Rab Total Pra - Pembangunan Royal Tulip Resort & Spa - Lombok [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

REKAPITULASI ANGGARAN BIAYA PERKIRAAN SEMENTARA (HPS) PROJECT PEKERJAAN LOKASI PEMILIK PROJECT TAHUN ANGGARAN NO. I. 1.1 1.2 1.3 1.4 1.5 II. 2.1 2.2 2.3 III. 3.1 IV. V. VI. VII. VIII. IX. X. XI. XII. XIII. XIV. XV.



URAIAN PEKERJAAN



: : : : :



PEKERJAAN PEMBANGUNAN ROYAL TULIP RESORT & SPA STRUKRUR, ARSITEK, INTERIOR, MEP & LANDSCAPE LOMBOK TENGAH - NUSA TENGGARA BARAT PT. THE ONES PARTNER 2021 Jumlah Harga ( Rp. )



PEKERJAAN KONSTRUKSI UNIT VILLA 1 BED Rp 67,463,500,000.00 UNIT VILLA 1 BED TYPE A ( 26 UNIT ) Rp 33,283,087,500.00 UNIT VILLA 1 BED TYPE B ( 13 UNIT ) Rp 23,864,962,500.00 UNIT VILLA 1 BED TYPE C ( 9 UNIT ) Rp 2,694,787,500.00 UNIT VILLA 1 BED TYPE D ( 1 UNIT ) Rp 2,669,175,000.00 UNIT VILLA 1 BED TYPE E ( 1 UNIT ) PEKERJAAN KONSTRUKSI UNIT VILLA 2 BED Rp 17,843,250,000.00 UNIT VILLA 2 BED TYPE A ( 4 UNIT ) Rp 22,436,875,000.00 UNIT VILLA 2 BED TYPE B ( 5 UNIT ) Rp 4,659,312,500.00 UNIT VILLA 2 BED TYPE C ( 1 UNIT ) PEKERJAAN KONSTRUKSI UNIT VILLA 3 BED Rp 6,501,400,000.00 UNIT VILLA 3 BED TYPE A ( 1 UNIT ) Rp 5,460,000,000.00 PEKERJAAN LOBBY & OFFICE Rp 7,056,250,000.00 PEKERJAAN MAIN RESTAURANT Rp 4,503,750,000.00 PEKERJAAN RESTAURANT & SPA Rp 5,890,000,000.00 PEKERJAAN BEACH BAR & POOL Rp 11,451,250,000.00 PEKERJAAN MAIN POOL & KIDS POOL Rp 1,975,000,000.00 PEKERJAAN WEDDING CHAPEL Rp 3,300,000,000.00 PEKERJAAN HEALING PATH Rp 624,000,000.00 PEKERJAAN BEACH VOLLEY BALL Rp 2,625,000,000.00 PEKERJAAN AREA PARKIR Rp 16,920,000,000.00 PEKERJAAN LANDSCAPE DAN JALAN AKSES Rp 10,540,000,000.00 PEKERJAAN UTILITAS Rp 17,623,312,000.00 BIAYA LAIN - LAIN Rp 269,384,912,000.00 JUMLAH TOTAL Rp 26,938,491,200.00 PPN 10% Rp 296,323,403,200.00 JUMLAH + PPN Rp 296,323,404,000.00 DIBULATKAN TERBILANG : Dua Ratus Sembilan Puluh Enam Milyar Tiga Ratus Dua Puluh Tiga Juta Empat Ratus Empat Ribu Rupiah. Dibuat oleh, Penyedia Jasa Konstruksi PT. ………………………………………. Selaku Kontraktor Pelaksana



……………………………. DIREKTUR



RENCANA ANGGARAN BIAYA PERKIRAAN SEMENTARA PROJECT PEKERJAAN LOKASI PEMILIK PROJECT TAHUN ANGGARAN



: : : : :



PEKERJAAN PEMBANGUNAN ROYAL TULIP RESORT & SPA STRUKRUR, ARSITEK, INTERIOR, MEP & LANDSCAPE LOMBOK TENGAH - NUSA TENGGARA BARAT PT. THE ONES PARTNER 2021



URAIAN PEKERJAAN I. 1.1 1 2 3 4 5 6 7 8



PEKERJAAN KONSTRUKSI UNIT VILLA 1 BED UNIT VILLA 1 BED TYPE A ( 26 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 8.2 x 4 m



SAT



VOL



Ls m2 m2 m2 m2 m2 m2 m2



1.00 99.12 99.12 99.12 99.12 99.12 76.60 32.80



1.2 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 1 BED TYPE A UNIT VILLA 1 BED TYPE B ( 13 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 8.2 x 4 m



