4 0 132 KB
BLASTING & PAINTING
PT. DUTA UTAMA TEHNIK ABADI MECHANICAL -ELECTRICAL - CONSTRUCTION
INSPECTION REPORT
Project No. Doc. Number Location Blasting & Painting
PROJECT
: New Compressor Room
Owner
: PT. Vopak Terminal Merak
LOCATION
: Jl. Raya Merak Km. 3. Kel. Gerem
Mark No. / Item No.
ITEM NAME
Profile
Cleanliness
PAINT MANUFACTURE
Workshop PT. DUTA -
Appropriate Drawing Length Thickness
Material
SURFACE PREPARATION : Type of Abrasive
: : : : :
DATE
Anchore Profile 2.0 - 3.0 mils (50 - 75 μm)
PRIMER COAT
CLEANING METHOD
Quantity
COLOUR OF PAINT : : :
Primer Coat Dry Blasting Second Coat Finish Coat PRODUCT NAME / TYPE OF PAINT SECOND COAT
FINISH COAT
Weather Condition of Blasting & Painting √ PAINTING 1
st
2
nd
3
rd
Time Wet Bulb (ºC) Dry Bulb (ºC) Relative Humidity (%) Dew Point (ºC) Steel Temperature (ºC)
DRY FILM THICKNESS REPORT No
DESCRIPTION
1
PRIMER COAT
2
SECOND COAT
3
FINISH COAT
RESULT :
1 2 3 DFT (μm) DFT (μm) DFT (μm)
√ Accepted
4 DFT (μm)
5 DFT (μm)
Reference :
AVERAGE DFT OF PER COAT
DATE
Rejected
Table 1 Painting Specification
NOTE : Only for Type of Abrasive to be Reference WI-DUTA-Paint-01 FINAL INSPECTION :
PT. DUTA UTAMA TEHNIK ABADI PREPARED & CHECKED BY :
REMARKS
PT. Synthetic Rubber Indonesia APPROVED BY :
PT. DUTA UTAMA TEHNIK ABADI
PICTURE OF INSPECTION (BLASTING)
MECHANICAL -ELECTRICAL - CONSTRUCTION
PREPARED & CHECKED BY :
CHECKED BY :
HAFID
QUALITY CONTROL
PT. DUTA UTAMA TEHNIK ABADI
PT. DUTA UTAMA TEHNIK ABADI
APPROVED BY
SUWARNO PT. Vopak Terminal Merak
PT. DUTA UTAMA TEHNIK ABADI MECHANICAL -ELECTRICAL - CONSTRUCTION
PHOTOGRAPH FOR DRY FILM THICKNESS (DFT) (3 COAT SYSTEM)
Primer Coat 84.5 µm
82.8 µm
215 µm
208 µm
78.7 µm
81.4 µm
77.4 µm
218 µm
202 µm
306 µm
257 µm
Second Coat 216 µm
Finish Coat 298 µm
Judgment
264 µm
282 µm
√
Acceptable
PT. DUTA UTAMA TEHNIK ABADI Prepared & Checked By : SIGN ITEM
Name
Unacceptable PT. Vopak Terminal Merak Checked By :