7 0 195 KB
RINCIAN ANGGARAN BIAYA (RAB) PEKERJAAN LOKASI TAHUN
: PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN : NUNUKAN : 2018
NO
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN PERSIAPAN
Rp.
1,300,000.00
II.
PEKERJAAN TANAH
Rp.
4,608,400.00
III.
PEKERJAAN PASANGAN
Rp.
187,371,666.00
A.
JUMLAH
Rp.
193,280,066.00
B.
PPN 10 % x A
Rp.
19,328,006.60
C.
TOTAL A + B
Rp.
212,608,072.60
D.
DIBULATKAN
Rp.
212,608,000.00
Terbilang : Dua Ratus Dua Belas Juta Enam Ratus Delapan Ribu Rupiah
RINCIAN ANGGARAN BIAYA (RAB) PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN No. I
URAIAN PEKERJAAN PEKERJAAN PERSIAPAN 1 Papan Nama Proyek 3 Administrasi Dan Dokumentasi Proyek
VOLUME
1.00 1.00
SATUAN HARGA SATUAN ( Rp )
Bh Ls
300,000.00 1,000,000.00
Sub Total Pekerjaan Persiapan II
PEKERJAAN TANAH 1 Galian Tanah ( Alat ) 2 Urugan Tanah Kembali
83.00 25.00
PEKERJAAN PASANGAN 1 Pasangan Batu Gunung ( 1pc : 4 ps ) 2 Siaran ( 1pc : 3 ps ) 3 Pancang Kayu Laut Ø 10 - 15 Cm 4 Pipa Poroust/Suling - PVC 1,5"
Sub Total Pekerjaan Pasangan
300,000.00 1,000,000.00 1,300,000.00
M3 M3
34,800.00 68,800.00
Sub Total Pekerjaan Tanah III
JUMLAH HARGA ( Rp )
2,888,400.00 1,720,000.00 4,608,400.00
142.00 141.00 450.00 50.00
M3 M2 M1 M1
1,157,667.00 60,872.00 30,400.00 14,400.00
164,388,714.00 8,582,952.00 13,680,000.00 720,000.00 187,371,666.00
HARGA SATUAN PEKERJAAN PONDASI A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP No A
B
Uraian TENAGA Pekerja Tukang Batu Kepala Tukang Mandor BAHAN Batu Gunung Semen portland Pasir Pasang
C
PERALATAN
D E F
Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)
Kode
Satuan
Koefisien
L.01.01 OH 1.5000 L.02.03 OH 0.7500 L.03.01 OH 0.0750 L.04.01 OH 0.0750 JUMLAH TENAGA KERJA m3 1.2000 Kg 202.0000 m3 0.4850 JUMLAH HARGA BAHAN
Harga Satuan (Rp.) 80,000 100,000 120,000 125,000 345,000 1,600 210,000 -
JUMLAH HARGA ALAT 10% -
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 3PP. Harga Satuan No Uraian Kode Satuan Koefisien (Rp.) A TENAGA Pekerja L.01.01 OH 0.3000 80,000 Tukang Batu L.02.03 OH 0.1500 100,000 Kepala Tukang L.03.01 OH 0.0150 120,000 Mandor L.04.01 OH 0.0150 125,000 JUMLAH TENAGA KERJA B BAHAN Semen portland Kg 6.3400 1,600 Pasir Pasang m3 0.0120 210,000 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 10% 10% F Harga Satuan Pekerjaan (D+E) -
Jumlah Harga (Rp.) 120,000.00 75,000.00 9,000.00 9,375.00 213,375.00 414,000.00 323,200.00 101,850.00 839,050.00 1,052,425.00 105,242.50 1,157,667.00
Jumlah Harga (Rp.) 24,000.00 15,000.00 1,800.00 1,875.00 42,675.00 10,144.00 2,520.00 12,664.00 55,339.00 5,533.90 60,872.00
FORMULIR STANDAR NASIONAL INDONESIA UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN NAMA PAKET LOKASI JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : :
PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN NUNUKAN GALIAN TANAH ( ALAT ) M3
NO
URAIAN PEKERJAAN
SATUAN
1 A 1 2
2
3
Tenaga Kerja Operator Mandor
HARGA SATUAN ( Rp ) 4
KUANTITAS 5
OJ OJ
17,142.86 17,857.14
0.1633 0.0163
Jam
880,000.00
0.0324
Jumlah B
Bahan
Jumlah C 1
Alat Excavator
Jumlah D E F G
Jumlah A + B + C Over Head Dan Profit = 10 % x D Jumlah Harga Satuan Pekerjaan ( D + E ) Pembulatan
BIAYA SATUAN ( Rp ) 6 2,799.43 291.07
3,090.50
0.00 28,551.11
28,551.11 31,641.61 3,164.16 34,805.77 34,800.00
FORMULIR STANDAR NASIONAL INDONESIA UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN NAMA PAKET LOKASI JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : :
PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN NUNUKAN URUGAN TANAH - ( DARI SUMBER GALIAN ) M3
NO
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN ( Rp )
KUANTITAS
1 A 1 2
2
3
4
5
Tenaga Kerja Pekerja Mandor
OH OH
80,000.00 125,000.00
0.330 0.033
Jam
880,000.00
0.0365
Jumlah B
Bahan
Jumlah C 1
Alat Excavator
Jumlah D E F G
Jumlah A + B + C Over Head Dan Profit = 10 % x D Jumlah Harga Satuan Pekerjaan ( D + E ) Pembulatan
BIAYA SATUAN ( Rp ) 6 26,400.00 4,125.00
30,525.00
0.00 32,081.66
32,081.66 62,606.66 6,260.67 68,867.33 68,800.00
FORMULIR STANDAR NASIONAL INDONESIA UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN NAMA PAKET LOKASI JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : :
PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN NUNUKAN PANCANG KAYU LAUT Ø 10 - 15 CM M1
NO
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN ( Rp )
KUANTITAS
1 A 1 2 3
2
3
4
5
Tenaga Kerja Pekerja Tukang Batu Mandor
OH OH OH
80,000.00 100,000.00 125,000.00
0.1200 0.0400 0.0120
M1
10,500.00
1.100
Ls
1,000.00
1.000
Jumlah B 1
Bahan Kayu Laut Ø 10 - 15 cm
Jumlah C 1
Alat Alat Bantu
Jumlah D E F G
Jumlah A + B + C Over Head Dan Profit = 10 % x D Jumlah Harga Satuan Pekerjaan ( D + E ) Pembulatan
BIAYA SATUAN ( Rp ) 6 9,600.00 4,000.00 1,500.00
15,100.00 11,550.00
11,550.00 1,000.00
1,000.00 27,650.00 2,765.00 30,415.00 30,400.00
FORMULIR STANDAR NASIONAL INDONESIA UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN NAMA PAKET LOKASI JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : :
PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN NUNUKAN PIPA POROUST / SULING - PVC 1,5" M1
NO
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN ( Rp )
KUANTITAS
1 A 1 2 3 4
2
3
4
5
OH OH OH OH
80,000.00 100,000.00 120,000.00 125,000.00
-
M1
11,000.00
1.100
Ls
1,000.00
1.000
Tenaga Kerja Pekerja Tukang Las Kepala Tukang Mandor
Jumlah B 1
Bahan Pipa PVC 1,5"
Jumlah C
Alat Alat Bantu
Jumlah D E F G
Jumlah A + B + C Over Head Dan Profit = 10 % x D Jumlah Harga Satuan Pekerjaan ( D + E ) Pembulatan
BIAYA SATUAN ( Rp ) 6 -
0.00 12,100.00
12,100.00 1,000.00
1,000.00 13,100.00 1,310.00 14,410.00 14,400.00
DAFTAR HARGA BAHAN NO 1 2 3 4 5 6 7 8 9 10 11 12
BAHAN - BAHAN Pasir Timbunan Tanah Timbunan Pasir Pasang Pasir Beton Batu Gunung / Batu Kali Batu Pecah Kerikil Sungai Semen Pipa PVC - AW / 6" Pipa PVC - AW / 4" Pipa PVC - AW / 1,5" Kayu Laut Ø 10 - 15 cm / P = 4 mtr
DAFTAR HARGA UPAH KERJA NO 1 2 3 4 5 6 7 8 9 10
PEKERJA Pekerja Tukang Batu, Gali, Kayu, Besi Kepala Tukang Mandor Operator Pembantu Operator Mekanik Mekanik Pembantu Sopir Pembantu Sopir
DAFTAR HARGA ALAT NO
JENIS ALAT
NO 1 2 3 4 5
JENIS ALAT Dump Truck Kap. 6 Ton / 3 - 4 M³ Excavator PC 200 - 6 Water Tank Truck 3000 - 4500 L Concrete Mixer (Molen) Concrete Mixer (Ready Mix)
DAFTAR HARGA BAHAN HARGA ( Rp ) 220,000.00 57,000.00 210,000.00 510,000.00 345,000.00 740,000.00 535,000.00 1,600.00 203,500.00 106,500.00 11,000.00 42,000.00
SATUAN / / / / / / / / / / / /
M3 M3 M3 M3 M3 M3 M3 Kg M1 M1 M1 Btg
DAFTAR HARGA UPAH KERJA HARGA ( Rp ) 80,000.00 100,000.00 120,000.00 125,000.00 120,000.00 80,000.00 120,000.00 80,000.00 100,000.00 80,000.00
SATUAN / / / / / / / / / /
OH OH OH OH OH OH OH OH OH OH
DAFTAR HARGA ALAT HARGA
SATUAN
( Rp ) 170,000.00 880,000.00 513,000.00 250,000.00 1,207,000.00
SATUAN / / / / /
JAM JAM JAM HARI JAM
JADWAL PEKERJAAN
: PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN
LOKASI
: NUNUKAN
NO. I.
