10 0 8 MB
PIPING WORK PACKAGE #8 EARLY TANK TEST PACKAGE NO.
333-AG-FW-0001 SYSTEM
:
SUB SYSTEM
:
Fire Water
RELEASED FOR TEST HYDROSTATIC TEST
PNEUMATIC TEST
VISUAL TEST
REVIEWED BY
APPROVED BY
PREPARED BY
Date Remarks :
Date
Date
TABLE OF CONTENTS Piping Work Package #8 Early Package No Tank
Project
:
Subcon
: PT. Yasa Industri Nusantara
System No
: 333-AG-FW-0001 : 333
Sub-system No : 333-0001 No
Document Description
YES
1
Pressure Test Cover Sheet
2
Plot Plan (Marking Area)
3
Marked-up P&ID / Test Block Diagram
4
Line List
5
Isometric Drawings
6
Pressure Test Package Welding Summary
7
Punch List
8
Pre-Test Check List
9
Water Analysis Report
10
Calibration Report for Test (Pressure Gauge, Relief Valve)
11
Pressure Test Report
12
Drain & Dry Report
13
Line Reinstatement Report
14
Flange Joint Report
15
Orifice Flange Inside Inspection (If Required)
16
NDT Report
NO
Remarks
17 Note:
Inspection Result : Inspection by
□ Accept Subcontractor
□ As noted Contractor (QC)
□ Reject IPMT
Name Signature Date Form No. :
ITR-PI-007
SPBU KARANGANYAR
NEW BRIDGE & CONSTRUCTION ACCESS GATE
EXIST. POLICLINIC WAREHOUSE PHASE 2
CAR PARKING
GREEN VILLAGE WAREHOUSE
ACCESS RAMP & GATE
PARKING SCHOOL AREA
PIPE TRENCH
130000
NEW HSSE BUILDING RE-LOCATED JL. YOS SOEDARSO ( JL. MINYAK )
NEW OCR SUMP PIT EXIST. MOSQUE
95500
PEN/TEK PEN
OVER FLOW WEIR 94000 35000
RELOCATED OUTFALL
EXIST. CHURCH
EXIST. SCHOOL
GAS JL. BON
SPBU KARANGANYAR
CONSTRUCTION LAYDOWN AREA
NEW BRIDGE & CONSTRUCTION ACCESS GATE
P-5
DRAINAGE
D-320-12
NEW MAKE-UP HYDROGEN COMPRESSOR (K-3-02D/E)
CAR PARKING
V-3 V-6 V-5 V-4 V-7
G-320-25A/B/C NEW DIESEL TRANSFER PUMPS
EPC SITE OFFICES
GREEN VILLAGE WAREHOUSE
ACCESS RAMP & GATE
PARKING "LOT A"
WAREHOUSE PHASE 2
PIPE TRENCH
D-20-08 130000
PARKING "LOT A"
NEW HSSE BUILDING
NEW OCR SUMP PIT
R-9
R-6
R-3
R-8
R-5
R-2
R-7
R-4
R-1
D-20-07A
D-20-07B
FUTURE VACUUM RESIDUE TANKS (PHASE 2) (EXIST. LOCATION OF TANKS O-15 TO 0-20)
D-20-07C
FUTURE VACUUM RESIDUE TANKS (PHASE 2) (EXIST. LOCATION OF TANKS O-09 TO 0-14)
FUTURE VACUUM RESIDUE PUMPS (PHASE 2)
D-320-02B
95500
PEN/TEK PEN
OVER FLOW WEIR 94000 35000
RELOCATED OUTFALL
V-3 V-6 V-5 V-4 V-7
P-5
R-10
320
NEW OCR SUMP PIT
DRAINAGE 341-SS-114 D-320-12
DIESEL BLENDING
RELOCATED SMOOTH FLUID LOADING
NEW LABORATORY BUILDING NEW CFR ENGINE ROOM
P-2
P-8
SHIFT DINING ROOM (TO BE RELOCATED BY REFINERY) (EXIST. INSPECTION SHOP)
P-3
P-4
D-320-10
P-1
P-7
NEW SS-1
D-320-02A
NEW SATELITE FIRE HOUSE
AR EA
RELOCATED OUTFALL
D-20-11
0-22
D-20-12
POWER STATION - GTG (PHASE 2)
0-23
D-320-11C
00
D-320-11A
214500
0-21 83000
D-20-18
C-20-01A/B
D-20-03
D-320-11B 50000
341-SS-107 341-ISH-107
40000
321
35000
D-320-11B
321
D-320-11A
331
UP V
001(R)
331
PERTAMINA MAIN OFFICE
NEW SITE OFFICE
D-320-11D
RE
VE TM
EN T
RELOCATED SMOOTH FLUID LOADING
R600
D-20-11 POWER STATION - GTG (PHASE 2)
RE
320
NEW OCR SUMP PIT
AR EA
RELOCATED OUTFALL
SS-76
D-320-02B
EN T
P-31
FUTURE VACUUM RESIDUE TANKS (PHASE 2) (EXIST. LOCATION OF TANKS O-09 TO 0-14)
D-320-02A
341-MCR-001 (MAIN CONTROL BUILDING) RELOCATED FOAM TANK WEST OF PRE-FLASH
P-32
VE TM
NEW MAKE-UP HYDROGEN COMPRESSOR (K-3-02D/E)
006
D-20-17
331
331 R 15 00 0
19111
R
ISH
61708
37000
39000
R 15 00 0
30 00 0
0 00
0 00
R 30
R30
341-OP-010
341-ISH-101
HELICOPTER SITE
94580
083
341-OP-009 341-OP-017
33B
125000
341-SS-109 341-ISH-109 (ABOVE)
37A
321
24B
054
181000
181000
