15 0 231 KB
PEKERJAAN HARGA PEKERJAAN PENUNJANG ( PERSIAPAN / BONGKAR / PERANCAH / RAPIH ) HARGA PEKERJAAN PEMASANGAN 1 KG BESI PROFIL WF 250 / 200 / 150 HARGA PEKERJAAN PEMASANGAN 1 M2 BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 1 ) HARGA PEKERJAAN PEMASANGAN 1 M2 BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 2 ) HARGA PEKERJAAN PEMASANGAN 1 M2 BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 3 ) HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 /TEMP. GLASS ( KANOPI ) Lt.1 HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.Roof Top HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.2 HARGA PEKERJAAN PEMASANGAN TEMP. GLASS HARGA PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( DINDING DALAM ) HARGA PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFON ) Lt.1 HARGA PEKERJAAN PEMASANGAN PVC ( PLAFON ) Lt.1 HARGA PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFON ) Lt.Atap HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,9 & ACP PVDF ( DINDING LUAR ) HARGA PEKERJAAN PEMASANGAN BESI HOLLOW & ACP LASER CUTTING ( DINDING LUAR ) HARGA PEKERJAAN PEMASANGAN CONWOOD ( DINDING LUAR ) HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,7 For CONWOOD ( DINDING LUAR ) HARGA PEKERJAAN PEMASANGAN ATAP ( BESI CNP / SPANDEK / LISTPLANK / TALANG ) HARGA PEKERJAAN PEMASANGAN FURNITURE & MATRIAL HARGA PEKERJAAN PEMASANGAN TANGGA, RAILING & MATRIAL HARGA PEKERJAAN PEMASANGAN PINTU, JENDELA & MATRIAL HARGA PEKERJAAN PEMASANGAN ELEKTRIKAL & LAMPU HARGA PEKERJAAN PEMASANGAN LANTAI KAMAR MANDI HARGA MATRIAL KAMAR MANDI HARGA MATRIAL PENGECATAN TOTAL HARGA SELURUHAN
15%
Total + Overhead &
Nama Pekerjaan Lokasi Pekerjaan HARGA
: : Bobot %
Februari 1
2
3
8.15
8.15
Maret 4
1
2
3
Rp49,492,400.00
11.42
5.7103
Rp105,902,700.00
24.44
8.15
Rp14,767,901.52
3.41
Rp13,023,337.66
3.01
Rp8,358,517.32
1.93
Rp9,611,956.67
2.22
Rp6,463,298.67
1.49
Rp7,710,984.67
1.78
Rp4,000,000.00
0.92
0.92
Rp7,934,636.11
1.83
1.83
Rp938,430.56
0.22
Rp374,500.00
0.09
Rp3,398,395.03
0.78
Rp69,723,333.33
16.09
Rp4,692,555.56
1.08
Rp15,942,770.54
3.68
Rp17,154,000.00
3.96
Rp9,356,195.00
2.16
Rp26,000,000.00
6.00
Rp25,000,000.00
5.77
1.92
Rp20,323,520.00
4.69
4.69
Rp3,612,806.10
0.83
0.83
Rp2,764,000.00
0.64
Rp4,098,240.00
0.95
Rp2,716,300.00
0.63
3.41 3.01 1.93 2.22
0.78 16.09 1.08 3.68 3.96 2.16
0.64 0.95 13.86
Rp433,360,778.72 Rp65,004,116.81 Rp498,364,895.53
100.00
8.15
8.15
6.35
23.41
6.83
13.50
13.86 22.00 30.15 36.50 59.91 66.74 80.24
Maret
April 4
1
2 5.71029987367
3
4 100.00
90.00
80.00
1.49 1.78
70.00
60.00
0.22 0.09
50.00
40.00
30.00
3.00
3.00
1.92
1.92
20.00
10.00
0.31
0.31
8.81
5.24
89.05 94.29
5.71
100.00
0.00
KETERANGAN
Rp6.500,-/kg RP165.000,-/m2 RP165.000,-/m2 RP165.000,-/m2 RP165.000,-/m2 RP165.000,-/m2 RP165.000,-/m2 RP15.000,-/m2 RP25.000,-/m2 RP25.000,-/m2 Rp75.000,-/m2 RP50.000,-/m2 Rp350.000,-/m2 RP165.000,-/m2 RP250.000,-/m2 Rp100.000,-/m2 Rp50.000,-/m2 n/y n/y
Aplikator
Pak. Aceng 0812-1452-2002 Pak. Dani 0812-9628-9401 Pak. Dani 0812-9628-9401 Pak. Dani 0812-9628-9401 Pak. Dani 0812-9628-9401 Pak. Dani 0812-9628-9401 Pak. Dani 0812-9628-9401 Pak. Dani 0812-9628-9401 Pak. Agus Pak. Agus Pak. Agus Pak. Aceng 0812-1452-2002 Pak. Ekiw 0813-8095-5230 / Tawakal-Workshop 0857-2221-5411 Pak. Dani 0812-9628-9401 Distributor 0818-0944-8400 Distributor 0818-0944-8400 Pak. Aceng 0812-1452-2002
Pak. Ekiw 0813-8095-5230
-
HARGA SATUAN PEKERJAAN PEMASANGAN 1 KG BESI PROFIL WF 250 / 200 / 150 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01
kg
Jumlah Harga Satuan Harga (Rp) (Rp)
No
1
6,500.00
6,500.00 6,500.00
2,000.00
2,000.00