URAIAN PEKERJAAN
1
8
15
22
29
36
7
14
21
28
35
42
1-7
8-14
15-21
22-28
29-35
36-42
BOBOT (%)
PEKERJAAN PERSIAPAN 1 Papan Nama Proyek
Err:509
Err:509
2 Err:509
Err:509
Err:509
3 Administrasi Dan Dokumentasi Proyek
Err:509
Err:509
4 Err:509
Err:509
Err:509
II.
III
IV
PEKERJAAN TANAH 1 Galian Tanah ( Alat )
Err:509
2 Urugan Tanah Kembali
Err:509
Err:509 Err:509 Err:509
PEKERJAAN PASANGAN 1 Pasangan Batu Gunung ( 1pc : 4 ps )
Err:509
2 Siaran ( 1pc : 3 ps )
Err:509
3 Pancang Kayu Laut Ø 10 - 15 Cm
Err:509
Err:509 Err:509 Err:509 Err:509
4 Pipa Poroust/Suling - PVC 1,5"
Err:509
Err:509
Err:509 Err:509
PEKERJAAN PIPA AIR 1 Pipa Distribusi Air ( PVC 6" - AW )
Err:509
Err:509 Err:509
TOTAL RENCANA KOMULATIF PROGRESS PROGRESS KOMULATIF DEVIASI
Err:509 0
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
ADWAL PELAKSANAAN PEKERJAAN
43
50
57
64
71
78
85
92
99
106
113
120
127
134
141
49
56
63
70
77
84
91
98
105
112
119
126
133
140
147
127-133
134-140
141-147
180 ( SERATUS DELAPAN PULUH ) HARI KELENDER 43-49
50-56
57-63
64-70
71-77
78-84
85-91
92-98
99-105
106-112
113-119
120-126
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
148
155
162
169
176
154
161
168
175
180
KET 148-154
155-161
162-168
169-175
176-180
100
80
Err:509
60
Err:509 Err:509
40
Err:509
20
0
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
0.00 Err:509
Err:509 Err:509 Pemeliharaan 120 (Seratus Dua Puluh) Hari Kalender
NUNUKAN, 05 JUNI 2017
CV. ANAK AGUNG PERKASA
PITONO SUPARTONO, ST DIREKTUR
Rekapitulasi Penilaian TKDN Gabungan Barang dan Jasa
FORMULIR REKAPITULASI TINGKAT KOMPONE NAMA PENYEDIA BARANG/JASA ALAMAT NAMA PEKERJAAN PEMILIK PEKERJAAN NO. DOKUMEN
: : : : :
CV. ANAK AGUNG PERKASA
JLN. TEUKU UMAR RT 013 KEL. NUNUKAN TENGAH KAB PEMBANGUNAN SIRING KANTOR RRI KAB. NUNUKAN DINAS PERTANIAN DAN KETAHANAN PANGAN
NILAI GABUNGA URAIAN PEKERJAAN
(1)
DN (2)
BARANG I Material Langsung (Barang Baku) II Peralatan (Barang Jadi) A.
Sub Total Barang
106,304,000.00 21,260,800.00 127,564,800.00
JASA III Manajemen Proyek dan Perekayasaan
10,630,400.00
IV Alat Kerja/Fasilitas Kerja
21,260,800.00
V Konstruksi dan Fabrikasi
21,260,800.00
VI Jasa Umum
31,891,200.00
B.
Sub Total Jasa
C.
