PT. PERENCANA INDAH Engineering CONSULTANT & SUPERVISION RT.012/RW.005 Kel. Liliba Kec. Oebobo, Telepon/Fax : 085100080121/0380-8553552 Kupang - NUSA TENGGARA TIMUR Email : [email protected]  



REKAPITULASI RENCANA ANGGARAN BIAYA ENGINEERING ESTIMATE (EE) PEKERJAAN : PROYEK PEMBANGUNAN GEDUNG PAMERAN DAN HOTEL KUPANG -NTT LOKASI : KOTA KUPANG SUB PEKERJAAN : PEMBANGUNAN GEDUNG PAMERAN TAHUN ANGGARAN : 2017 NO



TOTAL (Rp)



URAIAN PEKERJAAN



I A B C D E F G H I



PEKERJAAN ELEKTRIKAL SAMBUNGAN DAYA LISTRIK PLN (Sistem TM 20 kV) PEKERJAAN PANEL TEGANGAN MENENGAH PEKERJAAN TRANSFORMATOR PEKERJAAN PANEL TEGANGAN RENDAH PEKERJAAN KABEL TEGANGAN MENENGAH PEKERJAAN KABEL TEGANGAN RENDAH PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK PEKERJAAN RAK KABEL PEKERJAAN INSTALASI PENANGKAL PETIR TOTAL PEKERJAAN ELEKTRIKAL II PEKERJAAN ELEKTRONIK PEKERJAAN FIRE ALARM A C PEKERJAAN KABEL TRAY ELEKTRONIK D PEKERJAAN TATA SUARA TOTAL PEKERJAAN ELEKTRONIK III PEKERJAAN MEKANIKAL A PEKERJAAN PLUMBING B PEKERJAAN PEMADAM KEBAKARAN C PEKERJAAN AC D PEKERJAAN ESCALATOR TOTAL PEKERJAAN MEKANIKAL TOTAL PEKERJAAN MEKANIKAL & ELEKTRIKAL



#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Err:509 Err:509 Err:509 Err:509 Err:509 #NAME? Err:509 Err:509 Err:509 #NAME?



Terbilang : Delapan Miliyar Lima Ratus Empat Belas Juta Seratus Dua Belas Ribu Dua Ratus Tujuh Puluh Enam Rupiah



Kupang,



Desember 2017



Konsultan Perencana PT. PERENCANA INDAH ENGINEERING



LUHUT MANALU, ST,MT Direktur Utama



RENCANA ANGGARAN BIAYA ( RAB ) RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN AC TERKOREKSI NO.



A



URAIAN PEKERJAAN



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



LANTAI 1 PEKERJAAN AIR CONDITIONING Unit AC DUCTED 15 PK Freon R410a



unit



6.0



-



Unit AC DUCTED 10 PK Freon R410a



unit



6.0



-



m



262.00



-



m



487.0



-



Kabel kontrol indoor ke outdoor kabel NYM 2 x ( 4 x 2,5 ) mm



m



560.0



-



Instalasi Remote AC



ttk



12.0



-



Dudukan Indoor



set



12.0



-



Dudukan Outdoor



set



12.0



-



Commisioning Test



lots



1.0



-



INSTALASI AC Pipa refrigerant lengkap dengan isolasi 19 mm : Ø 1 3/8 " x 5/8 " Pipa Drain / pembuangan air AC - Pipa PVC 1 1/4" + isolasi aeroflex / superlon tebal 9 mm Kabel Power AC :



INSTALASI DUCTING Bahan PU - ukuran 160 cm x 50cm



m



13.20



-



- ukuran 150 cm x 40cm



m



26.60



-



- ukuran 120 cm x 40cm



m



14.60



-



- ukuran 110 cm x 40cm



m



23.20



-



- ukuran 100 cm x 40cm



m



16.20



-



- ukuran 90 cm x 40cm



m



20.80



-



- ukuran 60 cm x 30cm



m



65.40



-



Grill Supplay 55 cm x 55 cm



set



42.00



-



Grill Return 60 cm x 40 cm



set



24.00



-



m



2.00



-



Rounduct 8"