24A
201500
002
341-OP-08
33A
HVU-III
341-OP-005
255500
75000
321
341-SS-101
13000
257000
75000
RESIDUE DESULFURIZATION UNIT
78000
30000
PROCESS COOLING TOWER 341-OP-012
341-SS-106/108 341-ISH-106/108 (ABOVE)
EXISTING SS-4 TO BE DEMOLISHED 341-ISH-110
NEW SHIFT DINING ROOM (RU-V)
341-OP-015 341-SS-110
12000
80000
060
167
15000
321
341-SS-115 341-ISH-115 (ABOVE)
174933
GASOLINE BLENDING (R90 & R92)
14813
G-320-20A/B G-320-22A/B
332 G-320-16A/B G-320-13A/B
065
321
320
321
IT CENTRAL SRU - PHASE 1 TRAIN-A
321
SRU - PHASE 1 TRAIN-B
321 320
065
0 R6
A-28
0 00
A-26 A-24
313000
SULFUR RECOVERY - PHASE 2
A-22 A-27 A-25
67000
079 49500
341-SS-105 341-ISH-105 (ABOVE)
EXIST. CONSTRUCTION JETTY
JAL
NEW GASOLINE TANK
R 60
A21
BERTH 8
T-202 SULFUR HANDLING & STORAGE
EXISTING CW & FW PUMP HOUSE
FOAM TANK U-23 RELOCATED BUNKER FUEL TANK RELOCATED EXISTING DITCH INTERMEDIATE FLARE KO DRUM FOR HH ROAD CROSSING
G-320-19 G-320-18A/B G-320-09A/B G-320-08A/B
A-20
YO S
A-31
SU
DA RS O
321 A-7 NEW TEMPORARY ROAD & GATE 2A (BY EPC)
T-201 A-19 A-18
T-203
A-32
A-17
321
321
E-3
V-1
EXISTING FW SUPPLY TANK FOR JOCKEY PUMPS
AN
A-33 A-23
15000
EXISTING WAREHOUS E
EXISTING CW OUTFALL
EXISTING OUTFALL
059
321
25000
341-OP-014
341-OP-006
10009
0 00 19 29
EXISTING RECEIVER
LPG & PROPYLENE STORAGE SPHERES 128500
067
337
069
RPAL
321
247000
064
319
BALIKPAPAN 1 HYDROCARBON FLARE V-219-01
135000
160
160000
28A
210000
082
30000
R10 700 0
30000
321
80000
36
30000
EXISTING WAREHOUS E
70000
32A
334
BOILER
30000
0 00 R 30
SS# NO.70
SS# NO.73
E XIS T. CONTRO L ROOM
70000
28B
325
30000
55A
83000
334
335
54000
173000
17000
CPI
97500
127000
321 337
A-6
A-16 A-15
V-2
E-2
A-5 A-4
METERING (NEW) LPG, COMPACT PROVER PROPYLENE, GASOLINE & PROPYLENE
341-SS-113
E-5 E-4 E-1
E-7
341-OP-016
E-6
CONSTRUCTION JETTY A-3
SPACE NEW RDMP RFCC FLARE RESEVED FOR (RFCC) AMINE HANDLING
NEW RDMP HCC FLARE (NEW BPP-II & HCC)
NEW 24" SUBSEA PIPELINE (NAT. GAS FROM FSRU)
NEW 20" SUBSEA PIPELINE (CRUDE FROM LAWE-LAWE)
SOUTH ACID GAS FLARE K.O. DRUM EXISTING SEA WATER INTAKE
NEW SEA WATER INTAKE
A-2
BERTH 5A
BERTH 7
SOUTH ACID GAS FLARE STACK
NEW SULFUR JETTY
D-320-07A A-1 D-320-07B
SS-71 SUB STN
BERTH 6A
GA
OIL MOVEMENT ROOM
SO LI NE TAN K
BERTH 5C BERTH 5B BERTH 5
BERTH 4
BERTH 3
BERTH 0
D-320-07C
5
4
6
7
8
A
000
6"
333-ARV-021
6"
333-FW-201-12"-12LC2T21-NI
P
16"x12"
333-FW-001-12"-12LC2T21-NI
333-FW-186-2"-12CG2T01-NI
333-FW-182-3"-12CG2T01-NI
333-FW-185-3"-12CG2T01-NI
333-FW-072-4"-12CG2T01-NI
333-FW-077-4"-12CG2T01-NI
NC NOTE 12
16"x10"
3" 333 PRV 16"x10" 0006
333-FW-050-10"-12CG2T01-NI
16"
333 TP 053
12CG2T01 12LC2T01
333-ARV-023 16"
TST 002 16"x10"
NOTE 19
333-SP
D
16"x10"
12CG2T01 12LC2T01
NOTE 7 333-FW-071-10"-12LC2T01-NI
NOTE 13 NOTE 7
2"
333-FW-076-10"-12LC2T01-NI
P
333-FW-070-16"-12LC2T01-NI 333-FW-181-2"-12CG2T01-NI
333-FW-177-2"-12CG2T01-NI
333-FW-180-3"-12CG2T01-NI
333-FW-176-3"-12CG2T01-NI
333-FW-179-4"-12CG2T01-NI
333-FW-175-4"-12CG2T01-NI
333-FW-011-6"-12CG2T01-NI
333-FW-013-6"-12CG2T01-NI
12"
UG
8"x4" 333-FW-178-8"-12CG2T01-NI
333-FW-010-6"-12CG2T01-NI
I 33
NOTE 12
BY VENDOR
D-320-02B
3"
3" 333-FW-053-12"-12CG2T01-NI 16"x12"
AG
UG 21 -N I
12LC2T01
16"x12" NOTE 7
333-FW-168-3"-12CG2T01-NI
333-FW-171-4"-12CG2T01-NI
333-FW-167-4"-12CG2T01-NI
333-FW-015-6"-12CG2T01-NI
333-FW-017-6"-12CG2T01-NI
2T 2L C 8"-1 33 3
333-FW-172-3"-12CG2T01-NI
8"x4"
333-FW-410-4"-12CG2T01-NI