Unit



26



Ls m2 m2 m2 m2 m2 m2 m2



1.00 98.17 98.17 98.17 98.17 98.17 64.19 32.80



1.3 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 1 BED TYPE B UNIT VILLA 1 BED TYPE C ( 9 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 8.2 x 4 m



Unit



13



1.4 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 1 BED TYPE C UNIT VILLA 1 BED TYPE D ( 1 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 8.2 x 4 m



Unit



1.5 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 1 BED TYPE D UNIT VILLA 1 BED TYPE E ( 1 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 8.2 x 4 m



Unit



TOTAL BIAYA UNIT VILLA 1 BED TYPE E



Unit



Ls m2 m2 m2 m2 m2 m2 m2



Ls m2 m2 m2 m2 m2 m2 m2



Ls m2 m2 m2 m2 m2 m2 m2



1.00 102.17 102.17 102.17 102.17 102.17 73.33 32.80 9 1.00 104.11 104.11 104.11 104.11 104.11 76.79 32.80 1 1.00 103.42 103.42 103.42 103.42 103.42 67.34 32.80 1



HARGA SAT (Rp)



123,900,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 2,594,750,000.00 122,712,500.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 2,560,237,500.00 127,712,500.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 2,651,662,500.00 130,137,500.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 2,694,787,500.00 129,275,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 2,669,175,000.00



JML HARGA (Rp)



Rp Rp



123,900,000.00 74,340,000.00 446,040,000.00 941,640,000.00 247,800,000.00 148,680,000.00 95,750,000.00 516,600,000.00 2,594,750,000.00 67,463,500,000.00



Rp Rp



122,712,500.00 73,627,500.00 441,765,000.00 932,615,000.00 245,425,000.00 147,255,000.00 80,237,500.00 516,600,000.00 2,560,237,500.00 33,283,087,500.00



Rp Rp



127,712,500.00 76,627,500.00 459,765,000.00 970,615,000.00 255,425,000.00 153,255,000.00 91,662,500.00 516,600,000.00 2,651,662,500.00 23,864,962,500.00



Rp Rp



130,137,500.00 78,082,500.00 468,495,000.00 989,045,000.00 260,275,000.00 156,165,000.00 95,987,500.00 516,600,000.00 2,694,787,500.00 2,694,787,500.00



Rp Rp



129,275,000.00 77,565,000.00 465,390,000.00 982,490,000.00 258,550,000.00 155,130,000.00 84,175,000.00 516,600,000.00 2,669,175,000.00 2,669,175,000.00



URAIAN PEKERJAAN



SAT



VOL



Ls m2 m2 m2 m2 m2 m2 m2



1.00 192.76 192.76 192.76 192.76 192.76 30.89 36.00



II. 2.1 1 2 3 4 5 6 7 8



PEKERJAAN KONSTRUKSI UNIT VILLA 2 BED UNIT VILLA 2 BED TYPE A ( 4 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 9 x 4 m



2.2 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 2 BED TYPE A UNIT VILLA 2 BED TYPE B ( 5 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 8.5 x 4.5 m



Unit



2.3 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 2 BED TYPE B UNIT VILLA 2 BED TYPE C ( 1 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 9 x 4 m



Unit



III. 3.1 1 2 3 4 5 6 7 8



TOTAL BIAYA UNIT VILLA 2 BED TYPE C PEKERJAAN KONSTRUKSI UNIT VILLA 3 BED UNIT VILLA 3 BED TYPE A ( 1 UNIT ) Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang 9.5 x 4.7 m



Unit



IV. 1 2 3 4 5 6 7



TOTAL BIAYA UNIT VILLA 3 BED TYPE A PEKERJAAN LOBBY & OFFICE Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan



Unit



V. 1 2 3 4 5 6 7



TOTAL BIAYA LOBBY & OFFICE PEKERJAAN MAIN RESTAURANT Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan



Unit



TOTAL BIAYA MAIN RESTAURANT



Unit



Ls m2 m2 m2 m2 m2 m2 m2



Ls m2 m2 m2 m2 m2 m2 m2



Ls m2 m2 m2 m2 m2 m2 m2



Ls m2 m2 m2 m2 m2 m2



Ls m2 m2 m2 m2 m2 m2



4 1.00 193.85 193.85 193.85 193.85 193.85 6.35 38.25 5 1.00 196.88 196.88 196.88 196.88 196.88 123.77 36.00 1



1.00 270.39 270.39 270.39 270.39 270.39 312.29 44.65 1 1.00 245.00 245.00 245.00 245.00 245.00 350.00 1 1.00 320.00 320.00 320.00 320.00 320.00 215.00 1



HARGA SAT (Rp)



240,950,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 4,460,812,500.00 242,312,500.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 4,487,375,000.00 246,100,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 4,659,312,500.00