NO. B



URAIAN PEKERJAAN



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



LANTAI 2 PEKERJAAN AIR CONDITIONING Unit AC DUCTED 15 PK Freon R410a



unit



6.0



-



Unit AC DUCTED 10 PK Freon R410a



unit



6.0



-



m



262.00



-



m



487.0



-



Kabel kontrol indoor ke outdoor kabel NYM 2 x ( 4 x 2,5 ) mm



m



560.0



-



Instalasi Remote AC



ttk



12.0



-



Dudukan Indoor



set



12.0



-



Dudukan Outdoor



set



12.0



-



Commisioning Test



lots



1.0



-



INSTALASI AC Pipa refrigerant lengkap dengan isolasi 19 mm : Ø 1 3/8 " x 5/8 " Pipa Drain / pembuangan air AC - Pipa PVC 1 1/4" + isolasi aeroflex / superlon tebal 9 mm Kabel Power AC :



INSTALASI DUCTING Bahan PU - ukuran 160 cm x 50cm



m



12.24



-



- ukuran 150 cm x 40cm



m



24.50



-



- ukuran 120 cm x 40cm



m



13.20



-



- ukuran 110 cm x 40cm



m



21.60



-



- ukuran 100 cm x 40cm



m



14.40



-



- ukuran 90 cm x 40cm



m



13.20



-



- ukuran 60 cm x 30cm



m



52.80



-



Grill Supplay 55 cm x 55 cm



set



42.00



-



Grill Return 60 cm x 40 cm



set



16.00



-



m



2.00



-



Rounduct 8" TOTAL PEKERJAAN AC



-



RENCANA ANGGARAN BIAYA ( RAB ) PEKERJAAN MEP RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN ELEKTRIKAL TERKOREKSI NO.



URAIAN PEKERJAAN



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



ELEKTRIKAL A



SAMBUNGAN DAYA LISTRIK PLN (Sistem TM 20 kV) Biaya perizinan penyambungan daya listrik PLN dengan Sistem Sambungan Tegangan Menengah 20kV, Kap.690 Kva BP +UJL PLN



VA



690,000



-



SL0



VA



690,000



-



SUB TOTAL PEKERJAAN SAMBUNGAN DAYA B



-



PEKERJAAN PANEL TEGANGAN MENENGAH Pengadaan, pemasangan dan pengujian seluruh pekerjaan panel tegangan menengah yang etrdiri dari panel incoming dan outgoing lengkap dengan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. MVDP, 20 kV : - Incoming cubicle



unit



1.00



-



lot



1.00



-



- Outgoing cubicle Testing & commissioning SUB TOTAL PEK. PANEL TM



C



-



PEKERJAAN TRANSFORMATOR Pengadaan, pemasangan dan pengujian seluruh pekerjaan transformator 20kV, 50 Hz lengkap dengan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. Transformator, Type : Oil Immerse Kap. 800 kVA,



unit



1.00



-



buah



1.00



-



- Titik netral trafo BC 95 mm² lengkap dengan elektroda pembumian.



lot



1.00



-



- Body trafo BC 95 lengkap dengan elektroda pembumian.



lot



1.00



-



Material bantu



lot



1.00



-



Testing & commissioning



lot



1.00



-



20 kV/400 V, 50 Hz, DYn5. Lightning arrester 20 kV, 50 Hz. Instalasi pembumian



SUB TOTAL PEK. TRANSFORMATOR



-



NO.



D



URAIAN PEKERJAAN



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



PEKERJAAN PANEL TEGANGAN RENDAH Pengadaan, pemasangan dan pengujian pekerjaan panel tegangan rendah lengkap dengan MCCB, MCB, relay-relay dan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis.