D
AG
NC
NOTE 12
3"
333-FW-429-8"-12CG2T01-NI
H
NOTE 13 NOTE 18
REFERENCE DRAWINGS
3"
333-FW-055-12"-12CG2T01-NI
P
333-FW-054-12"-12CG2T01-NI
TST 006
TST 005
333-ARV-001
333 PRV 0002
333-ARV-025
+
BUNDWALL 16"x12"
18" NOTE 3
D 3/4"
3/4" NOTE 12 NC
BY VENDOR
D-320-02A
3"
12"x8" D
8"x4"
BY VENDOR
8"x3"
3"
8"x6" 333-FW-411-4"-12CG2T01-NI
8"x4"
3/4"
NOTE 11
8"x6"
333-FC-007 ~012 333-FW-016-6"-12CG2T01-NI
12"x8" 333-FW-428-8"-12CG2T01-NI
8"
FC
8"x6"
+
333-FW-166-8"-12CG2T01-NI
BY F/F VENDOR 333-FW-014-6"-12CG2T01-NI
000
333 PRV 0001
8"x6"
8"x6"
8"
000
G
NO LO
8"x4" 333-FW-170-8"-12CG2T01-NI
16"
333-FW-169-2"-12CG2T01-NI
333-FW-173-2"-12CG2T01-NI
000
2"
NOTE 13 NOTE 7
333-FW-127-12"-12LC2T01-NI
333-FW-007-16"-12LC2T01-NI
333-FW-124-12"-12LC2T01-NI
333-FHF-004
16"x12"
12CG2T01 12LC2T01
LO
UG
NOTE 19
333-SP
12CG2T01
12"
333 TP 051
333-ARV-024
TST 004
333-SP
12LC2T21 12LC2T01 UG AG
333 PRV 0004
F
NOTE 13 NOTE 18
NOTE 12
+
16"x12" TST 003
02 -1
D NC
333-FW-427-8"-12CG2T01-NI
BUNDWALL
3"
12"x8" 3/4"
8"x4"
333-FW-051-12"-12CG2T01-NI
-FW -0
8"x3"
16" EXISTING FW HEADER
-N T2 1 C2 2L "-1 -16 18 3-F W-0
3/4" NC
18"x16"
NOTE 11
D 3/4"
333-FW-409-4"-12CG2T01-NI
BY VENDOR
3"
12"
333-FHF-003
8" 8"x6"
8"x6"
8"x4"
D
+
BY F/F VENDOR
333-FC-001 ~006 333-FW-012-6"-12CG2T01-NI
333-FW-408-4"-12CG2T01-NI
12"x8"
333 PRV 0003
333-FW-174-8"-12CG2T01-NI
8"x6"
8"x6"
333-FW-426-8"-12CG2T01-NI
E
8"x4"
8"x6"
8"
000
NO LO
16"
H
333-FHF-006
NOTE 13 NOTE 18
D 3/4" NC NOTE 12
333-FW-425-6"-12CG2T01-NI
D-320-12
LO
15. STEEL PIPE FOR FIRE WATER MAIN SHALL BE CONCRETE LINED TO ENSURE INTERNAL CORROSION RESISTANCE AND GREATLY LESSENED FRICTION LOSS. BURIED STEEL PIPE SHALL BE SUITABLY COATED AND WRAPPED AND HAVE CATHODIC PROTECTION FOR CORROSION PROTECTION. 16. CONNECTION FOR HCFM USE 12" STAND PIPE HYDRANT. THE DETAIL OF HCFM IS PROVIDED BY HCFM VENDOR P&ID. 17. FOR DETAILS REGARDING FIRE WATER DEMAND, FOAM, SPRAY NOZZLE, TYPICAL DETAILS DELUGE VALVE,HYDRANT, MONITORS, ETC. REFER TO THE DOCUMENTS & DRAWINGS LISTED IN THE REFERENCE SECTION. 18. THE NUMBER OF QUICK COUPLING FOR FOAM CHAMBER SHALL 2 COUPLING FOR 1 FOAM CHAMBER. 19. ARV SHALL BE INSTALLED AT HIGHEST POINT.
12"
C
BY VENDOR
333-SP
333-FHF-009
14. THE APPROPRIATE TACTIC SHALL BE USED TO AVOID THE POSSIBILITY OF "SLOPOVER" WHEN FOAM ADDED TO TANK.
000
16"
+
TST 001
12LC2T21 12LC2T01 UG AG
5. THE SECTIONAL VALVE FOR FIRE WATER MAIN SHALL BE GATE VALVE WITH POST INDICATOR SHOWING CLOSED OR OPEN STATUS OF THE VALVE. WHERE INSTALLED IN UNDERGROUND FIRE WATER MAIN. THE SECTIONAL VALVE SHALL BE DIRECTLY BURIED AND THE STEM OF SECTIONAL VALVE SHALL BE EXTENDED SO THAT THE INDICATOR IS POSITION AT APPROX. 900MM ABOVE THE FINAL GRADE. 6. EXISTING FIRE WATER LINE (AREA TANK 0-25) IS LOCATED ABOVE GROUND. 7. THE SYSTEM ACTUATION VALVE FOR WATER SPRAY SHALL BE MANUAL VALVE AND SHALL BE LOCATED 1D FROM PROTECTED TANK OR AT LEAST 15 M AWAY FROM THE PROTECTED EQUIPMENT. 8. DETAILS FOR UL LISTED AND/OR FM APPROVED FOR ALL FIREFIGHTING AND SAFETY EQUIPMENT REFER TO DATA SHEET FOR FIRE AND SAFETY EQUIPMENT (26071-100-U0D-000-00001). 9. HOSE REEL POSITION SHALL BE MIN 15 M FROM PUMP. 10. THE BREAKING PRESSURE OF BREAK GLASS IN FOAM CHAMBER IS 2.8 KG/CM2.G. 11. FOAM CHAMBER IS TYPICAL AND THE LINE NUMBER REFER TO TABLE. 12. QUICK COUPLING CONNECTION PROVIDED BY F/F VENDOR FOR FLUSHING ONLY.
I
3"
10"x6"
6"x4"