JUMLAH TENAGA KERJA B BAHAN JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
2 3 4 5 6
Material
Baja WF Plat Besi Baja WF Plat Besi Baja WF Plat Besi
JUMLAH HARG JUMLAH HARGA P
2,000.00 8,500.00 1,275.00 9,775.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 1 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01 m2 JUMLAH TENAGA KERJA
165,000.00
165,000.00 165,000.00
No
Material
1
Besi Hollow
2
Multiplek
3
Vinyl Taco
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 175,000.00 26,250.00 201,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 2 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01
m2
165,000.00
165,000.00
No
Material
1
Besi Hollow
165,000.00
JUMLAH TENAGA KERJA
2
Multiplek
3
Vinyl Taco
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit
15%xD
F Harga Satuan Pekerjaan (D+E)
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 175,000.00 26,250.00 201,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 3 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01 m2 JUMLAH TENAGA KERJA
165,000.00
165,000.00 165,000.00
No
Material
1
Besi Hollow
2
Multiplek
3
Vinyl Taco
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 175,000.00 26,250.00 201,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 /TEMP. GLASS ( KANOPI ) Lt.1 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01
m2
JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
165,000.00
165,000.00 165,000.00
B BAHAN
JUMLAH HARGA BAHAN C PERALATAN
-
No
Material
1
Besi Hollow
2
Temp. Glass
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 175,000.00 26,250.00 201,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / TEMP. GLASS ( KANOPI ) Lt.Ro Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01 m2 JUMLAH TENAGA KERJA
165,000.00
165,000.00 165,000.00
No
Material
1
Besi Hollow
2
Temp. Glass
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 175,000.00 26,250.00 201,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.2 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01 m2 JUMLAH TENAGA KERJA
165,000.00
165,000.00 165,000.00
No
Material
1
Besi Hollow
2
Temp. Glass
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00 10,000.00 175,000.00 26,250.00 201,250.00
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN TEMP. GLASS Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01 m2 JUMLAH TENAGA KERJA
15,000.00
Harga Matrial Satuan di Jumlah Harga Upah No
Material
1
Temp. Glass
15,000.00 15,000.00
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit
15%xD
F Harga Satuan Pekerjaan (D+E)
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 25,000.00 3,750.00 28,750.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( DINDIN Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01
m2
Jumlah Harga Satuan Harga (Rp) (Rp)
25,000.00
JUMLAH TENAGA KERJA
25,000.00 25,000.00
No
Material
1
Besi Hollo Gal
2
Gypsum
3
Compound
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 35,000.00 5,250.00 40,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFO Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
No
Material
A TENAGA Pekerja
L.01
m2
25,000.00
JUMLAH TENAGA KERJA
25,000.00 25,000.00
1
Besi Hollo Gal
2
Gypsum
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 35,000.00 5,250.00 40,250.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFO Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01
m2
Jumlah Harga Satuan Harga (Rp) (Rp)
50,000.00
JUMLAH TENAGA KERJA
50,000.00 50,000.00
No
Material
1
Besi Hollo Gal
2
Gypsum
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 60,000.00 9,000.00 69,000.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,9 & ACP PVDF ( DINDING LUAR ) Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