337,987,500.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 1,500,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 6,501,400,000.00 306,250,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 2,000,000.00 1,250,000.00 SUBTOTAL 5,460,000,000.00 200,000,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 3,000,000.00 1,750,000.00 SUBTOTAL 7,056,250,000.00



JML HARGA (Rp)



Rp Rp



240,950,000.00 144,570,000.00 867,420,000.00 1,831,220,000.00 481,900,000.00 289,140,000.00 38,612,500.00 567,000,000.00 4,460,812,500.00 17,843,250,000.00



Rp Rp



242,312,500.00 145,387,500.00 872,325,000.00 1,841,575,000.00 484,625,000.00 290,775,000.00 7,937,500.00 602,437,500.00 4,487,375,000.00 22,436,875,000.00



Rp Rp



246,100,000.00 147,660,000.00 885,960,000.00 1,870,360,000.00 492,200,000.00 295,320,000.00 154,712,500.00 567,000,000.00 4,659,312,500.00 4,659,312,500.00



Rp Rp



337,987,500.00 202,792,500.00 1,216,755,000.00 2,568,705,000.00 675,975,000.00 405,585,000.00 390,362,500.00 703,237,500.00 6,501,400,000.00 6,501,400,000.00



Rp Rp



306,250,000.00 183,750,000.00 1,102,500,000.00 2,327,500,000.00 612,500,000.00 490,000,000.00 437,500,000.00 5,460,000,000.00 5,460,000,000.00



Rp Rp



200,000,000.00 240,000,000.00 1,440,000,000.00 3,040,000,000.00 800,000,000.00 960,000,000.00 376,250,000.00 7,056,250,000.00 7,056,250,000.00



URAIAN PEKERJAAN



SAT



VOL



Ls m2 m2 m2 m2 m2 m2 m2



1.00 175.00 175.00 175.00 175.00 175.00 215.00 30.00



VI. 1 2 3 4 5 6 7 8



PEKERJAAN RESTAURANT & SPA Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Jacuzzi & SPA



VII. 1 2 3 4 5 6 7 8



TOTAL BIAYA RESTAURANT & SPA PEKERJAAN BEACH BAR & POOL Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Interior Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Bangunan Fasilitas Kolam Renang



Unit



VIII. 1 2 3 4 5 6



TOTAL BIAYA RESTAURANT & SPA PEKERJAAN MAIN POOL & KIDS POOL Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape Kolam



Unit



1



Ls m2 m2 m2 m2 m2



1.00 625.00 625.00 625.00 140.00 1,000.00



IX. 1 2 3 4 5 6



TOTAL BIAYA MAIN POOL & KIDS POOL PEKERJAAN WEDDING CHAPEL Pekerjaan Persiapan & Mobdemob Pekerjaan Tanah & Pondasi Pekerjaan Struktur Pekerjaan Arsitek & Finishing Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape



Unit



1



Ls m2 m2 m2 m2 m2



1.00 100.00 100.00 100.00 100.00 1,300.00



X. 1 2 3



TOTAL BIAYA WEDDING CHAPEL PEKERJAAN HEALING PATH Pekerjaan Persiapan & Mobdemob Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape



Unit



1



Ls m2 m2



1.00 2,000.00 2,000.00



XI. 1 2 3



TOTAL BIAYA HEALING PATH PEKERJAAN BEACH VOLLEY BALL Pekerjaan Persiapan & Mobdemob Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape



Unit



1



TOTAL BIAYA HEALING PATH



Unit



1



Ls m2 m2 m2



1.00 1,000.00 1,000.00 300.00



Ls m2 m2 m2 m2 m2 m2 m2



Ls m2 m2



1 1.00 140.00 140.00 140.00 140.00 140.00 295.00 150.00



1.00 324.00 324.00



XII. 1 2 3 4



PEKERJAAN AREA PARKIR Pekerjaan Persiapan & Mobdemob Pekerjaan Perkerasan Pekerjaan Mekanikal, Elektrikal dan Plumbing Pekerjaan Landscape



XIII. 1 2 3 4 5



TOTAL BIAYA AREA PARKIR PEKERJAAN LANDSCAPE DAN JALAN AKSES Pekerjaan Persiapan & Mobdemob Pekerjaan Perkerasan Jalan Akses Pekerjaan Penerangan Jalan Inc. Accessories Pekerjaan Drainase Jalan Pekerjaan Landscape