BUNDWALL
333-FHF-007
13. BUTTERFLY VALVE FOR ACTIVATION WATER SPRAY SYSTEM AND FOAM STATION SHALL BE LOCATED IN SAME FIRE SCREEN/FIREWALL.
G
4" 6"x3"
333-FW-407-4"-12CG2T01-NI
AG
F
B
3"
BY VENDOR
3"
12"
333-FW-206-8"-12CG2T01-NI 333-FW-349-8"-12CG2T01-NI 333-FW-350-8"-12CG2T01-NI 333-FW-079-6"-12CG2T01-NI 333-FW-351-6"-12CG2T01-NI 333-FW-352-6"-12CG2T01-NI 333-FW-080-6"-12CG2T01-NI 333-FW-353-6"-12CG2T01-NI
16" 333 TP 050
NOTE 11 D 3/4"
6"x4"
6"x4"
3/4"
+
AG UG
CONT. NOTES : E
333-FW-018-16"-12LC2T21-NI
333-FW-345-8"-12CG2T01-NI 333-FW-346-8"-12CG2T01-NI 333-FW-205-8"-12CG2T01-NI 333-FW-347-8"-12CG2T01-NI 333-FW-348-8"-12CG2T01-NI
333-FW-406-4"-12CG2T01-NI
333-FW-424-6"-12CG2T01-NI D 333 PRV 0005
6"
333-FC-013~017 333-FW-078-4"-12CG2T01-NI
6"x4"
333-FW-038-10"-12CG2T01-NI
16"
AG
333-FW-073-4"-12CG2T01-NI
FC
D
000
UG
333-FW-126-6"-12CG2T01-NI
FC
333-FHF-002
AG UG
BY F/F VENDOR
6" 10"x6"
A
000
6"x4"
333-FW-125-6"-12CG2T01-NI
LINE No. 333-FW-203-8"-12CG2T01-NI 333-FW-343-8"-12CG2T01-NI 333-FW-344-8"-12CG2T01-NI 333-FW-204-8"-12CG2T01-NI
NO LO
12"
333-FHF-001 333-FW-183-2"-12CG2T01-NI
16"x12"
NOTE 19
333-SP
333-FW-006-16"-12LC2T21-NI
P
NOTE 3
K
12CG2T01 12LC2T01
16"x12"
NOTE 7 333-FW-128-12"-12LC2T01-NI
LO
333-FW-131-12"-12LC2T01-NI
333-FW-008-16"-12LC2T01-NI
2
3
333 PG 0001
2"
2"
SYMBOL
DESCRIPTION
QTY
PRESSURE REGULATOR VALVE
BUTTERFLY VALVE
6
6
10
4
5
6
MJB
ADN
DRAWN
CHK'D
APP'D
RDMP RU V BALIKPAPAN CONTRACTOR:
333 TP 054
RDMP BALIKPAPAN JO OWNER:
16"
333-FW-009-4"-12LC2T01-NI
2" 333-FHF-011 4"x1-1/2"
12"
4"x1-1/2"
REKIND VENDOR
10"(2), 12"(4) 8"(4)
7
333-HR-036
333-HR-037
PERTAMINA TITLE:
CONT. REFERENCE DRAWING
8
I
PROJECT:
LONO UG AG
6"x4"
12"
AIR RELEASE VALVE
BSN
DESCRIPTION
NO
SIZE
333-FHF-014 6"
ISSUED FOR CONSTRUCTION
DATE
LO
333-FW-006-16"-12LC2T21-NI
9
G-320-21A/B 10
11
12
13
14
J
PT. PERTAMINA BALIKPAPAN, INDONESIA
TEST BLOCK DIAGRAM FIRE WATER SYSTEM RFCC FEED TANK COOLING WATER, UTILITY BOILER & STEAM GENERATION PERTAMINA DRAWING NO.
26071-100-U1C-000-10001 HYDRAULIC CALCULATION REPORT FOR FIRE WATER SYSTEM
1
16"x12" NOTE 13 NOTE 7
CONT. LEGENDS
UG AG 6"
333-FW-004-16"-12LC2T21-NI
FIRE WATER M6-333-00002 12857 TO/FROM FIRE WATER HEADER
333-FW-005-16"-12LC2T21-NI
12CG2T01 12LC2T01
UG AG
FIRE WATER M6-333-00002 12856 TO/FROM FIRE WATER HEADER
6"
6"
NOTE 3 16"
12LC2T01 AG
P
J
12"
16 Sept 20
NOTE 6
UG
AG UG
333-FHF-010 AG UG
FIRE WATER 12848 TO/FROM EXISTING FIRE WATER HEADER
AG
12"
18"x16"
AG UG 16"
12LC2T21 UG
333-FHF-008
000 REV
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO)
333 TP 052
NOTE 19
333-SP
333-FHF-013
16 LEGENDS
333 TP 049
2"
AG
333-FHF-005 12"
15
NOTE 19
2" UG
UG
AG UG
FOAM CHAMBER 333-FC-001 333-FC-002 333-FC-003 333-FC-004 333-FC-005 333-FC-006 333-FC-007 333-FC-008 333-FC-009 333-FC-010 333-FC-011 333-FC-012 333-FC-013 333-FC-014 333-FC-015 333-FC-016 333-FC-017
000
AG
SLUDGE POND
AG UG
12"
C
333-ARV-022
NOTE 19
6"
AG UG
NOTE 3
000
14
13
000
333-FW-162-12"-12LC2T21-NI
333-FHF-017
12
333-FHF-015
6"
B
11
000
333-FHF-181 6"
10
333-FHF-012
AG UG
6"
9
FIRE WATER 12849 TO FROM EXISTING FIRE WATER HEADER
3
-
2
FIRE WATER M6-333-00017 13074 TO/FROM FIRE WATER HEADER
1
NONE
26071
SCALE
JOB NO.
26071-TB-333-AG-FW-0001 DOCUMENT NO.
15
K
REV.
/ SHT NO.
16
000
A1 (841X594)
LINE LIST Test Package
Iso Drawing
Line No
PID
Dia (in)
333-AG-FW-0001
333TIE-FW-001-01 333TIE-FW-006-01 333TIE-FW-007-01 333TIE-FW-008-01 333TIE-FW-070-01
333-FW-001-16"-12LC2T01-NI 333-FW-006-16"-12LC2T01-NI 333-FW-007-16"-12LC2T01-NI 333-FW-008-16"-12LC2T01-NI 333-FW-070-16"-12LC2T01-NI
26071-203-M6-333-00001 26071-203-M6-333-00001 26071-203-M6-333-00001 26071-203-M6-333-00001 26071-203-M6-333-00001
16.00 16.00 16.00 16.00 16.00
Inspection by Name signature Date
Subcontractor
Length (m) 0.61 0.61 0.61 0.61 0.61
Volume (m3)
Volume Total (m3)
Temperature Operation ©
Temperature Design ©
Design Test (kg/cm2[g])
Press Test (kg/cm2[g])
TEST
0.4
37.00 37.00 37.00 37.00 37.00
65 65 65 65 65
17 17 17 17 17
25.5 25.5 25.5 25.5 25.5
HYDROTEST HYDROTEST HYDROTEST HYDROTEST HYDROTEST
0.08 0.08 0.08 0.08 0.08
Contractor
IPMT
PIPING WORK PACKAGE # 8 EARLY TANK SPOOL DRAWING LIST 333-AG-FW-0001 NO.
SPOOL DWG NO :
SHEET
REV
LINE NO :
1
333TIE-FW-001-01
1
0
333-FW-001-16"-12LC2T01-NI
2
333TIE-FW-006-01
1
0
333-FW-006-16"-12LC2T01-NI
3
333TIE-FW-007-01
1
0
333-FW-007-16"-12LC2T01-NI
4
333TIE-FW-008-01
1
0
333-FW-008-16"-12LC2T01-NI
5
333TIE-FW-070-01
1
0
333-FW-070-16"-12LC2T01-NI
SHT
ISO DWG NO.
REV.
