125 hari 0.250 hari
x x
0.02 hari 0.02 hari 0.02 hari
0.485 kg 0.30%
0.02 hari 0.02 hari
x x
Rp Rp
7,500 = 30,000 = Jumlah a =
Rp Rp Rp
16,320.00 90.00 16,410.00
x x x
Rp Rp Rp
95,000 75,000 50,000 Jumlah b
= = = =
Rp Rp Rp Rp
1,900.00 3,000.00 4,000.00 8,900.00
Jumlah a+b =
Rp
25,310.00
x x
Rp Rp
7,500 = 30,000 = Jumlah a =
Rp Rp Rp
3,637.50 90.00 3,727.50
x x
Rp Rp
95,000 = 75,000 =
Rp Rp
1,900.00 3,000.00
3
Pembantu Teknisi .
=
27 Instalasi Penyambungan Kabel Kontrol SQFL Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
2 orang
1 1 2
x
orang orang orang
x x x
0.02 hari
0.250 hari 0.500 hari 0.500 hari
x
x x x
Rp
50,000 = Jumlah b =
Rp Rp
2,000.00 6,900.00
Jumlah a+b =
Rp
10,627.50
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 =
Rp Rp Rp
23,750.00 37,500.00 50,000.00
Jumlah
Rp
111,250.00
28 Pemasangan Kabel NYYHY 5 x 2,5 mm² Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
1 1 1
orang orang orang
x x x
0.030 hari 0.030 hari 0.030 hari
x x x
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 = Jumlah
Rp Rp Rp Rp
2,850.00 2,250.00 1,500.00 6,600.00
29 Pemasangan Kawat BC x 16 mm² Upah : 1. Kepala Teknisi 2. Teknisi 3. Pembantu Teknisi
1 1 1
orang orang orang
x x x
0.030 hari 0.030 hari 0.050 hari
x x x
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 = Jumlah
Rp Rp Rp Rp
2,850.00 2,250.00 2,500.00 7,600.00
1.00 orang 1.00 orang
x x
0.125 hari 0.25 hari
x x
Rp Rp
0.32 mm
x
Rp
0.125 hari 0.25 hari
x x
Rp Rp
0.32 mm
x
32 Galian Tanah dan Pengurugan Kembali / meter a. Galian Tanah Berbatu / m³ Upah : 1 Mandor 2 Pekerja
= =
Galian Tanah / m (L.bawah 30 cm x L.atas 50 cm x dalam 80 cm) Harga galian / meter = b. Pengurugan Kembali Tanah Bekas Galian / m³ Upah : 1 Mandor 2 Pekerja
= =
1.00 orang 1.00 orang
x x
Galian Tanah / m (L.bawah 30 cm x L.atas 50 cm x dalam 80 cm) Harga galian / meter = Bahan / m : 1 Pasir 2 Batu bata
Harga galian dan pengurugan kembali (a+b) 33 Galian Tanah dan Pengurugan Kembali / meter a. Galian Tanah Perkerasan RESA / m³ Upah : 1 Mandor 2 Pekerja
= =
0.08 m³ 10.00 bh
9,375.00 12,500.00 21,875.00 0.32 7,000.00 7,000.00
75,000 = Rp 50,000 = Rp Jumlah = Rp = Rp 21,875 = Rp Jumlah b.1 = Rp
9,375.00 12,500.00 21,875.00 0.32 7,000.00 7,000.00
Rp Rp
9,600.00 17,000.00 26,600.00
120,000 = Rp 1,700 = Rp Jumlah b.2 = Rp Jumlah b =
Rp
33,600.00
=
Rp
40,600.00
=
= =
1.00 orang 1.00 orang
x x
Galian Tanah / m (L.bawah 30 cm x L.atas 50 cm x dalam 80 cm) Harga galian / meter = b. Pengurugan Kembali Tanah Bekas Galian / m³ Upah : 1 Mandor 2 Pekerja