1.00



PDTR



unit



1.00



-



Capasitor Bank, 2.00



SDP I



unit



1.00



-



1.00



SDP AC



unit



1.00



-



3.00



P AC.1 Lantai I



unit



1.00



-



2.00



P AC. 2 Lantai II



unit



1.00



-



4.00



PP 1 Lantai I



unit



1.00



-



3.00



PP 2 Lantai II



unit



1.00



-



5.00



P. B



unit



1.00



-



6.00



P. STP



unit



1.00



-



7.00



FUSE BOX Stand Pameran 1-33 Lt 1



unit



33.00



-



8.00



FUSE BOX Stand Pameran 1-36 Lt 2



unit



36.00



-



9.00



KWH Meter Stand Pameran 1-33 Lt 1



unit



33.00



-



###



KWH Meter Stand Pameran 1-36 Lt 2



unit



36.00



-



SUB TOTAL PEK. PANEL TR E



-



PEKERJAAN KABEL TEGANGAN MENENGAH Kabel dari gardu PLN menuju ke : - MVDP



: N2XSEFGbY 3 x 95 mm²



mtr



45.00



-



: N2XSY 3 x 1 x 95 mm²



mtr



15.00



-



Kabel dari MVDP ke : - Sisi primer trafo



SUB TOTAL PEK. KABEL TM



-



NO.



F



URAIAN PEKERJAAN



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



PEKERJAAN KABEL TEGANGAN RENDAH Pengadaan, pemasangan dan pengujian seluruh pekerjaan kabel tegangan rendah berbagai ukuran lengkap dengan schoen kabel, dan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. Kabel dari sisi sekunder trafo ke : PDTR



: NYY 4 (4 x 1 x 300 mm²)



mtr



15.00



-



: NYY 4 (4 x 1 x 300 mm²)



mtr



20.00



-



: NYY 4 (4 x 1 x 300 mm²)



mtr



25.00



-



Kabel dari Genset ke : - P-Genset (AMF Panel)



Kabel dari P-Genset (AMF Panel) ke : PDTR Kabel dari PDTR ke : Capasitor Bank



: NYY 4 (4 x 1 x 300 mm²)



mtr



12.00



-



SDP AC Lantai 1



: NYY 4 (4 x 1 x 240 mm²)



mtr



15.00



-



SDP 1 Lantai I



: NYY 4 x 185 mm²+ BC 70mm²



mtr



28.00



-



PP.1



: NYY 4 x 70 mm² + BC 25mm²



mtr



20.00



-



PP.2



: NYY 4 x 95 mm² + BC 50 mm²



mtr



30.00



-



mtr



20.00



-



P AC.1 : NYY 2(4 x 1 x 185 mm²)



mtr



10.00



-



P AC.2 : NYY 2(4 x 1 x 185 mm²)



mtr



30.00



-



mtr



754.00



-



mtr



734.00



-



P.Pompa Transfer : NYY 4 x 10 mm² + BC 6mm²



mtr



20.00



PIT. Peluap 1 : NYY 4 x 4 mm² + NYA 6mm²



mtr



27.00



PIT. Peluap 2 : NYY 4 x 4 mm² + NYA 6mm²



mtr



60.00



mtr



1,950.00



mtr



2,010.00



mtr



98.00



-



mtr



20.00



-



Kabel dari SDP I ke :



P.B : NYY 4 x 16 mm² + BC 6mm² Kabel dari SDP AC ke :



Kabel dari P AC 1 ke : Indor Unit AC 1-12 Lantai 1 : NYY 4 x 16 mm² + BC 6mm² Kabel dari P AC 2 ke : Indor Unit AC 1-12 Lantai 2 : NYY 4 x 16 mm² + BC 6mm² Kabel dari P. B ke :



Kabel dari PP. 1 ke : FUSE BOX Stand Pameran 1-33 Lt 1 : NYM 3 x 4 mm² + BC 2,5mm² Kabel dari PP. 2 ke : FUSE BOX Stand Pameran 1-36 Lt 2 : NYM 3 x 4 mm² + BC 2,5mm² P.ESC. : NYY 4 x 16 mm² + BC 6mm² Kabel dari P. Pompa ke : Pompa Transfer : NYY 4 x 4 mm² + NYA 6mm² SUB TOTAL PEK. KABEL TR



-



NO.