BILL OF MATERIALS
N
SHOP MATERIALS PT NO
1
2
DESCRIPTION
RED TEE, CS A234-WPB-SMLS CEMENT LINED BE B16.9 per AWWA C205 NORMALIZED S-STD x S-STD WN FLG, CS A105 FF B16.5 CL150 CEMENTED LINED per AWWA C205 NORMALIZED S-STD
SIZE (IN)
MATERIAL CODE
QTY
MAT'L CLASS
16X12
I110745569
1
12LC2T01
12
I112374144
1
12LC2T01
SIZE (IN)
MATERIAL CODE
QTY
I122047719
1
12LC2T01
I145555240
12
12LC2T01
I135414567
1
12LC2T01
356
CONT. ON 333U01-FW-001 SHT:01 E 2620.163M N 3080.692M EL +100.266M 5 SPINDLE EAST E 2620.468M N 3080.692M EL +99.499M
408
1
234 12"NS
333TIE-FW-001-01-SPL001
1 16X12"NS EL +99.499M
E 2619.858M N 3080.692M EL +99.499M
333 TP 50B
FIELD MATERIALS PT NO
305
3
305
333 TP 050A
4
5
CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2
WELD NO 1
N.S
WELD TYPE
WELD CAT
12"
BW
SHOP
DESCRIPTION
GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 12 FULL FACE FOR CEMENT LINED BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 7/8 GR B7 W/A194 GR 2H PTFE COATED B18.31.2/B18.2.2 W/2 WASHER, 140MM BOLT LENGTH (VG1DF301) GATE VA FLGD, DI A536 GR. 12 65-45-12 EPDM TRIM - DI + EPDM CL150 FF FP RESILIENT WEDGE BB IS-NRS AWWA-C515 B16.42 EPOXY LINED & COATED HW
MAT'L CLASS
WELD LOC 2-1
LEGEND 00
SHOP WELD
00
FIELD WELD
00
SHOP THD.
00
FIELD THD.
PREP
BM
CHKD
KWN
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO).
CUT PIECES NO.
00
MATERIAL NO.
00
SPOOL NO.
DATE
NPS
MAT'L CLASS
OPER. PRESS. TEMP. (° C) (kg/cm2[g])
PROJECT
RDMP RU V BALIKPAPAN DESIGN PRESS. TEMP. (° C) (kg/cm2[g])
TEST PRESS. TYPE (kg/cm2[g])
INSULATION CODE
TH'K (mm)
PAINT CODE
PWHT
CONTRACTOR
NDE
RDMP BALIKPAPAN JO OWNER
ISSUED FOR CONSTRUCTION
REV. ISOMETRIC ID : SUB SYSTEM NO :
DATE
DESCRIPTION
KWN
DRAWN
Ai/STN
CHECK'D
IP
APPR'D
AREA NO.
PT PERTAMINA BALIKPAPAN, INDONESIA UNIT NO.
SUB-UNIT NO.
P&ID NO.
LINE NO.
STRESS PKG. NO.
ISO DWG NO.
EXTRACTION DATE : EXTRACTION NO :
CA NO.
SHT
REV.
TOTAL SHEET :
SHT
ISO DWG NO.
REV.
BILL OF MATERIALS
N
SHOP MATERIALS PT NO
1 2
430
1
MATERIAL CODE
QTY
MAT'L CLASS
16X16
I110681969
1
12LC2T01
16
I112374211
1
12LC2T01
SIZE (IN)
MATERIAL CODE
QTY
I122047721
1
12LC2T01
I119784463
16
12LC2T01
I135426988
1
12LC2T01
E 2221.705M N 3077.746M EL +98.749M
234 16"NS
333TIE-FW-006-01-SPL001
TEE, CS A234-WPB-SMLS CEMENT LINED BE B16.9 per AWWA C205 NORMALIZED S-STD WN FLG, CS A105 FF B16.5 CL150 CEMENTED LINED per AWWA C205 NORMALIZED S-STD
SIZE (IN)
5 SPINDLE EAST ORIENT HANDLE NORTH
406
CONT. ON 333U01-FW-006 SHT:01 E 2221.400M N 3077.746M EL +99.588M
DESCRIPTION
1 16X16"NS EL +98.749M
333 TP 054A
333 TP 054B
FIELD MATERIALS
E 2221.095M N 3077.746M EL +98.749M
PT NO
305
3
305
4
5
CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2
WELD NO 1
N.S
WELD TYPE
WELD CAT
16"
BW
SHOP
DESCRIPTION
GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 FULL FACE FOR CEMENT LINED BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 GR B7 W/A194 GR 2H PTFE COATED B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT LENGTH (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 65-45-12 EPDM TRIM - DI + EPDM CL150 FF FP RESILIENT WEDGE BB IS-NRS AWWA-C515 B16.42 EPOXY LINED & COATED GO
MAT'L CLASS
WELD LOC 2-1
LEGEND 00
SHOP WELD
00
FIELD WELD
00
SHOP THD.
00
FIELD THD.
PREP
BM
CHKD
KWN
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO).
CUT PIECES NO.
00
MATERIAL NO.
00
SPOOL NO.
DATE
NPS
MAT'L CLASS
OPER. PRESS. TEMP. (° C) (kg/cm2[g])
PROJECT
RDMP RU V BALIKPAPAN DESIGN PRESS. TEMP. (° C) (kg/cm2[g])
TEST PRESS. TYPE (kg/cm2[g])
INSULATION CODE
TH'K (mm)
PAINT CODE
PWHT
CONTRACTOR
NDE
RDMP BALIKPAPAN JO OWNER
ISSUED FOR CONSTRUCTION
REV. ISOMETRIC ID : SUB SYSTEM NO :
DATE
DESCRIPTION
KWN
DRAWN
Ai/STN
CHECK'D
IP
APPR'D
AREA NO.
PT PERTAMINA BALIKPAPAN, INDONESIA UNIT NO.
SUB-UNIT NO.
P&ID NO.
LINE NO.
STRESS PKG. NO.
ISO DWG NO.
EXTRACTION DATE : EXTRACTION NO :
CA NO.
SHT
REV.
TOTAL SHEET :
SHT
ISO DWG NO.
REV.