350,000.00
350,000.00 350,000.00
B BAHAN
-
No
Material
1
Besi Hollow
2
ACP PVDF
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
-
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
JUMLAH HARG JUMLAH HARGA P
350,000.00 52,500.00 402,500.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN PVC ( PLAFON ) Lt.1 Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
75,000.00
No
Material
1
Plafon PVC
75,000.00 75,000.00
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 85,000.00 12,750.00 97,750.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA HARIAN PEKERJAAN PENUNJANG ( BONGKAR / RAPIH / PERANCAH ) Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pengawas i
Koef Satuan
Pengawas II
OH OH
Pekerja Tukang
OH OH JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
200,000.00 200,000.00 165,000.00 165,000.00
No
1
200,000.00 200,000.00 165,000.00 165,000.00 730,000.00
B BAHAN
JUMLAH HARGA BAHAN
-
2 3 4 5 7 8 9 10 11
Material
Perancah Kayu Perancah Bambu Kuas Palu Beton Pahat Beton Multiplek Bekas Gerinda Mata Gerinda Ikat Ijuk Paku
C PERALATAN
Alat Bantu Lainnya
Kg
-
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
JUMLAH HARG JUMLAH HAR
730,000.00 109,500.00 839,500.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA PEKERJAAN PEMASANGAN CONWOOD ( DINDING LUAR ) Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
250,000.00
250,000.00 250,000.00
No
Material
1
Conwood EPC
2
Conwood BG
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 260,000.00 39,000.00 299,000.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 20 X 0,7 For CONWOOD ( DINDING LUAR ) Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
L.01 m2 JUMLAH TENAGA KERJA
100,000.00
100,000.00 100,000.00
No
Material
1
Besi Hollow
2
Conwood BG
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit
15%xD
10,000.00 10,000.00 110,000.00 16,500.00
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit
126,500.00
F Harga Satuan Pekerjaan (D+E)
Harga Keseluruhan Pekerjaan
HARGA PEKERJAAN PEMASANGAN ATAP ( BESI CNP / SPANDEK / LISTPLANK / TALANG ) Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
50,000.00
50,000.00 50,000.00
B BAHAN
-
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
Material
1
Besi CNP Besi CNP Spandek Pasir List Plank GRC Talang Air PVC
2 3 4 5
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
No
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 60,000.00 9,000.00 69,000.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA PEKERJAAN PEMASANGAN PINTU, JENDELA & MATRIAL Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
A TENAGA Pekerja
-
L.01 m2 JUMLAH TENAGA KERJA
B BAHAN
-
JUMLAH HARGA BAHAN
No
Material
1 2 3 4 5 6 7
Kusen Pintu Jendela Kaca Jalusi List Lem
C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00 10,000.00 10,000.00 1,500.00 11,500.00
HARGA PEKERJAAN PEMASANGAN ELEKTRIKAL & LAMPU Harga Upah
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
Harga Matrial Satuan di Jumlah Harga Upah
No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
25,000.00
No
25,000.00 25,000.00
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00 10,000.00 35,000.00 5,250.00 40,250.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Material
Skop Kontak Saklar Tunggal Saklar Double Pipa PVC Conduit Acc. Stop Kontak Acc. Stop Saklar Fiting Lampu Lampu Down Light Lampu LED 15 Watt Lampu LED Strip Lampu Dinding Lampu Gantung Lampu Spot Light Instalasi Listrik