G



URAIAN PEKERJAAN



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi penerangan dan stop kontak lengkap dengan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. Lantai Basement II Lampu TL Balk Premium 1 x 36 watt



bh



32.00



-



Lampu dinding 40 W



bh



8.00



-



Saklar tunggal



bh



2.00



-



Saklar seri



bh



2.00



-



Stop kontak



bh



8.00



-



Instalasi penerangan



ttk



40.00



-



Instalasi stop kontak



ttk



8.00



-



Down light DLS 24 W



bh



277.00



-



Down light PLC 18 W



bh



18.00



-



Down light PLC 8 W



bh



8.00



-



Exhaust fan



bh



8.00



-



Saklar tunggal



bh



40.00



-



Saklar seri



bh



75.00



-



Stop kontak



bh



115.00



-



Instalasi penerangan



ttk



303.00



-



Instalasi stop kontak



ttk



115.00



-



Down light DLS 24 W



bh



272.00



-



Down light PLC 18 W



bh



18.00



-



Down light PLC 8 W



bh



8.00



-



Exhaust fan



bh



8.00



-



Saklar tunggal



bh



40.00



-



Saklar seri



bh



75.00



-



Stop kontak



bh



110.00



-



Instalasi penerangan



ttk



298.00



-



Instalasi stop kontak



ttk



110.00



-



Lantai I



Lantai II



SUB TOTAL PEK. INST. PENERANGAN DAN STOP KONTAK



-



NO.



URAIAN PEKERJAAN



H



SAT



VOL



HARGA SATUAN



JUMLAH HARGA



PEKERJAAN RAK KABEL Pengadaan dan pemasangan instalasi kabel rak lengkap dengan penggantung, support dan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. Lantai I Kabel Leder 800 x 100 Tray kabel 400 x 100 Tee 300 Elbow 90°, 300 Accessories dan material bantu



20.00



-



140.00



-



2.00



-



4.00



-



1.00



-



140.00



-



2.00



-



4.00



-



1.00



-



Lantai II Tray kabel 400 x 100 Tee 300 Elbow 90°, 300 Accessories dan material bantu



SUB TOTAL PEK. KABEL TRAY I



-



PEKERJAAN INSTALASI PENANGKAL PETIR Pengadaan, pemasangan dan pengujian pekerjaan instalasi penangkal petir lengkap dengan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. -



Penangkal Petir Type Konventional



unit



6.00



-



-



Kabel BC 50 mm2 dalam konduit



mtr



135.00



-



-



Grounding max 2 ohm



unit



2.00



-



-



Bok Kontrol uk. 40 x 40 x 30 cm



unit



2.00



-



-



Biaya pemasangan



lsm



1.00



-



-



Biaya Izin Disnaker setempat



unit



1.00



-



SUB TOTAL PEK. PENANGKAL PETIR



-



RENCANA ANGGARAN BIAYA ( RAB ) PEKERJAAN MEP RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN PEMADAM KEBAKARAN TERKOREKSI NO.



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



PERALATAN UTAMA PEKERJAAN INSTALASI PIPA HYDRANT DAN SPRINKLER A



Pekerjaan Instalasi Pipa Hydrant dan Sprinkler Pemipaan Lantai I



1



Hydrant Box (Indoor) c/w instalasi



unit



3.00



-



Material Steel, t 1,2 mm Dimensi (1250 x 750 x 180) mm House Rack 40 mm x 30 m Fire House 1,5 inc Hydrant Nozzle 1,5 inc Alarm bel Manual push button, jack telepon Indicator lamp