BILL OF MATERIALS
N
SHOP MATERIALS PT NO
1 2
406
1
MATERIAL CODE
QTY
MAT'L CLASS
16X16
I110681969
1
12LC2T01
16
I112374211
1
12LC2T01
SIZE (IN)
MATERIAL CODE
QTY
I122047721
1
12LC2T01
I119784463
16
12LC2T01
I135426988
1
12LC2T01
E 2247.410M N 3077.748M EL +98.589M
234 16"NS
333TIE-FW-007-01-SPL001
TEE, CS A234-WPB-SMLS CEMENT LINED BE B16.9 per AWWA C205 NORMALIZED S-STD WN FLG, CS A105 FF B16.5 CL150 CEMENTED LINED per AWWA C205 NORMALIZED S-STD
SIZE (IN)
5 SPINDLE WEST ORIENT HANDLE NORTH
430
CONT. ON 333A01-FW-007 SHT:06 E 2247.105M N 3077.748M EL +99.428M
DESCRIPTION
1 16X16"NS EL +98.589M
333 TP 052A
333 TP 052B
FIELD MATERIALS
E 2246.800M N 3077.748M EL +98.589M
PT NO
305
3
305
4
5
CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2
WELD NO 1
N.S
WELD TYPE
WELD CAT
16"
BW
SHOP
DESCRIPTION
GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 FULL FACE FOR CEMENT LINED BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 GR B7 W/A194 GR 2H PTFE COATED B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT LENGTH (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 65-45-12 EPDM TRIM - DI + EPDM CL150 FF FP RESILIENT WEDGE BB IS-NRS AWWA-C515 B16.42 EPOXY LINED & COATED GO
MAT'L CLASS
WELD LOC 2-1
LEGEND 00
SHOP WELD
00
FIELD WELD
00
SHOP THD.
00
FIELD THD.
PREP
BM
CHKD
KWN
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO).
CUT PIECES NO.
00
MATERIAL NO.
00
SPOOL NO.
DATE
NPS
MAT'L CLASS
OPER. PRESS. TEMP. (° C) (kg/cm2[g])
PROJECT
RDMP RU V BALIKPAPAN DESIGN PRESS. TEMP. (° C) (kg/cm2[g])
TEST PRESS. TYPE (kg/cm2[g])
INSULATION CODE
TH'K (mm)
PAINT CODE
PWHT
CONTRACTOR
NDE
RDMP BALIKPAPAN JO OWNER
ISSUED FOR CONSTRUCTION
REV. ISOMETRIC ID : SUB SYSTEM NO :
DATE
DESCRIPTION
KWN
DRAWN
Ai/STN
CHECK'D
IP
APPR'D
AREA NO.
PT PERTAMINA BALIKPAPAN, INDONESIA UNIT NO.
SUB-UNIT NO.
P&ID NO.
LINE NO.
STRESS PKG. NO.
ISO DWG NO.
EXTRACTION DATE : EXTRACTION NO :
CA NO.
SHT
REV.
TOTAL SHEET :
SHT
ISO DWG NO.
REV.
BILL OF MATERIALS
N
SHOP MATERIALS PT NO
1 2
406
1
MATERIAL CODE
QTY
MAT'L CLASS
16X16
I110681969
1
12LC2T01
16
I112374211
1
12LC2T01
SIZE (IN)
MATERIAL CODE
QTY
I122047721
1
12LC2T01
I119784463
16
12LC2T01
I135426988
1
12LC2T01
E 2553.207M N 3078.543M EL +99.259M
234 16"NS
333TIE-FW-008-01-SPL001
TEE, CS A234-WPB-SMLS CEMENT LINED BE B16.9 per AWWA C205 NORMALIZED S-STD WN FLG, CS A105 FF B16.5 CL150 CEMENTED LINED per AWWA C205 NORMALIZED S-STD
SIZE (IN)
5 SPINDLE WEST ORIENT HANDLE NORTH
430
CONT. ON 333A01-FW-008 SHT:06 E 2552.902M N 3078.543M EL +100.099M
DESCRIPTION
1 16X16"NS EL +99.259M
E 2552.597M N 3078.543M EL +99.259M
333 TP 053B
FIELD MATERIALS
333 TP 053A
PT NO
305
3
305
4
5
CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2
WELD NO 1
N.S
WELD TYPE
WELD CAT
16"
BW
SHOP
DESCRIPTION
GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 FULL FACE FOR CEMENT LINED BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 GR B7 W/A194 GR 2H PTFE COATED B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT LENGTH (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 65-45-12 EPDM TRIM - DI + EPDM CL150 FF FP RESILIENT WEDGE BB IS-NRS AWWA-C515 B16.42 EPOXY LINED & COATED GO
MAT'L CLASS
WELD LOC 2-1
LEGEND 00
SHOP WELD
00
FIELD WELD
00
SHOP THD.
00
FIELD THD.
PREP
BM
CHKD
KWN
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO).
CUT PIECES NO.
00
MATERIAL NO.
00
SPOOL NO.
DATE
NPS
MAT'L CLASS
OPER. PRESS. TEMP. (° C) (kg/cm2[g])
PROJECT
RDMP RU V BALIKPAPAN DESIGN PRESS. TEMP. (° C) (kg/cm2[g])
TEST PRESS. TYPE (kg/cm2[g])
INSULATION CODE
TH'K (mm)
PAINT CODE
PWHT
CONTRACTOR
NDE
RDMP BALIKPAPAN JO OWNER
ISSUED FOR CONSTRUCTION
REV. ISOMETRIC ID : SUB SYSTEM NO :
DATE
DESCRIPTION
KWN
DRAWN
Ai/STN
CHECK'D
IP
APPR'D
AREA NO.
PT PERTAMINA BALIKPAPAN, INDONESIA UNIT NO.
SUB-UNIT NO.
P&ID NO.
LINE NO.
STRESS PKG. NO.
ISO DWG NO.
EXTRACTION DATE : EXTRACTION NO :
CA NO.
SHT
REV.
TOTAL SHEET :
SHT
ISO DWG NO.
REV.