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit Harga Keseluruhan Pekerjaan HARGA PEKERJAAN PEMASANGAN LANTAI KAMAR MANDI Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
250,000.00
No
250,000.00 250,000.00
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
HARGA MATRIAL KAMAR MANDI Harga Upah
15%xD
Harga Matrial Satuan di Jumlah Harga Upah
10,000.00 10,000.00 260,000.00 39,000.00 299,000.00
1 2 3 4 5 6
Material Semen Pasir Beton Bondek Wiremesh
Air Keramik
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
Harga Matrial Satuan di Jumlah Harga Upah
No
Uraian
A TENAGA Pekerja
Kode Satuan
Jumlah Harga Satuan Harga (Rp) (Rp)
No
-
L.01 m2 JUMLAH TENAGA KERJA
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
Uraian
A TENAGA Pekerja
Floor Drain Closet Duduk Wastafel Kran Shower
Pipa PVC 3" Pipa PVC 4" Pipa PVC 3/4" Pipa PVC 1/2"
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
Harga Matrial Satuan di Jumlah Harga Upah
Kode Satuan
L.01
8
10,000.00 10,000.00 1,500.00 11,500.00
HARGA MATRIAL PENGECATAN Harga Upah No
1 2 3 4 5 6 7
Material
Jumlah Harga Satuan Harga (Rp) (Rp)
m2
JUMLAH TENAGA KERJA
No
Item Pekerjaan
1
Dinding Dalam
-
2
Plafon
-
3
Rangka Besi
B BAHAN
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
Kg
10,000.00
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
15%xD
10,000.00
JUMLAH HARG JUMLAH HARGA P
10,000.00 10,000.00 1,500.00 11,500.00
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW & ACP CUTTING Harga Upah Harga Matrial Satuan di Jumlah Harga Upah No
Uraian
A TENAGA Pekerja
Kode Satuan
L.01 m2 JUMLAH TENAGA KERJA
Jumlah Harga Satuan Harga (Rp) (Rp)
150,000.00
150,000.00 150,000.00
No
Item Pekerjaan
1
ACP Cutting
2
ACP Cutting
B BAHAN
-
Kg
-
JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E)
Besi Hollow
-
JUMLAH HARGA BAHAN C PERALATAN
Alat Bantu Lainnya
3
15%xD
150,000.00 22,500.00 172,500.00
JUMLAH HARG JUMLAH HARGA P
Juml Overhead & Profit Harga Keseluruhan Pekerjaan
n di Jumlah Harga Upah Dimensi
Volume
250 x 125 x 6 x 9 1686.00 12 127.90 200 x 100 x 5,5 x 8 1536.00 10 346.20 150 x 75 x 5 x 7 492.00 6 141.20 TOTAL 4329.30 JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN KG
Satuan
Harga Satuan
kg kg kg kg kg kg kg
16,500.00 16,500.00 16,500.00 16,500.00 16,500.00 16,500.00
Jumlah Harga Rupiah
27,819,000.00 2,110,350.00 25,344,000.00 5,712,300.00 8,118,000.00 2,329,800.00
Detail
Satuan
12
m
12
m
12
m
Detail
Satuan
69,103,650.00 36,799,050.00
Jumlah Keseluruhan
105,902,700.00 15,885,405.00
15%xD
& Profit eluruhan Pekerjaan
121,788,105.00
EK / VINYL ( LANTAI 1 ) n di Jumlah Harga Upah Dimensi
40 x 80 x 14 1200 x 2400 x 15 172 x 1210 x 4
Harga Satuan
Jumlah Harga Rupiah
Volume
Satuan
93
m
49,666.67
4,619,000.00
6
m
20.300 7.0486111 20.300 96.666667
m2
300,000.00
2,114,583.33
2.88
m2
m2
46,363.64
4,481,818.18
0.21
m2
Detail
Satuan
6
m
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
11,215,401.52 3,552,500.00
Jumlah Keseluruhan
14,767,901.52 2,215,185.23
15%xD
& Profit eluruhan Pekerjaan
16,983,086.74
EK / VINYL ( LANTAI 2 ) n di Jumlah Harga Upah Dimensi
40 x 80 x 14
Volume
Satuan
77
m
Harga Satuan
49,666.67
Jumlah Harga Rupiah
3,824,333.33
1200 x 2400 x 15 172 x 1210 x 4
18.4 6.3888889 18.4 87.619048
m2
300,000.00
1,916,666.67
2.88
m2
m2
46,363.64
4,062,337.66
0.21
m2
Detail
Satuan
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
9,803,337.66 3,220,000.00
Jumlah Keseluruhan
13,023,337.66 1,953,500.65
15%xD
& Profit eluruhan Pekerjaan
14,976,838.31
EK / VINYL ( LANTAI 3 ) n di Jumlah Harga Upah Dimensi
40 x 80 x 14 1200 x 2400 x 15 172 x 1210 x 4
Harga Satuan
Jumlah Harga Rupiah
Volume
Satuan
47.5
m
49,666.67
2,359,166.67
6
m
12 4.1666667 12 57.142857
m2
300,000.00