Pipa Pipa Hydrant (BSP Sch 40, incl. accessories) 1



BSP ø 1 1/2 inc



m



9.00



-



2



BSP ø 2 1/2 inc



m



95.00



-



3



BSP ø 4 inc



m



10.00



-



4



BSP ø 6 inc



m



20.00



-



Pipa Sprinkler (BSP Sch 40, incl. accessories) 1



BSP ø 1 inc



m



590.00



-



2



BSP ø 1 1/4 inc



m



174.00



-



3



BSP ø 1 1/2 inc



m



65.00



-



4



BSP ø 3 inc



m



220.00



-



5



BSP ø 4 inc



m



16.00



-



6



BSP ø 6 inc



m



8.00



-



Valve dan Instruments Valve (Class 20 K) & Accessories 3



Flow switch



bh



1.00



-



4



Head sprinkler (pendent type)



bh



239.00



-



5



Perssure gauge c/w gate valve & accessories



bh



1.00



-



9



Branch control valve



set



1.00



-



NO.



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



Lantai II 1



Hydrant Box (Indoor) c/w instalasi



unit



3.00



-



Material Steel, t 1,2 mm Dimensi (1250 x 750 x 180) mm House Rack 40 mm x 30 m Fire House 1,5 inc Hydrant Nozzle 1,5 inc Alarm bel Manual push button, jack telepon Indicator lamp



Pipa Pipa Hydrant (BSP Sch 40, incl. accessories) 1



BSP ø 1 1/2 inc



m



9.00



-



2



BSP ø 2 1/2 inc



m



95.00



-



3



BSP ø 4 inc



m



10.00



-



4



BSP ø 6 inc



m



8.00



-



Pipa Sprinkler (BSP Sch 40, incl. accessories) 1



BSP ø 1 inc



m



528.00



-



2



BSP ø 1 1/4 inc



m



140.00



-



3



BSP ø 1 1/2 inc



m



65.00



-



4



BSP ø 3 inc



m



205.00



-



5



BSP ø 4 inc



m



16.00



-



6



BSP ø 6 inc



m



8.00



-



Valve dan Instruments Valve (Class 20 K) & Accessories 4



Head sprinkler (pendent type)



bh



194.00



-



6



Branch control valve



set



1.00



-



TOTAL PEKERJAAN PEMADAM KEBAKARAN



-



RENCANA ANGGARAN BIAYA ( RAB ) PEKERJAAN MEP RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN PLUMBING TERKOREKSI NO.



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



PEKERJAAN PLUMBING I



SISTEM AIR BERSIH



A



Pompa Transfer



B



Type



: NF 30



Jenis



: Centrifugal



Kapasitas



: 24 m3/h



Head



: 25 m



Power



: 3 KW



Panel Control Pompa Sumpit ( peluap) Merk



: Ground fos



Type



: DPK 10.50



Jenis



: Sumbersible



Kapasitas



: 330 lpm



Head



: 15 m



Disch



: 2"



Power



: 3 KW



Panel Control



bh



2.00



-



unit



1.00



-



set



2.00



-



unit



1.00



-



PERALATAN UTAMA LANTAI ATAP A



Tangki Air Kapasitas 3.100 liter ( Plastik)



unit



2.00



-



B



Testing Commissioning Peralatan Utama Air Bersih



lot



1.00



-



SUB TOTAL PEKERJAAN PERALATAN UTAMA AIR BERSIH & AIR PANAS



-



NO.



URAIAN PEKERJAAN



III



SISTEM AIR KOTOR & AIR BEKAS



A



Sewage Treatment Plan



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



paket



1.00



-



lot



1.00



-



Capasity : 10 m3/day lengkap ; air blower, submersible pump, box screen, air diffuser, biomedia, chlorination, fliter, instalasi & accessories, panel kontrol D