BILL OF MATERIALS
N
SHOP MATERIALS PT NO
1 2
406
1
MATERIAL CODE
QTY
MAT'L CLASS
16X16
I110681969
1
12LC2T01
16
I112374211
1
12LC2T01
SIZE (IN)
MATERIAL CODE
QTY
I122047721
1
12LC2T01
I119784463
16
12LC2T01
I135426988
1
12LC2T01
E 2343.466M N 3077.755M EL +99.101M
234
333 TP
16"NS
333TIE-FW-070-01-SPL001
TEE, CS A234-WPB-SMLS CEMENT LINED BE B16.9 per AWWA C205 NORMALIZED S-STD WN FLG, CS A105 FF B16.5 CL150 CEMENTED LINED per AWWA C205 NORMALIZED S-STD
SIZE (IN)
5 SPINDLE WEST ORIENT HANDLE NORTH
430
CONT. ON 333A01-FW-070 SHT:08 E 2343.161M N 3077.755M EL +99.941M
DESCRIPTION
1 051B 16X16"NS EL +99.101M
E 2342.856M N 3077.755M EL +99.101M
FIELD MATERIALS
333 TP 051A
PT NO
305
3
305
4
5
CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2
WELD NO 1
N.S
WELD TYPE
WELD CAT
16"
BW
SHOP
DESCRIPTION
GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 FULL FACE FOR CEMENT LINED BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 GR B7 W/A194 GR 2H PTFE COATED B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT LENGTH (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 65-45-12 EPDM TRIM - DI + EPDM CL150 FF FP RESILIENT WEDGE BB IS-NRS AWWA-C515 B16.42 EPOXY LINED & COATED GO
MAT'L CLASS
WELD LOC 2-1
LEGEND 00
SHOP WELD
00
FIELD WELD
00
SHOP THD.
00
FIELD THD.
PREP
BM
CHKD
KWN
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO).
CUT PIECES NO.
00
MATERIAL NO.
00
SPOOL NO.
DATE
NPS
MAT'L CLASS
OPER. PRESS. TEMP. (° C) (kg/cm2[g])
PROJECT
RDMP RU V BALIKPAPAN DESIGN PRESS. TEMP. (° C) (kg/cm2[g])
TEST PRESS. TYPE (kg/cm2[g])
INSULATION CODE
TH'K (mm)
PAINT CODE
PWHT
CONTRACTOR
NDE
RDMP BALIKPAPAN JO OWNER
ISSUED FOR CONSTRUCTION
REV. ISOMETRIC ID : SUB SYSTEM NO :
DATE
DESCRIPTION
KWN
DRAWN
Ai/STN
CHECK'D
IP
APPR'D
AREA NO.
PT PERTAMINA BALIKPAPAN, INDONESIA UNIT NO.
SUB-UNIT NO.
P&ID NO.
LINE NO.
STRESS PKG. NO.
ISO DWG NO.
EXTRACTION DATE : EXTRACTION NO :
CA NO.
SHT
REV.
TOTAL SHEET :
PIPING WORK PACKAGE #8 EARLY TANK
OWNER PROJECT TITLE JOB NO. AREA/UNIT/SECTION TEST PACKAGE NO. NDT REQUIREMENT
: : : : : :
PT PERTAMINA Piping Work Package #8 Early Tank 26071 9 333-AG-FW-0001 5%
SUMMARY NDT RECORD
SUMMARY
1. 2. 3. 4. 5. 6. 7. 8. 9.
TOTAL JOINT BUTT WELD TOTAL JOINT SOCKET WELD TOTAL JOINT THREADED TOTAL JOINT RT TOTAL JOINT PAUT TOTAL JOINT PT TOTAL JOINT PWHT TOTAL JOINT HARDNESS TEST TOTAL JOINT PMI TEST
: : : : : : : : :
JOINT JOINT JOINT JOINT JOINT JOINT JOINT JOINT JOINT
YES
NO
NDT RELEASED :
PREPARED BY, SUBCONTRACTOR
DATE :
REVIEWED BY, CONTRACTOR
DATE :
APPROVED BY, OWNER
DATE :
WELDING HISTORY SHEET Project
: Piping Work Package #8 Early Tank
Subcon : PT. Yasa Industri Nusantara
Report No : No
Area
Date
:
Location : ISO DWG
Rev
1
333TIE-FW-001-01
0
2
333TIE-FW-006-01
0
3
333TIE-FW-007-01
0
4
333TIE-FW-008-01
0
5
333TIE-FW-070-01
0
Inspection by
Spool No
Size
Issued by
Class
Paint code
Joint No
Report No.
Received by
NDE PWHT
Hard ness
PMI
Paint
Remark
Approved by
Name Signature Date ITR-PI-004
PUNCH LIST Project
:
Piping Work Package #8 Early Tank
No
ISO DWG
1
333TIE-FW-001-01
2
333TIE-FW-006-01
3
333TIE-FW-007-01
4
333TIE-FW-008-01
5
333TIE-FW-070-01
Description
Test Type :
Package No : 333-AG-FW-0001 Category
Issue by
Issue Date
Clear Date
Hydrotest Sub-con
Contractor
Owner
Remark
Category Legend : A – Before Test B – After Test
ITR-PI-008
PIPING WORK PACKAGE #8 EARLY TANK PRE-TEST CHECKLIST
PIPING (BEFORE PRESSURE TEST) OWNER
: PT. PERTAMINA
TEST PACKAGE NO. : 333-AG-FW-0001
SERVICE NAME
: FIRE WATER AND FOAM
UNIT
: 333
: REF. DWG. NO.
:
P&ID DWG. NO.
: 26071-203-M6-333-00001
:
: :
No.
Description
ACC
1
Check system complies with P&ID's and isometrics.
2
Check that all NDT / Stress relieving requirements as per specification have been met and recorded and all welded attachments installed. Check that correct bolts and gaskets are installed at all mechanical joints.
3 4
Check that all vents and drains are installed (Add temporary vents and drains for testing as required).
5
Check piping for correct schedule and type and ratings of forged steel fittings and reinforcement is correct.
6
Check valve materials, use spec. ref. in piping material specification, tags and nameplates.
7
Check that all pressure connections are installed correctly as per specification and all thermowells are installed.
REJ
NA
Comments
Check for correct direction of flow through filters and strainers, traps, check valves, globe valves and control valves. 9 Check orifice valve tap orientation and that taps and plugs have been seal welded and unused tapped holes area plugged and welded. 10 Check that instrument connections installed and any delicate in line instrument excluded from test. 8
11 Check all pipe supports are correctly installed - all temporary pipe supports removed and any additional suports fitted. 12 Check all relief valves, bursting discs and specified control valves have been removed. 13 Check that gags on spring supports and expansion joints are in position. 14 Check that all chainwheels and extended spindles and locking devices required for specified valves have been installed. 15 Check that there is no spring in pipework affecting pumps and vessel. 16 Check that all sprinkler heads, rosettes and nozzles have been removed and connections plugged. Note :
(Tick as Applicable),
Prepare by Name:
ACC NA
= Acceptable = Not Applicable
Checked by Name:
Date:
Reviewed/Witnessed by Name:
Date: Construction
= Rejected
Approved by Name:
Date: Subcontractor
REJ
Date: Contractor
Owner
Doc. No. : 26071-203-V21A-000-00064 Job No. : 26071
Rev.000
RESULT OF WATER TEST FOR HYDROTEST
PROJECT
:
Engineering, Procurement and Construction (EPC) Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL) for the Refinery Development Master Plan (RDMP) Project RU V Balikpapan
000 REV.
LOCATION
:
Refinery Unit V Balikpapan, East Kalimantan,Indonesia
OWNER
:
PT PERTAMINA (Persero)
PO NO.