1,250,000.00
2.88
m2
m2
46,363.64
2,649,350.65
0.21
m2
Detail
Satuan
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
6,258,517.32 2,100,000.00
Jumlah Keseluruhan
8,358,517.32 1,253,777.60
15%xD
& Profit eluruhan Pekerjaan
9,612,294.91
ASS ( KANOPI ) Lt.1 n di Jumlah Harga Upah Dimensi
Harga Satuan
Jumlah Harga Rupiah
Volume
Satuan
40 x 80 x 12
35.53
m
39,666.67
1,409,356.67
6
m
10
10.584
m2
600,000.00
6,350,400.00
/
m2
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
7,759,756.67 1,852,200.00
Jumlah Keseluruhan
9,611,956.67 1,441,793.50
15%xD
& Profit eluruhan Pekerjaan
11,053,750.17
LASS ( KANOPI ) Lt.Roof Top n di Jumlah Harga Upah Dimensi
40 x 80 x 14 10
Volume
Satuan
Harga Satuan
27
m
49,666.67
6.638
m2
600,000.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Jumlah Harga Rupiah
Detail
Satuan
1,318,848.67
6
m
3,982,800.00
/
m2
Detail
Satuan
5,301,648.67 1,161,650.00
Jumlah Keseluruhan
6,463,298.67 969,494.80
15%xD
& Profit eluruhan Pekerjaan
7,432,793.47
LASS ( KANOPI ) Lt.2 n di Jumlah Harga Upah Harga Satuan
Jumlah Harga Rupiah
Dimensi
Volume
Satuan
40 x 80 x 12
41.941
m
39,666.67
1,663,659.67
6
m
10
7.803
m2
600,000.00
4,681,800.00
/
m2
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
& Profit eluruhan Pekerjaan
6,345,459.67 1,365,525.00
Jumlah Keseluruhan 15%xD
7,710,984.67 1,156,647.70 8,867,632.37
n di Jumlah Harga Upah Dimensi
10 total
Volume
Satuan
4.700 1.700 6.400
m2 m2 m2
Harga Satuan
600,000.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Jumlah Harga Rupiah
Detail
Satuan
/
m2
Detail
Satuan
3,840,000.00
3,840,000.00 160,000.00
Jumlah Keseluruhan
4,000,000.00 600,000.00
15%xD
& Profit eluruhan Pekerjaan
4,600,000.00
0,3 & GYPSUM ( DINDING ) n di Jumlah Harga Upah Dimensi
40 x 40 x 0,3 1200 x 2400 x 9 A-Plus
Harga Satuan
Jumlah Harga Rupiah
Volume
Satuan
332.7
m
5,750.00
1,913,025.00
4
m
101.800 35.347222 1
m2
68,000.00
2,403,611.11
2.88
m2
zak
55,000.00
55,000.00
20
kg
Detail
Satuan
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
4,371,636.11 3,563,000.00
Jumlah Keseluruhan 15%xD
& Profit eluruhan Pekerjaan
7,934,636.11 1,190,195.42 9,124,831.53
0,3 & GYPSUM ( PLAFON ) Lt.1 n di Jumlah Harga Upah Dimensi
Volume
Satuan
Harga Satuan
Jumlah Harga Rupiah
40 x 40 x 0,3 1200 x 2400 x 9
20.5
m
5,750.00
117,875.00
4
m
14 4.8611111
m2
68,000.00
330,555.56
2.88
m2
Detail
Satuan
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
448,430.56 490,000.00
Jumlah Keseluruhan
938,430.56 140,764.58
15%xD
& Profit eluruhan Pekerjaan
1,079,195.14
0,3 & GYPSUM ( PLAFON ) Lt.Atap n di Jumlah Harga Upah Dimensi
40 x 40 x 0,3 1200 x 2400 x 9
Harga Satuan
Jumlah Harga Rupiah
Volume
Satuan
123
m
5,750.00
706,117.25
4
m
32.2 11.180556
m2
68,000.00
760,277.78
2.88
m2
Detail
Satuan
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
1,466,395.03 1,932,000.00
Jumlah Keseluruhan
3,398,395.03 509,759.25
15%xD
& Profit eluruhan Pekerjaan
3,908,154.28
DF ( DINDING LUAR ) n di Jumlah Harga Upah Dimensi
40 x 40 x 0,9 1200 x 2400 x 0,5
Harga Satuan
Jumlah Harga Rupiah
Volume
Satuan
401
m
17,083.33
6,850,416.67
6
m
103 35.763889
m2
750,000.00
26,822,916.67
2.88
m2
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
33,673,333.33 36,050,000.00
Jumlah Keseluruhan
69,723,333.33 10,458,500.00
15%xD
& Profit eluruhan Pekerjaan
80,181,833.33
n di Jumlah Harga Upah Dimensi
4000 x 200
Volume
Satuan
3.5
m2
Harga Satuan
22,000.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Jumlah Harga Rupiah
77,000.00
Detail
Satuan
0.8
m2
Detail
Satuan
77,000.00 297,500.00
Jumlah Keseluruhan 15%xD
& Profit eluruhan Pekerjaan
374,500.00 56,175.00 430,675.00