x x
75,000 = Rp 50,000 = Rp Jumlah = Rp = 21,875 = Rp Jumlah a = Rp
= =
1.00 orang 1.00 orang
x x
Galian Tanah / m (L.bawah 30 cm x L.atas 50 cm x dalam 80 cm) Harga galian / meter = Bahan / m : 1 Pasir 2 Batu bata
= =
Harga galian dan pengurugan kembali (a+b)
=
34 Instalasi Sistem Kontrol pada Control Desk Tower Upah : 1. Tenaga Ahli 2. Kepala Teknisi 3. Teknisi 4. Pembantu Teknisi
0.1250 hari 0.250 hari
x x
Rp Rp
0.32 mm
x
Rp
0.125 hari 0.250 hari
x x
Rp Rp
0.32 mm
x
0.08 m³ 10.00 bh
x x
115,000 = Rp 50,000 = Rp Jumlah = Rp = 26,875 = Rp Jumlah a = Rp
14,375.00 12,500.00 26,875.00 0.32 8,600.00 8,600.00
115,000 = Rp 50,000 = Rp Jumlah = Rp = Rp 26,875 = Rp Jumlah b.1 = Rp
14,375.00 12,500.00 26,875.00 0.32 8,600.00 8,600.00
Rp Rp
9,600.00 17,000.00 26,600.00
120,000 = Rp 1,700 = Rp Jumlah b.2 = Rp Jumlah b = =
1 1 1 1
orang orang orang orang
x x x x
0.50 1.00 1.00 1.00
hari hari hari hari
x x x x
Rp 350,000.00 Rp 95,000.00 Rp 75,000.00 Rp 50,000.00 Jumlah
Rp Rp
35,200.00 43,800.00
= = = =
Rp Rp Rp Rp Rp
175,000.00 95,000.00 75,000.00 50,000.00 395,000.00
=
Rp
13,664.00
35 Pekerjaan Pembuatan Patok tanda kabel dengan beton cor 1:2:3 Pekerjaan Beton 1 : 2 : 3 ukuran
0.1
x
Harga beton patok tanda kabel ukuran 10cm x 10 cm x 40 cm =
0.1
x
0.004 m³
0.4 = 0.004
x
Rp
3,415,966.00
Pemasangan tanda patok 1 Mandor 2 Pekerja
= =
1.00 orang 1.00 orang
36 Instalasi Junction box dan pemasangan kabel NYY 3 x 4 mm² Upah : 1. Kepala Teknisi 1 2. Teknisi 1 1 3. Pembantu Teknisi
orang orang orang
x x
x x x
0.021 hari 0.021 hari
75,000 = Rp 50,000 = Rp Jumlah = Rp
1,575.00 1,050.00 2,625.00
Jumlah pembuatan dan pemasangan pat Rp
16,289.00
0.50 hari 1.00 hari 1.00 hari
x x
x x x
Rp Rp
Rp 95,000.00 = Rp 75,000.00 = Rp 50,000.00 = Jumlah
Rp Rp Rp Rp
47,500.00 75,000.00 50,000.00 172,500.00
37. Factory Acceptance Test Kabel di Pabrik kabel di Jakarta Dikuti oleh 2 (dua) orang dari Kantor Cabang Bandara Juanda dan 1 (satu) orang dari Kantor Pusat Jakarta a Tiket Juanda - Jakarta - Juanda 2 tiket x Rp2,350,000.00 b. Hotel / Penginapan 2 orang x 2 hari x Rp1,200,000.00 c. Allowance 3 orang x 2 hari x Rp 150,000.00 d. Transportasi dalam kota 3 orang x 2 hari x Rp 100,000.00
= = = =
Rp 4,700,000.00 Rp 4,800,000.00 Rp 900,000.00 Rp 600,000.00 Rp11,000,000.00
= = = = =
Rp Rp Rp Rp Rp Rp
= = = =
Rp 2,350,000.00 Rp 2,400,000.00 Rp 300,000.00 Rp 200,000.00 Rp 5,250,000.00
=
USD
4,800.00
USD 150.00 = USD USD 325.00 = USD Jumlah.......... USD dan (USD 1.00 = Rp. 13.300,00) Jumlah......