:
26071-203-HCA-PP00-00021
10-Jun-2020 ISSUED FOR INFORMATION DATE
DESCRIPTION
RENDY
MUJIB
AHDAN B.
PREPARED
CHECKED
APPROVED
PT.YASA INDUSTRI NUSANTARA
Doc. No. : 26071-203-V21A-000-00064 Job No. : 26071
Rev.000
REVISION LOG
REV. NO.
DATE
PAGE
DESCRIPTION
000
10-Jun-2020
-
ISSUED FOR INFORMATION
PRESSURE TEST REPORT Piping Work Package #8 Early Package No Tank
Project
:
: 333-AG-FW-0001
Subcon
: PT. Yasa Industri Nusantara
System No
Area
:
Sub-system No : 333-0001
: 333
Pressure Gauge Details Instrument
Instrument No.
Type of Test
Calibrated On
Hydrostatic
Calibration Due Date
Gauge No.1
Pneumatic
Gauge No.2
In-Service
Gauge No.3
Visual
Others
Other (
Test Pressure Design
Test Medium
Test
No
ISO DWG
1 2 3 4 5
333TIE-FW-001-01 333TIE-FW-006-01 333TIE-FW-007-01 333TIE-FW-008-01 333TIE-FW-070-01
Holding Time (Required time: Start Time
No
Date
P-Partial / F-Full
)
)
Finish Time
Date
Remark
For detail guidance to control of pressure gauge, refer to 26071-100-GQI-GAQ-00004 Inspection, Measuring and testing Equipment Control Procedure.
Inspection Result :
Inspection by
□ Accept
Subcontractor
□ Reject
Contractor (QC)
IPMT
Name Signature Date Form No. :
ITR-PI-009
DRYING REPORT Piping Work Package #8 Early Package No Tank
Project
:
: 333-AG-FW-0001
Date
:
System No
: 333
Area
:
Sub-system No
: 333-0001
Drying Method Dry Air
Vacuum Drying
Dry Gas
Others
Data Test Medium
Inspection Result : Inspection by
Test Date
□ Accept
□ Reject
Subcontractor
Contractor (QC)
IPMT
Name Signature Date Form No. :
ITR-PI-010
LINE REINSTATEMENT REPORT Piping Work Package #8 Early Package No Tank
Project
:
Date
:
System No
Area
:
Sub-system No : 333-0001
No
Description
1
Drain & Drying completed
2
Gasket & Bolts Installed
3
All Instruments and valves reinstalled
4
Temporary blind flanges removed
5
Temporary pipes removed
6
Test gauges and fitting removed
7
Blind flanges Installed as per latest P&ID
8
Bolt torqueing done
9
Spring supports adjusted to cold position
10
Vents and drains plugged as specified
11
Conformance with final P&ID ensured
12
Filters, strainers, traps, check valves, globe valves & control valves Installed for correct flow and orientation
: 333-AG-FW-0001 : 333
Accept
Reject
N/A
Remark
13 14 15
Inspection by
Subcontractor
Contractor (QC)
IPMT
Name Signature Date Form No. :
ITR-PI-011
FLANGE JOINT Piping Work Package #8 Early Report No Tank
Project
:
:
Package No
: 333-AG-FW-0001
Date
:
Area
:
System No
: 333
No
ISO DWG
Gasket / Flange Rev
Joint Type
1
333TIE-FW-001-01
0
2
333TIE-FW-006-01
0
3
333TIE-FW-007-01
0
4
333TIE-FW-008-01
0
5
333TIE-FW-070-01
0
Size Rating
Bolt Tightening Req. Value
Act. Value
Remarks Sign
Note: Inspection by
Subcontractor
Contractor (QC)
IPMT
Name Signature Date Form No. :
ITR-PI-006
ORIFICE FLANGE INSIDE INSPECTION REPORT Project
:
Package No
:
Area
:
Piping Work Package #8 Early Tank 333-AG-FW-0001
Report No
:
Date
:
System No
:
333 Result
No
ISO DWG
Rev
Joint
Tag No
Size
Remark ACC
1
333TIE-FW-001-01
0
2
333TIE-FW-006-01
0
3
333TIE-FW-007-01
0
4
333TIE-FW-008-01
0
5
333TIE-FW-070-01
0
Inspection by
Subcontractor
Contractor (QC)
REJ
IPMT
Name Signature Date Form No. : ITR-PI-003
F-NDT-006
PT RADIANT UTAMA INTERINSCO Tbk
LIQUID PENETRANT EXAMINATION REPORT CLIENT
:
REPORT NO. :
JOB
:
DATE
:
LOCATION
:
SHEET NO.
:
ITEM NO.
:
LINE/DWG NO. : SURFACE PREPARATION :
STAGE OF EXAMINATION :
MATERIAL :
S O P NO.
:
TEMP.
CRITERION
:
:
AS - WELDED
AS - ROLLED
AS - FORGED
GRINDING
MACHINING
AS - CAST
BEFORE/AFTER PWHT
BEFORE/AFTER LOAD TEST
COLOR CONTRAST
FLUORESCENT PRODUCT
CLEANER PENETRANT DEVELOPER
SOLVENT REMOVAL
MANUFACTURER
: : :
PART OR WELD
DATE :
BLACK LIGHT INTENSITY LIGHT INTENSITY LIGHTMETER S/N
BRUSHING
WELDER IND. STAMP NO.
EXAMINER
DWELL TIME PENETRANT : DEVELOPER :
PENETRANT APPLICATION SPRAYING
AFTER WELDED TYPE
TECHNIQUE
MATERIALS
of
SIZE (mm) ROUNDED
LINEAR
RESULT ACC
QA/QC INSPECTOR
DATE :
REJ
PART OR WELD
WELDER IND. STAMP NO.
MINUTES MINUTES
W/cm² Lux
: : : SIZE (mm) ROUNDED
AUTHORIZED INSPECTOR
DATE :
LINEAR
RESULT ACC
CLIENT'S REP.
DATE :
REJ