Testing Commissioning Peralatan Utama Air Kotor & Air Bekas



SUB TOTAL PEKERJAAN PERALATAN UTAMA AIR KOTOR



IV



RUANG POMPA



A



RUANG POMPA



-



Pengadaan dan pemasangan pipa PPR-PN 10 lengkap penyangga yang diperlukan 1



Pipa diameter DN 50 mm



2



Header GIP diameter 100 mm , 4 meter panjang



3



Pipa GIP diameter 100 mm



m



40.00



-



1.00



-



m



12.00



-



unit



Valve dan Instruments 1



Gate valve diameter 2 1/.2"



bh



2.00



-



2



Gate valve diameter 2"



bh



4.00



-



3



Gate valve diameter 1 1/4"



bh



2.00



-



4



Check valve diameter 2 1/2"



bh



2.00



-



5



Strainer diameter 2 1/2"



bh



2.00



-



6



Flexible diameter 2 1/2"



bh



2.00



-



7



Foot Valve diameter 2 1/2"



bh



2.00



-



8



Water Level Control ( WLC )diameter 1 1/.4"



set



1.00



-



SUB TOTAL PEKERJAAN INSTALASI RUANG POMPA



V



PEKERJAAN INSTALASI PIPA DALAM GEDUNG



A



Pekerjaan Instalasi Pipa Air Bersih



-



Pemipaan



Pengadaan dan pemasangan pipa PPR-PN 10 lengkap aksessories yang diperlukan



Lantai I



Pipa 1



Pipa diameter DN 40 mm



m



55.00



-



2



Pipa diameter DN 32 mm



m



105.00



-



3



Pipa diameter DN 25 mm



m



20.00



-



4



Pipa diameter DN 20 mm



m



120.00



-



Valve dan Instruments 8



Gate Valve diameter 1 1/4"



bh



2.00



-



9



Gate Valve diameter 1"



bh



2.00



-



NO.



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



Lantai II



Pipa AirBersih 1



Pipa diameter DN 40 mm



m



50.00



-



2



Pipa diameter DN 32 mm



m



95.00



-



3



Pipa diameter DN 25 mm



m



20.00



-



4



Pipa diameter DN 20 mm



m



75.00



-



Valve dan Instruments 8



Gate Valve diameter 1 1/4"



bh



4.00



-



9



Gate Valve diameter 1"



bh



2.00



-



SUB TOTAL PEKERJAAN INSTALASI AIR BERSIH



C



-



Pekerjaan Inatalasi Pipa Air Kotor, Air Bekas, Air Bekas Kimia dan Vent



Pengadaan dan Pemasangan Pipa PVC AW kelas 10 kg/cm2 lengkap dengan Aksessories yang diperlukan



Pipa Lantai I



Pipa 1



Pipa diameter 150 mm



m



216.00



-



2



Pipa diameter 100 mm



m



145.00



-



3



Pipa diameter 80 mm



m



90.00



-



Instruments 8



Clean Out ( FCO ) diameter 100 mm



bh



2.00



-



9



Clean Out ( FCO ) diameter 80 mm



bh



2.00



-



10



Floor Drain



bh



22.00



-



11



P - Trap



bh



22.00



-



Lantai I



Pipa 1



Pipa diameter 150 mm



m



100.00



-



2



Pipa diameter 100 mm



m



168.00



-



3



Pipa diameter 80 mm



m



48.00



-



4



Pipa diameter 50 mm



m



40.00



-



5



Pipa diameter 40 mm



m



27.00



-



6



Pipa diameter 32 mm



m



40.00



-



Instruments 8



Clean Out ( FCO ) diameter 100 mm



bh



8.00



-



9



Clean Out ( FCO ) diameter 80 mm



bh



4.00



-



10



Floor Drain



bh



14.00



-



11



P - Trap



bh



14.00



-



NO.