n di Jumlah Harga Upah Keterangan
Bosch
Volume
Satuan
10 10 5 2 1 3 1 4 50 2
m2 m2 pcs pcs pcs pcs pcs pcs m kg
Harga Satuan
300,000.00 157,000.00 12,000.00 60,000.00 20,000.00 75,000.00 375,000.00 10,600.00 5,000.00 15,000.00
Jumlah Harga Rupiah
3,000,000.00 1,570,000.00 60,000.00 120,000.00 20,000.00 225,000.00 375,000.00 42,400.00 250,000.00 30,000.00
60 JUMLAH HARGA MATERIAL JUMLAH HARGA HARIAN
hr 5,692,400.00 43,800,000.00
Jumlah Keseluruhan
49,492,400.00 7,423,860.00
15%xD
& Profit eluruhan Pekerjaan
56,916,260.00
n di Jumlah Harga Upah Dimensi
600 x 1200 x 11 150 x 3050 x 11
Volume
Satuan
Harga Satuan
5.697 7.913 62.4 135.65217
m2
187,000.00
m2
95,700.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Jumlah Harga Rupiah
Detail
Satuan
1,479,637.50
0.72
m2
12,981,913.04
0.46
m2
Detail
Satuan
6 16,333.33
m
14,461,550.54 1,481,220.00
Jumlah Keseluruhan
15,942,770.54 2,391,415.58
15%xD
& Profit eluruhan Pekerjaan
18,334,186.13
INDING LUAR ) n di Jumlah Harga Upah
& Profit
Dimensi
40 x 40 x 0,75
Volume
Satuan
630
m
62.4
m2
Harga Satuan
16,333.33
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Jumlah Harga Rupiah
10,290,000.00
10,290,000.00 6,864,000.00
Jumlah Keseluruhan 15%xD
17,154,000.00 2,573,100.00
eluruhan Pekerjaan
19,727,100.00
LANG ) n di Jumlah Harga Upah Dimensi
Volume
Satuan
150 x 50 x 2,3 100 x 50 x 2,3 1000 x 3000 x 0,45 200 x 2440 x 8
33.825 66.000 32.73 24.5 24.15
m m m2 m m
Harga Satuan
40,000.00 31,500.00 64,000.00 52,000.00 24,500.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Jumlah Harga Rupiah
1,353,000.00 2,079,000.00 2,094,720.00 1,274,000.00 591,675.00
Detail
Satuan
6 6 1 1 1
m m m m m
Detail
Satuan
7,392,395.00 1,963,800.00
Jumlah Keseluruhan 15%xD
& Profit eluruhan Pekerjaan
9,356,195.00 1,403,429.25 10,759,624.25
n di Jumlah Harga Upah Dimensi
Volume
48.85 3.000 6 12.87 2 26.28 195.62
Satuan
Harga Satuan
110,000.00 2,000,000.00 600,000.00 170,000.00 600,000.00 30,000.00 6,000.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
n di Jumlah Harga Upah
5,373,500.00 6,000,000.00 3,600,000.00 2,187,900.00 1,200,000.00 788,400.00 1,173,720.00 20,323,520.00
Jumlah Keseluruhan
& Profit eluruhan Pekerjaan
Jumlah Harga Rupiah
15%xD
20,323,520.00 3,048,528.00 23,372,048.00
Keterangan
Volume
Broco 14 Broco 4.000 Broco 5 Broco 178.6 Broco 14 Broco 9 Broco 4 Philips 7 Philips 16 Philips 7.2 Informa 2 Informa 2 Informa 2 Eterna 56 JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Satuan
pcs pcs pcs m pcs pcs pcs pcs pcs m pcs pcs pcs titk
Harga Satuan
30,000.00 13,162.00 16,973.00 5,172.41 12,250.00 12,418.00 10,000.00 151,000.00 33,900.00 398,000.00 300,000.00 150,000.00 30,000.00
Jumlah Harga Rupiah
420,000.00 52,648.00 84,865.00 923,793.10 171,500.00 111,762.00 40,000.00 1,057,000.00 542,400.00 796,000.00 600,000.00 300,000.00 60,000.00
Detail
Satuan
2.9
m
5
m
Detail
Satuan
1 1 1 1 1 6
kg m3 m m lt pcs
1,652,806.10 1,960,000.00
Jumlah Keseluruhan 15%xD
& Profit eluruhan Pekerjaan
3,612,806.10 541,920.92 4,154,727.02
n di Jumlah Harga Upah Keterangan
0.76 mm 0.5 mm 40x40
Volume
Satuan
150 0.600 3 3
kg m3 m2 m2 lt m2
3
Harga Satuan
1,160.00 300,000.00 136,000.00 329,000.00 10,000.00 75,000.00
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
n di Jumlah Harga Upah
174,000.00 180,000.00 408,000.00 987,000.00 10,000.00 225,000.00
1,984,000.00 780,000.00
Jumlah Keseluruhan
& Profit eluruhan Pekerjaan
Jumlah Harga Rupiah
15%xD
2,764,000.00 414,600.00 3,178,600.00
Keterangan
Volume
Toto 1 Toto 1 Toto 2 Toto 1 Rucika 11.2 Rucika 16.3 Rucika 26 Rucika 8.5 JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
Satuan
