9 0 150 KB
JOB SAFETY ANALYSIS Date :…………….., 2021
Location : A
JSA Number : 04
Job / Task :
Company name :
Concrete Work
Royal-Technic JV
PPE Required: Basic PPE, Safety Goggles, Hand Gloves, Coverall, Safety Harness etc. Supervisor name and signature:
No
1
2
Basic Sequence of Job Steps Transfer materials and tools to work site. Prepare, inspect the work site.
Rebar Work
PTW no:
Potential of Hazard
Safety Control
1.Materials may fall 2.Hit by various materials 3.Slip, trip and fall 4. Pinch point 5. Biological Hazard 1.Swinging Rebar may hit worker 2. Pinch point 3.Sharp edge 4. electrocution from cutting machine 5.Tools &Materials may fall from hand while passing 6. Body positioning when manual lifting, standing or bending.
Hold materials firmly Look for loose item maintain safe distance Keep eyes on path Use PPE -maintain safe distance -use proper technique -keep eyes on task -use appropriate gloves (mechanical/ cotton) -Hold tools & Materials firmly. Keep eye on task and path. -Ensure correct tying material when lowering material with rope -Maintain proper communicate among work team. -Follow manual handling and lifting technique.
PIC
Risk Rating
L Supervisors
L Supervisor
3
4
Form work (Shuttering and deshuttering)
Welding, Cutting and Grinding work
1.Shutter may fall on body/ ground 2. pinch point 3. Hit by swinging hammer 4.Tools &Materials may fall from hand while passing down.
1.Burn or body parts specifically face caused by exposure to welding arc 2.Fire caused by welding sparks
5
6
Working at height and personnel involved the team
Concreting work
1.Fall from height 2.Personnel injury
1.Inappropriate PPE’s/ tools during Concrete work 1.1. Skin Contact with concrete or others chemicals 2. pinch point 3. Slip, trip and fall
-maintain safe distance -keep eyes on task -use hand gloves (mechanical/ others) -keep eyes on path -maintain safe distance -Hold tools & Materials firmly. Keep eye on task and path. -Ensure correct tying material when lowering material with rope 1. Welder to be certified and experienced 1.1 Appropriate PPE for welder must be worn. 1.2 Full face shield with smoked glass and welding gloves
Supervisor L
Supervisor and workers
M
2. Fire extinguisher to be on site 2.1 Ensure no flammable materials at the work area
1.Wear Safety harness when work above 1.8 meter from ground
Supervisor M
2.Appropreate PPE for all employees involved to the Piling work
1. Insure Proper PPE 2. maintain safe distance 3. Keep eyes on path while carrying concrete materials
Supervisor
L
7
Monitor Compliance
1.Lack of communication
1. Team leader or site in charge keep on eyes and supervised and monitor the team closely 1.2 The project managers or the appointed person shall on a weekly basis audit this procedure
Project manager
L
Supervisors
L
1.Be aware of the surrounding area and work surface you are standing 1.Slip, trips and fall 8
Housekeeping
2.Manual handling 3. Dropped objects
Reviewed by: Sl No 1 2 3 4
Name
Position
2. Use correct techniques Housekeeping
lifting when
3. Ensure all tools and equipment are secured or properly tied off.
Company Name
Signature