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



Lantai II



Pipa 1



Pipa diameter 100 mm



m



59.50



-



2



Pipa diameter 80 mm



m



38.00



-



3



Pipa diameter 50 mm



m



56.00



-



4



Pipa diameter 40 mm



m



18.00



-



5



Pipa diameter 32 mm



m



127.00



-



Instruments 7



Clean Out ( FCO ) diameter 100 mm



bh



4.00



-



8



Clean Out ( FCO ) diameter 80 mm



bh



4.00



-



9



Floor Drain



bh



5.00



-



P - Trap



bh



7.00



-



10



SUB PEKERJAAN INSTALASI PIPA AIR KOTOR,BEKAS, BEKAS KIMIA & VENT



-



TOTAL PEKERJAAN PLUMBING



-



RENCANA ANGGARAN BIAYA ( RAB ) PEKERJAAN MEP RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN ESCALATOR TERKOREKSI NO.



1



URAIAN PEKERJAAN



ESCALATOR Type



: Indoor Escalator



Inclanation



: 30°



Step Width



: 1000 mm



Rise (mm)



: 6000



Disignation Floor



:G-1



Speed



: 0.5 m/s



SAT



VOL



unit



2.0



unit



2.00



HARGA



JUMLAH



SATUAN



HARGA -



Motor Output Power : 5.5 KW Main Power



: 380 V - 3Phase - 50 Hz



Lighting Power



: 220 V



Group Arrengement : Single Arrengement



3



Truss Type



: Hollow section in L Shaped Steel



Horizontal Steep



: Stainles Steel



Testing & commissioning



TOTAL PEKERJAAN LIFT & ESCALATOR



-



-



RENCANA ANGGARAN BIAYA ( RAB ) RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN FIRE ALARM TERKOREKSI NO.



A



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



PEKERJAAN FIRE ALARM



1.00 PEKERJAAN PERALATAN UTAMA Pengadaan, pemasangan dan pengujian pekerjaan instalasi deteksi kebakaran (Fire Alarm Detector) lengkap dengan material bantu dan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. MCFA



Kap. 30 Zone lengkap dengan :



unit



1.00



-



TBF-Basement



unit



1.00



-



TBF-I



unit



1.00



-



TBF-II



unit



1.00



-



TBF-Basement



mtr



15.00



-



TBF-I



mtr



30.00



-



TBF-II



mtr



40.00



-



- ROR Heat Detector



unit



65.00



-



- FIX Heat Detector



unit



1.00



-



- Manual Break Glass Switch



unit



1.00



-



- Indicator lamp



unit



3.00



-



- Alarm bell



unit



3.00



-



- Instalasi detector



ttk



66.00



-



- Instalasi alarm bell + indicator lamp



ttk



6.00



-



- Instalasi break glass switch



ttk



1.00



-



- ROR Heat Detector



unit



58.00



-



- FIX Heat Detector



unit



1.00



-



- Manual Break Glass Switch



unit



1.00



-



- Indicator lamp



unit



3.00



-



- Alarm bell



unit



3.00



-



- Instalasi detector



ttk



59.00



-



- Instalasi alarm bell + indicator lamp



ttk



6.00



-



- Instalasi break glass switch



ttk



1.00



-



Testing & commissioning



lot



1.00



-



- Power surge arrester - Rectifier - Battery nicad Terminal Box



Kabel Distribusi : kabel AWG 16 twisted CAT 5E Kabel dari MCFA ke :



2.00



Pekerjaan Instalasi Fire Alarm Lantai I



Lantai II



TOTAL PEK. FIRE ALARM



-



RENCANA ANGGARAN BIAYA ( RAB ) ### RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN TELEPHONE TERKOREKSI NO.



C



URAIAN PEKERJAAN



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



PEKERJAAN KABEL TRAY ELEKTRONIK Pengadaan dan pemasangan instalasi kabel tray elektronik lengkap dengan penggantung, support dan accessories lainnya sesuai dengan gambar rencana dan spesifikasi teknis. LANTAI I - Kabel Tray 200