Total Biaya (A+B)
85,043,200.00 212,608,000.00
Formulasi Perhitungan : % TKDN (Gabungan Barang dan Jasa)
=
ASI TINGKAT KOMPONEN DALAM NEGERI (TKDN)
KEL. NUNUKAN TENGAH KAB NUNUKAN
ANTOR RRI KAB. NUNUKAN
ETAHANAN PANGAN
NILAI GABUNGAN BARANG/JASA (Rp)
TKDN TOTAL
LN (3)
RIBU (RP)
% KDN
(4)
(5)
BARANG/J GABUNGA ASA N (6)
-
106,304,000.00
100.00
83.33
-
21,260,800.00
100.00
16.67
-
127,564,800.00
200.00
100.00
-
10,630,400.00
100.00
12.50
-
21,260,800.00
100.00
25.00
-
21,260,800.00
100.00
25.00
-
31,891,200.00
100.00
37.50
-
85,043,200.00
400.00
100.00
-
212,608,000.00
600.00
(7)
100.00
Nilai Barang Total (3C)-Nilai Barang Luar Negeri (3B) Nilai Gabungan Barang dan Jasa (9C) Nilai Jasa Total (8C)-Nilai Jasa Luar Negeri (8B) Nilai Gabungan Barang dan Jasa (9C) NUNUKAN, 05 JUNI 2017 DIBUAT OLEH CV. ANAK AGUNG PERKASA
PITONO SUPARTONO, ST DIREKTUR
TEBEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RESIKO, PENGENDALIAN RISIKO K3, PROGRAM K3 DAN BIAYA NAMA PERUSAHAAN PEKERJAAN
: PT. VIRYA JAYA PRATAMA GROUP : NORMALISASI SUNGAI DESA BALANSIKU KEC SEBATIK (BKP)
NO
URAIAN PEKERJAAN
IDENTIFIKASI BAHAYA
SASARAN K3 PROYEK
PENGENDALIAN RISIKO K3
1
2
3
4
5
1
Pekerjaan Persiapan
Terpeleset dalam melakukan pengurukan kembali
Nihil Kecelakaan fatal
Memakai Peralatan APD lengkap, Memasang Turap, Memberi Peringatan/instruksi Kerja, Memasang Rambu rambu, Melakukan Pelatihan K3
2
Galian Tanah Mekanis (Excavator)
Pekerja terjatuh, terpeleset, Nihil Kecelakaan fatal terkena peralatan yang digunakan seperti excavator, Bulldozer
Memakai Peralatan APD lengkap, Memasang Turap, Memberi Peringatan/instruksi Kerja, Memasang Rambu rambu, Melakukan Pelatihan K3
3
Finishing Badan Tanggul Tertimbun / Tertimpa Material Nihil Kecelakaan fatal Timbunan, terkena peralatan yang digunakan seperti excavator, Bulldozer
Memakai Peralatan APD lengkap, Memasang Turap, Memberi Peringatan/instruksi Kerja, Memasang Rambu rambu, Melakukan Pelatihan K3
4
Pasangan Batu Amor Layer I
Pekerja terjatuh, Nihil Kecelakaan fatal terpeleset,tertimpa material batu gunung diwaktu memobilisasi meterial batu gunung dan disaat melekukan pekerjaan pasangan batu gunung.
Memakai Peralatan APD lengkap, Memberi Peringatan/instruksi Kerja, Memasang Rambu rambu, Melakukan Pelatihan K3
5
Pasangan Batu Amor Layer I
Pekerja terjatuh, terpeleset,tertimpa material plesteran diwaktu memobilisasi meterial semen atau pasir pasangan dan disaat melakukan pekerjaan pasangan plesteran
Memakai Peralatan APD lengkap, Memberi Peringatan/instruksi Kerja, Memasang Rambu rambu, Melakukan Pelatihan K3
Nihil Kecelakaan fatal
6
Operasional alat berat
Terserempet, tergilas, tertabrak
Nihil Kecelakaan fatal
Memakai Peralatan APD lengkap, Memasang Turap, Memberi Peringatan/instruksi Kerja, Memasang Rambu rambu, Melakukan Pelatihan K3
NUNUKAN, 05 JUNI 2017 CV. ANAK AGUNG PERKASA
PITONO SUPARTONO, ST DIREKTUR
SIKO K3, PROGRAM K3 DAN BIAYA
PROGRAM SUMBER DAYA
BIAYA (Rp)
6
7
Bahan / Peralatan K3 1 set, Pelaksana K3 1 org
1,500,000.00
Bahan / Peralatan K3 1 set, Pelaksana K3 1 org
1,700,000.00
Bahan / Peralatan K3 1 set, Pelaksana K3 1 org
1,700,000.00
Bahan / Peralatan K3 1 set, Pelaksana K3 1 org
2,500,000.00
Bahan / Peralatan K3 1 set, Pelaksana K3 1 org
1,500,000.00
Bahan / Peralatan K3 1 set, Pelaksana K3 1 org
1,200,000.00