1,200.00 3,900.00 9,900.00
38. Factory Acceptance Test SQFL Light di Luar negeri selama 6 (hari) termasuk perjalanan diikuti oleh 1 (satu) orang pejabat teknis PT. Angkasa Pura I (Persero) Kantor Cabang Bandara Juanda dan 1 (satu) orang dari Kantor Pusat Jakarta Biaya pengurusan Passport dan Visa a. Tiket Juanda - Jakarta - Juanda c. Hotel / Penginapan d. Allowance e. Transportasi dalam kota f. Biaya Paspor + Visa
1 1 1 1 2
tiket orang orang orang orang
x x x x
2 2 2 1
hari hari hari ls
x x x x x
Rp2,350,000.00 Rp1,200,000.00 Rp 150,000.00 Rp 100,000.00 Rp1,750,000.00 Jumlah I
Domestik (Biaya 1 orang pejabat dari Kantor Cabang Bandara Juanda, selama di Jakarta) a. Tiket Juanda - Jakarta - Juanda 1 tiket x Rp2,350,000.00 c. Hotel / Penginapan 1 orang x 2 hari x Rp1,200,000.00 d. Allowance 1 orang x 2 hari x Rp 150,000.00 e. Transportasi dalam kota 1 orang x 2 hari x Rp 100,000.00 Luar Negeri (2 Orang selama 6 hari termasuk perjalanan) a. Tiket Jakarta - Factory - Jakarta 2 orang - Jakarta. Pulang-Pergi b. Biaya Penginapan / Hotel 2 orang c. Allowance 2 orang
d. Airport Tax Jakarta - Luar negeri
x
1 tiket
x
x x
4 hari 6 hari
x x
2 orang
x
USD
2,400.00
Rp 150,000.00 =
2,350,000.00 2,400,000.00 300,000.00 200,000.00 3,500,000.00 8,750,000.00
Rp
Jumlah Total
### 300,000.00 ###
39. Factory Familiarisasi SQFL Light di Luar negeri selama 6 (hari) termasuk perjalanan diikuti oleh 2 (dua) orang teknisi listrik PT. Angkasa Pura I (Persero) Kantor Cabang Bandara Juanda dan 1 (satu) orang electricity officer dari Kantor Pusat Jakarta Biaya pengurusan Passport dan Visa a. Tiket Juanda - Jakarta - Juanda c. Hotel / Penginapan d. Allowance e. Transportasi dalam kota f. Biaya Paspor + Visa
2 2 2 2 3
tiket orang orang orang orang
x x x x
2 2 2 1
hari hari hari ls
x x x x x
Domestik (Biaya 2 orang teknisi dari Kantor Cabang Bandara Juanda, selama di Jakarta) a. Tiket Juanda - Jakarta - Juanda 2 tiket x c. Hotel / Penginapan 2 orang x 2 hari x d. Allowance 2 orang x 2 hari x e. Transportasi dalam kota 2 orang x 2 hari x Luar Negeri (3 Orang selama 6 hari termasuk perjalanan) Tiket Jakarta - Factory - Jakarta 3 orang - Jakarta. Pulang-Pergi Biaya Penginapan / Hotel 3 orang Allowance 3 orang
d. Airport Tax Jakarta - Luar negeri
3 orang
x
1 tiket
x
x x
4 hari 6 hari
x x
x
Rp2,350,000.00 Rp1,200,000.00 Rp 150,000.00 Rp 100,000.00 Rp1,750,000.00 Jumlah I
= = = = =
Rp 4,700,000.00 Rp 4,800,000.00 Rp 600,000.00 Rp 400,000.00 Rp 5,250,000.00 Rp15,750,000.00
Rp2,350,000.00 Rp1,200,000.00 Rp 150,000.00 Rp 100,000.00
= = = =
Rp 4,700,000.00 Rp 4,800,000.00 Rp 600,000.00 Rp 400,000.00 Rp10,500,000.00
USD
2,400.00
USD
7,200.00
USD 150.00 USD USD 300.00 USD Jumlah.......... USD dan (USD 1.00 = Rp. 13.300,00) Jumlah......
1,800.00 5,400.00 14,400.00
Rp 150,000.00 = Jumlah Total
Rp
### 450,000.00 ###
40. Test dan Commissioning, dilaksanakan selama 2 (Dua) hari diikuti oleh 2 (dua) orang pejabat kantor Cabang dan 2 (dua) orang kantor pusat. Biaya 2 orang dari Kantor Pusat, selama di Juanda a. Tiket Juanda - Jakarta - Juanda 2 tiket x Rp2,350,000.00 = Rp 4,700,000.00 c. Hotel / Penginapan 2 orang x 2 hari x Rp1,200,000.00 = Rp 4,800,000.00 d. Allowance 2 orang x 2 hari x Rp 150,000.00 = Rp 600,000.00 e. Transportasi dalam kota 2 orang x 2 hari x Rp 100,000.00 = Rp 400,000.00 Jumlah..........I Rp10,500,000.00 Upah :
a. b. c. d.
Tenaga Ahli Kepala Teknisi Teknisi Pembantu Teknisi
a. Biaya snack dan makan siang
1 1 1 1
orang orang orang orang
x x x x
2 2 2 2
hari hari hari hari
x x x x
8 orang
x
2 hari
x
Rp 350,000.00 Rp 95,000.00 Rp 75,000.00 Rp 50,000.00 Jumlah……….II Rp 40,000.00 Jumlah...........III Jumlah Total....