12.00



-



- Equal tee 200



2.00



-



- Accessories dan material bantu



1.00



-



LANTAI I - Kabel Tray 200



12.00



-



- Equal tee 200



2.00



-



- Accessories dan material bantu



1.00



-



LANTAI I - Kabel Tray 200



36.00



-



- Equal tee 200



2.00



-



- Accessories dan material bantu



1.00



-



Lantai II - Kabel Tray 200



35.00



-



- Equal tee 200



2.00



-



- Accessories dan material bantu



1.00



-



SUB TOTAL PEK. KABEL TRAY ELEKTRONIK



-



RENCANA ANGGARAN BIAYA ( RAB )



RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN TATA SUARA



TERKOREKSI URAIAN PEKERJAAN



NO. I



TATA SUARA



A



PEKERJAAN PERALATAN UTAMA



SAT



VOL



HARGA



JUMLAH



SATUAN



HARGA



Pengadaan dan Pemasangan Tata Suara dan semua aksessories yang diperlukan



1



Power Amplifier 240W



unit



1.00



-



2



Mixer Amplifier 360 W with Zone Selector



unit



1.00



-



3



Driver unit 50W with matching, ZH-652MD



unit



4.00



-



4



Microphone with Chime



unit



1.00



-



5



Portable Flight Case Rak



unit



1.00



-



6



USB Player



unit



1.00



-



PEKERJAAN INSTALASI



B



Lantai 1 Terminal Box ( TB )



unit



1.00



-



Ceilling Speaker



bh



46.00



-



Speaker dinding 10 W



bh



6.00



-



Titik instalasi Tata suara



ttk



52.00



-



Lantai 2 Terminal Box ( TB )



unit



1.00



-



Ceilling Speaker



bh



29.00



-



Speaker dinding 10 W



bh



6.00



-



Titik instalasi Tata suara



ttk



35.00



-



lot



1.00



-



PEKERJAAN TESTING & COMMISSIONING



C 1



Testing & Commissioning pekerjaan Tata Suara



TOTAL PEKERJAAN TATA SUARA



-



RENCANA ANGGARAN BIAYA GEDUNG PAMERAN NTT FAIR PEKERJAAN CCTV NO. E



URAIAN PEKERJAAN



VOL



SAT



HARGA SATUAN



JUMLAH HARGA



PEKERJAAN CCTV PEKERJAAN PERALATAN UTAMA



### ### ###



###



### ### ### ###



Colour Monitor 20" ( Multi Screen ) Colour Monitor 17" DVR 16ch, CJ-HDR416 H.264, HDMI, 4HDD w/o DVD Drive, EMS cloud systems DVR 4ch, CJ-HDR104 H.264, HDMI, w/o DVD Drive, EMS cloud systems Hard disk 4TB Power supply 16ch Jack BNC drat + pasangan, Connector power,



1.00 1.00 3.00



unit unit unit



-



1.00



unit



-



4.00 3.00 98.00 50.00



unit unit pcs pcs



-



PEKERJAAN INSTALASI



###



Lantai Basement Indoor Camera, IR Fixed 2.0 MP dome analog camere 3,6 mm



3.00



bh



-



###



Kabel Coaxial RG 6 / 5C di dalam pipa conduit dia 20 mm



3.00



titik



-



###



Stop Kontak + kabel NYM 3 x 2,5 mm di dalam conduit 20 mm



3.00



titik



-



###



LANTAI 1 Indoor Camera, IR Fixed 2.0 MP dome analog camere 3,6 mm



8.00



bh



-



###



Kabel Coaxial RG 6 / 5C di dalam pipa conduit dia 20 mm



8.00



titik



-



###



Stop Kontak + kabel NYM 3 x 2,5 mm di dalam conduit 20 mm



8.00



titik



-



8.00



unit



-



###



LANTAI 2 Indoor Camera, IR Fixed 2.0 MP dome analog camere 3,6 mm



###



Kabel Coaxial RG 6 / 5C di dalam pipa conduit dia 20 mm



8.00



titik



-



###



Stop Kontak + kabel NYM 3 x 2,5 mm di dalam conduit 20 mm



8.00



titik



-



###



Testing & Commisioning



1.00



lot



-



SUB TOTAL PEKEJAAN CCTV



-