Unit



1



Ls m2 m2 m1 m2



1.00 5,400.00 5,400.00 1,800.00 1,080.00



TOTAL BIAYA LANDSCAPE & JALAN



Unit



1



HARGA SAT (Rp) 218,750,000.00 750,000.00 4,500,000.00 9,500,000.00 2,500,000.00 3,000,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 4,503,750,000.00 218,750,000.00 1,500,000.00 4,500,000.00 9,500,000.00 2,500,000.00 3,000,000.00 1,250,000.00 15,750,000.00 SUBTOTAL 5,890,000,000.00 468,750,000.00 1,500,000.00 7,500,000.00 5,500,000.00 3,000,000.00 1,500,000.00 SUBTOTAL 11,451,250,000.00 125,000,000.00 750,000.00 3,000,000.00 3,500,000.00 1,500,000.00 750,000.00 SUBTOTAL 1,975,000,000.00 300,000,000.00 250,000.00 1,250,000.00 SUBTOTAL 3,300,000,000.00 300,000,000.00 250,000.00 750,000.00 SUBTOTAL 624,000,000.00 300,000,000.00 2,000,000.00 250,000.00 1,250,000.00 SUBTOTAL 2,625,000,000.00 810,000,000.00 2,000,000.00 250,000.00 1,750,000.00 750,000.00 SUBTOTAL 16,920,000,000.00



JML HARGA (Rp)



Rp Rp



218,750,000.00 131,250,000.00 787,500,000.00 1,662,500,000.00 437,500,000.00 525,000,000.00 268,750,000.00 472,500,000.00 4,503,750,000.00 4,503,750,000.00



Rp Rp



218,750,000.00 210,000,000.00 630,000,000.00 1,330,000,000.00 350,000,000.00 420,000,000.00 368,750,000.00 2,362,500,000.00 5,890,000,000.00 5,890,000,000.00



Rp Rp



468,750,000.00 937,500,000.00 4,687,500,000.00 3,437,500,000.00 420,000,000.00 1,500,000,000.00 11,451,250,000.00 11,451,250,000.00



Rp Rp



125,000,000.00 75,000,000.00 300,000,000.00 350,000,000.00 150,000,000.00 975,000,000.00 1,975,000,000.00 1,975,000,000.00



Rp Rp



300,000,000.00 500,000,000.00 2,500,000,000.00 3,300,000,000.00 3,300,000,000.00



Rp Rp



300,000,000.00 81,000,000.00 243,000,000.00 624,000,000.00 624,000,000.00



Rp Rp



300,000,000.00 2,000,000,000.00 250,000,000.00 375,000,000.00 2,625,000,000.00 2,625,000,000.00



Rp Rp



810,000,000.00 10,800,000,000.00 1,350,000,000.00 3,150,000,000.00 810,000,000.00 16,920,000,000.00 16,920,000,000.00



URAIAN PEKERJAAN XIV. PEKERJAAN UTILITAS 1 Pengeboran Sumur Dalam & Geolistrik 2 Pengadaan Pompa Transfer 3 Pembuatan Ground Water Tank ( GWT ) Kap. 120 m3 4 Pembuatan Sistem Pengolahan Limbah ( IPAL ) Include Instalasi dan Testing 5 Pembuatan Power House 6x12 m 6 Pengadaan Genset Silent 1000 kVA dan Instalasinya 7 Penyambungan Daya Ke PLN Beserta Pengadaan Trafo 8 Biaya Testing & Commisioning TOTAL BIAYA UTILITAS XV. BIAYA LAIN - LAIN 1 Biaya Konsultan Perencana ( 3 % Total Biaya Konstruksi ) Survey Topografi Desain Arsitek dan DED Desain Struktur dan DED Desain MEP dan DED Desain Interior dan DED 2 Biaya Konsultan Pengawas ( 2 % Total Biaya Konstruksi ) 3 Biaya Preliminary Konstruksi ( 2 % Total Biaya Konstruksi ) TOTAL BIAYA LAIN - LAIN



SAT



VOL



HARGA SAT (Rp)



JML HARGA (Rp)



Ls Ls Ls Ls



1.00 1.00 1.00 1.00



550,000,000.00 250,000,000.00 750,000,000.00 3,150,000,000.00



550,000,000.00 250,000,000.00 750,000,000.00 3,150,000,000.00



m2 Unit Ls Ls



72.00 1.00 1.00 1.00



Unit



1



7,500,000.00 3,450,000,000.00 1,500,000,000.00 350,000,000.00 SUBTOTAL 10,540,000,000.00 TOTAL



540,000,000.00 3,450,000,000.00 1,500,000,000.00 350,000,000.00 10,540,000,000.00 10,540,000,000.00 251,761,600,000.00



Rp Rp Rp



Ls



1.00



7,552,848,000.00



7,552,848,000.00



Ls Ls



1.00 1.00



5,035,232,000.00 5,035,232,000.00 SUBTOTAL 17,623,312,000.00 GRAND TOTAL PPN 10% JUMLAH + PPN DIBULATKAN



5,035,232,000.00 5,035,232,000.00 17,623,312,000.00 17,623,312,000.00 269,384,912,000.00 26,938,491,200.00 296,323,403,200.00 296,323,404,000.00



Unit



1



Rp Rp Rp Rp Rp Rp