pcs pcs pcs pcs m m m m
Harga Satuan
326,200.00 850,000.00 538,000.00 1,183,000.00 59,200.00 98,075.00 9,600.00 7,075.00
Jumlah Keseluruhan
326,200.00 850,000.00 1,076,000.00 1,183,000.00 663,040.00 1,598,622.50 249,600.00 60,137.50 4,098,240.00
Detail
Satuan
4 4 4 4
m m m m
Detail
Satuan
4,098,240.00 614,736.00
15%xD
& Profit eluruhan Pekerjaan
Jumlah Harga Rupiah
4,712,976.00
n di Jumlah Harga Upah Keterangan
Jotun Majestic Perfect Beauty & Care Jotun Jotaplast Jotun Gardex Premium Gloss
Volume
Satuan
73.8 8 47.87 5 242.42 25
m2 lt m2 lt m2 lt
Harga Satuan
Jumlah Harga Rupiah
87,200.00
697,600.00
2.5
lt
50,040.00
250,200.00
2.5
lt
70,740.00
1,768,500.00
5
lt
Detail
Satuan
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
2,716,300.00
Jumlah Keseluruhan 15%xD
& Profit eluruhan Pekerjaan
2,716,300.00 407,445.00 3,123,745.00
n di Jumlah Harga Upah Volume
Satuan
2850 x 3150
9 3.125 5
m2
800,000.00
2,500,000.00
2.88
m2
m2
800,000.00
1,388,888.89
2.88
m2
2850 x 1750
Harga Satuan
Jumlah Harga Rupiah
Keterangan
40 x 40 x 0,9
1.7361111 31.8
m
17,083.33
JUMLAH HARGA MATERIAL JUMLAH HARGA PEMASANGAN M2
& Profit eluruhan Pekerjaan
543,250.00
4,432,138.89 260,416.67
Jumlah Keseluruhan 15%xD
4,692,555.56 703,883.33 5,396,438.89
6
m
Weight (kg)
355 16,500.00 256 16,500.00 168 16,500.00
Price (Rp)
298,000.00 300,000.00 510,000.00 /box isi 11 46,363.64
Price (Rp)
298,000.00
Jenis Galvanis Galvanis Galvanis Galvanis Galvanum Besi Besi
Dimensi 4x8x12 4x8x14 4x4x0,9 4x4x0,75 4x4x0,35 150x50x2,3 100x50x2,3
Total Volume 77.47 244.05 401.00 630.00 476.00 33.83 66.00
Satuan Barang m m m m m m m
6 6 6 6 6 6 6
Jumlah Batang 12.9 40.7 66.8 105.0 79.3 5.6 11.0
300,000.00 510,000.00 /box isi 11 46,363.64
Price (Rp)
298,000.00 300,000.00 510,000.00 /box isi 11 46,363.64
Price (Rp)
238,000.00 600,000.00
Price (Rp)
298,000.00 600,000.00
Price (Rp)
238,000.00 600,000.00
Price (Rp)
600,000.00
Price (Rp)
23,000.00 68,000.00 55,000.00
Price (Rp)
23,000.00 68,000.00
Price (Rp)
23,000.00 68,000.00
Price (Rp)
102,500.00 750,000.00
Price (Rp)
22,000.00
Price (Rp)
Price (Rp)
187,000.00 95,700.00
Price (Rp)
98,000.00
Price (Rp)
240,000.00 189,000.00 64,000.00 52,000.00 24,500.00
Price (Rp)
4.967 4.067
kg/m kg/m
29.8 24.4
kg kg
168 268.4
5.638 33.825503356 11 66.000
Price (Rp)
15,000.00
398,000.00
1
sak
1.25
2.4
=
50 kg
=
Price (Rp) 1,160.00 300,000.00
136,000.00 329,000.00 50.00 75,000.00
0.00048
0.2
0.6
0.012
0.024
Price (Rp)
236,800.00 392,300.00 38,400.00 28,300.00
Price (Rp) 218,000.00
7.38
10
125,100.00
4.787
10
353,700.00
24.24
10
Price (Rp) 800,000.00 800,000.00
102,500.00
m3
0.00048 kg/m3
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
BAHAN Tukang Laden Perancah Kayu Perancah Bambu Paku Ikat Ijuk Kuas Palu Beton Pahat Beton Multiplek Bekas Gerinda Mata Gerinda Baja WF Baja WF Baja WF Plat Besi (Base Plate Kolom) Plat Besi (Plate Body) Plat Besi (Stifner) Besi Hollow Galvanis Besi Hollow Galvanis Besi Hollow Galvanis Besi Hollow Galvanis Besi Hollow Galvanum Besi CNP Besi CNP Multiplek Gypsum Alumunium Composit Panel (APC) PVFD Alumunium Composit Panel (APC) Cutting Laser Conwood Panel EPC Conwood Slide BG Vinyl Taco Temp. Glass Plafon PVC List Plank GRC Spandek Pasir Talang Air PVC Skop Kontak Saklar Tunggal Saklar Double Pipa PVC Conduit Acc. Stop Kontak Acc. Stop Saklar
KETERANGAN
Bosch 250 x 125 x 6 x 9 200 x 100 x 5,5 x 8 150 x 75 x 5 x 7 12 10 6 40 x 80 x 14 40 x 80 x 12 40 x 40 x 0,9 40 x 40 x 0,75 40 x 40 x 0,3 150 x 50 x 2,3 100 x 50 x 2,3 1200 x 2400 x 15 1200 x 2400 x 9 1200 x 2400 x 0,5 1200 x 2400 x 0,5 600 x 1200 x 11 150 x 3050 x 11 172 x 1210 x 4 10 4000 x 200 200 x 2440 x 8 1000 x 3000 x 0,45 Broco Broco Broco Broco Broco Broco