= = = = =
Rp 700,000.00 Rp 190,000.00 Rp 150,000.00 Rp 100,000.00 Rp 1,140,000.00 Rp 640,000.00 Rp 640,000.00 Rp12,280,000.00
41. Site Familiarisasi, dilaksanakan selama 3 (tiga) hari diikuti oleh 2 (dua) orang peserta kantor Pusat dan seluruh teknisi Kantor Cabang Bandara Juanda sebanyak 20 (dua puluh) orang Biaya 2 orang peserta dari Kantor Pusat, selama di Kupang a. Tiket Jakarta - Juanda - Jakarta 2 tiket c. Hotel / Penginapan 2 orang d. Allowance 2 orang e. Transportasi dalam kota 2 orang
x x x
3 hari 3 hari 3 hari
x x x
Rp2,350,000.00 Rp1,200,000.00 Rp 150,000.00 Rp 100,000.00 Jumlah..........I
= = = =
Rp 4,700,000.00 Rp 7,200,000.00 Rp 900,000.00 Rp 600,000.00 Rp13,400,000.00
Upah : a. Trainer
1 orang
x
3 hari
x
Rp 350,000.00
=
Rp
22 orang
x
3 hari
x
b. Biaya snack dan makan siang
Jumlah……….II Rp 40,000.00 Jumlah...........III Jumlah Total....
=
350,000.00
Rp 350,000.00 Rp 2,640,000.00 Rp 2,640,000.00 Rp16,390,000.00
dua) orang kantor pusat.
isi Kantor Cabang
PT. ANGKASA PURA I (PERSERO)
PENGGANTIAN DAN PEMASANGAN APPROACH LIGHT SERTA SQFL
AIRPORT EQUIPMENT READINESS GROUP SUMBER HARGA NO.
URAIAN PEKERJAAN/MATERIAL
1
PT. HASTA ADHIRAYA Merk. Adb (Januari 2014 / Januari 2015)
Tahun 2013
Persentase kenaikan dari 2013 ke 2014
PT. LAJU KARUNIA JAYA Merk. Cooper Crouse Hinds
Estimasi Th. 2016
8 Sequenced Flashing Light Complete 30 Bar : a. b. c. d. e. f. g.
Flashing Head Inset Flashing Head Elevated Individual control unit / Flasher control unit Master Control Unit J-Bus Interface (Optional) Breakable Coupling Base Plate Harga Total 1 Sistem Flashing Light 30 bar
Rp Rp Rp Rp
35,200,000.00 9,175,000.00 82,000,000.00 55,000,000.00
Penawaran tgl 05 Mei 2014 € 2,816.00 € 734.00 € 6,560.00 € 4,400.00 € 494.75
44,359,659.52 11,562,496.48 103,337,843.20 69,311,968.00 7,793,658.22
20.65% 20.65% 20.65% 20.65%
Rp Rp Rp Rp Rp
53,519,319.04 13,949,992.96 124,675,686.40 83,623,936.00 7,793,658.22
###
SCHNEIDER ELECTRIC 12 Junction Box Panel outdoor ukuran 20 x 25 x 10 cm
Rp Rp Rp Rp Rp
Rp
PT. JEMBO CABLE
PT. VOKSEL ELEKTRIK
427,500.00
PT. KMI Wire and Cable 13 14 15 16 17 18 19 20 22 23 24
Kabel NYfGbY 4 x 25 mm² 0,6/1 kV Kabel Kontrol SQFL (Steel armoured cable 10 pairs x 0,8 mm²) Kabel NYYHY 5 x 25 mm² Kabel Kontrol SQFL 3 pair x 0.8 mm² Kabel NYY 3 x 4 mm Outdoor Direct Buried Armoured type, 4 core MM 50um/125 BC 16 mm² semi-flexible polyester resin compound / pourable grout Pipa PVC 2.5" Pipa Galvanis 2.5" Sock pipa Galvanis 2.5" Pipa Fleksibel Almunium 1/2" (pembungkus kabel ke Flashing head)
Rp $
JAYA MAPAN 21,000.00 3.84
Rp Rp Rp
203,000.00 112,200.00 25,000.00
Rp Rp
51,072.00 30,250.00
Rp Rp Rp Rp
85,700.00 400,000.00 85,000.00 40,000.00
Rp
Rp
18,000.00
21,000.00
AN APPROACH LIGHT SERTA SQFL
2
3
PT. LAJU KARUNIA JAYA
PT. THORINDO LENTERA LABUHAN
Merk. Cooper Crouse Hinds
Merk. Thorn
(Januari 2014)
(Maret 2014)
Tidak ada model inset Rp 33,600,000.00 Rp 82,500,000.00 Rp 99,000,000.00
###
Rp Rp Rp Rp
207,385,651.00 169,900,063.00 131,032,742.00
ACUAN HARGA
Rp Rp Rp Rp
###
53,519,319.04 13,949,992.96 124,675,686.40 83,623,936.00
###
PT. VOKSEL ELEKTRIKPT. KRAKATAU SINERGI
Rp
19,950.00
Rp
427,500.00
Rp Rp Rp Rp
203,000.00 112,200.00 35,700.00 -
Rp Rp
19,950.00 35,000.00
Rp Rp Rp Rp
51,850.00 35,000.00