HARGA Rp Rp
200,000 180,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
15,000 5,000 12,000 60,000 20,000 75,000 375,000 10,600 16,500 16,500 16,500 16,500 16,500 16,500 298,000 238,000 102,500
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
23,000 240,000 189,000 300,000 68,000 705,000 800,000 187,000 95,700 510,000 600,000 22,000 52,000 64,000 24,500 30,000 13,162 16,973 15,000 12,250 12,418
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
Fiting Lampu Lampu Down Light Lampu LED 15 Watt Lampu LED Strip Lampu Dinding Lampu Gantung Lampu Spot Light Semen Pasir Beton Bondek Wiremesh Keramik Floor Drain Closet Duduk Wastafel Kran Shower Pipa PVC 3" Pipa PVC 4" Pipa PVC 3/4" Pipa PVC 1/2" Jotun Majestic Perfect Beauty & Care Jotun Jotaplast Jotun Gardex Premium Gloss Sofa Puff Bar Stool
Broco Philips Philips Philips Informa Informa Informa
40x40 Toto Toto Toto Toto Rucika Rucika Rucika Rucika
Informa Informa
Rp 10,000 Rp 151,000 Rp 33,900 Rp 398,000 Rp 300,000 Rp 150,000 Rp 30,000 Rp 1,160 Rp 300,000 Rp 136,000 Rp 329,000 Rp 75,000 Rp 326,200 Rp 850,000 Rp 538,000 Rp 1,183,000 Rp 236,800 Rp 392,300 Rp 38,400 Rp 28,300 Rp 218,000 Rp 125,100 Rp 353,700 Rp 4,500,000 Rp 875,000
Volume
Satuan
1
Hari Hari
1 1 1 1 1 1 1 1 1 1 1 1 1 1 6 6 6
kg m pcs pcs pcs pcs pcs pcs kg kg kg kg kg kg m m m
4 6 6 2.88 2.88 2.88 2.88 0.72 0.46 11 1 0.8 1 1 1 1 1 1 2.9 1 1
m m m m2 m2 m2 m2 m2 m2 pcs m2 m2 m m m pcs pcs pcs m pcs pcs
Shop
Jl.Bojong-Koneng Jl.Bojong-Koneng Jl.Bojong-Koneng Jl.Bojong-Koneng Jl.Bojong-Koneng Jl.Bojong-Koneng Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200 Sumber-Bangun Jl.Ahmad-Yani Gypsum-Jayaboard Jl.Rajawali-Timur 022-6010580 Tawakal-Workshop Jl.Cikoneng 0827-2221-5411 Paneru Jl.Gg-Suniaraja 0812-2390-9619 Distributor 0818-0944-8400 Distributor 0818-0944-8400 PD.Kawan-Kita Jl.Gg-Suniaraja 022-4238506 Sumber-Daya-Toko Jl.Gg-Suniaraja 0811-2188-097 Shunda-Plafon-Paskal Jl.Pasir-Kaliki 0877-8853-3787 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
1 1 1 5 1 1 1 1 1 1 1 6 1 1 1 1 4 4 4 4 2.5 2.5 5
pcs pcs pcs m pcs pcs pcs kg m3 m2 m2 pcs pcs pcs pcs pcs m m m m lt lt lt
Informa Informa Informa
Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
Informa Informa
Shop
Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782 Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782 Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782 Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782 Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782 Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782
Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782
Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782
TAHAPAN PEKERJAAN TAHAP 1 Pekerjaan Persiapan Pekerjaan Pembongkarann TAHAP 2 Struktur Lantai 1 Struktur Lantai 2 Struktur Lantai 3 Pekerjaan Rangka Atap & Penutup Atap Pekerjaan Talang Air, List Plank & Plafon TAHAP 3 Pekerjaan Lantai 1 Pekerjaan Lantai 2 + Lantai Kamar Mandi Pekerjaan Lantai 3 Pekerjaan Sanitasi TAHAP 4 Pekerjaan Rangka Dinding Luar Pekerjaan Penutup Dinding Luar (ACP) Pekerjaan Rangka Dinding Decorative Pekerjaan Penutup Dinding Decorative (Conwood) Pekerjaan Elektrikal Pekerjaan Rangka Dinding Dalam & Plafon Pekerjaan Penutup Dinding Dalam & Plafon TAHAP 5 Pekerjaan Pintu, Jendela & Kaca Pekerjaan Kanopi & ACP Cutting Pekerjaan Tangga Pekerjaan Furniture TAHAP 6 Pekerjaan Finishing Lantai Pekerjaan Finishing Tembok & Plafon Pekerjaan Perapihan & Pembersihan
Harga Satuan (Rp)
Bobot (%) -
Februari 1
2
3
4
Maret 1
2
April 3
4
1
2
3
4